Reference: Request for Representative Outfall Status
Procter & Gamble Manufacturing - Browns Summit
NPDES General Permit COC NCG060069
Dear Sir or Madam
On behalf of The Procter & Gamble Manufacturing Company (P&G), Kleinfelder, Inc. (Kleinfelder)
is submitting this request to obtain approval for Representative Outfall Status (ROS) for Outfall
Nos. 02 and 03 at the P&G facility located at 6200 Bryan Park Road in Browns Summit, NC.
These outfalls have similar drainage and stormwater discharge characteristics. Supporting
information for granting ROS status is provided below. Attachments to this letter include: the
completed ROS Form; two copies of the site map; and analytical results from stormwater
monitoring at both outfalls.
Outfall Descriptions
Outfall 03 is associated with Drainage Area 3 and covers a recently constructed expansion of the
facility at the southeast portion of the property. Stormwater drainage from the impervious areas
at this side of the property are conveyed to a detention basin located on the southern portion of
the property. The outlet pipe for the detention basin (Outfall 03) discharges stormwater when
water levels are high enough due to significant rainfall.
Outfall 02 is associated with Drainage Areas 2 and 2A, located at the north side of the property.
Stormwater flows to two engineered wetlands and a detention basin prior to discharge at Outfall
02.
The drainage areas for Outfalls 02 and 03 both consist of buildings, paved areas, grassy
landscaped areas, loading docks, roadways with vehicle/truck movement, and parking areas.
Both drainage areas each have one emergency generator with associated double -walled diesel
fuel tanks built into the frame of the generator which serves as tertiary containment. Drainage
Area 2 (associated with Outfall 02) also has a fueling station with a 2,000-gallon double -walled
diesel storage tank with a tertiary concrete containment area and a fire pump house that contains
a 460-gallon double -walled fuel tank.
There are no outdoor processing equipment or raw material chemical tanks at the drainage areas
associated with Outfalls 02 and 03. The raw material storage and loading areas are located at the
west side of the plant in Drainage Area 1 and discharge to Outfall 01. The attached site map
depicts the drainage areas, outfall locations, and oil storage locations.
KLEINFELDER 9009 Penmeter Woods Dnve, Suite H, Charlotte, NC 28216 p 1704.598 1049 f 1704.598.1050