HomeMy WebLinkAbout20180263 Ver 1_Frena proposed major change_20190114From:
Renaldi, Ronald
To:
Scarbrauah. Anthony
Subject:
FW: [External] Frena proposed major change (LAMA MP#104-18)
Date:
Monday, January 14, 2019 3:31:19 PM
Attachments:
imaae003.onno
Scan0011.pdf
imaae004.onno
Anthony,
I have a request for a change to the Frena CAMA Major Permit (#104-18) at 121 S Dogwood
Trl., Southern Shores. Check out the attached proposed revision and my short explanation
below of what's going on. Will this change require a revision to your General Certification?
Ron Renaldi
Field Representative
NC Division of Coastal Management
NC Department of Environmental Quality
Ronald. Renaldi&ncdenr.gov
(252)264-3901 Ext. 237
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
N, Z-1.
N lothing Compares,.,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Bodnar, Gregg
Sent: Monday, January 14, 2019 3:23 PM
To: Renaldi, Ronald <ronald.renaldi@ncdenr.gov>
Subject: RE: [External] Frena proposed major change (MP#104-18)
I would give DWR a call and confirm that the revision would not cause a need to change the General
Certification. If it would not trigger a certification revision then the refinement should work. If it
does then will need to modify.
Gregg
From: Renaldi, Ronald
Sent: Monday, January 14, 2019 2:40 PM
To: Bodnar, Gregg <gregg.bodnar(@ncdenr.gov>
Subject: RE: [External] Frena proposed major change (MP#104-18)
The dredge footprint cannot be changed since it has already been done. This change came
about because a local ordinance prohibits two docks on a property.... Long story short,
contractor goes to get building permit and mentions they are not doing the roof over the lift
right now (possibly not at all). This completely changes how the Town looks at the basin docks
since there isn't a roof. With roof, the docks are considered part of the boathouse, no roof
equals separate docks and they have to choose one or the other. Slide the docks together,
Town is good and considers them one single dock.
Ron Renaldi
Field Representative
NC Division of Coastal Management
NC Department of Environmental Quality
Ronaid.Renaidi@ncdenr.gov
(252)264-3901 Ext. 237
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
h 1 0'.
-5'Nothing Compares ---%,
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Bodnar, Gregg
Sent: Monday, January 14, 2019 2:33 PM
To: Renaldi, Ronald <ronald.renaldi(a ncdenr.gov>
Cc: Jennings, Frank <frank.jennings(@ncdenr.gov>
Subject: RE: [External] Frena proposed major change (MP#104-18)
Afternoon Ron,
Would the dredge footprint also be reduced? Considering the shape of the footprint was to
accommodate the 2nd dock. The revised drawing does not show the northern section of the
footprint.
Gregg
From: Renaldi, Ronald
Sent: Monday, January 14, 2019 1:31 PM
To: Bodnar, Gregg <gregg.bodnar(@ncdenr.gov>
Cc: Jennings, Frank <frank.iennings(@ncdenr.gov>
Subject: FW: [External] Frena proposed major change (MP#104-18)
G regg,
I have a modification request (attached) for the Frena Major. What they are proposing is to
slide the 32' dock from the north side of the property to the south side connecting it to the
authorized dock at the basin for one continuous one. It will remain 32'x4', but it will instead
only be 2' over the water instead of the authorized 4'.
Are you all right with this being a refinement since it is a reduction of shading and a 15' waiver
is not required?
Ron Renaldi
Field Representative
NC Division of Coastal Management
NC Department of Environmental Quality
Ronald. RenaldiQncdenr.gov
(252)264-3901 Ext. 237
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
N`Z.— 1Vothing Compares
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Kevin Lineberger <millstonemarine(@gmail.com>
Sent: Monday, January 14, 2019 1:02 PM
To: Renaldi, Ronald <ronald.renaldi(@ncdenr.gov>
Subject: [External] Frena proposed major change
• xternal email
achment to report.spam(@nc.gov
Ron please see the attached request
Kevin
r tNiILLSTONE MARINE
7000 Maritime Woods Drive • Montea N C 27934
January 14th, 2019
Ron Renaldi
NCDEQ Division of Coastal Management
Elizabeth City, N.C.
Reference: Request for Major Permit Change for Mark and Anita Frena
Mr. Renaldi:
The Frena's would like to make a sleight change to the dock alignment on their major
permit. Please review and let me know how we can make this happen
Pro iect Narrative
The Frena's went through the major permit process in order to bulkhead a previously un
stabilized section of shoreline and dredge a small boat basin to install a boat lift and
docking facility. That major permit has been issued.
Due to a zoning conflict that was overlooked with The Town of Southern Shores we are
not able to pull a building permit to construct the elements contained in the Cama Major
Permit. The Town has an ordinance that specifically prohibits having two docks on one
subdivided lot.
In order to comply with the Town's rules and regulations we propose to relocate the dock
down to and connect to the dock containing the boatlift.
Impacts
The only impact is a positive one due to the alignment of the dock containing the lift the
shaded area of the relocated dock is decreased by approximately 64 square feet. Please
see the attached permit drawing changes.
Hopefully this is something that can be done administratively. Please let me know what
steps you would like us to take in trying to remedy the situation with the Town conflict
Ha
e erger -
Estimator
Millstone Marine Construction, Inc.
252-202-2678 cell
Phone (252) 305-8842 + Fox(252)305-8259 9 E-mail: millstonemorine@gmail.com
b
w M >(A
w' X X Y
".@ /�� 0
;µms
X XO ��0� 0m
Ul oy �? 0 mR0a) IM Xrr-
(r a (n 'T' CD rn n 0
I O m C --i I x� C�
1
Z 0
x o0 0°� x�
m — 0-% m
D
z
1W
FTI
C)
Z D
D
2a
O
W
c
,r,
x
U)
m
O
m
m
a
o
z
v
b
w M >(A
w' X X Y
".@ /�� 0
;µms
X XO ��0� 0m
Ul oy �? 0 mR0a) IM Xrr-
(r a (n 'T' CD rn n 0
I O m C --i I x� C�
1
Z 0
x o0 0°� x�
m — 0-% m
D
z
1W
FTI
C)
Z D