Loading...
HomeMy WebLinkAbout20160628 Ver 1_Certification of Completion_20190108ROY COOPER o„ronmr MICHAEL S. REGAN .Cerre�m,� Environittenfa! r S. JAY 7.IMMERMAN QuQ�ity / Uirrriar NCDWR Project No.: �� IO �=��25� County: _1�N� �2____ _ , __ Applicant: __.�L_�G� _- n�A---- — ---- ProjeciName: _�r���ry_�� _GYI._SIL�B.U.�_._.V 'S Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion o(all work approved wilhin the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modilica�ions, tlie applican� is required to return lhis certificate to the 401 Transponation Permiuing Unit, North Caroline Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-16 1 7. This form may be returned to NCDWR by ihe applicant, the applicaN's authorized agent, or the project engineer. I� is not necessary to send certificates from all of these. App(ican!'s Certificalion 1, _y��j n��jt,/ , hereby sla�e Ihal, to the best of my abililies, due care and diligence was us m ihe observati n of the conslruction such that the construction was observed to be built within substantial compliance and iNent of the 401 Water Quality Certifica�ion and Buffer R�les, ihe approved plans and specifications, and other supporting materials. Signa[ure: ��Z' Q _____ _ Date: � � alq - �---�� _- � - Ageii!'s Cerllfica/ion I, , hereby s�ate �hat, to the best of my abilities, due care and diligence was used in the observation of Ihe construc�ion such ihat the construction was observed to be built within substantial compliance and intenl of the 401 Water Quali�y Certificalion and Dut7er Rules, the approved plans and specifications, and other supporting materials. Signature: Ei�gineei's CerHJlcntla� Parlial Pinal I, , as a duly registered Professional Enginecr in the State of Nonh Carolina, having been authorized io observe (periodically, �veekly, full time) the construction o(the project for the Penniuee hereby state �haL to Ihe best of my abilities, due care and diligence was used in �he observation of the construction such that the construction was observeJ to be built wi�hin substaNial compliance and intent of the 401 Water Qualiry Cenification and 13ufter Rules, �he approved plans and specifications, and other supponing materials. Signature Date Registralion No. 51mo ol Nonh C�aiohna I F.mironineNzl QuaL�y IGI7 A1aJ tierrmt Centrr I Raleigh. Nurth Caruhna 27699�1617