HomeMy WebLinkAboutGT Properties_NOV_20180503ROY COOPER Governor MICHAEL S. REGAN Secretary MI Energy, Mineral WILLIAM E (TOBY) VINSON, JR 9Y+ Interim Director and Land Resources ENVIRONMENTAL QUALITY May 3, 2018 NOTICE OF VIOLATIONS OF THE SEDIMENTATION POLLUTION CONTROL ACT GENERAL PERMIT - NCG 010000 TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM FOR CONSTRUCTION ACTIVITIES CERTIFIED MAIL RETURN RECEIPT REQUESTED GT Properties of NC, Incorporated 7016 1370 0000 2595 8662 Attention: James Grady Cook, President and Registered Agent 3841 Willow Grove Lane Concord, North Carolina 28025 GT Properties of NC, Incorporated 7016 1370 0000 2595 8686 Attention: Todd Eury, Vice President 3841 Willow Grove Lane Concord, North Carolina 28025 RE: Project Name: GT Properties of NC, Incorporated Project ID: Not Assigned County: Cabarrus Compliance Deadlines: 15 days from receipt by certified mail for SPCA violations 15 days from receipt by certified mail for Construction Stormwater Permit NCG 010000 violations Dear Mr. Cook and Mr. Eury: On May 1, 2018, personnel of this office inspected a project located on 870 Accent Avenue SE, Concord in Cabarrus County, North Carolina. This inspection was performed to determine compliance with the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 and General Permit - NCG 010000 to Discharge Stormwater Under The National Pollutant Discharge Elimination System for Construction Activities (Construction Stormwater Permit NCG 010000). The inspection revealed a land -disturbing activity of approximately 3 acres being conducted. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Ave Ste 301 1 Mooresville, NC 28115 704 663 1699 T Notice of Violations GT Properties of NC, Incorporated May 3, 2018 Page 2 of 4 It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The purpose of this letter is to inform you that this activity was found to be in violation of the SPCA, G.S. 113A-50 to 665 Title 15A, North Carolina Administrative Code (NCAC), Chapter 4 and Construction Stormwater Permit NCG 010000. If you feel that you are not responsible for the following violations, please notify this office immediately. The violations of the SPCA that were found are: Failure to file an erosion and sedimentation control plan with this office 30 or more days prior to initiating any land -disturbing activity that will disturb more than one acre on a tract, failure to secure this office's prior approval of the plan for any land -disturbing activity prior to beginning the land -disturbing activity. G.S. 113A-54(d)(4), G.S. 113A-57(4) and 15A NCAC 4B.0107(c). 2. Failure to take all reasonable measures to protect all public and private property from damage by such land -disturbing activities. 15A NCAC 4B .0105 The violations of the Construction Stormwater Permit NCG 010000 that were found are: 1. Discharge of stormwater without a permit. Because the land -disturbing activity does not have an approved erosion and sedimentation control plan it does not have coverage under the Construction Stormwater Permit NCG 010000 and you are not permitted to discharge stormwater. G.S. 143-215.1(a) and 15A N.C.A.C. 02H .0126 To correct these violations, you must: Submit three (3) copies of an approvable sedimentation and erosion control plan and the appropriate plan review fee to this office. Until the required plan has been approved, no land -disturbing activity may be conducted, except that which is necessary to bring the site into compliance. Until an erosion and sedimentation plan has been approved, any land - disturbing activity, except that which is necessary to bring the site into compliance, will constitute additional violations of the SPCA and G.S. 143-215.1(a) and 15A N.C.A.C. 02H .0126 . Following our review of the plan within 30 days of receipt, this office will notify you that the plan has been approved, approved with modifications or disapproved. Following approval of the plan, all land -disturbing activity on the site must be conducted in accordance with the terms of the approved plan, the SPCA and the implementing rules and Construction Stormwater Permit NCG 010000. SPCA Violations The violations of the SPCA cited herein may be referred to the Interim Director of the Division of Energy, Mineral and Land Resources (William E. (Toby) Vinson, Jr.), for appropriate enforcement action, including civil penalty assessments for an initial one -day violation and/or a continuing violation. The penalty for an initial one -day violation of the SPCA may be assessed Notice of Violations GT Properties of NC, Incorporated May 3, 2018 Page 3 of 4 in an amount not to exceed $5,000.00. The Division of Energy, Mineral and Land Resources is not required to provide a time period for compliance before assessing an initial penalty for the violations of the SPCA cited herein. Please be advised that a civil penalty may be assessed for the initial day of violations of the SPCA regardless of whether the violations are corrected within the time period set out below. In addition, if the violations of the SPCA cited herein are not corrected within fifteen (15) calendar days of receipt of this Notice, this office may request that the Interim Director take appropriate legal action against you for continuing violations pursuant to NCGS 113A-61.1 and 113A-64. A penalty may be assessed from the date of the violation of the SPCA, pursuant to NCGS 113A-64(a)(1), and for each day of a continuing violation of the SPCA in an amount not to exceed $5,000.00 per day. Construction Stormwater Permit NCG 010000 Violations The violations of the Construction Stormwater Permit NCG 010000 cited herein may be referred to the Interim Director of the Division of Energy, Mineral and Land Resources (William E. (Toby) Vinson, Jr.) for appropriate enforcement action, including civil penalty assessments for a continuing violation. This Notice serves as a letter of proposed civil penalty assessment. You have fifteen (15) calendar days from receipt of this Notice by certified mail to cease the violations listed above, and to submit in writing reasons why the civil penalty should not be assessed. Accordingly, you are directed to respond to this letter in writing within fifteen (15) calendar days of receipt of this Notice by certified mail. Your response should be sent to this regional office at the letterhead address and include the following: 1. The date by which the corrective actions listed above have been or will be completed. 2. A plan of action to prevent future violations. 3. Reasons why a civil penalty should not be assessed. Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to a civil penalty assessment of up to a maximum of $25,000.00 per day for each violation. Your above - mentioned response to this correspondence, the degree and extent of harm to the environment and the duration and gravity of the violation(s) will be considered in any civil penalty assessment process that may occur. Please be advised that any new land -disturbing activity associated with this project should not begin until the area presently disturbed is brought into compliance with the SPCA and Construction Stormwater Permit NCG 010000. When corrective actions are complete, you should notify this office so that work can be inspected. You should not assume that the project is in compliance with the SPCA and Construction Stormwater Permit NCG 010000 until we have Notice of Violations GT Properties of NC, Incorporated May 3, 2018 Page 4 of 4 notified you. After installation, all erosion control measures must be maintained in proper working order until the site is completely stabilized. We solicit your cooperation, and would like to avoid taking further enforcement action. At the same time, it is your responsibility to understand and comply with the requirements of the SPCA and Construction Stormwater Permit NCG 010000. Copies of the relevant statute and administrative rules may be examined at this office or will be sent to you upon request. Should you have questions concerning this notice or the requirements of the SPCA and Construction Stormwater Permit NCG 010000 please contact either Mr. Michael L. Peveler or me at your earliest convenience. Sincerely, V-- Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section MLP/OS/TE/cys Enclosures: Sedimentation Inspection Report Construction Stormwater Permit NCG 010000 Financial Responsibility Form Erosion Control Plan Checklist Resources for Technical Assistance — Erosion and Sediment Control c: State Sediment Specialist Supervisor, Regional Water Quality Operations Section North Carolina Department of Environmental Quality Land Quality Section: 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115, Phone: (704)-663-1699 County: Cabarrus Project: GT Properties of NC, Inc. River basin: Yadkin Pee Dee Person Financially Responsible: James Grady Cook - Project #: CABAR-2018-502 Address: 3841 Willow Grove Lane, concord, North Carolina 28025 1. Project location: 870 Accent Ave SE Concord, NC 28025 Pictures: No: r_ Yes: 17 Video: r- Digital: 2. Weather & soil conditions: I Sunny, 72, workable soils First inspection: Yes: !_' No: f- 3. Is site currently under notice of violation? Yes: r- No: r7 4. Is the site in compliance with S.P.C.A. and rules? Yes: No: P If no, check violations below: 5. Violations: a. No approved plan, G.S. 113A-57 (4) and 15A NCAC 413.0107(c) T7 g. Inadequate buffer zone, G.S. 113A-57(1) b. Failure to follow approved plan, G.S. I I3A-57(5) h. Graded slopes and fills too steep, c. Failure to submit revised plan, G.S. I I3A-54.1(b) and G.S. 113A-57(2) or 15A NCAC 413.0124(d) 15A NCAC 413.0118(a) i. Unprotected exposed slopes, G.S. 113A-57(2) d. Failure to provide adequate groundcover, G.S. 113A-57(3); r j. Failure to maintain measures, 15A NCAC 413.0113 15A NCAC 413.0107(b) or 15A NCAC 413.0124(e) k. Failure to self -inspect G.S. 113A-54.1(e) and e. Insufficient measures to retain sediment on site, G.S. 113A-57(3) 15A NCAC 4B.0131 f. Failure to take all reasonable measures, 15A NCAC 413.0105 1. Other describe) I 6. Is the site in compliance with NPDES Permit NCG 010000? Yes: r- No: T_ Not Applicable: If no, check violations below: M. Failure to manage construction site pollutants, NCG 010000 Sec. I1, 13.1 F r. Failure to have approved plan and NPDES n. Failure to provide ground stabilization, NCO 010000 Sec. I1, B.2 permit on site, NCG 010000 Sec. III, 3(d) o. Failure to maintain rain gauge or record daily rainfall, F s. Failure to install and maintain BMP's, NCG 010000 Sec. II, 13.3(a, b) NCG 010000 Sec. III, 4 p. Failure to meet self -inspection and reporting requirements, t. Failure to operate and maintain control NCG 010000 Sec, II, B.3(c-i) measures, NCG 010000 Sec. IV, 1 q. Failure to dewater sediment basin from surface, u. Bypass of stormwater control facilities, NCO 010000 Sec. 1I, 13.4 NCG 010000, Sec. IV, 3 _ v. Other (describe) - - 7. Has sedimentation damage occurred: r since last inspection F at I" inspection? Yes: No: If yes, where? (check all that apply): Lake/natural watercourse on the tract: r- Lake/natural watercourse off the tract: Other property: 17 Description: _ . . Stormwater Discharge Outfall with sediment loss: Degree of damage: slight: r moderate: F severe: l- 8. Contact made with: Austin Yow Title: Foreman Date Inspection report sent to financially responsible party: I With NOV. M ichael Peveler Report by:_ Others present: 5/1/2018 � 11:30am 12:OOpm Date of inspection: Time arriving on site: Time leaving site: North Carolina Department of Environmental Quality Land Quality Section: 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115, Phone: (704)-663-1699 cc: 9. Corrective actions needed Submit three (3) copies of an approvable sedimentation and erosion control plan and the appropriate plan review fee to this office. Until the required plan has been approved, no land -disturbing activity may be conducted, except that which is necessary to bring the site into compliance. Until an erosion and sedimentation plan has been approved, any land -disturbing activity, except that which is necessary to bring the site into compliance, will constitute additional violations of the SPCA and G.S. 143-215.1(a) and 15A N.C.A.C. 02H.0126. Following our review of the plan within 30 days of receipt, this office will notify you that the plan has been approved, approved with modifications or disapproved. Following approval of the plan, all land -disturbing activity on the site must be conducted in accordance with the terms of the approved plan, the SPCA and the implementing rules and Construction Stormwater Permit NCG 010000. 10. Comments: This inspection was conducted due to a complaint of a land disturbing activity not having a permit. Upon inspecting the site, we found that more than one acre had been disturbed without an approved erosion control plan. RPvNlon Dgrf- OQO()'?O ! i Page 2 of 2