Loading...
HomeMy WebLinkAbout20090806 Ver 1_401 Application_20090709? ? 1800 Herring Avenue P. O. Box 10 Wilson, North Carolina 27894-0010 0 9 - 0 8 0 6 252-296-3305 City of Wilson ? Stonnwater Division July 23, 2009 NC DWQ, 401IWetlands Unit 1650 Mail Service Center Raleigh, NC, 27699-1650 SUBJECT: Buffer Authorization To Whom It May Concern: in ?(:C3 A Ifni. ? JUL 2 4 2009 DENR - WATER QUALITY WETLANDS AND STORWS TER ERNNC 'li Please review the enclosed PCN for Neuse Buffer Authorization only. The project consist of piping an existing roadside ditch in the buffer and the addition of roadside sidewalk in the buffer. Enclosed also are the construction plans and aerial photo of the site. Sincerely, 4ai s S tormwater Environmental Specialist Enc. 09-0 8 0 6 O?_ W AT 4 9 O? ? o ? Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: El Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Tilghman Road Sidewalk Project 2b. County: Wilson k_ _ r-R, Q 4Z 2c. Nearest municipality / town: Wilson L L. i.-_. 2d. Subdivision name: E) n 2e. NCDOT only, T.I.P. or state project no: -Uj DENR - WATER QUALITY 3. Owner Information % AhRVERBRANCH 3a. Name(s) on Recorded Deed: City of Wilson / NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 1800 Herring Ave 3e. City, state, zip: Wilson, NC 27894 3f. Telephone no.: 252-296-3305 3g. Fax no.: 252-399-2453 3h. Email address: dnorris@wilsonnc.org Page 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Daryl Norris 5b. Business name (if applicable): City of Wilson Stormwater Division 5c. Street address: 1800 Herring Ave 5d. City, state, zip: Wilson, NC 27894 5e. Telephone no.: 252-296-3305 5f. Fax no.: 252-399-2453 5g. Email address: dnorris@wilsonnc.org Page 2 of 11 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): DOT Right of Way within city limits 1 b. Site coordinates (in decimal degrees): Latitude: 35.750175 Longitude: - 77.91675 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 60' Right of Way acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: NRCS Intermittent UT to Toisnot Swamp 2b. Water Quality Classification of nearest receiving water: WS-III NSW CA 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing state maintained right of way perpendicular stream crossing with 72" culvert. Existing roadside ditch through the buffer to the stream. Land use in the immediate vicinity includes school atheletic fields, wooded lots, and residential lots. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 65 3d. Explain the purpose of the proposed project: Provide sidewalk for safe pedestrian access to the school property 3e. Describe the overall project in detail, including the type of equipment to be used: Piping of existing roadside ditch through the buffer with 96' of 24" RCP. Fill and grade existing ditch and install 5' wide sidewalk along side road through buffer on the south side of the stream. Heavy equipment such as excavators may be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ®No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 11 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - PER or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 11 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T B1 ®P ? T Piping existing UT to Toisnot Swamp ? Yes ® No 0 0 ditch B2 ®P ? T New impervious UT to Toisnot Swamp ? Yes ® No 150 100 sidewalk B3 ? P ? T ? Yes ? No 6h. Total buffer impacts 150 100 6i. Comments: Side walk will be placed over newly installed pipe inplace of existing ditch. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ? Yes ? No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps ? Mitigation bank 2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form - Version 1.3 December 10, 2008 Version 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No ? ® Comments: Piping of existing ROW ditch 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Sidewalk along right of way 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 11 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B.0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 10 of 11 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? 7E] Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ? No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Daryl Norris 7/' o 9 Applicant/Agent's Printed Name icant/Agent's Signature Date (Agent's signature valid only if an authorization letter from the applicant is rovide,4 Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version 01 1 \ f EX, MH N P. 70P 106.14 f ` GRETCt'EN BARBER c •, ItJ?' INd. '96.64 NANCY BARBER II ,,.. "9723- 2219 PG 733 I ?. ?3 G3 \. iy . 10-8423 ? \ I 1 ?._ 98.0 G HOUSE CB 19 P8 I 'At" 06 8.87 \ ?.k?,S10'?'"`• -..??.,,? ? \``?.°-fir ?' ?? ? ?` ,? `...`,..` '\--?.._: ' 4 1 ? ? 101.74 EX. 51 f)(-LJPLpe EX. CONC. ?. ENV 24 TOP .64 1OJ.0 ?' . 6 N/F WILSON COUNTY 1 DB 1888 PG 89 1 3722-19-1704 1 i l \ s\ ®g~osas w ~,~i~ A i 1 l 1{ SAN. SEt,JER } 1 OENR.MJATEROUALITY '~dETl~tdOSAP1DST0tu"tid~'~RP1~C~ ~L~C ~ 1 ~y EX. MH N/F TOP 106.ta GRETCt'EN BARBER k, .l, ' ~ INV. 96.64 NANCY BARBER "1 ~ ~ TO3.O3 DB 2219 PG 733 '1 f s~''-'.~.. w ~ t 3723-i0-8a23 s,:,~ f' i ~tp1G-(L r , _ . ss.a , ~ ~ I e ~ prN , MOUSE NOW, 1~C. 1 0~ Ij~' ~ DB 19!6 PG 868 at' r~ t 3712-19-4585 0 1 . s`^^~„ ~ ~ ~ ; e , 1 , 3 II I ~ ~ r. , 8,87 ~ ~ ~ i 1 ~ . II ,,1 `,j 'F, ~ , ~ ~ l r !I fI I~ II q / , 7 ~ ~ 1 1 ~ 01.4 ` ~ ~ i j N/F 1 I I I f HOUSE N W IN . "J j O . C F ea 's±~ PG a6e I~ I Top 10.8 f R °x. N , ~ A ~ PB 12 PG tag ? ;..d CO C ~ INV. 102 ~ l 3722-t9-5410 I ( ~ ~ N/F CHRISTOPHER L, BATTS HEADWALL 109, P , . s8 ~ 1 I , y~l," i t,~~~~ EX. C8 { I I 1 oe 22ot PG 727 ~ ~ ~ E'X TOP 107.75 IP I' ~ tl I, < ~ . rop c$ INV. ta3.$4 ~ c4NG. ~ , ~ I I ~ I N/F 3712?18G7964 ~ t / N/F '`64 ~ f ! DAITON ANDERSON ( I f ~ WIIUAMWLIIAMSILOA H. C t s ~ ' ~ ~ ~ i! 1 DB 1910 PG 423 I ( I N/F OB 1313 PG 710 03,Og PB 12 PG 149 N. ~ ' ~ ~ . _ 3722-t9-5259 ALBERTINE ( VICTOR A. BROWN ALBERTINE Mf SPEIGHT I ~ 3722?19GT000 "~~.a, " DB 1182 DB 1182 PG 157 ~ ` ; DB 2047 PG 45 PB"12 PG Y49 PB 12 PG 149 } TOP iC8.55 ~ ~ a' CNA`.N 3722-t t 1 lNV. 103.35 : ?NK s ' 3722-t9-5272 i 3722-t9-60t9 1 1 f WILSON COt;NTr 1 ` ~ ~ ~ 4 OB t 888 PG 89 t M ` . j 1 ~ _ _ 3722-19-170a k TOP 108.91 ti r, " ! 4' CHAIN ~ INV. 104,76 ~ I;y r, I ~ I _ _ } TRANSFCRA+ER ~ - , ~ - _ t ~ - - - Fig P. ~`'c+ - ~ ~ m - _ E _ _ _ . - f 0- +C ti off, T.'-' . ~ ~ GRETCHEN tJ. BARBER FED } \ 11 DB 2219 PG 733 t - A F a P++oNE } 3723-td-8423 ~ R NS 0 MER PED FIBER' ` 1 ~ ~ OPTIC ~ / CABLE r EX. CB AO t ~ ' TQP t 12.58 1~'pH so' rau~trc . PED - ~ . _ .(7 ~ a I PHONE ~ N F TRANSFORMEF, +r OA*r ~ 1 ~ " fN ..r r,. PHONE FBER PED ~ 8En54V REKTA.LS LLC +1 C~61. ' D9 2Cd9 PG 45# T ~ . . MER r w7 " ~ OPTIC P3 22 PG it " . k 3722-19-34a5 N/f ~ 1' 1 ~ ,r ~ ~ r ~ FIBER TRANSFORMER CABLE BENSGN ?ENTALS lLC ~ TRANSFORMER f18ER / OPriC ~ OPTIC FIBER BENSON RENTALS LLC CB 20C9 PG 451 1 ! ~ r PEDNE OPTIC ! P r PB 22 PG t 1 CABLE ~ GIBER O I TRANSFORMER CABLE N f F t f 3722-t9-3363 J TRANSFORMER N/F Ex. MH TRANSFORMER CA9LE / FIBER OPTIC N/F OB 2009 PG 451 GONE IR OpTiC TRANSFORMER CABLE BENSON RENTALS LLC PB 21 PG 35 B~NSOn RENTALS LLC TQP 112.74 j ''B 20G9 PG a5t ~ ; CABLE N/F DB 2009 PG 451 3722-t8-6$12 E BENSON RENTALS LLC 3722?tt$ 5887 1 1 ' J P8 22 PG ii 4 I ~ N/F N/F DB 2009 PG 451 - ~ 3722-19-3276 NfF 1 ~ BENSON RENTALS lLC t N/F !R' ~ I # BENSON RENTALS LLC BEr~ON RENTALS LLC PB 21 PG 35 DB 2009 PG 451 BENSON ! PB 22 PG 1t DB 2O0 BENSON RENTALS lLC ! ~ DB 2009 PG 451 08 2009 PC 45t 3722-18-5942 DB 2009 PG 451 1 PB 22 PG tt PB 21 PG 35 3722-19-3280 P8 2. 3722- P8 22 PG 11 ~ ~ 3722-19-4062 3722-18-5917 3722-19-4103 E , i 1 1 9 I I I 1 ' ~ ~1 i I 4 i { ~ l l 1 f I I { (k I N/F ~N N/F FREDERICK P. & r ( N/F w v m t N/f { ® I FREDERICK P. & . ~m , VICTORIA H. JENKlNS T! ~ ~ N/F CH.ARUE & 'aA?a+E M. dCnES { { DB 2064 PG T4' ARIA N. JENKlNS TRliSTEES '.J CRESCENT GARDENS ASSOC• I~N:,+, Z ~ E~vrA D ~ DOROTHY HiGGS DB 1339 og 810 ji,~ I PB 12 PG 149 DB 2064 PG 741 OB 1135 PG. 58 N F ~ 3 ~ ~ , 3 1'62 ?G 671 PB 12 P„ 149 ( I - ~ 3722-2$-1405 ~ r1jF ChEx~ELA D_ FAR T40MA$ pfF a£ t2 PG 149 3722 18-9684 { ~ I 37B22?28~1405 ~ ~ 3721-27-8907 ~ I ~i7LG Pa 1ARy L. IAfLT DB 2233 PG ~ER 'JB 163) ~krJS, dR .~a, ~ 3722-to-9774 ll d9 2103 p ON F8 t2 8„8 ps , pG b96 rn~~~ ,1 ~ i ( ( I p8 12 P G ] 3722-I~ ]4g 3) ? FG )ag m ~ ~ 4` I 372ti_ G tcg 8 8851 22 t8..g~] ~ 4: ~ { I~.?~ { ' PHONE Q~II~ I ' I 18`58C8 6 ~ ;,I .v I U f ~ PHONE SHELTER PED ,r~p,Fr~:>, ( ~ + EX. MH ~ ~ ~ ~ ~ ` ' TOP 11 .38 ~ fENCE EX. fEtJCE JL - ---G--- Y \ CONC. r P 1 --e-=-- - - _ ~ , _ , _ _ _ _ _ , IPO~ - ~ I - ~ I -.r - . - - - 1 ~ w~. B ~ TOP 1 ~ ,74 TlLGHI~4N RDAD SR 1323 ~o' Pva~rc R/w n . _ . _ _ _ _ _y- _ _ _ Z TOP t 1 7O -r , - - n ~ - - - ~ r ~ ~ r ~ PHONE ~ w ~ ~ ~c it w N ~TRANSfOR~R ~ 1 ~p r/b ~ ~ ~ c CA FIBER IP FIBER _ E"" X, MH PHONE IR EX. MH IR~ c TRANSFORMER TOP 128.21 aED FIBER TOP 128.56 PP pNf~ ~ ~ t r FIBER IP PHONE PED OPTIC x f ~ ~ ~ n r z o ~o p ~ a~ ~ yHO•".E N OPTIC OPTIC PEO CABLE (EX. OPflC CABLE .t~ FENCE CABLE ~r~ ~ , x PED E`' x CABLE TRANSwORu i r U A TRavSFaRMER { I TRANSFORMER "T""- r pNONE , pN01E ~ EX. MH Ex K><, TRANSwOR~+ER c ~ ` ~RPEO ~ { T ED rl8 t i ~~S- TOP t 19. MN FENCE ENCE I ~ ''u'SFDRMER I WiN$fgRMER OF ER C~!,sCRS P 120,44 FrBER FIBER nC 4 OPTIC ,A*,~ CA81E „ABLE CABLE ~ I I i ~ '~vmm _ N/F NfF N/F PJ/F N/F 4 ANTi'ONY T. OLLS, JR, SLEEPY HpI,IOW DEVELOPMENT CO. ~ 0 N r~ . o BRENDA G, OLLS B£N ,NfF '~'~D~ I vSldpA`E E, dt KATHERINE StdITH CHARLES RA,.PH HC7GE DB 1622 PG It CHARLES RALPH HOOGE & BRENDA C. OLIS DB 1365 PG 827'" OB 1362 PG 492 Soh R , 68 392 G ,.d sc.NSOti of F~ NfF ~ 209 ENT4L5 LLC m m~ OB 1399 PG~383 3722-t8-847g 3722-18-9339 BENSON A'fNTgL DB i336 PG 846 3722-28-0762 3722-28-t123 ' I 3722-28-0300 ~ ,gam, i i?6 2d, ENTgLS t.LC D8 2 S LLC PB zi~PPG 4g] Inv-zi't }722-1E~-9..t, F,e 2?9 PG q F t Pg 409 AG 45 ] ' 37,22_ # G 35• ~ ~ b Ji22+1 PG 35 J72 7] PG ~ ( 8 7&28 ~ c~~ A~~ 18'6757 2 1$`6793 W ~~r , I ~ I I i i ~ ~ { fi ~ ~HELVMINA~Y U1~ i 1 1 ~ I LII~R~ Nt~T FoA RECORDATION, ~1P1~ nn nnt~ngn~ angina, •~A(.F~ nR rn~v~YA~uC~s Pull M 111V~ U~ I Iva mpo~ DATE: JUNE 2008 PROJECT: 08- 1 55 mP"` `f'r BARTLE kqm%om m SCALE(HORZ): CADFLEC00a 55SPC CITY OF WILSON WILSON COUNTY ENGINEERING & SURVEYING, PC CONSTRUCTION (Dl"rY OF W Wl L%j 0 Mwp I 1 30' FIELD BOOK: 04-09 SCALE(VERT): DRAWN BY: LR 1906 NASH STREET NORTH ' PLANS N/A SURVEY BY: TO, LP NORTH CAROLINA ZONE: ~k ~oN. N.C. 27893- wu,. ~„Oe,rtl.,t..~m (252) 8a_ - I ILGMMAN ROAD SIDEW) REVISIONS: PIN # SHEET CP1 DEWAUK PRWrt=m%.# I