HomeMy WebLinkAbout20090451 Ver 1_Meeting Minutes_20010214 Scoping Meeting Agenda TIP PROJECT R-2408 Federal Project No. STP-28(1) State Project No. 8.1970801 February 14, 2001 L Sign-In II. Introductions II[. Project Description A. Draft TIP Description: Widen, upgrade, and make safety improvements to SR 1323 (Riverview Street) and NC 28, from SR 1659 (Depot Street Extension - TIP project U-2929) in Franklin to SR 1335 (Sanderstown Road), Macon County, a length of approximately 3.6 miles (TIP indicates 4.4 miles). See attached vicinity map. Both will be widened to a 24-foot paved roadway with 8-foot shoulders (2-foot paved and 6-foot grassed). The project will be constructed in two sections: Section A - SR 1323 (Riverview Street), from SRI 659 (Depot Street Extension - TIP project U-2929) to NC 28. 0.9 miles. Section B - NC 28, from SR 1323 (Riverview Street) to SR 1335 (Sanderstown Road), 2.7 miles. B. Proposed Scoping Description: SR 1323 (Riverview Street) and NC 28, from SR 1659 (Depot Street Extension - TIP project U-2929) in Franklin to SR 1378 (Bennett Road). SR 1378 is just south of Bridge #27, which based on preliminary information is not in need of improvements at this time. B. TIP Schedule: Right of Way: A - 2005 Construction: A - 2007 B -2006 B -2008 C. TIP Funding: Right-of-Way $ 2.500,000 Construction $8,200,000 Prior Year $250,000 Total $10,950,000* * Includes approximately $900,000 in widening and rehab of bridge #27 over Little Tennessee River which is not proposed to be included in this project. D. Purpose and Need: The purpose of this project is to improve the safety of NC 28 and SR 1323 (Riverview Street) in and around the Town of Franklin. As part of this project, a portion of NC 28 is proposed to be re-routed around downtown Franklin along SR 1659 (Depot Street Extension - TIP Project U-2929) and SR 1323 (Riverview Street), from US 441 business to NC 28. The project is needed because both NC 28 and SR 1323 are substandard with narrow lanes and shoulders. IV. Area Projects A. Project U-2929: Depot Street Extension, from US 441 business to SR 1323 (Riverview Street), Franklin. Proposes to construct a 24-foot paved roadway with 4-foot paved shoulders to accommodate bicycles and 8-toot grassed shoulders. The project is currently in the right of way acquisition stage and is expected to go to construction in Januarv 2002. _ V. Existing Conditions A. Cross Section: SR 1323 (Riverview Street) is a two-lane shoulder section with 18- to 20-foot wide pavement and l- to 2-foot wide soil shoulders. NC 28 is a two-lane shoulder section with 20- to 22-foot wide pavement and 2- to 4-foot wide soil shoulders. B. Right of Way: varies, but generally 60 feet. C.' Alignment: rolling D. Signals: none E. Speed Limit: varies from 35 mph in Franklin to 55 mph outside of town F. Traffic: 2000 ADT- 7500 vpd G. Utilities: Low conflict, above and below ground H. Sidewalks/Bicycle Facilities: None. VI. Environmental Concerns A. Tributary Crossings • Jacobs Branch is crossed by the proposed project at SR 1434 (Airport Road) • lotla Creek runs adjacent to the project at the northern project limit. • An Unnamed Tributary is crossed by the project approx. 500ft south of Riverview/NC 28 Intersection It is anticipated based on inspection of preliminary mapping that the following impacts could be potentially associated with these tributaries: • Jacobs Branch approx. 100-110 ft • Iotla Creek Minimal; possibly no impacts • Unnamed Tributary approx. 90-100 ft B. Lakes: Lake Emory is in the project vicinity. C. Rivers: The Little Tennessee River is at the nor-them project limit. C. Threatened and Endangered species: Vertebrates Indiana Bat Endangered Spotfin chub Threatened Invertebrates Appalachian elktoe Endangered Little-wing pearlymussel Endangered Vascular Plants Smalled-whorled pogonia Threatened Virginia spiraea Threatened VII. Proposed Improvements A. Cross Section: Two-lane, 24-Foot roadway, with 3-foot shoulders, of which 4-foot will be Ak}?? paved to accommodate bicycles. B. Structures: Bridge 427 over Little Tennessee River is just outside the project limit. "-1 ?a? ptf C. Proposed Signals: None. D. Design Speed: varies from 40 mph in Franklin to 60 mph outside of town E. Projected Traffic: 2025 ADT - 13400 vpd F. Bicycle and Pedestrian Accommodations: The Bicycle Unit has recommended bicycle accommodations hence the proposed 4-feet of paved shoulder. G. Alternatives: Alternative I Alternative 2 Upgrade to ASHTO Minimal widening and standards based on the posted resurfacing, increasing speed limit, including some existing pavement width and minor horizontal and vertical shoulders alignment changes H. Right of Way Area 20.1 Ac 0 Ac 1. Easement Area 17.8 AC 265 Ac J. Relocations 12 Residential 3 Business 3 Residential 1 Business K. Current Construction Cost $6,100,000 $3,100.000 VIII. Schedule Planning Citizen Informational Workshop Environmental Assessment: FONSL May 2001 September 2002 July 2003 - IX. Comments X. Summary r m le SR ` SR 0JJ7 ? U• To. ?0 u,. { 7 N t? Cast OWN RD :C J .J N N TIP PROJECT U-29291 ./l -_.I BEGIN PROJEC? -, ? F A\ \ 3 ?MPIN ?s St ? :.m. MILES 0 2 3 0 2 3 4 5 KILOMETERS o `•.NORTH CAROLINA DEPARTMENT OF TRANSPORGTION DIVISION OF HIGHWAYS PROJECT DEVELOPMENT AND ENVIRONMENGL ANALYSIS BRANCH MACON COUNTY SR 1323 (RIVERVIEW STY FROM 1659 (DEPOT ST EXT) AND NC 28. FROM OR 1323 . (RIVERVIEW STY TO.SR 1335 (SANDERSTOWN ROY IN FRANXLIN STATE PROJECT NO.BJ970801 FEDERAL PROJECT NO. STP-280) R-2408 V/1/65 Stream Impact Comparison at Culvert Location Original Alignment: At Culvert: Permanent Stream Impacts=260' Temporary Stream Impacts=65' Stream Relocation=45' Net Loss=215' At Sta 102: Permanent Stream Impacts=130' Temporary Stream Impacts=30' Stream Relocation-- 120' Net Loss=10' Totals: Permanent Stream Impacts=390' Temporary Stream Impacts=95' Stream Relocation-- 165' Net Stream Loss=390'-165'=225' Shifted Alignment: At Culvert: Permanent Stream Impacts=70' Temporary Stream Impacts=40' Net Loss=70' At Sta 102: Permanent Stream Impacts=370' Temporary Stream Impacts=30' Stream Relocation=330' Net Loss=40' Totals: Permanent Stream Impacts=440' Temporary Stream Impacts=70' Stream Relocation=330' Net Stream Loss=440'-330'=110' The original alignment has 115' more net stream loss and 25' more temporary stream impacts. Also, individually, the original alignment has 145' more net loss of larger stream. HYDRAULICS DESIGN/PERMIT DRAWINGS REVIEW Location and Survey Conference Roomo F o?? NCDOT Century Center Complex November 9,2005 NoF 6' " 9? pG C; 1:00 Nottingham R-2408B, NC 28 from SR-1323 (Riverview Street) to SR-1378 (Bennett Road) Macon County, Division 14 Team Members: Angie Pennock-USAGE V \ Marella Buncick-USFWS r L7% Marla Chambers-NCWRC Brian Wrenn- NCDWQ Chris Militscher- EPA Clarence Coleman- FHWA S1? Harold Draper- TVA Bryan Kluchar- PDEA 'Jason Moore- Roadway Tyler Stanton- NEU 'Jamie Wilson- Division 14 . jr koY Vkw 2:00 Clawson R-4430 SR-1783 (Upward Road) from US 176 to SR-1006 (Howard Gap Road) Henderson County, Division 14 Hydraulic Design Review Team Members: Angie Pennock- USACE Marella Buncick- USFWS Marla Chambers- NC WRC Brian Wrenn- NCDWQ Chris Militscher- EPA Clarence Coleman- FHWA Harold Draper- TVA Chris Rivenbark-NEU Quang Nguyen- Structure Doug Taylor- Roadway Jamie Wilson- Division 14 Teresa Hart- PDEA David Harris- REV 3:00. Adjourn