Loading...
HomeMy WebLinkAbout20181478 Ver 1_Withdrawl Request_20181212Wojoski, Paul A From: Becky Ward <bward@wce-corp.com> Sent: Monday, January 21, 2019 12:44 PM To: Wojoski, Paul A Cc: 'Jim Middleton' Subject: [External] Underwood Dam Breach DWR#18-1478 or open attachments unless you verified. Send all suspicious email as an �w_ Paul: After discussions with all of the permitting agencies and the delays anticipated in obtaining Dam Safety approval for the breach, the owner would like to proceed with dewatering the pond as the first phase of the project to allow as much of the existing pond to stabilize with vegetation as possible prior to the breach being made. Therefore we are currently working on a revised set of plans to show only the dewatering operations. We would like to withdraw the current PCN application DWR#18-1478. We will be re -submitting the application in the near future to reflect only this first phase. In the future prior to the breach we will be submitting another PCN that will include the impacts for the breach work as the second phase of the project. The dewatered pond area will be re-evaluated at that time to determine the conditions after dewatering and impacts as a part of the phase II submittal. Thank you, Becky L. Ward, P.E. Ward Consulting Engineers, P.C. 4805 Green Road, Suite 100 Raleigh, NC 27616-2848 Ph: 919-870-0526 email: bward(a wce-cora.com