Loading...
HomeMy WebLinkAbout20151256 Ver 3_More info requested_20190115Strickland, Bev From: Homewood, Sue Sent: Tuesday, January 15, 2019 12:39 PM To: 'Dalton Cook' Cc: Gibby, Jean B CIV USARMY CESAW (US) Subject: Hodge Rd Business Park Dalton, I have reviewed the application and have a few items that need to be addressed before I can draft up the Certification: 1. The application document contradicts itself with regards to impacts to the buffers. The Alternative Site Plans (page 11) and Figure 1 state and show that the preferred alternative includes impacts to both Zone 1 and Zone 2. But in other locations within the document it is indicated that the project has been redesigned to avoid all impacts to buffers. Please go back through the document and provide consistency throughout. 2. With regards to the stormwater ponds, I understand that those are reviewed and approved by the local government, however most ponds are designed with discharge pipes/channels and these often require impacts to the buffers. Please show enough detail on the ponds to show the outlet means/locations and if necessary modify the application to include a Buffer Authorization application for any impacts from stormwater discharges through the adjacent buffers. 3. The email from Restoration Systems confirming available wetland credits does not indicate any date it was sent. Please provide some indication that credits are currently available. Also please note that DWR will require all wetland mitigation to be secured prior to any impacts unless a phased mitigation plan is clearly proposed by the applicant. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.