Loading...
HomeMy WebLinkAbout20190063 Ver 1_Shoreline Stabilization_20190109State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resoul-C 5 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization CNV!R0NMENTAL GUA.'_ FORM: SSGP 02-2017 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Karen Higgins Karen Higgins DWR-401 & Buffer Permitting Branch DWR-401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information [15A NCAC 02H .0502(a)] �" �' UI 1 PAID 1. Owner Information ,\ 1 Name: S S .v_w. att�e it Mailing Address: le 1 to Telephone Number: 19XV. 334-6§►0 Fax Number: E-mail Address: cow,. 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.arm .mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORI ZATION FORM.pdf) Name: :5P_U �4p_aVexl_ Company Affiliati . .ML Se hQit Mailing Address: � Telephone Number: '7_ Fax Number: q,Zg E-mail Address: ` � �,�a)_ g p�„� B. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 Attach a photograph of the shoreline/ buffer proposed to be stabilized. (include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: joy' uN6M Nearest Town: Lake/ river/ ocean adjacent to property: NC k*t P44 Property size (acres): . 5 Subdivision name or site address (include phase/lot number): 43 \ 3 v6m% Directions to site - please include road names and numbers, landmarks, etc.: -Rc, s�+�• Lafitude (in decimal degrees) X5.96 Longitude (decimal degrees) gl. ZbbQO 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): �e � a 0 - v.�ae�f 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): �5 4)M -M -Q 11% 7. Will work be conducted from land? From water? I] 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: ACO . J( -A klvll +, Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary it /(o DU C construction corridor) in square feet: 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): �rr (, �L ry l ` O b OIG. Smolt 4Ye'eS CSS apt UU 11. Signature FORM: SSGP 02-2017 Page 2 of 3 ►� 1u� L f z 3 t Owner/Agent's Signature.[15A NCAC 02H .0502(f)] ate Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Levet elevation C. Location of rip rap or fill to be placed below the Full Pond) Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake SOS TC Full Pond/ Normal Water Lever !!!!!!E / Shoreline 0 J Lake; (At Full Pond/ Normal Water Level) M RoeN L- /1 o x cao Z Vii, -- ,� �e`tUCWfj2V CU /x/,r °�o�� v ur r it P' J Side View- , Lake / (At haP MH-rnal`RIffL++d) ExtngOodf 1., i r' a t 3 ftxt%ft .d fuipoWNWL Full Pond) NWater leA�g�ne7Riprap AXWfiAPM&ft NW zkt Mk mdMund dewft M P L E FORM: SSGP 02-2017 Plan View Page 3 of 3 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: \'_C� A' \ Owner: Print Contractor/agent: Pri County: Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B.0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H.0502 and 15A NCAC 0213.0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake. [15A NCAC 02B.0243(5), (6)] Acknowledgement of Notification l 4 S• GAII�p hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work ducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Byrffer Rules, the approv d plan(s) and specification(s), and other supporting materials. / a Signature (owner): JI Date: % !z Page 1 of 1 https://photos.zillowstatic.com/p_f/lSyf nv2i3gtk5m1000000000 jpg 08/23/2018 ,�r �► "nR P?,� .;.6 ,t • , t �a;y, ��' i � �4� a' �` • t � r �. V�> •' 'i r. �1 f " �� .1 ��r l� , �•e �''t ti� �' ,a� `' {` c� � { + SCE � � �'�� , s�+' �" � �, � .r 31 1 i t r.' rte. c•'� ''l •'! st *t`^ R'-.- . �' ,r .w f 'A k. _ �. � .�C,+ "� 1 "'mss° ' ,+. � • `, 4 v ,� ;1' "'� x;- x 49 µ: 10 1 ..• err r: F .o r '\N r r k . e yr � • �,i"e Yom;. - - � .,�.. , � .,�. �,. � ,. - ��-m'c _ r. - A •baa: . _ * .-.'' " �' - .. , ` tw f �}1 a Y r F r..a. .. t Y y - f Y t. r �• „ a � r x i 1173 Shiloh Church Rd, Hickory, NC 28601-7855 to 20 Snug Harbor Dr Directions - M... Page 2 of 2 m 3 ti Tpag�e c f er S6 qua` hp R a 0.gµ pam Rd 7,- ibbartl Rpn re ? 2 V N BETHLEHEM M MBook a hotel tonight and Car Vouble mid -trip? save with some great deals! MapQuest Roadside (1-877-577-5766) Assisfanceis here: Mai (3-888-463-3625) https://www.mapquest.com/directions/list/1 /us/north-carolinalhickory/28601-785 5/ 1173... 08/23/2018 1173 Shiloh Church Rd, Hickory, NC 28601-7855 to 20 Snug Harbor Dr Directions - M... Page 1 of 2 YOUR TRIP TO: MCDQJOW 20 Snug Harbor Dr S MIN 1 3.3 MI Est. fuel cost: $0.34 TO time based on traffic conditions as of 3:27 PM on August Print a full health report of your car with 23. 2078. current Traffic: Light HUM vehicle diagnostics (Boo) go6-2501 1. Start out going southwest on Shiloh Church Rd toward Rosenbalm Ln. Then 0.05 miles 0.05 total miles 2. Tum sharp left onto Rink Dam Rd. 41 Rink Dam Rd is just past Rosenbalm Ln. If you are on Hubbard Rd and reach Cedar Forest Loop you've gone about 0.1 miles too far. Then 1.75 miles 1.80 total miles 3. Turn slight right onto River Hills Cl. River Hills Ct is 0.1 miles past Robin Ln. Then 0.86 miles 2.66 total miles a 4. Turn right onto Harbor Dr. 1 - Harbor Dr is 0.2 miles past Maher Dr. If you reach Lakeshore Ln you've gone a little too far. Then 0.40 miles 3.07 total miles 5. Take the 1st right onto River Haven Dr. River Haven Dr is 0.1 miles past Windjammer Cf. If you are on River Haven Dr and reach Sullivan Point Ln you've gone about 0.3 miles too far. Then 0.16 miles t6. Stay straight to go onto Snug Harbor Dr 3.22 total miles Then 0.074 miles 3.26 total miles n 7. mi Snug Harbor Dr, Taylorsville, NC 28681-3991, 20 SNUG HARBOR DR is on -the right. If you reach the end of Snug Harbor Dr you've gone a little too far. Use of directions aM maps is subject to our Terms of Use. of Usee. We dont guarantee accuracy, route eonditicns or usability. You assume all risk of use. https://www.mapquest.com/directionsllistll /us/north-carolinalhickory/28601-7855/1173... 08/23/2018 i4 n 579 .RIVER RIDG 599 us��w Page I of 1 http://maps.alexandercountync.govlarcgislrestlserviceslWebsite mapIMapServer/export?... 08/23/2018 Page 1 of 1 http: //maps.alexandercountync.gov/arcgis/restlservices/Website_mapIMapServer/export?... 08/23/2018 , �rM.. t c,y 3 r e y.. ,4 ' ,� Gil . • M - 5 ry' :q G12 ve 75 1 T3 10 1 AS 12 �17 30 \ ria. rFZ l � t Y . - _ � t•ti#row � GI ci I.. Alexander County 1:1,200 0 0.01 0.02 0.04 mi 0 0.015 0.03 0.06 km August 23, 2018