Loading...
HomeMy WebLinkAbout20160839 Ver 1_Narron Sediment notice_20190110S E P I ]anuary 3, 2019 �NaiNceniMcc CQNSTRUC710N Narron Contracting, Inc. 2320 Auburn Drive Raleigh, NC 27610 Re: Panther Creek Greenway (PR1187) and Mills Park Trailhead (PR1184) Erosion & Sediment control Mr. Brian Narron, This letter is tfl inform Narron Contracking af the offsite sedimentation faifure due to not foflowing the EC plans at the Panther Creek/ Mil�s Park project. We need to suspend operations until we ha�e corrective action as of 1/3/2019 at 3:30pm. Once corrective action has heen completed, please let SEPI Engineering & Construrtion know and we will review and inspect in accordance with permit and plans. Once approved, SEPT wiil send certifred mail of date and time to resume work. Attached in th�s package: • Photos of sedfinentation offsite . Location in attached map • Permit • NCDOT Construction manual - suspension order . NCDOT Construction manual — Failure to maintain the project or perForm EC work Respectfully, � nat�an Persson CEI manager / PM manager 1025 Wade Avenue ] Ralelgh, NC j 27b05 � Phone: 919.789.9977 � Fax: 919J89.9591 sepiengineering.com E @SEPIengineers