HomeMy WebLinkAbout20190046 Ver 1_PCN Form Submission_20190108DWR
IDIOM n of Water Resources
1a. Name of project:
Elizabeth Heights S/D
1a. Who is the Primary Contact?*
Wyatt Brown
1b. Primary Contact Email:*
brownenvgrp@gmail.com
Date Submitted
1/8/2019
Nearest Body of Water
Austin Creek
Basin
Neuse
Water Classification
QNSW
1c. Primary Contact Phone:*
(919)524-5956
Site Coordinates
Latitude: Longitude:
35.957606 -78.458883
AProcessing Information U
County (or Counties) where the project is located:
Wake
Is this project a public transportation project?*
r Yes r No
1a. Type(s) of approval sought from the Corps:
* Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
rJ Nationwide Permit (NWP)
F- Regional General Permit (RGP)
F Standard (IP)
Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
tial Review
Has this project met the requirements for acceptance
in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned *
Version#*
20190046
1
Is a payment required for this project?*
* No payment required
What amout is owed?*
* Fee received
r $240.00
r Fee needed - send electronic notification
r $570.00
Reviewing Office*
Select Project Reviewer*
Raleigh Regional Office - (919) 791-4200
Stephanie Goss:eads\szgoss
Information for Initial Review
1a. Name of project:
Elizabeth Heights S/D
1a. Who is the Primary Contact?*
Wyatt Brown
1b. Primary Contact Email:*
brownenvgrp@gmail.com
Date Submitted
1/8/2019
Nearest Body of Water
Austin Creek
Basin
Neuse
Water Classification
QNSW
1c. Primary Contact Phone:*
(919)524-5956
Site Coordinates
Latitude: Longitude:
35.957606 -78.458883
AProcessing Information U
County (or Counties) where the project is located:
Wake
Is this project a public transportation project?*
r Yes r No
1a. Type(s) of approval sought from the Corps:
* Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
rJ Nationwide Permit (NWP)
F- Regional General Permit (RGP)
F Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - Regular
F Non -404 Jurisdictional General Permit
F Individual Permit
39 - Commercial/Institutional Developments
1e. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
W Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
O Yes r No
B. Applicant Information
1d. Who is applying for the permit?
W Owner W Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Douglas Jones
2b. Deed book and page no.:
Book 017035, Page 01542
2c. Responsible party:
2d. Address
Street Address
1109 Averette Road
Address Line 2
Oty
Wake Forest
Postal / Zip Cade
27587
2e. Telephone Number:
(919)577-1080
2g. Email Address:*
tadal70@yahoo.com
3. Applicant Information (if different from owner)
3a. Name:
Wyatt Brown
State / Ffovin / Pagion
North Carolina
Country
United States
2f. Fax Number:
r Yes r No
r Yes r No
3b. Business Name:
Brown's Environmental Group, Inc
3c. Address
Street Address
242 Batten Farm Road
Address Line 2
cfty
Selma
Postal / Zip Code
27575
3d. Telephone Number:
(919)524-5956
3f. Email Address:*
brownenvgrp@gmail.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
ff appropriate)
1c. Nearest municipality/ town:
Wake Forest
2. Project Identification
2a. Property Identification Number:
1860038619
2c. Project Address
Street Address
1205 Averette Road
Address Line 2
City
Wake Forest
Postal / Zip Code
27587
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Austin Creek
3b. Water Resources Classification of nearest receiving water:*
C;NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12 -digit HUC in which the project is located.
030202010702
4. Project Description and History
State / Ftwince / Region
North Carolina
Country
United States
3e. Fax Number:
2b. Property size:
82.22
State / Ftwince / Region
North Carolina
(buntry
Wake
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The site is an approximately 82 acre farm and woodland tract located in a rural area in north east Wake County. The general area is changing to single family home subdivisions.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r' Yes r No 6 Unknown
4d. Attach an 8 1/2X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
Quad buffers.pdf 840KB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Soil map for stream buffers.pdf 514.34KB
4f. List the total estimated acreage of all existing wetlands on the property:
-5.23
4g. List the total estimated linear feet of all existing streams on the property:
-4548
4h. Explain the purpose of the proposed project:*
Install subdivision streets with a stream crossing to provide single family homes in a subdivision.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The existing property is open fields and woodland. Subdivision streets are the main earth moving construction on the project. The streets are planned to avoid all wetlands and have
just one stream crossing impact. Track hoes, bulldozers and motor graders will bee the main equipment used. A sediment and erosion control and storm water plan must be approved
by Wake County before construction can begin.
4j. Please upload project drawings for the proposed project.
Elizabeth Heights Wetlands 2019.01.04.pdf 2.9MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No O Unknown
Comments:
James Lastinger field verified the delineation 10/31/17
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Wyatt Brown
Agency/Consultant Company: Brown's Environmental Group, Inc
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
Corps - 10/31/17
DWR - 9/21/2017
5d1. Jurisdictional determination upload
17-294 Averette Road Property Determination.pdf 1.45MB
COE email Averette Road Wetlands (1).pdf 29.86KB
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
F Wetlands 9 Streams -tributaries W Buffers
F Open Waters 17 Pond Construction
3. Stream Impacts
3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact
(?) Jurisdiction* length*
road crossing Permanent Culvert Ui to Austin Creek Perennial Both ::] ]�;;]
134
i1 9 (linear feet)
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
134 0
3i. Total stream and ditch impacts:
134
3j. Comments:
30 feet of Rip Rap was included in the 134 feet of stream impact, rip rap will be placed flush with stream channel bottom so actual stream impact will be
104 feet
6. Buffer Impacts (for DWR)
6a. Project is in which protect basin(s)?
Chack all that apply.
rJ Neuse r Tar -Pamlico
r- Catawba r Randleman
r- Goose Creek r Jordan Lake
r- Other
6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact
Stream Crossing
P 11
UT to Austin Creek
No
6,199
3,986
Aerial Sewer Crossing
P
UT to Austin Creek
No
363
155
6h. Total buffer impacts:
Zone 1 Zone 2
Total Temporary impacts: 0.00 0.00
Zone 1 Zone 2
Total Permanent impacts: 6,562.00 4,141.00
Zone 1 Zone 2
Total combined buffer impacts: 6,562.00 4,141.00
61. Comments:
Aerial sewer crossing is for the support piers of the sewer line, City of Raleigh only allows 45 ft maximum span between piers.
Supporting Documentation
E. Impact Justification and Mitigation v
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Over 2500 linear feet of streets are planned, all wetlands will be avoided and only 1 stream crossing is planned. The street crossing the stream is
planned as perpendicular as possible. 2 sewer stream crossings are planned; one sewer crossing will be aerial and the other stream crossing Will be
aerial. Both of the sewer stream crossings are planned to minimize impact. Flead walls are also planned on the crossing to reduce earth fill impact.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Tree clearing for the stream crossing will be minimal as practical. Care will be taken not to install crossing in high flow days are when immanent
precipitation is forecast. Sediment and erosion control measures will be installed according to the approved sediment and erosion control plan and will
be inspected by Wake County.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
O Yes r No
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
What type of SCM are you providing?
rJ Level Spreader
F_ Vegetated Conveyance (lower SHWT)
F_ Wetland Swale (higher SHWT)
F Other SCM that removes minimum 30% nitrogen
r Proposed project will not create concentrated stormwater flow through the buffer
Diffuse Flow Documentation
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
r Yes r No
Comments:
Area is 15.99 % impervious, Wake County Local Government will reviewand approved the Storm Water Plan.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
C' Yes r No
2. Violations (DWR Requirement)
u
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B.0200)?*
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
Project is being designed to be all in one phase using the entire tract.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
rYes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5d. Is another Federal agency involved?*
r Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?
r^ Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r^ Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
NC Natural Heritage
Consultation Documentation Upload
project _report _elizabeth_heights_sd_16095_16095.pdf 975.26KB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA Habitat Conservation Essential Fish Habitat Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r^ Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
SHPO HPOWEB GIS Data
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain?*
r Yes r No
8c. What source(s) did you use to make the floodplain determination?*
FEMA maps from the link you provided
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Signature kfJ
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
. I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
. I intend to electronically sign and submit the PCN form.
Full Name:
Wyatt Brown
Signature
Sign
Date
1/8/2019