Loading...
HomeMy WebLinkAbout20150407 Ver 1_401 Approval Letter_20150706AT4 *5AW NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor July 6, 2015 Mr. James Sowers Trump National Golf Club 120 Trump Square Mooresville, NC 28117 Subject: Catawba Riparian Buffer Authorization with Additional Conditions; Trump National Golf Club, Lake Norman Dear Mr. Sowers, Donald van der Vaart Secretary I- DWR # 15 -00407 Iredell County You have our approval for the impacts listed below for the purpose described in your application dated April 21, 2015, and additional information was received on July 3, 2015. These impacts -are covered by the Catawba Riparian Buffer Rule and the additional conditions listed below. Please note that you should obtain any other applicable federal, state or local permits before proceeding with your project, including those required by (but not limited to) the local lake management authority, erosion and sediment control, non - discharge, and water supply watershed regulations. This approval requires you to follow the conditions listed in the enclosed Certification, the General Permit, and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Buffer Authorizations are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b), 15A NCAC 02H .0507(c) and 15A NCAC 02B .0243(8)) Type of Impact Amount Approved (sq. ft.) permanent Zone 1 < 1000 sq. ft. Zone 2 0 sq. ft. Shoreline length Oft. Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Phone: 704 - 663 -16991 Fax: 704- 663 - 6040 /Customer Service 1-877 -623 -6748 Internet www ncdenr gov An Equal Opportunity 1 Affirmative Action Employer— Made in part by recycled paper DWQ# 15 -0407 This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification /Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and Certification /Buffer Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] 3. Where practical, lower growing trees should be planted to replace the larger shade trees that are to be removed. 4. The Division's Mooresville Regional Office (610 East Center Avenue, Suite 301, Mooresville, NC 28115) shall be notified in writing once construction at the approved impact areas has commenced. [15A NCAC 02H .0502 (e)] 5. Any access corridor shall not exceed 10 -feet in width and shall be restored to its original condition prior to the project. [15A NCAC 02B .0243(6)] 6. All staging, including spoil, stockpile and construction materials, shall occur outside of the buffer. [15A NCAC 02B .0243(4)] 7. The applicant and /or authorized agent shall• provide a completed Certificate of Completion Form to the DWR 401 and Buffer Permitting Unit within ten days of project completion. available at: htto: / /Dortal.ncdenr.ore/ web /wa /swo /ws/ 401 /certsandDermits /apply /forms) or see attached. [15A NCAC 02H .0507 (c) and 15A NCAC 02B .0243(8)] This approval and its conditions are final and binding unless contested. This Certification /Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings hereby known as OAH). A petition form may be obtained from the OAH at htto: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and 5:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699 -6714 Raleigh, NC 27609 -6285 0 DWQ# 15 -0407 One (1) copy of the petition must also be served to -DENR: - -- Sam M. Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 This letter completes the review of the Division under section 401 of the Clean Water Act and the Catawba Riparian Buffer Rules as described in 15A NCAC 02B .0243. Please contact Alan Johnson at 704 - 663 -1699 or alan.iohnson@ncdenr.gov if you have any questions or concerns. Sincerely, Michael L. Parker, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Enclosures cc: DWR MRO - file copy DWR 401 & Buffer Permitting Unit — file copy JUL 1 5 2015 1t DENR - C S 401 & BUFFER i'FRIN11 T TING