Loading...
HomeMy WebLinkAbout20190009 Ver 1_more information received_20190122 Homewood, Sue From:Brad Luckey <bluckey@pilotenviro.com> Sent:Tuesday, January 22, 2019 7:57 AM To:Homewood, Sue Cc:Roden Reynolds, Bryan K CIV (US) Subject:\[External\] RE: Sedge Hollow SD Attachments:Emailing: Permit of Sanitary Sewerage Collection-Outfall 103118; Permit of Sanitary Sewerage Collection-Outfall 103118.pdf; FW: Sedge Hollow Subdivision- Wetland Impact Map; 18-031-SH_WETLAND IMPACTS.PDF CAUTION: External email. Do not click links or open attachments unless you verified. Send all suspicious email as an attachment to report.spam@nc.gov Good Morning Sue, There was actually not an attachment from the City response to the applicant. However, it is our understanding that the City was referring the local sanitary sewer permit approval or the previous attachment (preliminary impact exhibits) submitted to the City in inquiry email, both of which confirm the proposed crossing location. I have attached copies of the email correspondence and both pdf attachments as stand-alone documents. Note that the impact drawings provided to the City were preliminary in nature and differ from those submitted within the PCN application due to design changes. Additionally, it is the applicant’s understanding that the City of WS will be responsible for maintenance activities of the proposed sewer line following installation. Please let me know if you require additional information. Thanks. Sincerely, Bradley S. Luckey, PWS 336.708.4997 (c) 336.310.4527 (o) PO Box 128 Kernersville, NC 27285 www.pilotenviro.com bluckey@pilotenviro.com From: Homewood, Sue \[mailto:sue.homewood@ncdenr.gov\] Sent: Tuesday, January 15, 2019 3:11 PM To: Brad Luckey <bluckey@pilotenviro.com> Cc: Roden Reynolds, Bryan K CIV (US) <bryan.k.rodenreynolds@usace.army.mil> Subject: Sedge Hollow SD Brad, Can you provide a copy of the “attachment” referenced in the email from the City. Can you also clarify if the sewer is to be turned over to the City once constructed? I’m unclear as to why the City staff would need to perform maintenance (as referenced in the email) if it’s a private sewer (as referenced in the justification of why they could not secure an easement). 1 Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 IMPACT LOCATIONPE LINEAR STREAM WETLAND IMPACT ID IMPACT (SQUARE FEET) (FEET) 1 STORM CROSSING 121.71 2,612 2 RIP RAP IMPACT 20.1 182 L . I _M 1 inch = 500 tL I L _ L IMPACT AREA DEVELOPER: SHUGART ENTERPRISES, LLC 221 JONESTOWN RD WINSTON—SALEM, NC 27104 PHONE: (336) 765-9661 CELL.• (336) 399-7197 GREGOSHUGARTHOMES. NET I I I mll II I II SITE MAP SEDGE HOLLOW WETLAND IMPACT MAP FORSYTH COUNTY, NC DECEMBER 7, 2018 SEDGE HOLLOW SU PHASE -II MUNICIPALITY: CITY OF WINSTON-SALEM TOWNSHIP: WINSTON V 0 RIP RAP PLACED BANKS C STREAM SHEET 7. F1 n. 60in STORM BDIVISION STATE: NORTH CAROLINA COUNTY: FORSYTH BY ANT GREEN MOUNTAIN ENGINEERING, PLLC 7A WENDY CT GREENSBORO, NC 27409 Tet: 336.294.9394 CERTIFICATE #P-0826 www.greenmountainengineers.com 920 910 •I• E:IsI91 DEVELOPER: SHUGART ENTERPRISES, LLC 221 JONESTOWN RD WINSTON—SALEM, NC 27104 PHONE: (336) 765-9661 CELL: (336) 399-7197 GREGOSHUGARTHOMES.NET 920 IMPACT LOCATION TYPE LINEAR STREAM WETLAND IMPACT ID IMPACT (SQUARE FEET) (FEET) 1 STORM CROSSING 121.71 2,612 2 RIP RAP IMPACT 20.1 182 0' 20' 40' 80' SCALE: 1" = 40' I� I WETLANDS I I II I /I A II II \\ �1< \ (TYP.) / �— I I I I I 121.7 LF \ / / I I I PERMANENT FROM CULVERT Y/ \\ UNNAMED TRIBUTARY TO 910 LEE LAKE MH�OS�\I \� / I / SSMAI-OS-4� 2,794 SF TOTAL A ssP—_/ I— I PERMANENT / — — / I I \I\ IMPACT FROM \ CULVERT FILL & \ RIP RAP \ OQ��/ // / \ 20.1 LF \ \ \ 9Q � \ \ I \\HAND PACED RIP RAP CREEK BANK(BOTH / 1/ PERMANENT \ i y \ \ AMERICAN GREEN 5150 STRAW EROSIONR CONTROL BLANKET OR IMPACT FROM \ ' I ' \ EQUAL PANT SWITCHGRASS (PANICUM \ / Q RIP RAP \ I I y \ \ VIRGATUM) AT A RATE OF 1 TO 2 POUNDS PER ACRE. HORIZ. SCALE: 1" = 40' VERT. SCALE 1 " = 4' :•• SEDGE HOLLOW SUBDIVISION PHASE -II MUNICIPALITY: CITY OF WINSTON-SALEM TOWNSHIP: WINSTON STATE: NORTH CAROLINA COUNTY: FORSYTH GREEN MOUNTAIN ENGINEERING, PLLC 7A WENDY CT GREENSBORO, NC 27409 Tel: 336.294.9394 CERTIFICATE #P-0826 www.greenmountainengineers.com In accordance with the provisions of Article 21 of Chapter 143 of the General Statutes of North Carolina as amended and other applicable Laws, Rules, and Regulations, including the City/County Utility Commission Water and Sewerage System Policy Resolutions. Permission is hereby granted to: Shurgart Enterprises, LLC For the use of approximately: 608; 391 lineal feet of 8" VC; 8" DI gravity sewer To Serve (project name and location) : Sedge Hollow - Phase 3 Outfall 830 Sedge Garden Road, Winston-Salem, NC 27107 This Permit and Authorization to Construct provides for the discharge of collected domestic wastewater into the City of Winston- Salem's existing sewerage system, pursuant to the application received on 10-30-18 and in conformity with the requirements of the North Carolina Department of Environment and Natural Resources (NCDENR). This Permit and Authorization to Construct shall be valid for 24 months from the date of issuance or until rescinded, and shall be subject to the following specified conditions and limitations: 1. This Permit and Authorization to Construct shall become void unless the facilities are constructed in accordance with approved plans, specifications, and other supporting data. 2. Construction of the sewers shall be so scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 3. This Permit and Authorization to Construct is effective only with respect to the nature and volume of wastes describe in the application and other supporting data. 4. Use of the facilities cannot begin until final inspection approval has been received and a Contract of Conveyance executed by the City and the applicant. 5. The facilities shall be properly maintained and operated at all times by the City of Winston-Salem upon acceptance by the City. 6. The sewage and wastewater collected by this system shall be adequately treated in the City of Winston-Salem's: ❑ Elledge Wastewater Treatment Plant prior to being discharged into the receiving stream. ® Muddy Creek Wastewater Treatment Plant prior to being discharged into the receiving stream. 7. A copy of this Permit and Authorization to Construct and a copy of the approved engineering plans must be made available at the job site upon request by a representative of the City of Winston-Salem. Permit Number: 2942 Project Number: 12361 Date Issued: �/V3/ X 16 APPROVED: Utilities Director Utilities Plan Review Forms: Revised 04127/11 Homewood, Sue From:Greg Garrett <greg@shugarthomes.net> Sent:Friday, January 18, 2019 4:29 PM To:Brad Luckey Subject:Emailing: Permit of Sanitary Sewerage Collection-Outfall 103118 Attachments:Permit of Sanitary Sewerage Collection-Outfall 103118.pdf There was not an attachment from what Todd Lewis sent me but he did reference the attached document so here it is. Your message is ready to be sent with the following file or link attachments: Permit of Sanitary Sewerage Collection-Outfall 103118 Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of file attachments. Check your e-mail security settings to determine how attachments are handled. 1 Homewood, Sue From:Greg Garrett <greg@shugarthomes.net> Sent:Friday, January 18, 2019 4:21 PM To:Brad Luckey Subject:FW: Sedge Hollow Subdivision- Wetland Impact Map Attachments:18-031-SH_WETLAND IMPACTS.pdf This is what I sent to Todd Lewis. From: jordan@greenmountainengineers.com \[mailto:jordan@greenmountainengineers.com\] Sent: Friday, December 7, 2018 4:55 PM To: Greg Garrett <greg@shugarthomes.net> Cc: 'Vince Townsend' <vince@greenmountainengineers.com> Subject: Sedge Hollow Subdivision- Wetland Impact Map Greg, I have attached the updated Wetland Impact Map for Sedge Hollow Phase 2. Bradley Luckey from Pilot Environmental has asked us to obtain a letter from the City of Winston Salem stating that the storm pipe cannot be installed as an aerial crossing with no impact to the stream. If you could handle that for us, that would be great! Let me know if you need any further information. Thanks, Jordan Young Green Mountain Engineering, PLLC (336) 252-2781 1