Loading...
HomeMy WebLinkAbout20180340 Ver 2_More Info Received_20190108Strickland, Bev From: Perry Isner < perry.isner@gmail.com > Sent: Tuesday, January 08, 2019 2:21 PM To: Johnson, Alan Subject: [External] Sylvan Creek sediment removal Attachments: 190108_SylvanCreek_sediment.removal.plan.pdf External email. Do not click links or open attachments unless you verified. Send all suspicious email as an attachment to report.spam@nc.gov Alan, see attached for our conceptual sediment removal plan for the Sylvan Creek dam repairs. Let me know if you have any questions, thanks! Perry Isner Wetlands & Waters, inc. 6018 Little Mountain Road Sherrills Ford, NC 28673 704.773.4239 Perry. isner(o-)-gmail.com 0 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for your cooperation and consideration. 1 lv,ti ' y� OVERALL PLAN - REPAIR AREA 0 30 60 120 SCALE: 1"=60' u u u u �I/ - L1 TYPICAL CROSS-SECTION VIEW LOOKING DOWNSTREAM 1 . ALL HEAVY EQUIPMENT TO BE ON EXISTING ROAD WHERE POSSIBLE, WITH EXCAVATED SEDIMENT TO BE PLACED ON ADJACENT HIGH GROUND. 2. CONSTRUCTION AREAS TO BE SEEDED AND STABILIZED WITH RYE AND STRAW MULCH FOLLOWING COMPLETION OF SEDIMENT REMOVAL ACTIVITIES. 3. CAUTIONARY MEASURES WILL BE EMPLOYED TO MINIMIZE DOWNSTREAM TURBIDITY. 4. No MORE CHANNEL WILL BE EXCAVATED IN A DAY THAN CAN BE STABILIZED, SEED AND STABILIZE SEDIMENT DEPOSITS ALONG BOTH BANKS EXPOSED NATIVE BED MATERIAL WETLANDS & .T. WATERS, INC. Figure 1: Concept Sediment Removal Plan DISPOSE OF EXCAVATED SEDIMENT IN ADJACENT HIGH GROUND \ '10� EXCAVATE ACCUMULATED SEDIMENT THROUGHOUT REACH FROM DAM OUTLET TO POINT -30' BELOW CULVERT