Loading...
HomeMy WebLinkAbout20180263 Ver 1_Frena proposed major change_20190114From: Renaldi, Ronald To: Scarbrauah. Anthony Subject: FW: [External] Frena proposed major change (LAMA MP#104-18) Date: Monday, January 14, 2019 3:31:19 PM Attachments: imaae003.onno Scan0011.pdf imaae004.onno Anthony, I have a request for a change to the Frena CAMA Major Permit (#104-18) at 121 S Dogwood Trl., Southern Shores. Check out the attached proposed revision and my short explanation below of what's going on. Will this change require a revision to your General Certification? Ron Renaldi Field Representative NC Division of Coastal Management NC Department of Environmental Quality Ronald. Renaldi&ncdenr.gov (252)264-3901 Ext. 237 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 N, Z-1. N lothing Compares,., Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bodnar, Gregg Sent: Monday, January 14, 2019 3:23 PM To: Renaldi, Ronald <ronald.renaldi@ncdenr.gov> Subject: RE: [External] Frena proposed major change (MP#104-18) I would give DWR a call and confirm that the revision would not cause a need to change the General Certification. If it would not trigger a certification revision then the refinement should work. If it does then will need to modify. Gregg From: Renaldi, Ronald Sent: Monday, January 14, 2019 2:40 PM To: Bodnar, Gregg <gregg.bodnar(@ncdenr.gov> Subject: RE: [External] Frena proposed major change (MP#104-18) The dredge footprint cannot be changed since it has already been done. This change came about because a local ordinance prohibits two docks on a property.... Long story short, contractor goes to get building permit and mentions they are not doing the roof over the lift right now (possibly not at all). This completely changes how the Town looks at the basin docks since there isn't a roof. With roof, the docks are considered part of the boathouse, no roof equals separate docks and they have to choose one or the other. Slide the docks together, Town is good and considers them one single dock. Ron Renaldi Field Representative NC Division of Coastal Management NC Department of Environmental Quality Ronaid.Renaidi@ncdenr.gov (252)264-3901 Ext. 237 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 h 1 0'. -5'Nothing Compares ---%, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bodnar, Gregg Sent: Monday, January 14, 2019 2:33 PM To: Renaldi, Ronald <ronald.renaldi(a ncdenr.gov> Cc: Jennings, Frank <frank.jennings(@ncdenr.gov> Subject: RE: [External] Frena proposed major change (MP#104-18) Afternoon Ron, Would the dredge footprint also be reduced? Considering the shape of the footprint was to accommodate the 2nd dock. The revised drawing does not show the northern section of the footprint. Gregg From: Renaldi, Ronald Sent: Monday, January 14, 2019 1:31 PM To: Bodnar, Gregg <gregg.bodnar(@ncdenr.gov> Cc: Jennings, Frank <frank.iennings(@ncdenr.gov> Subject: FW: [External] Frena proposed major change (MP#104-18) G regg, I have a modification request (attached) for the Frena Major. What they are proposing is to slide the 32' dock from the north side of the property to the south side connecting it to the authorized dock at the basin for one continuous one. It will remain 32'x4', but it will instead only be 2' over the water instead of the authorized 4'. Are you all right with this being a refinement since it is a reduction of shading and a 15' waiver is not required? Ron Renaldi Field Representative NC Division of Coastal Management NC Department of Environmental Quality Ronald. RenaldiQncdenr.gov (252)264-3901 Ext. 237 401 S. Griffin St., Ste 300 Elizabeth City, NC 27909 N`Z.— 1Vothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kevin Lineberger <millstonemarine(@gmail.com> Sent: Monday, January 14, 2019 1:02 PM To: Renaldi, Ronald <ronald.renaldi(@ncdenr.gov> Subject: [External] Frena proposed major change • xternal email achment to report.spam(@nc.gov Ron please see the attached request Kevin r tNiILLSTONE MARINE 7000 Maritime Woods Drive • Montea N C 27934 January 14th, 2019 Ron Renaldi NCDEQ Division of Coastal Management Elizabeth City, N.C. Reference: Request for Major Permit Change for Mark and Anita Frena Mr. Renaldi: The Frena's would like to make a sleight change to the dock alignment on their major permit. Please review and let me know how we can make this happen Pro iect Narrative The Frena's went through the major permit process in order to bulkhead a previously un stabilized section of shoreline and dredge a small boat basin to install a boat lift and docking facility. That major permit has been issued. Due to a zoning conflict that was overlooked with The Town of Southern Shores we are not able to pull a building permit to construct the elements contained in the Cama Major Permit. The Town has an ordinance that specifically prohibits having two docks on one subdivided lot. In order to comply with the Town's rules and regulations we propose to relocate the dock down to and connect to the dock containing the boatlift. Impacts The only impact is a positive one due to the alignment of the dock containing the lift the shaded area of the relocated dock is decreased by approximately 64 square feet. Please see the attached permit drawing changes. Hopefully this is something that can be done administratively. Please let me know what steps you would like us to take in trying to remedy the situation with the Town conflict Ha e erger - Estimator Millstone Marine Construction, Inc. 252-202-2678 cell Phone (252) 305-8842 + Fox(252)305-8259 9 E-mail: millstonemorine@gmail.com b w M >(A w' X X Y ".@ /�� 0 ;µms X XO ��0� 0m Ul oy �? 0 mR0a) IM Xrr- (r a (n 'T' CD rn n 0 I O m C --i I x� C� 1 Z 0 x o0 0°� x� m — 0-% m D z 1W FTI C) Z D D 2a O W c ,r, x U) m O m m a o z v b w M >(A w' X X Y ".@ /�� 0 ;µms X XO ��0� 0m Ul oy �? 0 mR0a) IM Xrr- (r a (n 'T' CD rn n 0 I O m C --i I x� C� 1 Z 0 x o0 0°� x� m — 0-% m D z 1W FTI C) Z D