Loading...
HomeMy WebLinkAboutBUNCO-2019-010_NOV_20190114 t.gt STATEo> i � y ROY COOPER l Governor MICHAELS.REGAN � .' Secretary +- WILLIAM E.(TOBY)VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality Date 14 January 2019 CERTIFIED MAIL 7017 2620 0000 9759 0324 i RETURN RECEIPT REQUESTED i I Mr. Vladimir Grebenyuk 21 Westmont Dr. Asheville,N.C. 28806-5100 RE: NOTICE OF VIOLATION Construction Stormwater General Permit-NCGO10000 Project Name: Grading Improvements for Vladmir Grebenyuk Project ID: BUNCO-2019-010 Buncombe County Compliance Deadlines: 15 days from receipt by certified mail for Construction Stormwater Permit NCG 010000 violations Dear Mr. Grebenyuk: On January 11, 2019, personnel of this office inspected a project located on US 19/23 Smokey Park Highway, PIN# 8687.53.7567, 8687.63.1693, Asheville in Buncombe, County, North Carolina. This inspection was performed to determine compliance with the National Pollutant Discharge Elimination System (NPDES) for Stormwater Discharges. The inspection revealed a land-disturbing activity of approximately 3.2 acres being conducted. I, A Construction Stormwater General Permit-NCGO10000 is issued upon the approval of an Erosion and II Sedimentation Control Plan. This permit applies to projects that receive a Division of Energy, Mineral and Land Resources, or delegated local program, Erosion and Sedimentation Control Plan Approval Letter for land disturbance of 1 acre or greater. Specifically,the General Permit(NCGO10000)authorizes the discharge of stormwater under the National Pollutant Discharge Elimination System (NPDES) in accordance with Title 15A North Carolina Administrative Code 2H .0100. I p' As a result of the inspection, the following violations are noted: l Item I Staff with the Division of Energy, Mineral and Land Resources, Land Quality Section j; determined during their inspection that the site was in violation for failure to follow approved plan. This represents a violation of Section III, Item 3) of the NCG010000 F General Permit, which states in part: "The Permittee must implement and follow the E&SC Plan, which has been approved by Division of Land Resources or local delegated program." _ North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 828.296.4500 Mr.Vladimir Grebenyuk January 14, 2018 Item II Staff with the Division of Energy, Mineral and Land Resources, Land Quality Section determined during their inspection that the site was in violation for failure to maintain erosion control measures. This represents a violation of Section III, Item 4) of the NCGO10000 General Permit,which states in part:"...the permittee must...implement and maintain best management practices (BMPs) and control measures..." { Item III Records of daily rainfall data could not be provided for review as requested. This represents a violation of Section ILB,Item 3)b)of the NCGO10000 General Permit,which states in part: "A written record of the daily rainfall amounts shall be retained and all records shall be made available...upon request." Item IV Records of inspections of erosion and sediment control measures and observations of stormwater outfall discharges could not be provided for review.This represents a violation of Section II.B., Item 3)e) and Item 3)d) of the NCGO10000 General Permit, which states j in part: "Erosion and sedimentation control measures shall be inspected to ensure that they ll are operating correctly. Inspection records must be maintained for each inspection event and for each measure." and"...stormwater runoff discharge outfalls shall be inspected by observation...at least once every seven calendar days and within 24 hours after any storm event greater than 0.50 inches of rain per 24 hour period." Requested Response: You are asked to respond to this office, in writing,within 15 calendar days from receipt of this notice. Your written response should include an explanation as to the cause of the aforementioned violations. Please explain in your response the date by which the above items have been or will be completed and how you propose to prevent these violations from recurring on this project and on any future projects. Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly resolved. These violations and any future violations are subject to a civil penalty assessment of up to$25,000 per day for each violation. Should you have any questions regarding these matters,please contact Michael Smith or me (828)296-4500. Sincerely, tanley E. Aike .Gn Regional Engin er Land Quality Section Enclosure: Inspection Report Mr.Vladimir Grebenyuk January 14, 2018 ec: Annette Lucas,PE, Stormwater Program Supervisor, (annette.lucas@ncdenr.gov) Doug Sharp, Erosion Control Officer, (doug.sharp@buncombe county.org) Zan Price, PE, Assistant Regional Supervisor Water Quality Regional Operations Section (zan.price@ncdenr.gov). 1 J i II 1 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources 2090 US Highway 70, Swannanoa,NC 28778 (828)296-4500 _i County: Buncombe Project: Grading Improvements for Valdimir River basin: French Broad Person financially responsible:Vladimir Grebenyuk Project#: BUNCO-2019-010 Address: 21 Westmont Dr.,Asheville,N.C.28806 1. Project Location: US 19/23 Stookey Park Highway,Asheville N.C.PIN#8687.53.7567,8687.63.1693 Pictures: Yes-Digital �I2. Weather and soil conditions: Clear,sunny,41 degrees F,workable soils Initial inspection: Yes 3. Is site currently under notice of violation? Yes 4. Is the site in compliance with S.P.C.A.and rules? No If no,check violations below: 1 5. Violations: ✓ o. Failure to maintain rain gauge or record daily rainfall,NCG 010000 Sec.II,B.1(a,b) ✓ p. Failure to meet self-inspection and reporting requirements,NCG 010000 Sec.II,B.1(c-i) ✓ s. Failure to install and maintain BMP's,NCG 010000 Sec.III,4 ✓ I. Failure to operate and maintain control measures,NCG 010000 Sec.IV, 1 6. Is the site in compliance with the NPDES Permit? No Describe: Failure to maintain self-inspection reports. Failure to maintain a range gage on site. Failure to maintain erosion and sediment control measures. 7. Has sedimentation damage occurred since last inspection? Yes If Yes,where? (check all that apply) ✓ Lake/Natural watercourse off the tract Description: Sediment deposition off tract in the UT of George Branch,stream classification C. 1 Degree of damage: Severe 8. Contact made with(name): Vladimir Grebenyuk Title: Developer Inspection report: Sent Report Date given/sent: Sent with NOV 9. Corrective action needed: 1 Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage. 2 Provide adequate temporary or permanent ground cover on areas where land-disturbing activity has ceased in 7 or 14 days according to NCG 010000 permit. 3 Inspect all erosion and sedimentation control measures and storm discharge outfalls at least weekly and within 24 hours of a rainfall event of%:inch or greater and complete self-monitoring reports. 4. Maintain a rain gauge in good working order and record daily rainfall amounts. 1 5 Provide a copy of the approved sedimentation and erosion control plan and NPDES permit on site. 10. Comments: On Friday, 11 January 2019,this site was inspected for NPDES compliance. No self-inspection reports were available on-site. Additionally,the rain gauge was just being installed on-site at the time of inspection. Sedimentation was observed off-site in the unnamed tributary of George Branch. i Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources 2090 US Highway 70, Swannanoa,NC 28778 (828) 296-4500 Reported by: Michael Smith Date of inspection: January 11,2019 Time arriving on site: 12:00 PM Time leaving site: 1:30 PM I j