Loading...
HomeMy WebLinkAbout20190109 Ver 1_PCN Form Submission_20190124D1�VR �irlslan af Water Resources Initial Review Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20190109 Is a payment required for this project?* f No paymentrequired � Fee received f Fee needed - send electronic notification Select Project Reviewer" Rob Ridings:eads\rgridings Information for Initial Review 1a. Name of project: B-5326 Bridge 247 over White Oak Creek on SR 2555 Raynor Rd. (Central) 1a. Who is the PrimaryContact?* NCDOT 1b. PrimaryContact Email:* jldilday@ncdot.gov Date Submitted 1/24/2019 Nearest Body of Water White Oak Creek Basin Neuse Water Classification C, NSW Site Coordinates Latitude: 35.671817 Longitude: -78.548724 A. Processing Information County (or Counties) where the project is located: Wake Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* G Yes r No (NCDOT only) T.I.P. or state project number: B-5326 WBS # (�) 46040.1.1 1a. Type(s) of approval sought from the Corps: Ve rsion# * 1 Reviewing Office * Central Office - (919) 707-9000 1c. PrimaryContact Phone:* (919)707-6111 :: rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? fJ Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? F Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular r' Non-404 Jurisdictional General Permit r Individual Permit 1e. Is this notification solelyfor the record because written approval is not required? Forthe record onlyfor DWR401 Certification: For the record onlyfor Corps Permit: 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C' Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes r No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? f Yes r No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: 2d. Address Street Address 1000 Birch Ridge Road Address Line 2 �Y Raleigh Fbstal / Zip Code 27610 2e. Telephone Number: (919)707-6111 2g. Email Address:* r 401 Water Quality Certification - E�ress rJ Riparian Buffer Authorization State / Aovince I F�gion NC Country USA 2f. Fax Number: x C' Yes R No G Yes C' No pharris@ncdot.gov C. Project Information and Prior Project History " 1. Project Information 1b. Subdivision name: (rf appropriate) 1c. Nearest municipality/town: Garner 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address Line 2 ary Fbstal I Zip Code 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* White Oak Creek 3b. Water Resources Classification of nearest receiving water:* C.NSW 3c. What river basin(s) is your project located in?* Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202011003 4. Project Description and History 2b. Property size: State / Aovince / Re3ion Country 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Land use is comprised of a mix of residential, commercial, industrial, and wooded communities. 46. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* f Yes �' No r Unknown 4d. Attach an 8 1/2 X 77 excerpt from the most recent version of the USGS topogrephic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 0.5 acre 4g. List the total estimated linear feet of all existing streams on the property: 500 linear feet 4h. Explain the purpose of the proposed project:* To replace a functionally obsolete and structurally deficient bridge. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project involves replacing a 36-foot., two span bridge with a 150-foot, three span bridge on ebsting alignment using an on-site detour. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4j. Please upload project drawings for the proposed project. 5. Jurisdictional Determinations Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?" � Yes r No r Unknown Comments Sb. If the Corps made a jurisdictional determination, what type of determination was made?" � Preliminary r Approved � Not Verified � Unknown r WA Corps AID Number: SAW-2013-01348 Sc. If Sa is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Jason Dilday NCDOT 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR USACE PJD dated 7/26/2013 Sd1. Jurisdictional determination upload B5326PJD. pdf 13.44 MB 6. Future Project Plans 6a. Is this a phased project?* � Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�i? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): 17 Wetlands IIJ Streams-tributaries � Open Waters I� Pond Construction 2. Wetland Impacts fJ Buffers 2a. Site #* (') 2a1 Reason (�) 2b. Impact type *(') 2c. Type of W. * 2d. W. name * 2e. Forested * Zf. Type of 2g. Impact Jurisdicition*(�) area* 1a Fill/Mech. Clearing P Bottomland Hardwnod Forest WA Yes Corps 0.001 (acres) 1b Fill/Mech. Clearing P Bottomland Hard�wod Forest WA Yes Corps 0.090 (acres) 2g. Total Temporery Wetland Impact 0.000 2g. Total Wetland Impact 0.091 2h. Comments: Impacts to wetland from 1a total less than 0.01 ac. combined. 3. Stream Impacts 2g. Total Permanent Wetland Impact 0.091 ❑ 3a. Reason for impact (') 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width* 3h. Impact (?) Jurisdiction* length* ri ra at embankment Permanent Bank Stabilization White Oak Creek Perennial Both 36 19 S1 P P Average (feeq Qinear feat) ri ra at embankment Permanent Bank Stabili�ation White Oak Creek Perennial Both 36 26 S2 P P Average(feet) Qinearfeet) S3 riprap at embankment Temporary Bank Stabili�ation White Oak Creek Perennial Both 36 5 Average(feet) (linearfeet) S4 bridge pier removal Temporary Dewatering White Oak Creek Perennial Both 36 25 Average(feet) (linearfeet) ri ra at embankment Permanent Bank Stabilization White Oak Creek Perennial Both 36 135 SS P P Average(Feet) (linearfeet) S6 riprap at embankment Temporary Bank Stabili�tion White Oak Creek Perennial Both 36 5 Average(feet) (linearfeet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 180 3i. Total stream and ditch impacts: 215 3j. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. fJ Neuse r Catawba r Goose Creek r Other 3i. Total temporary stream impacts: 35 � Tar-Pamlico r Randleman r Jordan Lake 6h. Total buffer impacts: Total Temporary impacts: Zone 1 0.00 Zone 2 0.00 Total Permanent impacts: Total combined buffer impacts: 6i. Comments: Supporting Documentation B5326_Pe rmit_Drawi n gs_20190122. pdf B5326_Permit_Drawings_Buffer_20190122.pdf B5326_Roadway.pdf Zone 1 9,902.00 Zone 1 9,902.00 E. Impact Justification and Mitigation 1. Avoidance and Minimization Zone 2 9,804.00 Zone 2 9,804.00 5.08MB 2.66MB 2.71 MB 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: NCDOT Design Standards in Sensitive Watersheds will be employed. See Stormwater Management Plan for additional measures. 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: The replacement sVucture will not have deck drains. All bridge drainage will discharge outside of the buffers. Velocities of stormwater are reduced to non-erosive flows through the use of riprap pads and 'V' ditches. 2:1 slopes will be used in v�,�tlands. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? C' Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: n� Impacts to jurisdictional streams and wetlands within the project area do not require mitigation. Permanent impacts to streams are due to bank stabili�ation and do not require mitigation. Permanent impacts to v�,�tlands are less than 0.1 acre. Mitigation is required for buffer impacts. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? F Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lowar SFIWf) r Wetland Swale (higher SMNf) r Other SCM that removes minimum 30 % nitrogen r Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* � Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? F Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?* r Yes r No n �I 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPAISEPA)?" � Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?" � Yes r No NEPAor SEPAFinal Approval Letter 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* � Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water qualit�/? * C' Yes r No 3b. If you answered "no," provide a short narretive description. Due to the minimal transportation impact resulting from this bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study w�ll not be necessary. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C' Yes �' No F fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat?* � Yes r No Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?* � Yes r No Sc. If yes, indicate the USFWS Field Office you have contacted. Raleigh Sd. Is another Federal agency involved?* C' Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No �' Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? N.C. Natural Heritage Program database; USFWS-Raleigh Field Office v�,�bsite; biological surveys for protected species listed for Wake County, which include red-cockaded vYnodpecker (RCW), dwarf wedgemussel, Tar River spinymussel, yellow lance, Cape Fear shiner and Michaux s sumac. The species received biological conclusions of "No EffecP'. No habitat is present for RCW, Cape Fear shiner, or the three listed mussels. Habitat for Michau�fs sumac ebsts, ho�ver no specimens were observed during a 9/22/2017 survey. There were no bald eagles or nest observed within 660 feet of the project area on 9/22/2017. PBO for Nothem Long Eared bat. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?" � Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?" NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* C' Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NEPA Documentation 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) Sa. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 86. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination?* FEMA Maps Miscellaneous Comments Miscellaneous attachments not previouslyrequested. TalecrisB-5326. pdf Signature * �J By checking the box and signing below, I certify that: 126.75KB • I have given true., accurate., and complete information on this form; . I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Artide 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Mack Christopher Rivenbark, III Signature X� e. R�uu6�.111 � � Date 1 /24/2019