Alan, see attached for our conceptual sediment removal plan for the Sylvan Creek dam repairs.
Let me know if you have any questions, thanks!
Perry Isner
Wetlands & Waters, inc.
6018 Little Mountain Road
Sherrills Ford, NC 28673
704.773.4239
Perry. isner(o-)-gmail.com
0
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual
or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any
dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by
return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for
your cooperation and consideration.
1
lv,ti '
y�
OVERALL PLAN - REPAIR AREA
0 30 60 120
SCALE: 1"=60'
u u u u �I/
- L1
TYPICAL CROSS-SECTION VIEW LOOKING DOWNSTREAM
1 . ALL HEAVY EQUIPMENT TO BE ON EXISTING ROAD WHERE POSSIBLE, WITH EXCAVATED SEDIMENT TO
BE PLACED ON ADJACENT HIGH GROUND.
2. CONSTRUCTION AREAS TO BE SEEDED AND STABILIZED WITH RYE AND STRAW MULCH FOLLOWING
COMPLETION OF SEDIMENT REMOVAL ACTIVITIES.
3. CAUTIONARY MEASURES WILL BE EMPLOYED TO MINIMIZE DOWNSTREAM TURBIDITY.
4. No MORE CHANNEL WILL BE EXCAVATED IN A DAY THAN CAN BE STABILIZED,
SEED AND STABILIZE
SEDIMENT DEPOSITS
ALONG BOTH BANKS
EXPOSED NATIVE
BED MATERIAL
WETLANDS &
.T. WATERS, INC.
Figure 1: Concept Sediment
Removal Plan
DISPOSE OF EXCAVATED
SEDIMENT IN ADJACENT
HIGH GROUND
\ '10�
EXCAVATE ACCUMULATED
SEDIMENT THROUGHOUT
REACH FROM DAM
OUTLET TO POINT -30'