Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Project Infinity Pre and Post flow table for Sand Filter as built January 2019
Storm Event Pre-Dev DA Post-Dev DA Pre-Dev Q Post-Dev Q Routed Q to DI-5 Forebay Elev. Sand Filter Elev. (Yr) (Ac.) (Ac.) (CFS) (CFS) (CFS) (Ft.) (Ft.) 10 7.2 10.77 8.97 51.11 4.79 769.25 769.1 25 7.2 10.77 12.47 61.44 8.38 769.76 769.46 50 7.2 10.77 15.22 69.28 15.67 770.01 769.59 100 7.2 10.77 18.5 79.41 26.38 770.23 769.66