Loading...
HomeMy WebLinkAboutNCG030564_ComplianceEval_20180501Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY May 1, 2018 Industrial Fabricators, Incorporated Attention: Roger Bingham, President 4328 South York Highway Gastonia, North Carolina 28052 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG030564 Gaston County, North Carolina Dear Mr. Bingham: ROY COOPER Governor MICHAEL S. REGAN secre[ary WILLIAM E. [TOBY] VINSON, JR. lnterim Director Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Industrial Fabricators South Plant located at 5053 South York Highway on April 4, 2018. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at Holliday.Keen@ncdenr.gov. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Compliance Inspection Report Permit: NCG030564 Effective: 11/16/17 Expiration: 10/31/18 Owner: Industrial Fabricators SOC: Effective: Expiration: Facility: Industrial Fabricators/South Plant County: Gaston 5053 S York Highwy Region: Mooresville Gastonia NC 28052 Contact Person: Roger Bingham Directions to Facility: On corner of South York Highwy and Community Drive System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: President Certification: Inspection Date: 04/04/2018 Entry Time: 10:OOAM Exit Time: 11:00AM Primary Inspector: Holliday Keen Secondary Inspector(s): Phone: 704-864-3032 Phone: Phone: Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page: 1 Permit: NCG030564 Owner - Facility: Industrial Fabricators Inspection Date: 04/04/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: This site remains under Notice of Deficiency due to the absence of a Stormwater Pollution Prevention Plan and inadequate stormwater monitoring results. Please complete the SWPPP as soon as possible and conduct and document analyitcal and qualitative monitoring by July 1, 2018. Contact our office at 704-663-1699 or by email at Holliday. Keen@NCDENR.gov with any questions. Page: 2 Permit: NCG030564 Owner - Facility: Industrial Fabricators Inspection Date: 04/04/2018 Inspection Type : Compliance Evaluation Reason for Visit: Follow-up Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ 0 ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ 0 ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ N ❑ ❑ # Does the Plan include a BMP summary? ❑ N ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ 0 ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ■ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑0 ❑ ❑ Comment: The SWPPP has not been completed and remains in progress. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ E ❑ ❑ Comment: Qualitative monitoring has not been conducted. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ N ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Analytical monitoring has not been conducted. Permit and Clutfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ E ❑ ❑ Comment: The permit and COC were available on site and the outfalls have been determined for this facility. Page: 3