Loading...
HomeMy WebLinkAboutProject Infinity BMP ASBUILT Supporting Calculations January 2019Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 1-Inch 1 " WQ Rainfall=1.25" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 0.29 cfs @ 3.65 hrs, Volume= 0.037 af, Depth= 0.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-Inch 1" WQ Rainfall=1.25" Area (ac) CN Description 7.200 73.0 Woods, Fair, HSG C 7.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0335 0.27 Sheet Flow, Range n= 0.130 P2= 3.32" 13.6 716 0.0310 0.88 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 25.8 916 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph — — —I I— T—I — — — —I— l — —I — — 0.32—I — _ — 1— —I — � � — 1— 4 —1 — 4- —1 — 1— -4 — 1— 4 —1 — — ■Runoff 0.3 ors I 1 1 1 1 1 1 1 0.29 0.28 1 1 1 1 1 Charlotte 6-hr 1-Inch 0.26 1 � /nII IC�. -Ro' IH 0.24 li "ioI 7 0.22 I I T I 14 I-k I 1 4 I 4- 1 -4 0.2 -1- 1 —1 _ - - _ 1_ _1 _ _1 _ 1_ Runoff 1Valume=9.0 7 af_ 018 1 1 11 li 11 Kttl� "'f" h 0,06i1' 0.16 o T 1 F- F T 1 T- F 7 P-'�� i 1 T FI-OW-Ld- =916V th LL 0.14 0.12 1 T I I C—Ip—��— 1 1 1 _4T_c=2&& m n 0.1 _ I_ _I _ I_ _ I_ _I _ 111 1— 1 1 1 1 —1— 1 _I — I— — 1— ON413— 1 1 1 1 1 1' 0.08 0.06 —1-7-1-77—I—T-1-7--1—-1 1 1 1 —1-7-1—F7- 0.04 0.02 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 40 45 160 165 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 1-Inch 1 " WQ Rainfall=1.25" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1S: POST TO SAND FILTER [49] Hint: Tc<2dt may require smaller dt Runoff = 13.52 cfs @ 3.12 hrs, Volume= 0.487 af, Depth= 0.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 1-Inch 1" WQ Rainfall=1.25" Area (ac) CN Description 10.770 91.0 Urban industrial, 72% imp, HSG C 3.016 28.00% Pervious Area 7.754 72.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: POST TO SAND FILTER Hydrograph 15 I. _I_ L _1 _ L 14 13.52 cfs I I I 1 1 CrlarFofte 6-fir fi-rnchi 13 12 11 -11��111U�(�1�lainf�ll1�56 11 1 _ 1 1 RuAoff Ar6& M.7-7-0 -ati 10 1 1 1 1 1 - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ruirioffl VorunYe�0.4$7 of 9 � � �_ O�n4ff11�gp_�hz��1547 - _ _11_ _�_ 0 7 -1 1 1-1—TC-*_5aJ�ih LL 6 —7-1—F7-1—T—I—T 1 1 1 1 1 1 1 1 1 1 1+ 1 1 11 --1—F7—FT Cr91-.V 5 1- -4 — 1— 4 —1— 4- —1— —1—k--4-1——1-4--1—� 4 3 2 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ■ Runoff Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 1-Inch 1" WQ Rainfall=1.25" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 7 Summary for Pond 2P: FOREBAY Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 0.54" for 1" WQ event Inflow = 13.52 cfs @ 3.12 hrs, Volume= 0.487 of Outflow = 3.47 cfs @ 3.24 hrs, Volume= 0.487 af, Atten= 74%, Lag= 7.1 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Secondary = 3.47 cfs @ 3.24 hrs, Volume= 0.487 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 767.27' @ 6.02 hrs Surf.Area= 14,419 sf Storage= 11,526 cf Plug -Flow detention time= 524.6 min calculated for 0.487 of (100% of inflow) Center -of -Mass det. time= 525.4 min ( 739.8 - 214.4 ) Volume Invert Avail.Storage Storage Description #1 766.00' 75,720 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 766.00 1,854 0 0 767.00 13,657 7,756 7,756 768.00 16,496 15,077 22,832 769.00 19,407 17,952 40,784 770.00 22,459 20,933 61,717 770.60 24,218 14,003 75,720 Device Routing Invert Outlet Devices #1 Primary 765.05' 24.00" Round RCP -Round 24" L= 36.7' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 765.05' / 764.53' S= 0.0142'/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 767.29' 24.00" W x 4.00" H Vert. 10 YR. ORIFICE C= 0.600 #3 Device 1 769.86' 48.00" x 48.00" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 765.34' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 1 769.34' 36.00" W x 6.00" H Vert. 25 YR. ORIFICE C= 0.600 #6 Secondary 765.87' 6.00" Round Culvert X 4.00 L= 28.9' Ke= 0.500 Inlet / Outlet Invert= 765.87' / 765.59' S= 0.0097'/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=766.00' TW=0.00' (Dynamic Tailwater) L1=RCP_Round 24" (Passes 0.00 cfs of 4.88 cfs potential flow) 2=10 YR. ORIFICE ( Controls 0.00 cfs) 3=TOP OF OUTLET STRUCTURE( Controls 0.00 cfs) 5=25 YR. ORIFICE ( Controls 0.00 cfs) Secondary OutFlow Max=3.20 cfs @ 3.24 hrs HW=766.96' TW=766.23' (Dynamic Tailwater) �__:Culvert FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.01 cfs) (Outlet Controls 3.19 cfs @ 4.06 fps) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 1-Inch 1" WQ Rainfall=1.25" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 8 Pond 2P: FOREBAY Hydrograph / t -1 - - F -t -1 - I- 1- t -1 - F t -i - I- r t -1 - I- t -t -I - I i I-++LOIlow 13.52cfs tflowInffow Area .770 ac imary15 ' _I t condary 14 ' -1 -1- Peak Elev=767.27' 13 Storage=11,526 cf 12 11 t F I 10 t I- -t-1 1--t 1 I H 9/ 4� + � 1 � 4 1 � w 8 _0 7 - - - - - - - - -1- - - LL g 3.47 cfs 5 I - - - - - - - - - 4 I I I I I I I I I I I I I I I I I 1 m d w c 0 d w 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 Time (hours) Pond 2P: FOREBAY Stage -Discharge 0 5 10 15 20 25 30 35 40 Discharge (cfs) ❑ Total ❑ Primary ❑ Secondary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 1-Inch 1" WQ Rainfall=1.25" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 13 Summary for Pond 3P: SAND FILTER [78] Warning: Submerged Pond 2P Secondary device # 4 by 1.93' Inflow = 3.47 cfs @ 3.24 hrs, Volume= 0.487 of Outflow = 0.21 cfs @ 6.03 hrs, Volume= 0.463 af, Atten= 94%, Lag= 167.8 min Primary = 0.21 cfs @ 6.03 hrs, Volume= 0.463 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 767.27' @ 6.03 hrs Surf.Area= 4,855 sf Storage= 7,704 cf Plug -Flow detention time= 609.1 min calculated for 0.463 of (95% of inflow) Center -of -Mass det. time= 527.8 min ( 1,267.5 - 739.8 ) Volume Invert Avail.Storage Storage Description #1 765.34' 24,571 cf SAND FILTER STORAGE (Prismaticyisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 765.34 3,093 0 0 766.00 3,756 2,260 2,260 767.00 4,610 4,183 6,443 768.00 5,529 5,070 11,513 769.00 6,513 6,021 17,534 770.00 7,561 7,037 24,571 Device Routing Invert Outlet Devices #1 Primary 765.66' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary OutFlow Max=0.21 cfs @ 6.03 hrs HW=767.27' TW=0.00' (Dynamic Tailwater) L1=FILTER MEDIA (Custom Controls 0.21 cfs) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 1-Inch 1 " WQ Rainfall=1.25" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 14 3 0 d 0 c 0 d w Pond 3P: SAND FILTER Hydrograph Time (hours) Pond 3P: SAND FILTER Stage -Discharge 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 Discharge (cfs) ■ Inflow ❑ Primary ■ Primary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 1-Inch 1 " WQ Rainfall=1.25" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 19 Summary for Pond 4P: TOTAL [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 0.52" for 1" WQ event Inflow = 0.21 cfs @ 6.03 hrs, Volume= 0.463 of Primary = 0.21 cfs @ 6.03 hrs, Volume= 0.463 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph + t t t ■ Inflow 0.23 i 0.zI cfs 1 T T T J T 1 T 1 T 7 I T J 1- TT T T Primary 0.21 o.z its -II 0.21 -1- I -I - 1- I -1 _ 1_ 1 _I�1fI�iW_IAre V�.��Ia�i- 0.2 - 1 1 1 1 T 1-4 I I T� I T 0.19 -1- t -1 -I- t -1- I- t -1- -t - I - t -1 -I- t t -I- t - 0.18 T -I- T J -I- T T - I - T 7 - I - T J -I- T T -I- T- 0.17 0.16 _I_ L J -I- 1 -1- I_ 1 -1- J 1 - I - L J -I- 1 J -I- 1- 0.15 A 1 T 1 T 1 4 I A I T I T 0.14 -T .- fi I I -r I T I L rt I fi I I t I T 0.13 0.12 T T T c 0.11 L 1 L -1 1- 1 1 1 1 L 1 I L -1I L -1I 1 LL 0.1 4 - I - 4- -I- T -I- I- T -I- 4 - I - -4 -1- T -4 -I- T - 0.09 -T I r 1 rt T L-1 I t- I I tI T 0.08 1 I 1 1 1 1 T 1 0.07 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.06 L I LL I 1 1 L-1 I L-1 I 1-1 11 0.05 -+ - I - i- � - I - +- - - I- + -1 - 4 - I - I - I- t - I- + - 0.04 T- I - TT - I -T -1- T-1-T-T-I -I-TT-I-T- 0.03 0.02 0.01 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 10-yr 10yr-6hr Rainfall=3.40" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 8.97 cfs @ 3.46 hrs, Volume= 0.668 af, Depth= 1.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr 10yr-6hr Rainfall=3.40" Area (ac) CN Description 7.200 73.0 Woods, Fair, HSG C 7.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0335 0.27 Sheet Flow, Range n= 0.130 P2= 3.32" 13.6 716 0.0310 0.88 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 25.8 916 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph 10 f'." cfs91 1 1 1 1 1 1Charrlottel 6ohr 10-yrr 1 1 1 1 1 10 1r ohr R1,ainfall 3.1AA01" 8 1 I II I I I I I I I I Y- I I T �T I 7 1 1 1 1 1 Runbff Ater=7.200 at I I I I I I I I I I I I I I I I I I I I 6 1 1 1 1Run0ff1 V-0[ume=;Q.668 a# w 11 `ff 1 D q pr7h 1.111-1 �. 5 q I I I I I I I I I I I I I I I I I I LL I I I Tc=25.18 min 3 2 I 1 I L J 1 1 1 L I L 1 L- 1 1 L 1 L 1 I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 10-yr 10yr-6hr Rainfall=3.40" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 1S: POST TO SAND FILTER [49] Hint: Tc<2dt may require smaller dt Runoff = 51.11 cfs @ 3.15 hrs, Volume= 2.196 af, Depth= 2.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr 10yr-6hr Rainfall=3.40" Area (ac) CN Description 10.770 91.0 Urban industrial, 72% imp, HSG C 3.016 28.00% Pervious Area 7.754 72.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: POST TO SAND FILTER Hydrograph 55 50 ii 1 1 1 1 1 1 1 1 1 1 1■Runoff 1 1 1 1 Charrlotte 6hr 10-yrr 45/ fi-1-1�Oyr- I hr, Rainfall-73.;401' I I I I I I I 40 , 1 1 ' ' 1 1 Ruhoff Arda:�:10.770 at 35 _I_ I _I I I I I _I_ � _I I - 1 1 1 1offl Volume-P2.196 of Ruin 1 - 1 11 30 1 1 1 1 1 1 1 04ff nO'1DaOh72.�451' R.M 25 l l l l l l Tc$3 friii h 20 C1 J1.0 I -k 1 1 -4 1 4- 1 � 1 � 15 1 1 1 1 10 F--1-1-7-1—T-1—T-1 —T- —I —F- I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 10-yr 10yr-6hr Rainfall=3.40" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 29 Primary OutFlow Max=4.69 cfs @ 3.59 hrs HW=769.42' TW=0.00' (Dynamic Tailwater) L1=RCP_Round 24" (Passes 4.69 cfs of 27.75 cfs potential flow) P3=TOP =10 YR. ORIFICE (Orifice Controls 4.49 cfs @ 6.74 fps) OF OUTLET STRUCTURE( Controls 0.00 cfs) =25 YR. ORIFICE (Orifice Controls 0.20 cfs @ 0.89 fps) Secondary OutFlow Max=4.56 cfs @ 3.28 hrs HW=769.13' TW=767.65' (Dynamic Tailwater) �--6=Cullvert 4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) (Outlet Controls 4.54 cfs @ 5.78 fps) Pond 2P: FOREBAY Hydrograph ■Inflow 51.11 cfs Arep=,1 7 ■ouOOutflow Ia� ■ Secondary aod 55 Ilnflgw, I Pdak Ele'v::1769142' 50 1 — 1— t —1 — 1— r rt —1 — I— t- rt —I — I— fi ' _ Storage 49,1144 d 45 40-' fi 35 N II III II II I I I I I I I I I I I I I w —"-30- IIfi-1Ir-rtIIt-rtIIfi 3 25 _ 20rt��rt�rtII� 9.07 ors 15 i I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 10-yr 10yr-6hrRainfall=3.40" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 30 m d w c 0 d w Pond 2P: FOREBAY Stage -Discharge 0 5 10 15 20 25 30 35 40 Discharge (cfs) ❑ Total ❑ Primary ❑ Secondary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 10-yr 10yr-6hr Rainfall=3.40" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 36 Pond 3P: SAND FILTER Hydrograph 4.81 cfs I I I I I I I I I 5 1 1 1 1 1 1 Peak E llev=769.19" ------------------------------- 1 1 1 1 1 1 1 1 1 1 1 1 " t rya -'1 gAT g0'3'd 4 T I I I I I I I I I I I I I I I I I I I I I ( I I I I I I I I I I I I I I I I I I I I I F 3 c LL 2 I I I I I I I I I I I I I I I I I I I I— t —I- 1I I I I I I I I I I I I I I 1 I I I I I I I I I I I I 0 41 cfs_ d 0 c 0 d w 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 3P: SAND FILTER Stage -Discharge 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 Discharge (cfs) ■ Inflow ❑ Primary ■ Primary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 10-yr 10yr-6hrRainfall=3.40" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 41 Summary for Pond 4P: TOTAL [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 2.42" for 10yr-6hr event Inflow = 5.05 cfs @ 3.60 hrs, Volume= 2.172 of Primary = 5.05 cfs @ 3.60 hrs, Volume= 2.172 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph ❑ Inflow ❑ Primary 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 25-yr 25yr-6hr Rainfall=4.01 " Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 12.47 cfs @ 3.45 hrs, Volume= 0.921 af, Depth= 1.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr 25yr-6hr Rainfall=4.01" Area (ac) CN Description 7.200 73.0 Woods, Fair, HSG C 7.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0335 0.27 Sheet Flow, Range n= 0.130 P2= 3.32" 13.6 716 0.0310 0.88 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 25.8 916 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph 1- - — 1— 4 —1— 4- i —1— —1 — -4 — I — —I— —1 — ■Runoff 13 12.47 12 cfs -1- -1- —1—-1�Marrloffel ��hn 25=yrr 11 2L5Yr-hrRainfallz4.101 10 — — — — — — — — — — — — — — — — — — nbff Ate=T- ND a� 9 I ——+—— I I I I I I I ——�A-1-4-1-4-—iRunoffNotume=4.92-1-a# I I I I II Iw�' I `, I I I I I -11- — — — — 11 -�- - -11- 11 - — �- 11 -11- — — -�- 11 4f11�ppth 11.1 -3 • 3 7 o LL 6 , 1 7 I F 1 F- 1 7 I T * �+ I r 1 Fldw 1L6n { -9t 5 I_I_L_I_LJ_I_L_I_L_I_L_I_L�_I_L__L_I_L Tc=25.18 min 4 3.0 1--4—I— —I-4--1—+-1— -4—I—+—— 1—• 3 2 1 I- -I — I— rt —I- — r —I — r- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 25-yr 25yr-6hr Rainfall=4.01 " Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 1S: POST TO SAND FILTER [49] Hint: Tc<2dt may require smaller dt Runoff = 61.44 cfs @ 3.15 hrs, Volume= 2.717 af, Depth= 3.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr 25yr-6hr Rainfall=4.01" Area (ac) CN Description 10.770 91.0 Urban industrial, 72% imp, HSG C 3.016 28.00% Pervious Area 7.754 72.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: POST TO SAND FILTER Hydrograph I - I - � -I - � ■Runoff 65 61.44 ds 1 1 L 1 L 1 L- 1 1 1 L 1 L 60 I I I I 1 1 1 Charlotte 6ohr 26mr -------------------- 1 1 11 1 2 Ir-�hr Rainf 1 14.1 11" 55 ' �/ a 45 1 1 1 1 1 11 1 1 `, 1 1 1 11 1 1 IRunoffVohi rne--m2.701-7 af w 40 _1- -1- -1- �'-nC?'ffllDepth 1 -03', 35 M 30 Tc$-5h i h --1-4-1-4--1-�-1-�- 1-1-�-1-� 25 1 1 1 1 ' 1 1 ' ' 1 CN=91.0 20 15 10 r—I_F- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 25-yr 25yr-6hr Rainfall=4.01 " Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 51 Primary OutFlow Max=9.24 cfs @ 3.46 hrs HW=769.90' TW=0.00' (Dynamic Tailwater) L1=RCP_Round 24" (Passes 9.24 cfs of 29.67 cfs potential flow) P3=TOP =10 YR. ORIFICE (Orifice Controls 5.01 cfs @ 7.52 fps) OF OUTLET STRUCTURE (Weir Controls 0.36 cfs @ 0.62 fps) =25 YR. ORIFICE (Orifice Controls 3.87 cfs @ 2.58 fps) Secondary OutFlow Max=4.99 cfs @ 3.28 hrs HW=769.69' TW=767.91' (Dynamic Tailwater) �--6=Cullvert 4=FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) (Outlet Controls 4.97 cfs @ 6.33 fps) Pond 2P: FOREBAY Hydrograph T T I I I I I I I I I I T T T T 1 T T T ■ Inflow 614 cfs —I— t- t �Q t -I outflow PrimaryInfc�wA-_10. a — ■ Secondary 65 _ 1_ -1-1- -1 -1- PdA-E1&::i7-$9190! 60 ' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Storarge=F5,9,423-cf 55 -1 -1- 1- t -1 - 1- fi t -1 - 1- t -1 -1- r t -1 - 1- t rt -1 - 1- t 50 ---T�---��--��---��-I-I-T 45 H 40 " 35 `L30 -1-T-4-1-1- -1- 4-1-1- -4-1-1-4- 25 II III II II 14.06 cfs 20 c oa� I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr25-yr 25yr-6hrRainfall=4.01" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 52 m d w c 0 d w Pond 2P: FOREBAY Stage -Discharge 0 5 10 15 20 25 30 35 40 Discharge (cfs) ❑ Total ❑ Primary ❑ Secondary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 25-yr 25yr-6hr Rainfall=4.01 " Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 58 Pond 3P: SAND FILTER Hydrograph I I I I I I I I I I I I I I I I I I ■ Inflow 5 23 cfs 0 Primary -1 Peak Et16v=-69:43" 5 1 1 1 1 1 1 1 1 1 1 1 _Rtbi`ago=�Q,8615 d 4 - fi� I rt I� rt I fi I I rt I� rt I L� I rt I N c I I I I I I I I I I I I I I I I I I I I LL I I I I I-I-+-1- 4-1--1-I I I I I I I I I I I I I I I I I 2 1 L-1 1 L-1 I L 1 I I I I I I I I I I I I I 1 I I I I I I I I I I I I I n 44 cf, I I I I I I I I I I d 0 c 0 d w 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 3P: SAND FILTER Stage -Discharge 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 Discharge (cfs) ■ Primary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 25-yr 25yr-6hr Rainfall=4.01 " Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 63 Summary for Pond 4P: TOTAL [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 3.00" for 25yr-6hr event Inflow = 9.61 cfs @ 3.46 hrs, Volume= 2.693 of Primary = 9.61 cfs @ 3.46 hrs, Volume= 2.693 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph I 4 I I I 1 1 I I I 1 4 1 I I I 1 I I I I I I I I I I I I 14 1 1 4 1 ■Inflow 9.61ds I I I I I 10 Primary 9.61 10 ors -Inf�oArea—ialMac- -Inflow g— — — — 1I I — — — — I I I — — — — I I — — I I — — — — — — — — — — — — — — — — — I I I I I I I I I I I I 8 1_1_L_I_1_1_1_L-1_1_1_1_I_-1_1_1-J_I_1_I_LJ 7 I I I 1 1 I I I 1 4-1—{-4 I I I I 1 + I I I I I I I I I I I 1 4 —1— --1 1 4 —1- 4 6 I—T 7—I—F-7-1—T 7-1—T-1-1—T-1-1 1 05 a I_I_I_I_I_I_I I I I I I I _I_I_I_I_I_I_I_I_I_I_I_I I I I I I I I I I I I I I 1 1 4 I L I 1 1 1 L 1 1 1 I A I L- 1 1 1 L 1 3 I I I —fi—-1—fi—I—t-�—I—t-1——-t—I—t--1—t-1— I I I I I I I I I I I I I I I I I I -1 2 I I I 1I I I I I I I I I I I I I I I I I I I I I I I — I I I I I I 1 0 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 66 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 15.22 cfs @ 3.41 hrs, Volume= 1.128 af, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Area (ac) CN Description 7.200 73.0 Woods, Fair, HSG C 7.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0335 0.27 Sheet Flow, Range n= 0.130 P2= 3.32" 13.6 716 0.0310 0.88 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 25.8 916 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph 17--t--t--��--t--t----��--t-I-1 _ _ -1- I_ -1- -I-_ -I-� 16 15.22dr 1 - 1 4- 1 L 1 15 1 1 1 L I L-1 1 1 1 L I L Charlot#eL6ohr 50-yT 14 lir, Rllainfalll=W.481y" 13 40yr= 12 nbff Ateti= -200 s1L 11 I 11 7 I I I I I 1 F- I I 1 7 I I 1 L I I I I I I I I � I� Ip I IRumoffAfolume�'1.i 28-af a 19 1- Q-11- 11 1-4-1-4-11-4--1-4- -741-1- _0 8 a 1 1 L-1 I 1-I-L-I-L 1 Rdw IL6nt i1=9 � T 7 I_ 1 g �II TCi=25.Iy rn i n 5 1 � 4 T 1 1 1 T I -1 1 7 1 1 L I I 1 1 1 r 1F -1 1 T IL 1F 3 t I�1IfiILI�I�� LIB 2 1-�-1-4-1-4--1-4---1— -4-1 —4--1—� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) ■ Runoff Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 69 Summary for Subcatchment 1S: POST TO SAND FILTER [49] Hint: Tc<2dt may require smaller dt Runoff = 69.28 cfs @ 3.10 hrs, Volume= 3.122 af, Depth= 3.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Area (ac) CN Description 10.770 91.0 Urban industrial, 72% imp, HSG C 3.016 28.00% Pervious Area 7.754 72.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: POST TO SAND FILTER Hydrograph 75 ■ Runoff 70 69.28 cfs I I I I rt fi 1 r- I I I rt I I I fi I I I �I w I I I c I I C 1 1 fi ICh �slat#er Vohr-JW� 65 _ �/I - � I-Rlai.� -50 ��r--�r nfall=4.,4'81 60 55 _ _ _ _ _ _ _ _ _ _ _ Ru LVff Arch# 1 0.770 -at 50 1 fi fi 1 fi t 1 1 1 1 1 1 1 1 1 1 Ru �l/�i1{n e=;3.1CL a w45 1��1��1�1�1� n�111C� ��1 In =40 1_1_ 1 1 1 Fes_1_ `0 35 _1 I I 1 I I 1 _1_ 1 I 11 _1_ _----111_�_p_�_� 11 1- 1 1 I Tc�k �19 tWi h 30 I I I I I I t fi 1 I I fi I I t I I I I I I I � I+� I�� I I t —C+ � 71.0 25 1 1- 1 1 - 1 1 4- 1 L 20 15 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 72 Summary for Pond 2P: FOREBAY Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 3.48" for 50yr-6hr event Inflow = 69.28 cfs @ 3.10 hrs, Volume= 3.122 of Outflow = 23.12 cfs @ 3.31 hrs, Volume= 3.122 af, Atten= 67%, Lag= 12.7 min Primary = 17.90 cfs @ 3.32 hrs, Volume= 2.290 of Secondary = 5.47 cfs @ 3.22 hrs, Volume= 0.833 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 770.13' @ 3.32 hrs Surf.Area= 22,844 sf Storage= 64,692 cf Plug -Flow detention time= 214.0 min calculated for 3.121 of (100% of inflow) Center -of -Mass det. time= 215.1 min ( 416.9 - 201.8 ) Volume Invert Avail.Storage Storage Description #1 766.00' 75,720 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 766.00 1,854 0 0 767.00 13,657 7,756 7,756 768.00 16,496 15,077 22,832 769.00 19,407 17,952 40,784 770.00 22,459 20,933 61,717 770.60 24,218 14,003 75,720 Device Routing Invert Outlet Devices #1 Primary 765.05' 24.00" Round RCP -Round 24" L= 36.7' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 765.05' / 764.53' S= 0.0142'/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 767.29' 24.00" W x 4.00" H Vert. 10 YR. ORIFICE C= 0.600 #3 Device 1 769.86' 48.00" x 48.00" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 765.34' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 1 769.34' 36.00" W x 6.00" H Vert. 25 YR. ORIFICE C= 0.600 #6 Secondary 765.87' 6.00" Round Culvert X 4.00 L= 28.9' Ke= 0.500 Inlet / Outlet Invert= 765.87' / 765.59' S= 0.0097'/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf Primary OutFlow Max=17.58 cfs @ 3.32 hrs HW=770.12' TW=0.00' (Dynamic Tailwater) L1=RCP_Round 24" (Passes 17.58 cfs of 30.53 cfs potential flow) 2=10 YR. ORIFICE (Orifice Controls 5.24 cfs @ 7.86 fps) 3=TOP OF OUTLET STRUCTURE (Weir Controls 7.11 cfs @ 1.68 fps) 5=25 YR. ORIFICE (Orifice Controls 5.23 cfs @ 3.49 fps) Secondary OutFlow Max=5.23 cfs @ 3.22 hrs HW=769.99' TW=768.05' (Dynamic Tailwater) �__:Culvert FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.02 cfs) (Outlet Controls 5.20 cfs @ 6.62 fps) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 73 w 0 0 U. m d w c 0 d w 23.12 cfs 15L10 Pond 2P: FOREBAY Hydrograph I —I —I —I I —I —I —I I—I—i—IJ—I—i I —I —I —I I —I —I —I ❑ Inflow r - - Inflow Area=10.770 ❑ Outflow ❑Primary ac ❑ Secondary 1 Peak Elev=770.13' Storage=64,692 cf t-1 +-11 fi 1 1— �--1 1 1 +� I +— —1— + I I— +� I + 1 I + 4 1 I 4� I -4 1 I �� 1 1 +� I 4 1 I 4 1 — 4� 1 L-L 1 1 1--J 1 1 +� 1 -L 1 1 L-4 1— L 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 Time (hours) Pond 2P: FOREBAY Stage -Discharge 0 5 10 15 20 25 30 35 40 Discharge (cfs) ❑ Total ❑ Primary ❑ Secondary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 78 Summary for Pond 3P: SAND FILTER [78] Warning: Submerged Pond 2P Secondary device # 4 by 4.26' [80] Warning: Exceeded Pond 2P by 1.10' @ 8.75 hrs (3.93 cfs 2.531 af) Inflow = 5.47 cfs @ 3.22 hrs, Volume= 0.833 of Outflow = 0.44 cfs @ 4.21 hrs, Volume= 0.809 af, Atten= 92%, Lag= 59.0 min Primary = 0.44 cfs @ 4.21 hrs, Volume= 0.809 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 769.60' @ 4.21 hrs Surf.Area= 7,140 sf Storage= 21,619 cf Plug -Flow detention time= 649.1 min calculated for 0.809 of (97% of inflow) Center -of -Mass det. time= 582.8 min ( 1,303.8 - 721.0 ) Volume Invert Avail.Storage Storage Description #1 765.34' 24,571 cf SAND FILTER STORAGE (Prismaticyisted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 765.34 3,093 0 0 766.00 3,756 2,260 2,260 767.00 4,610 4,183 6,443 768.00 5,529 5,070 11,513 769.00 6,513 6,021 17,534 770.00 7,561 7,037 24,571 Device Routinq Invert Outlet Devices #1 Primary 765.66' FILTER MEDIA Head (feet) 0.00 2.50 5.00 Disch. (cfs) 0.000 0.327 0.532 Primary Outflow Max=0.44 cfs @ 4.21 hrs HW=769.60' TW=0.00' (Dynamic Tailwater) L1=FILTER MEDIA (Custom Controls 0.44 cfs) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 79 Pond 3P: SAND FILTER Hydrograph ■ Inflow 6 crs D �I .� 14 IC'II� 'J n Primary I I I I I I I I I I I I I I I I I I I I I I 5 I I I I I I I I I I I �tpea � I I I I I I I I I I I I I I I I I I I I 4 N 3 3 0 LL I I I I I I I I I 2 I I I I l i l l l l l l l l 1 I I I I I I I I I I I I Iff, I I I I I I I I I I d 0 c 0 d w 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 3P: SAND FILTER Stage -Discharge 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 Discharge (cfs) ■ Primary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 50-yr 50yr-6hr Rainfall=4.48" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 84 Summary for Pond 4P: TOTAL [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 3.45" for 50yr-6hr event Inflow = 18.24 cfs @ 3.32 hrs, Volume= 3.098 of Primary = 18.24 cfs @ 3.32 hrs, Volume= 3.098 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph 4 1 1 1 4 1 -4 1 T I 4 1 1 4 1 1 ■Inflow 20 18.24 1 t 1 1-+ I-j I+ 1-f —I— I-1'�n� I ❑Primary 19 18.24crs —1 fi 1 1 rt 1 � rt 1 t 1 -Inflow Aroma=101/V�ac 18 —I— T —I — I— 7 —I— l- -7 —I— T —I — I— 7 —I— T -1 — I— T —I— F- 7 —I- 17 16 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 15 — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — 14 13 12 N 1_I_L v 11 1 1 1 - I - I I - I L- I -L I L T 3 10 � 1 1 4 I -4 I + 1 4 I A 1 4 1 LL 9 —— —1-1-4—I—} -4—I—+-1—— —I—+--1-1—+-1— � 8——t-1-1—-t I-1-�—I—t-1——-—I—t--1—t-1— 1 7—— -r —I —I— -r I-1--—I—T—I——-t 1-71-1—T—I— --I 6 1r 1 1 71F -11+ 1 1 11r-1171r I 5 4- - — — — — — — — — — — — — — — — — — — — — — — 3I- 2 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 87 Summary for Subcatchment OS: PRE - DEVELOPMENT Runoff = 18.50 cfs @ 3.40 hrs, Volume= 1.349 af, Depth= 2.25" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Area (ac) CN Description 7.200 73.0 Woods, Fair, HSG C 7.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 200 0.0335 0.27 Sheet Flow, Range n= 0.130 P2= 3.32" 13.6 716 0.0310 0.88 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 25.8 916 Total Subcatchment OS: PRE - DEVELOPMENT Hydrograph 20 _ I_ _I_ I _ I _ I_ _ I_ _I_ I _I_ _I _ I_ _ I_ _I_ _I _ I_ ■Runoff 19 18.50 cfs Ic I� 18 1 1 1 L 1 L J 1 1 1 L /� 1 L Charlotte 6 1h1r 1-00-YT 17 _ 1- 1 - I - L -1 - L -1 - I- 1 - I - L -1- -1- 1r' '1P 111 16 -I- -- -I- -I- -- Rain 06� -I_IJJ���lJJpy-y��{/-�-- aT�-�4.-7 15 4 1 1 A 1- 4 I I A' eti=I -at 14 - - - - -I - - I- - - I�1.Inb .M - Ip- + -11 -- - -i II-,.,�+w-I +- -1 - � 13 - I- t - - 1 -I - 1 - I- fi - - t '-. .1- -IRun-W�ff ' okn e--q T.3� 12 11 - rt -1- fi -1 r - - rt -1- t nl/ fi- hjT -I- � 1- T T T - 1- 7 T T T 1� LL 19 T T T T T rD T �W tdn�th:916' 8 I- I- I - I- I -I - I I- I- I- I- I- I- I -I - I- I I I I� I I 1 - IT�`i�.$�in 7 6 ---- ------------- - ----------- II 0 5 _ _I'_ q 3 II III II II II_ II 2 1_ -1 _ 1- 1 _ I _ L _ I _ L -1 _ L -1 _ L 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 90 Summary for Subcatchment 1S: POST TO SAND FILTER [49] Hint: Tc<2dt may require smaller dt Runoff = 79.41 cfs @ 3.10 hrs, Volume= 3.539 af, Depth= 3.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Area (ac) CN Description 10.770 91.0 Urban industrial, 72% imp, HSG C 3.016 28.00% Pervious Area 7.754 72.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: POST TO SAND FILTER Hydrograph ■Runoff 85 79.41 80 cfs -_1-7_1_r_1_F---1-7-1—T-1—rfhfrFofte67ihr'F I I �+ cc m rr 75 _1—t——t-1—r1-1—-t I—t—I—t-1— —I .I —t——�� 70 -1—+-1- -1-��-1-�-1-4--110p10� Rlainfall�4-, , 65 _ 1— 4 —1— —1 — � — 1— 4 — I — 4- yr� —1—R�.111off -Ards 1 0.77-0 -arc 55 _1_1_I_L_I_LJ_I_1_I_L_IRutnoffLVbune-=;3.539-af w 50 _ I_ _I_ _I _ I_ _ I_ _I_ I _I_ ff IDpI oh 1� L `'I 45 `0 40 TC-#5�0-ibjh 35 1�+�r 7I�pI 1-' 0 30 25 1 I T T 1 T 11 20 I rt I t I r� I rt I t I fi Ir- rt I rt I t I15 10 1 4 1 � 1 A 1 4 I -k I 1 -4 1— � 1 � 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Prepared by Burton Engineering Printed 1/24/2019 HydroCAD® 10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 93 Summary for Pond 2P: FOREBAY Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 3.94" for 100yr-6hr event Inflow = 79.41 cfs @ 3.10 hrs, Volume= 3.539 of Outflow = 34.58 cfs @ 3.27 hrs, Volume= 3.539 af, Atten= 56%, Lag= 9.8 min Primary = 29.06 cfs @ 3.27 hrs, Volume= 2.693 of Secondary = 5.69 cfs @ 3.21 hrs, Volume= 0.846 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 770.34' @ 3.27 hrs Surf.Area= 23,457 sf Storage= 69,528 cf Plug -Flow detention time=194.1 min calculated for 3.538 of (100% of inflow) Center -of -Mass det. time= 195.2 min ( 396.3 - 201.1 ) Volume Invert Avail.Storage Storage Description #1 766.00' 75,720 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 766.00 1,854 0 0 767.00 13,657 7,756 7,756 768.00 16,496 15,077 22,832 769.00 19,407 17,952 40,784 770.00 22,459 20,933 61,717 770.60 24,218 14,003 75,720 Device Routing Invert Outlet Devices #1 Primary 765.05' 24.00" Round RCP -Round 24" L= 36.7' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 765.05' / 764.53' S= 0.0142'/' Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 767.29' 24.00" W x 4.00" H Vert. 10 YR. ORIFICE C= 0.600 #3 Device 1 769.86' 48.00" x 48.00" Horiz. TOP OF OUTLET STRUCTURE C= 0.600 Limited to weir flow at low heads #4 Secondary 765.34' FLOW THROUGH RIPRAP BERM (Q=KIA) X 2.00 Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.003 0.005 0.008 0.011 0.013 #5 Device 1 769.34' 36.00" W x 6.00" H Vert. 25 YR. ORIFICE C= 0.600 #6 Secondary 765.87' 6.00" Round Culvert X 4.00 L= 28.9' Ke= 0.500 Inlet / Outlet Invert= 765.87' / 765.59' S= 0.0097'/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf Primary OutFlow Max=28.39 cfs @ 3.27 hrs HW=770.33' TW=0.00' (Dynamic Tailwater) L1=RCP_Round 24" (Passes 28.39 cfs of 31.29 cfs potential flow) 2=10 YR. ORIFICE (Orifice Controls 5.44 cfs @ 8.16 fps) 3=TOP OF OUTLET STRUCTURE (Weir Controls 16.77 cfs @ 2.24 fps) 5=25 YR. ORIFICE (Orifice Controls 6.18 cfs @ 4.12 fps) Secondary OutFlow Max=5.46 cfs @ 3.21 hrs HW=770.25' TW=768.13' (Dynamic Tailwater) �__:Culvert FLOW THROUGH RIPRAP BERM (Q=KIA)(Custom Controls 0.03 cfs) (Outlet Controls 5.44 cfs @ 6.92 fps) Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 94 i 50 45 34.56 I pis � 40 LL 35 29.06 cfs 30 25 20 15 10 s Po'f� e d d c 0 d w Pond 2P: FOREBAY Hydrograph I I I II i I I I I I II I I II I I I I I I I I I I I I I I I I I I I I I I I I rF T I TAI�A�I Imp ICI -(�I �I 1 1 I I 1 1 I 1111 Ilnf q , —1 _ 1 1—.1.,0•71' �I-aY 1 I I 1 1 I I 1 1 I I 1 I I Pea1�-E�:'770134! I I I I I I I I 11 1 11 1 1��I I I I 1 1 1 1 1J—I—LJ—I—I—LJ—I—I_JJ—I—StOrage--F-6.9,528_ef 1 J 1 L 1-1 1 L 1 I I 1 J 1 L 1-1 1 L I I I L 1 J —I— L L —1-1— L L —I— I— L J —I— L L —1-1— L-1 —1— 1— L -4 1 1 1- � 1 1 J 1 L 1 1 -4 1 1- 4 —1 — 1— 4- -4 —1— 1— —1—k-4-1-1— -4-1-1-4- 4 1+ 1I I I+ 1+ 11 4 1 1— +_ + —I— —I—I— —I— I—+ —I-1 —1-1— -4-1-1—+ + + II t + I I + + II + + II t + II t rrt 1 1—— —1——T 1— 7 1 1 rI I I T_ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105110 115 120 Time (hours) Pond 2P: FOREBAY Stage -Discharge 0 5 10 15 20 25 30 35 40 Discharge (cfs) LInflow wrydary ❑ Total ■ Primary ■ Secondary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 100 Pond 3P: SAND FILTER Hydrograph ■Inflow 5 69 cfs 0 Primary I I Peak ElIevr� 769.67" I I I I I I I I I I 7 I T T F T 1 T 7 I T T T 7 1 7-1 T 1 5 1�tpelago=��,j 111611c# ( I I I I I I I I I I I I I I I I I I I I I 4 I I I I I I I I I I I I I I I I I I I I I N F I I T I I I I 0 3 LL I I I I I I I I I I I I I I I I I I I 2 l l l l l l l I I I I I I I I I I I I I 1 I I I I I I I I I I I I I 0.45 cfs /%�.. d 0 c 0 d w 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) Pond 3P: SAND FILTER Stage -Discharge 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 Discharge (cfs) ■ Primary Infinity Sand Filter As Built Jan 2019 Charlotte 6-hr 100-yr 100yr-6hr Rainfall=4.96" Prepared by Burton Engineering Printed 1/24/2019 HydroCADO 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC Page 105 Summary for Pond 4P: TOTAL [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.770 ac, 72.00% Impervious, Inflow Depth = 3.92" for 100yr-6hr event Inflow = 29.41 cfs @ 3.27 hrs, Volume= 3.515 of Primary = 29.41 cfs @ 3.27 hrs, Volume= 3.515 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Pond 4P: TOTAL Hydrograph 1 I L I L 1 1 1 7 I L-1 1 1 L 1 ■ Inflow 29.4 ❑Primar y32 30 --1---1-- 11 11 -- ntowrea= iac 28 1 1 1 7 1 1 26 7 L� 7 I 1 rt �7 L- 1 7 F-� I t--t-----i--+-----t�--t--I- 24 +-I- -1-1-4-I- -4-I-+-1--7-I-+- 1-4- I-I- 22 20 u 18 3 16 LL 14 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12 1-1-T 1 7-I-F7-I-T 1 7-1-7--1-1-7-' 1 10 IL�IrtI1-rtIfiI�rtIfi�Irt 7 i- I + 1 7 I 8 I L 1 1 4 I - 1 4- 1 4 I L A 1 4 j 6 I I I I I I I I I 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours)