Loading...
HomeMy WebLinkAboutWQ0015180_Residual Annual Report 2018_20190122i' g 1� INTERNATIONAL PAPER RIEGELWOOD MILL 865 JOHN L. RIEGEL ROAD RIEGELWOOD, NC 28456 PHONE 910-362-3309 RECEIVEDINCDEOIDWR January 14, 2019 Certified Mail: 7017 2620 0000 24115194 North Carolina DEQ Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-1636 Attn: Mr. Ed Hardee Subject: Permit WQ0015180 Dear Mr. Hardee: JAN 2 2 2019 Non -Discharge Permitting Unit r,PR/ [) JAN 2 2 2019 DWR SECTION INFORMATION PROCESSING UNI' I am submitting this notification that no residuals were land applied in 2018 under the permit listed above. The certification form accompanies this letter. The covered residuals generated were landfilled or used as cover in the company's on -site landfill. Additionally, under recent review of activity as it pertains to this permit, IP has reported no activity for the past 11 years. Future plans do not indicate any intent on the part of IP to perform land application in the near term. Therefore, IP intends to let this permit lapse and will not be submitting a renewal application. If you have any questions or want to discuss this report for any reason, please contact Kim Fail (910-362- 4753) or me (910-362-3309) at your convenience. Sincerely, Gary W. Morrow Manager— Environment, Health, Safety and Sustainability K. � S . ANNUAL LAND APPLICATION CERTIFICATION FORM Permit#: WQ00015180 County: Columbus Year: 2018 Facility Name (as shown on permit): International Paper Land Application Operator: NA -No Residuals applied in 2018. Phone: 910-362-3309 Land application of residual solids as allowed by the permit occurred during the past calendar year? ❑ Yes ❑ No If No, skip Part A, and Part B and proceed to the certification. Also, if residuals were generated but not land applied, please attach an explanation on how the residuals were handled. Part A: Total number of application fields in permit: Total number of fields land application occurred during the year: Total amount of dry tons applied during the year for all application sites: Total number of acres land application occurred during the year: I I Part B: Facility was compliant during calendar year with all conditions of the land application permit (including but not limited to items 1-12 below) issued by the Division of Water Resources.❑ Yes ❑ No If no please, provide a written description why the facility was not compliant, the dates, and explain corrective action taken. 1. Only residuals approved for this permit were applied to the permitted sites. 2. Soil pH was adjusted as specified in the permit and lime was applied (if needed) to achieve a soil pH of at least 6.0 or the limit specified in the permit. 3. Annual soils analysis were performed on each site receiving residuals during the past calendar year and three (3) copies of laboratory results are attached. 4. Annual TCLP analysis was performed and three (3) copies of certified laboratory results. are attached. 5. All other monitoring was performed in accordance with the permit and reported during the year as required and three (3) copies of certified laboratory results are attached. 6. The facility did not exceed any of the Pollutant Concentration Limits in Table 1 of 40 CFR Part 503.13 or the Pollutant Loading Rates in Table 2 of 40 CFR part 503.13 (applicable to 40 CFR Part 503 regulated facilities). 7. All general requirements in 40 CFR Part 503.12 and management practices in 40 CFR Part 503.14 were complied with (applicable to 40 CFR Part 503 regulated facilities). 8. All operations and maintenance requirements in the permit were complied with or, in the case of a deviation, prior authorization was received from the Division of Water Resources. 9. No contravention of Ground Water Quality Standards occurred at a monitoring well or explanations of violations are attached to include appropriate actions and remediations. 10. Vegetative cover as specified in the permit was maintained on this site and the crops grown were removed in accordance with the crop management plan. 11. No runoff of residuals from the application sites onto adjacent property or nearby surface waters has occurred. 12. All buffer requirements as specified on the permit were maintained during each application of residuals. "I certify, under penalty of law, that the above information is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violatio ." Gar 5 VAZ„� t'4- I '-/ / Zo! Permittee Name and Title (type or print) SatSfatj of P ittee Date