Loading...
HomeMy WebLinkAbout20190096 Ver 1_161202 Impact Maps 3rd Submittal_20190121ENVIRONMENTAL IMPACT MAPS COLBY CROSSING COLBY CHASE DRIVE WHITE OAK TO WNSHIP APEX, NORTH CAROLINA 27502 HORTON PARK z (FUTURE) Q Z �O O S�OR a� O p C COLBY CROSSING z COLBY CHASE DR ��•` i. Wake County VICINITY MAP NO SCALE N NC CR/D (NAD 83) l'1\A/HIED MFW Investments LLC Mike Whitehead 114 Birklands Drive Cary, NC 27518 CI IDVEW-1D Bateman Civil Survey Company STEVE CARSON ENVIRONMETNAL CONSULTANT S&EC STEVEN BALL/DEBBIE SHIRLEY ,,& PEAK Engineering & Design 5448 Apex Peakway #368 1 Apex, NC 27502 ph: 919.439.0100 fax: 919.439.6411 w w w. P e a k E n g i n e e r i n g. c o m SITE DATA Existing Land Area: 7.58 acres Proposed Land Area: 7.58 acers Existing Zoning: MD -CZ Existing Use: Vacant Proposed Use: Single Family Existing Jurisdiction: Town of Apex Drainage Basin: Middle Creek Basin, COLBYCHASEDRIVE Neuse River Basin Secondary Chk By: Watershed Protection Overlay District FEMA Firm panel 3720075000J WAKE County Pin: 0750-26-4926 (Undeveloped) Revised: 11 /O1 /2018 Proj # IMPACT MAP COVER SHEET 161202 COLB Y CR OSSING Drwn By: FJS Dwg No COLBYCHASEDRIVE Chk By: JR 1 WHITE OAK TOWNSHIP Date: Oct 19, 2018 APEX, NORTH CAROLINA 27502 Scale: as noted 1 of 6 Revised: 11 /O1 /2018 INTERMITTENT/ 1 I 11NIMPORTA T �� �� / l I I l PERENNIAL/ STREAM \ ()~ / 1 1 (�/( IMPORT-AV- -�L 11 q ( \ STI AM ,� "W q \ S ° 0 S20 5 �� a 0. J 6 5„ wO J/ l' J PROPERTY BOUNDARY ALL STREETS SHOWN ON THIS PLAN ARE EXISTING. ON 3 I t al ar� I Ir 30, PROPERTY f BOUNDARY/ -J / J K 0-000 °, \. � 0 M / a ,• qa 1�\ � �� / �' / �/ \ � � 5o M SBR 5FFR / FFFR —1701 4 /, N 5 „ / ( / _� / FUOOD C PROPERTY MIDDLE CREEK �ti BOUNDARY r1G \\\ N b EXISTS SS S SS S \ \ TOTAL LINEAR FOOTAGE OF STREAMS ON SITE.' INTERMITTENT-251PERENNIAL-431 LF, INTERMITTENT -251 LF ,rS\ILL \Y I NO WETLANDS ONSITE: 55/ — '�\\ \\ / �� THE OVERALL IMPERVIOUS PERCENTAGE FOR THE PROPERTY AFTER COMPLETION OF THIS } PROJECT IS 3.03 AC (40%) I 0 50 100 200 SEXG F P MIDDLE CREEK REGIONAL \ \ - - PUMP STATION \\\\\ \ \ I I (DWR Project #20181333) \\\\\\ I ' I SCALE: 1" = 100' (NAD NC W> BY OTHERS ODWA ! 1 MIDDLE CREEK \ REEK FLO\�\� WETLAND DELINEATION PREPARED BY SOIL & I ING MIDDL� //� PERENNIAL STREAM �'�� �L \ ENVIRONMENTAL CONSULTANTS, INC. (S&EC). EXIST C. C� P REFER TO JURISDICTIONAL MAP: 16 OVERALL SITE MAP - EXISTING CONDITIONS 1 # \ � -PEAK 1202 Survey By: COLBYCROSSING Drwn By: FJS Dwg No I Bateman Civil Survey Company Engineering & Design COLBYCHASEDRIVE Chk By: JR 2 ` Engineers Surveyors Planners 5448 Apex Peakway #368 Apex, NC 27502 WHITE OAK TOWNSHIP Date: Oct 19, 201 8 2524 Reliance Avenue, Apex, NC 27539 ph: 919.439.0100 rax: 919.439.6411 APEX NORTH CAROLINAZ7S02 2 of 6 Phone: 919.577.1080 Fax: 919.577.1081 w ww. P e a kE n g i n e e r i n g. c o Scale: 1"= 100' 1 \ \ NCBELS FIRM No. C-2378 Revised: 11/01/2018 A, ------ J, � � I NTERN41' TTE`NT I � �l � �-- RE/ ((-- �� I ( ( l(/ PASS R ` PROP SED i n 1 R AWAYBOUN / /PROJECT j 388 IMPACT CHANNEL CHANNEL NEUSE N0. IMPACT IMPACT RIVER WETLAND PERMTEMP PERMTEMP BUFFER SF Al—S7 108LF I IOLF 438SF 141SF WETLAND 0 Al—B7 0 0 6,477 0 Al—B2 0 0 3,950 0 Ala -62 n/a n/a 2,385 n/a CHANNEL NEUSE IMPACT CHANNEL IMPACT RIVER WETLAND N0. AREAS (SF) BUFFER (SF) A2—S2 n/a n/a n/a 0 0 0 981 0 —B2 r.-I'a-821 0 0305 0 n/a n/a n/a n/a E \ N 386 _ ( a �— ,aTA< nNEAR PaDTN/iE OF SIRF/JIS ON 411E PERENNYiH01 IF. NNNOMMIIENf.01 LF 1 Y� Ha WEVmm ONM MIO LCT R J 11. \/ n ,HE a,FINLL IMPFRJNNIS PERCENTAGE FOR THE PROPERTY AFM aaMFU" OF TO \� / 4 PROJECT IS 3.0 AC (40i) n � NN �T N1 v 38q --- � 1 . , � � ` / � \ �� • 382 / I v`�i y ' / / I I / / ✓ vii _ r ' C b' co e ILL 00 LO 0� /uj N / I o \ ( r / I r -I co 372 7 3 368362 1 372 1V t� J/ /` I 376 H �601\1 — — PROPERTY f 372 3 372 r? 00 J BOUNDARY J ROADWAY IMPACT #2� ��° / �� 3b° 370 I 04 ARES A2) \ �� / M S E EP I HT 5 �C p \� _— M 10 ILL�� b N EXIs G� J 10 ✓ a RO$ER vffp \ o RCCA WAY IMPACT #I r ND 17 LL X605 RE�/AI� e d 0 N r X� ;� SEE EET 4 Lj o — � % .� 368 o a ° � �- \ � REEK FI- � ` , / v PROPERTY MIDDLE C �, S 3 ( % BOUNDARY XISIING r '1 Pvc i PVC P�Pe S/S s ss ss\ -- -- SS� _ _� �� \�\I� PR P --QS r WMI — — — —,a— S�� ` ' �—� ��� \ \ �\ � --MINOR COLLEC�fOR f ) STS G— �D IIJO� / I MIDDLE C K R NA\\\\\\\�\\ CONNECTION J �� PUMP STATION Project #201813 L O WA 1����j r MIDDLE CREEK \ 0 50 100 200 LE R \\� _ J q l PERENNIAL STREAM EXI$TING l ��` I \ SCALE: 1" = 100' N C CRID OVERALL SITE MAP - PROPOSED CONDITIONS Prot # C ` (NAD 83) -PEAK 161202 1 COLBYCROSSING Drwn By: FJS Dwg No I Engineering & Design COLBYCIIASEDRIVE Chk By: JR 3 ` WETLAND DELINEATION PREPARED BY SOIL & 5448 Apex Peakway #368 Apex, NC 27502 WHITE OAK TOWNSHIP Date: Oct 19, 2018 I I = _ ENVIRONMENTAL CONSULTANTS, INC. (S&EC). ph: 9,°.439.°'°° ` e ring.com APEX, NOR THCAROLINA27502 Scale: I"= 100' 3 of 6 ] REFER TO JURISDICTIONAL MAP: www . P e a k E n g i n e e r i n g. c o m — Revised: 12/03/2018 FUTURE EXTENSION OF HORTON PARK DR BY OTHERS � J 1 INTERMITTENT/UNIMPORTANT STREAM �A2-62 BUFFER (ROAD IMPACT) m -c� m 0 Amo � - J� IMS-61`T61STURBANCE �4 / 10625 SF N (NAD 83)NC GRID _ IMPACT CHANNEL CHANNEL NEUSE N0. IMPACT RIVER WETLAND ^b AREAS (SF) BUFFER (SF) i CHANNEL IMPACTS A2 -S2 n/a n/a n/a 0 A2-131 0 0 981 0 A2-132 0 0 305 0 A2a-B2 n/a n/a n/a n/a PROPOSED SANITARY SEWER MANH/QLE IN HORTON PARK DR A2-131 BUFFER (ROAD IMPACT) LIMITS OF / /DISTURB, NCE I/ / Roadway Impact Area A2 - Bl and B2 Proj # -PEAK 161202 COLB Y CR OSSING Drwn By: FJS Dwg No Engineering & Design WHITE Chk B : JR 5 5448 Apex Peakway #368 1 Apex, NC 27502 77 WHITEOAKT OWNSHIP7�77 Date: Oct 19, 2018 www..439.0100 fax: 919.439.6411 APEX NOR TH CAROLINA 2750 C at L www.Pea kEngineering.com , Scale: 1" - 40' J U Revised: 12/03/2018 3 10559 SF ^b z i CHANNEL IMPACTS B1= ZONE "1"BUFFER IMPACTS B2= ZONE "2" BUFFER IMPACTS offsite STREAM BUFFER onsite ZONE 1: UNDISTURBED/WOODED ZONE 2: VEGETATED Roadway Impact Area A2 - Bl and B2 Proj # -PEAK 161202 COLB Y CR OSSING Drwn By: FJS Dwg No Engineering & Design WHITE Chk B : JR 5 5448 Apex Peakway #368 1 Apex, NC 27502 77 WHITEOAKT OWNSHIP7�77 Date: Oct 19, 2018 www..439.0100 fax: 919.439.6411 APEX NOR TH CAROLINA 2750 C at L www.Pea kEngineering.com , Scale: 1" - 40' J U Revised: 12/03/2018 INLET PIPE BURIED 20% OF PIPE SIZE FROM EXISTING CHANNEL ELEVATION FINAL ELEVATION ABOVE PIPE WILL BE COORDINATED DURING CONSTRUCTION DRAWING DESIGN AND APPROVAL. UPSTREAM CULVERT PIPE INLET SHALL TIE TO EXISTING CHANNEL. FIELD LOCATION BY CROSS SECTION CONTRACTOR REQUIRED TO MAKE N.T.S. APPROPRIATE ALIGNMENT GRASS SHOULDER HEADWALL RIP RAP APRON DISSIPATOR 24" C&G FINISHED ELEVATION3 24" TO MATCH EXIST CHANNEL 1_ ELEVATION AT TIME OF INSTALLATION HORTON 20FT CLASS 1 RIPRAP PARK 24" DEPTH DRIVE 3 a 1 , HEADWALL INLET PIPE BURIED 20% OUTLET BURIED 20% OF OF PIPE SIZE FROM - PIPE SIZE FROM EXISTING EXISTING CHANNEL ELEVATION CHANNEL ELEVATION. OUTLET LINED WITH RIP RAP RIP RAP INLET PROTECTION PAD DISSIPATOR. FINISHED ELEVATION TO MATCH EXIST CHANNEL ELEVATION AT TIME OF INSTALLATION 6FT CLASS 1 RIPRAP CULVERT ROADWAY CROSS-SECTION 24" DEPTH N.T.S. OUTLET BURIED 20% OF PIPE SIZE FROM EXISTING CHANNEL ELEVATION. OUT[ LINED WITH RIP RAP DISSIPATOR. PIPE OUTLET SHALL TIE TO EXISTINGCHANNEL. FIELD BY J CONTRACTOR REQUIRED CTOOMAKE DOWNSTREAM CULVERT APPROPRIATE ALIGNMENT CROSS SECTION N.T.S. SEE PLAN AND PROFILE FOR FINAL ROADWAY ELEVATION ABOVE STORM PIPE OUTLET IMPACT Al - ROAD CROSS-SECTION Proj # -PEAK 161202 COLB Y CR OSSING Drwn By: FJS Dwg No Engineering & Design TC�OLTBYCHT�A�S+E�D�)R��I�VE7� Chk By: JR 7 5448 Apex Peakway #368 1 Apex, NC 27502 7J WHITE OAK lOYYNSHIP �7 Date: Oct 19, 2018 w w.Pe9.0100 fax: ring com ATEA NORTH 2750 L at L www. Pec kEngineering.com , Scale: NTS U V Revised: 11/01/2018