Loading...
HomeMy WebLinkAboutNC0004685_Inspection_20190111 CIO# wqr ROY COOPER Governor MICHAEL S.REGAN Secretary LINDA CULPEPPER µ ++ ' Director NORTH CAROLINA Enivii anmertfal Qrso111y 14 January 2019 Mr.Todd Douthit, Manufacturing Manager Nippon Electric Glass 940 Washburn Switch Road Shelby, NC 28150 Subject: Compliance Sampling Inspection NEG Industries/Shelby Facility NPDES Permit No. NC0004685 Cleveland County Dear Mr. Douthit: Enclosed is a copy of the Compliance Sampling Inspection for the inspection conducted at the subject facility on January 9, 2019 by Ori Tuvia and Tony Parker. Richard Young's, Guy O'Connor's and John Littlejohn's cooperation during the site visit was much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed report. At the time of the inspection split samples for Oil and Grease,TSS, Metals (Zinc, Copper and Lead) were taken. The results will be forwarded to you via separate correspondence. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Ori Tuvia at(704) 235-2190, or at ori.tuvia@ncdenr.gov Sincerely, DocuSigned by: A14CC681 AF27425... W. Corey Basinger Regional Supervisor Mooresville Regional Office Division of Water Resources cc: NPDES, MRO files (Laserfiche) e-_�D_F.Q5 4�� - __11%._%%.F__1r01 State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1 610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115 704 663 1699 United States Environmental Protection Agency Form Approved. EPA Washington,D.C.20460 OMB No.2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding(i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN I 2 15 I 3 I NC0004685 111 12 I 19/01/09 I17 18 LC]I 19 I G I 20I 211 1 I 1 I I I I I I I I I I I 1 1 I 1 1 I I I I I I I I I I I I I I I I I I I I 1 f6 Inspection Work Days Facility Self-Monitoring Evaluation Rating 131 QA ----------------------Reserved------------------- 67 1.0 70 71 [„ I 72 n 73 L_LJ74 751 I I I I I I I80 u Section B: Facility Data u Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES oermit Number) 08:05AM 19/01/09 14/05/01 Electric Glass Fiber America LLC 940 Washburn Switch Rd Exit Time/Date Permit Expiration Date Shelby NC 28150 10:20AM 19/01/09 18/08/31 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Guy Peter O'Connor/ORC/704-434-2261/ Name,Address of Responsible Official/Title/Phone and Fax Number Contacted Richard M Young,940 Washburn Switch Rd Shelby NC 28150//704-434-2261/7044340792 No Section C:Areas Evaluated During Inspection(Check only those areas evaluated) Permit Flow Measurement Operations&Maintenance Records/Reports Self-Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Ori A Tuvia --ci MRO WQ//704-663-1699/ 1/14/2019 cc FMM0r7A')nr-Q17AQQ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date W. Corey Basinger Division of Water Quality//704-2; EPA Form 3560-3(Rev 9-94)Previous editions are obsolete. DocuSigned by: eyl 1/14/2019 AtaccsatAFz�azs... Page# 1 NPDES yr/mo/day Inspection Type 1 31 NC0004685 I11 121 19/01/09 11 7 18 I S Section D:Summary of Finding/Comments(Attach additional sheetsof narrative and checklists as necessary) Complaince Sampling Inspection. Split samples for Oil and Grease, TSS, Metals (Zinc, Copper and Lead) Page# 2 Permit: NC0004685 Owner-Facility: Electric Glass Fiber America LLC Inspection Date: 01/09/2019 Inspection Type: Compliance Sampling Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ #Are there any special conditions for the permit? ❑ 0 ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The subject permit expired on 8/31/2018, a permit renewal application was sent. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years(lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain-of-custody complete? 0 ❑ ❑ ❑ Dates,times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported CM Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? 0 ❑ ❑ ❑ Comment: The records reviewed during the inspection were organized and well maintained. DMR's, COC's ORC logs, calibration logs and Process control logs were received for the period of July 2018-Sept 2018. Laboratory Yes No NA NE Page# 3 Permit: NC0004685 Owner-Facility: Electric Glass Fiber America LLC Inspection Date: 01/09/2019 Inspection Type: Compliance Sampling Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters)performed by a certified lab? 0 ❑ ❑ ❑ #Is the facility using a contract lab? 0 ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0.2 degrees? ❑ ❑ 0 ❑ Incubator(BOD)set to 20.0 degrees Celsius+/- 1.0 degrees? ❑ ❑ 0 ❑ Comment: On-site field analyses (conductivity, DO, pH and temperature) are performed under NEG's laboratory certification#5489. Pace Analytical Services, Inc. (BOD. TSS, fluoride, ammonia, nutrients, Oil &grease, metals)and R&A Laboratories, Inc. (Toxicity) have also been contracted to provide analytical support. The laboratory instrumentation used for field analysis appeared to be properly calibrated and well documented. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Is the facility sampling performed as required by the permit(frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: The subject permit requires effluent composite and grab samples. Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit(frequency, sampling type, and 0 ❑ ❑ ❑ sampling location)? Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters,for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Page# 4 Permit: NC0004685 Owner-Facility: Electric Glass Fiber America LLC Inspection Date: 01/09/2019 Inspection Type: Compliance Sampling Operations & Maintenance Yes No NA NE Comment: The facility appeared to be properly and well maintained. The operations staff incorporate comprehensive process control program with all measurements being properly documented and maintained on-site. The facility is equipped with computer/alarm notification system to assist the wastewater staff in the operation of the treatment units/processes. The surge retention pond at the influent of the plant appeared to have accesses vegetation growth and need to be cleared. Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical ❑ Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? ❑ ❑ ❑ Comment: Equalization Basins Yes No NA NE Is the basin aerated? ❑ ❑ 0 ❑ Is the basin free of bypass lines or structures to the natural environment? 0 ❑ ❑ ❑ Is the basin free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Are audible and visual alarms operable? 0 ❑ ❑ ❑ #Is basin size/volume adequate? 0 ❑ ❑ ❑ Comment: Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Page# 5 Permit: NC0004685 Owner-Facility: Electric Glass Fiber America LLC Inspection Date: 01/09/2019 Inspection Type: Compliance Sampling Primary Clarifier Yes No NA NE Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/of the sidewall depth) 0 ❑ ❑ ❑ Comment: Both primaries were operational and in service. Chemical Feed Yes No NA NE Is containment adequate? 0 ❑ ❑ ❑ Is storage adequate? 0 ❑ ❑ ❑ Are backup pumps available? E ❑ ❑ ❑ Is the site free of excessive leaking? 0 ❑ ❑ ❑ Comment: Chemical additions to selected treatment processes include the following: plymers, bentonite/clay mixture, ferric chloride, aluminum, lime and defoamer. Aeration Basins Yes No NA NE Mode of operation Ext.Air Type of aeration system Diffused Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? 0 ❑ ❑ ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25%of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) ❑ ❑ 0 ❑ Comment: The facility uses two aeration basins operated in series. The first aeration tank is equipped with diffused and mechanical aeration and the second aeration tank is equipped with diffused aeration. Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Page# 6 Permit: NC0004685 Owner-Facility: Electric Glass Fiber America LLC Inspection Date: 01/09/2019 Inspection Type: Compliance Sampling Secondary Clarifier Yes No NA NE Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) 0 ❑ ❑ ❑ Comment: Two out of the three secondary clarifiers were operational and in service at the time of the inspection. The third clarifier was not used due to low flow. Pumps-RAS-WAS Yes No NA NE Are pumps in place? N ❑ ❑ ❑ Are pumps operational? 0 ❑ ❑ ❑ Are there adequate spare parts and supplies on site? 0 ❑ ❑ ❑ Comment: Filtration (High Rate Tertiary) Yes No NA NE Type of operation: Is the filter media present? 0 ❑ ❑ ❑ Is the filter surface free of clogging? ❑ ❑ ❑ Is the filter free of growth? ❑ ❑ ❑ Is the air scour operational? ❑ ❑ 0 ❑ Is the scouring acceptable? ❑ ❑ ❑ Is the clear well free of excessive solids and filter media? ❑ ❑ 0 ❑ Comment: The facility is equipped with a traveling bridge tertiary filter. The filter backwash is returned to the head of the wastewater plant. Flow Measurement- Effluent Yes No NA NE #Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? 0 ❑ ❑ ❑ Comment: The flow meter is calibrated/verified regularly. Last calibrated on 8/20/2018 by Clear Water Inc. Effluent Pipe Yes No NA NE Page# 7 Permit: NC0004685 Owner-Facility: Electric Glass Fiber America LLC Inspection Date: 01/09/2019 Inspection Type: Compliance Sampling Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ 0 ❑ Comment: At the time of the inspection effluent from outfalls 001 and 002 appeared clear with no discoloring. Solids Handling Equipment Yes No NA NE Is the equipment operational? 0 ❑ ❑ ❑ Is the chemical feed equipment operational? 0 ❑ ❑ ❑ Is storage adequate? 0 ❑ ❑ ❑ Is the site free of high level of solids in filtrate from filter presses or vacuum filters? 0 ❑ ❑ ❑ Is the site free of sludge buildup on belts and/or rollers of filter press? 0 ❑ ❑ ❑ Is the site free of excessive moisture in belt filter press sludge cake? ❑ ❑ ❑ The facility has an approved sludge management plan? ❑ ❑ 0 ❑ Comment: Thickened sludge is dewatered on a belt press. Dewatered solids are transported to the county landfill for final disposal by waste pros. Page# 8 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Mr. Todd Douthit, Manufacturing Manager Nippon Electric Glass 940 Washburn Switch Road Shelby, NC 28150 Dear Mr. Douthit: NORTH CAROL INA Enrtronmerrfal griorrly February 22, 2019 Subject: Compliance Sampling Inspection NEG Industries/Shelby Facility NPDES Permit No. NC0004685 Cleveland County Enclosed is a copy of the laboratory results for the effluent samples collected during the Compliance Sampling Inspection performed at the subject facility on January 9, 2019 by Ori Tuvia. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed report. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia&ncdenr.gov. cc: NPDES, MRO files (Laserfiche) Sincerely, DocuSigned by: BB057A2DE017498... Ori Tuvia, Environmental Engineer Mooresville Regional Office Division of Water Resources, DEQ D� E State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699 AC58583 Nol-th Carolina Dhision of Water Resources Water Sciences Sectioti Laboratory Results Lac. Deacr.: MC0O04655 County Cleveland Collector: OTUVIA MsitlD Region: Mooresville Report To MRO Location ID: MRO NLC River Basin Collect Date: 0VOW2019 Priority RDUTINE Emergency Collect T ime: 08:24 Sample Matrix: 5U R FAC E WATER COC Yea1No Yea Sample Depth Loc. Type: Other Final Report tf this report is labeled preliminary report, the results have nor beery validated. Do not use for Regulatory purposes. Resultl Method Analysis Units CAS # AnalVte Name PQL Qualifier Reference Date Validated by LAB Sample temperature at receipt by lab 2.2 C 1110119 MSWIFT WET Residue —Suspended in liquid 6.2 6.2 U mgiL SM 2540 D-1997 1115M9 CGREEN MET Cu by ICPMS 2.0 2.4 ugrL EPA 200.8Rev5.4 215119 ESTAFFORD1 Pb by ICPMS 2.0 2.0 U ug4- EPA 200.3Rev5.4 2i5119 ESTAFFORD1 Zn by ICPMS 10 10 U ugrL EPA 200.8Rev5.4 215119 ESTAFFORD1 AC58584 Noith Carolina Division of Water Resources Water Sciences Section LaboratW Results Loc. Descr.: NCO004685 County: Cleveland Collector: O TUVIA Visi[ID Region: Mooresville Report To MRO Location ID: MRO NLC River Basin Collect Date: 0110912019 Priority ROUTINE Emergency Collect Time: 08_24 Sample Matrix: SURFACEWATER COC YeslNo Yes Sample Depth Lac. Type: Other Final Report If this report is labeled preliminary report; the results have not been validated. Do not cis for Regulatory purposes. Result! Units Method Analysis CAS t Analyte Name PQL qualifier Reference Date Validated by LAB Sample temperature at receipt by lab 2.2 1110119 MSWIFT WET Grease and ail in liquid 10 10 U mglL EPA 1664 B 1125/19 CGREEN