HomeMy WebLinkAboutWQ0005555_Add Info Letter_20190123ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
ROSS GARDNER — MILL MANAGER
WEYERHAEUSER NR COMPANY
524 PRIDE WAY
ELFIN, NORTH CAROLINA 28621
Dear Mr. Gardner:
NORTH CAROLINA
£nvironmentaI Quality
January 23, 2019
Subject: Application No. WQ0005555
Additional Information Request
Elkin OSB Manufacturing Facility
Wastewater Irrigation System
Surry County
Division of Water Resources' Central and Regional staff has reviewed the application package
received November 5, 2018. However, additional information is required before the review may be
completed. Please address the items on the attached pages no later than the close of business on February
25, 2019.
Please be aware that you are responsible for meeting all requirements set forth in North Carolina
rules and regulations. Any oversights that occurred in the review of the subject application package are
still the Applicant's responsibility. In addition, any omissions made in responding to the outstanding items,
or failure to provide the additional information on or before the above requested date may result in your
application being returned as incomplete.
Please reference the subject application number when providing the requested information. All
revised and/or additional documentation shall be signed, sealed and dated (where needed), with two paper
copies and one electronic copy.
If you have any questions regarding this request, please do not hesitate to contact me at (919) 707-
3660 or tessa.monday@ncdenr.gov. Thank you for your cooperation.
Sincerely,
Tessa Monday, Environmental Engineer
Division of Water Resources
cc: Winston-Salem Regional Office, Water Quality Regional Operations Section (Electronic Copy)
Permit Application File WQ0005555
North Carolina Department of Environmental Quality I Division of Water Resources
cr�-_D E 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
NOR0�C' ' �1
o"p .Mcr�beme Wore 919.707.9000
Mr. Ross Gardner
January 23, 2019
Page 2 of 2
A. Application (15A NCAC 02T .0105):
1. A new renewal application form was published on the Non -Discharge website. The form can be
downloaded from this link: https://files.nc.fzov/ncdeq/Water+Resources/files/NDSR-09-18.docx.
Please ensure to use the most current application forms in the future. The new renewal application
form does NOT need to be completed for this renewal.
2. Submit a major permit modification to address the changes to the facility (treatment system,
lagoons, flow direction, etc.) from what was permitted. The modification application should
include engineering plans, calculations, specifications, and O&M addendum.
I. Site Map:
Provide an updated site map in accordance with 15A NCAC 02T .0105(d) that shows the following:
1. Boundaries and physical features not under purview of other licensed professions shall be provided by a
professional land surveyor (indicate surveyor and date of survey)
2. Legend, north arrow, scale, and legible in black and white
3. Distance measurements verifying all setbacks are being met
4. Stormwater drainage controls
5. Location and ownership of property boundaries within 500 feet of the disposal area (including road/rail
right-of-ways)
6. All facility -related structures and fences within the treatment, storage, and disposal areas
7. All habitable residences and places of assembly within 500 feet of all treatment, storage, and disposal sites
8. Topographic contour intervals not exceeding 10 feet or 25 percent of total site relief
9. Soil mapping units on all disposal sites
10. Location of all wells, streams (ephemeral, intermittent, and perennial), springs, lakes, ponds, ditches, and
other surface drainage features within 500 feet of all waste treatment, storage, and disposal site(s)
11. Location and identification of each monitoring well (identify any background/upgradient wells)
12. Latitude and longitude coordinates of all monitoring wells (decimal degrees to 6 digits)
13. Location and identification of major components of the waste disposal system
14. Identification of all storage or treatment earthen structures that are part of the permit
15. The wetted perimeter of all irrigation/infiltration fields with field names (named according to the approved
permit)
16. The delineation of compliance and review boundaries
17. 100-year floodplain (if applicable)