HomeMy WebLinkAbout20160839 Ver 1_Narron Sediment notice_20190110S E P I ]anuary 3, 2019
�NaiNceniMcc
CQNSTRUC710N
Narron Contracting, Inc.
2320 Auburn Drive
Raleigh, NC 27610
Re: Panther Creek Greenway (PR1187) and Mills Park Trailhead (PR1184)
Erosion & Sediment control
Mr. Brian Narron,
This letter is tfl inform Narron Contracking af the offsite sedimentation faifure due to
not foflowing the EC plans at the Panther Creek/ Mil�s Park project. We need to
suspend operations until we ha�e corrective action as of 1/3/2019 at 3:30pm. Once
corrective action has heen completed, please let SEPI Engineering & Construrtion
know and we will review and inspect in accordance with permit and plans. Once
approved, SEPT wiil send certifred mail of date and time to resume work.
Attached in th�s package:
• Photos of sedfinentation offsite
. Location in attached map
• Permit
• NCDOT Construction manual - suspension order
. NCDOT Construction manual — Failure to maintain the project or perForm EC
work
Respectfully,
�
nat�an Persson
CEI manager / PM manager
1025 Wade Avenue ] Ralelgh, NC j 27b05 � Phone: 919.789.9977 � Fax: 919J89.9591
sepiengineering.com E @SEPIengineers