HomeMy WebLinkAboutNeilson WTP Modernization - 6 - DrawingsCONSTRUCTION DRAWINGS TABLE OF
CONTENTS
Neilson Water Treatment Plant
Modernization
1 Cover Sheet
2 G-00-004 – Legend
3 G-00-005 – Abbreviations and Designations
4 G-00-105 – Existing Site Survey
5 D-00-102 – Demolition Partial Site Plan 1 of 3
6 D-00-103 – Demolition Partial Site Plan 2 of 3
7 D-00-104 – Demolition Partial Site Plan 3 of 3
8 C-00-001 – Overall Site Plan
9 C-01-001 – Staking, Grading, Paving, & Erosion Control Partial Site Plan 1 of 3
10 C-01-002 – Staking, Grading, Paving, & Erosion Control Partial Site Plan 2 of 3
11 C-01-003 – Staking, Grading, Paving, & Erosion Control Partial Site Plan 3 of 3
12 C-02-001 – Yard Piping Partial Site Plan 1 of 3
13 C-02-002 – Yard Piping Partial Site Plan 2 of 3
14 C-02-003 – Yard Piping Partial Site Plan 3 of 3
15 C-02-801 – Yard Piping Profiles 1 of 3
16 C-02-802 – Yard Piping Profiles 2 of 3
17 C-02-803 – Yard Piping Profiles 3 of 3
18 C-99-501 – Miscellaneous Yard Details 1 of 4
19 C-99-502 – Miscellaneous Yard Details 2 of 4
20 C-99-503 – Miscellaneous Yard Details 3 of 4
21 C-99-504 – Miscellaneous Yard Details 4 of 4
22 C-99-507 – Erosion Control Details 1 of 3
23 C-99-508 – Erosion Control Details s of 3
24 C-99-509 – Erosion Control Details 3 of 3
25 S-45-101 – Neilson ¾ Electrical Building Plans
26 S-50-102 – Backwash Supply Valve Vault Plan and Section
27 S-50-103 – Plant Effluent Collection Box
28 S-60-101 – Residuals Lagoon Plan and Sections
29 S-65-101 – Wash Water Equalization Basin Plan and Sections
30 S-65-103 – Wash Water Clarifier Plan and Sections
31 S-65-104 – Residuals Electrical Building Plan and Sections
32 S-80-101 – Switchgear Foundation Top Plan
33 M-50-102 – Backwash Supply Tank Plan