Loading...
HomeMy WebLinkAbout20070865 Ver 1_EEP Letters_20090610 07 - o8tn5 �.- w4� o-) CO stem PROGRAM INVOICE #5 June 10,2009 Adam Fischer City of Greensboro Dept.of Engineering 300 W.Washington Street Greensboro,NC 27402 Project: Isaacson Boulevard invoice expires:August 10,2009 County: Guilford D W Q#: 07-0865 COE#: 2007-01784-241 EEP#: ILF-2007-5268 Location: Cape Fear 03030002 You have elected to satisfy the compensatory mitigation requirements of the Section 401/404/CAMA permit(s)issued for the above referenced project through payment of a fee to the North Carolina Ecosystem Enhancement Program(NCEEP). In accordance with 15A NCAC 2H.0500,the amount you owe is based upon the 2008-09 Fee Schedule and has been calculated as follows(Please note: payment for wetlands is calculated in increments of 0.25 acres). If you have any questions concerning this payment,please call Kelly Williams at(919)716-1921. Habitat Type Invoiced Amount Fee Schedule Cost Stream 212 linear feet x $ 323.00 = $68,476.00 TOTAL AMOUNT DUE if paid within 60 days $68,476.00 If payment is not received within 60 days of the date of this invoice,it will expire. Note that your permit(s)may require payment before this date. Subsequent invoices will be based on the fee schedule in effect on the date they are issued. Please send a check payable to NCEEP for the Total Amount Due to the appropriate address below and enclose a copy of this invoice. US Mail: Physical Address(for other delivery services): NCDENR Ecosystem Enhancement Program NCDENR Ecosystem Enhancement Program 1652 Mail Service Center 2728 Capital Boulevard, Suite 1H 103 Raleigh,NC 27699-1652 Raleigh,NC 27604 Please note that a payment made to NCEEP is not reimbursable unless a request for reimbursement is received within 12 months of the date of the receipt. Any such request must be accompanied by letters from the permitting agencies stating that the permit and/or authorization have been rescinded. If the account name on the check is not the same as the permit holder's name,please include a signed statement by the permit holder that the check is being written on behalf of,and with full knowledge and authorization of the permit holder. YOU MUST BE IN POSSESSION OF THE PAYMENT RECEIPT FROM NCEEP PRIOR TO COMMENCING THE ACTIVITIES AUTHORIZED BY THE DEPARTMENT OF ARMY 404 PERMIT AND/OR THE 401 WATER QUALITY CERTIFICATION. cc: Cyndi Karoly,NCDWQ Wetlands/401 Unit John Thomas,USACE-Raleigh,Thelma Hemmingway,USACE-Wilmington Sue Homewood,NCDWQ-Winston-Salem File Jzutoruic9... EKkA"... Prot�C�Gf�I� (UGLY Stn& DEN NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652/919-715-0476/www.nceep.net o - ogLIS -� 9stem �. PROGRAM RECEIPT July 21,2009 Adam Fischer City of Greensboro Dept.of Engineering 300 W. Washington Street Greensboro,NC 27402 Project: Isaacson Boulevard County: Guilford DWQ#: 07-0865 USACE Action ID: 2007-01784-241 EEP No.: ILF-2007-5268 Amount Paid: $68,476.00 Check Number: 221726 The North Carolina Ecosystem Enhancement Program(NCEEP)has received a check as indicated above as payment for the compensatory mitigation requirements of the 401 Water Quality Certification/Section 404/CAMA Permit(s)issued for the above referenced project. This receipt serves as notification that your compensatory mitigation requirements associated with the authorized activity as specified below have been satisfied. You must also comply with all other conditions of this certification and any other state,federal or local government permits or authorization associated with this activity. The NCEEP,by acceptance of this payment,acknowledges that the NCEEP is responsible for the compensatory mitigation requirements associated with the project permit and agrees to provide the compensatory mitigation as specified in the permit. The mitigation will be performed in accordance with the Memorandum of Understanding between the NC Department of Environment and Natural Resources and the US Army Corps of Engineers dated November 4, 1998,as indicated below. River Basin Stream Credits Wetland Credits Buffer I&II HUC (linear feet) (acres) (Sq.Ft.) Cape Fear Cold Cool Warm Riparian Non-Riparian Coastal Marsh 03030002 0 0 212 0 0 0 0 Please note that requests for reimbursement of payments made to NCEEP are considered on a case by case basis. Requests for reimbursement must be received within 12 months of the date of this receipt. Any such request must be accompanied by letters from the permitting agencies stating that the permit and/or authorization have been rescinded and/or that NCEEP is not responsible for providing mitigation credit. If you have any questions or need additional information,please contact Valerie Mitchener at(919)715-1973 or Kelly Williams at(919)716-1921. Sincerely, William D.Gilmore,PE Director cc: Cyndi Karoly,NCDWQ Wetlands/401 Unit John Thomas,USACE—Raleigh,Thelma Hemmingway,USACE Wilmington Sue Homewood,NCDWQ-Winston-Salem File PP.StOYl,GC9... F ... Protecting Oct, State NCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652/919-715-0476/www.nceep.net