Loading...
HomeMy WebLinkAboutNC0029122_Emails_20180129Strickland, Bev From: Weaver, Charles Sent: Monday, January 29, 2018 3:03 PM To: Tharrington, Tom Subject: RE: [External] South Wharf Lagoon Closure Tom —what you've given me is all I need. I'll rescind the permit. CHW From: Tharrington, Tom Sent: Monday, January 29, 2018 2:45 PM To: Weaver, Charles Subject: FW: [External] South Wharf Lagoon Closure Hey Charles, In case you want to see the closure report here it is. The Wilmington Regional Office agrees that they should move forward with a rescission request. From: Donavon Pullen [mailto:dpullen@zapatainc.com] Sent: Wednesday, November 08, 2017 6:05 PM To: Tharrington, Tom <tom.tharrington@ncdenr.gov> Cc: Paul Wiles <pwiles@trendinc.biz>; Jason Manning <Jason.b.manning@usace.army.mil>; Keith Ranker <Keith.A.Ranker@usace.army.mil>; Geoly, Shannon L CIV USARMY CESAW (US) <Shannon.L.Geoly@usace.army.mil>; david.m.vonkolnitz.ctr@mail. mi l; ydeese@trendinc.biz; Brant Blackburn <b.blackburn@trendinc.biz>; Shane Smith <ssmith@zapatainc.com> Subject: Re: [External] South Wharf Lagoon Closure CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Tom, Please find the attached South Wharf Lagoon Closure Letter. Let me know if you have any questions or concerns. Regards, Donavon Pullen, EIT Civil Engineer ZAPATA (704) 358-8240 office On Wed, Nov 8, 2017 at 4:50 PM, Tharrington, Tom <tom.tharrington@ncdenr.gov> wrote: Email will be fine 1 From: Donavon Pullen [mailto:dpullen@zapatainc.com] Sent: Wednesday, November 08, 2017 4:05 PM To: Tharrington, Tom <tom.tharrington@ncdenr.gov> Subject: Re: [External] South Wharf Lagoon Closure CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Good afternoon Tom, We have completed the draft lagoon closure letter. With that said, do you prefer to have an emailed electronic version or do we need to submit a hard copy? Regards, Donavon Pullen, EIT Civil Engineer ZAPATA (704) 358-8240 On Wed, Nov 1, 2017 at 1:10 PM, Donavon Pullen <dpullen@zapatainc.com> wrote: Thanks Tom. We should have something to you by the end of next week. Regards, Donavon Pullen, EIT Civil Engineer ZAPATA (704) 358-8240 office On Tue, Oct 31, 2017 at 1:42 PM, Tharrington, Tom <tom.tharrington@ncdenr.gov> wrote: Hi Donovan, just a bullet list of the actions taken and include a table of sampling activities and results. Any photos that show various stages of the clean out also. I'm just looking for a brief recap of the activities, nothing elaborate. have been compiling information as we have been going along but I would like a final report document for the file. From: Donavon Pullen [mailto:dpullen@zapatainc.com] Sent: Tuesday, October 31, 2017 9:32 AM To: Tharrington, Tom <tom.tharrington@ncdenr.gov> Subject: [External] South Wharf Lagoon Closure CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Good morning Tom, I'm Donavon Pullen with ZAPATA Engineering, the design consultant assisting Trend Construction with the South Wharf Lagoon Closure within MOTSU at Southport, NC. With the direction stated below to continue the closure operation, we wanted to verify the final certification closure process. we understand that we need to provide the following items within the engineers certification per Item I of the NCDEQ Lagoon Closure Guidelines: 1. Letter by the overseeing P.E. stating the actions were in accordance with the approved plan . Are we required to provide the exact milestone dates associated with all actions taken? How detailed does this letter need to be in regards to how Trend installed according to ZAPATA's design plans? 2. For wastewater disposal, submit a copy of the monitoring report that documents lagoon wastewater disposal activities, certified by the facility ORC. 3. For sludge disposal, submit a copy of the records documenting lagoon sludge disposal. 4. Sampling results from any post -closure sampling conducted at the facility to document proper removal of sludge in accordance with the approved closure plan shall be submitted. 5. Photos of closure activities documenting conditions prior to initiating closure and closure activities. Thanks for any help in advance. Regards, Donavon Pullen, EIT Civil Engineer ZAPATA (704) 358-8240 office