HomeMy WebLinkAbout19920203 Ver 1_COMPLETE FILE_199201014
Rw+
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Coastal Management
225 North McDowell Street- Raleigh, North Carolina 27602
James G. Martin, Governor
William W. Cobey, Jr., Secretary
Mr. Preston Howard
NC DEH&NR
Div. Environmental Management
127 Cardinal Drive
Wilmington, NC 28405
04/13/92
a,A?
Roger N. Schecter
Director
nqt 2 0
REFERENCE: CD92-04
Applicant/Sponsor: U.S. Army Corps of Engineers
Construction of Dock, Dolphins, and Refueling Facility, Snows Cut
Dear Mr. Howard:
4
The attached consistency Determination, dated 03/30/92
describing a proposed Federal Activity is being circulated to
State agencies for comments concerning the proposal's consistency
with the North Carolina Coastal Management Program.
Please indicate your viewpoint on7the proposal and return this
Ste en B. Benton
to the project as proposed.
Comments on this project are attached.
L This office supports the project proposal.
No Comment.
signed
Date
Agency
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293
ri,? rely,
form REPLY to me b?fo'rThie This 0of5/fice04/92 objects Si
Consistency Coordinator
An Equal Opportunity Affirmative Action Employer
A4
DIVISION OF ENVIRONMENTAL MANAGEMENT
MEMORANDUM rWAT
Date: May 1, 1992 To:
John Dorney
Planning Branch
From: James H. Gregson
Wilmington egi ia Office
Through: Dave Adkins
Wilmington g al Office
Subject: Regional Office Review and Recommendations
Application for Permit for Excavation and/or Fill
CD 92-04 / U.S. Army Corps of Engineers
Dock, Dolphins, and Refueling Facility, Snows Cut
New Hanover County
PROJECT DESCRIPTION: The Wilmington District Corps of Engineers
is requesting a after-the-fact consistency determination for the
construction of a dock and placement of dolphins in Snows Cut.
ADJACENT WATER BODY: Snows Cut
CLASSIFICATION: SC
The project has been reviewed to determine impacts to water
quality. The following comments have been provided.
1. The project will not require a 401 Water Quality
Certification.
This office has no objection to the project as proposed.
JHG:CD92-04.apr
cc: Wilmington Regional Office Files
Central Files
STArt Q,
v4 l
Gunn. ?'
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Coastal Management
225 North McDowell Street • Raleigh, North Carolina 27602
James G. Martin, Governor
William W. Cobey, Jr., Secretary
04/13/92
Mr. Preston Howard
NC DEH&NR
Div. Environmental Management
127 Cardinal Drive
Wilmington NC 28405
Roger N. Schecter
Director
APR 15 M
DIVISION OF
REFERENCE: CD92-04 COASTAL, MANAGEM
Applicant/Sponsor: U.S. Army Corps of Engineers
Construction of Dock, Dolphins, and Refueling Facility, Snows Cut
Dear Mr. Howard:
The attached Consistency Determination, dated 03/30/92
describing a proposed Federal Activity is being circulated to
State agencies for comments concerning the proposal's consistency
with the North Carolina Coastal Management Program.
Please indicate your viewpoint on?the proposal and return this
form to me before 05/04/92 Si i36 rely,
Ste en B. Benton
consistency coordinator
REPLY This office objects to the project as proposed.
Comments on this project are attached.
This office supports the project proposal.
No Comment.
Signed
Date
Agency
P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293
An Equal Opportunity Affirmative Action Employer
ORIGINAL W/ATTACHMENTS TO STEVE BENTON
_ EIVE(]
j ' 2 1
` DEPARTMENT OF THE ARMY I
WILMINGTON DISTRICT CORPS OF ENGINEERS ?Q
P.O. BOX 1890
• .: {," WILMINGTON, NORTH CAROLINA 28402-1890 ?-1
IN REPLY REFER TO March 30, 1992 CID z fi/
Planning Division
Mr. Roger Schecter, Director
Division of Coastal Management
North Carolina Department of Environment,
Health, and Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
Dear Mr. Schecter:
The Wilmington District, Corps of Engineers, requests your
concurrence/nonconcurrence on an after-the-fact consistency
determination for the construction of a dock and placement of
dolphins in Snows Cut, New Hanover County, North Carolina.
The Corps of Engineers leases this property to the North
Carolina Wildlife Resources Commission for use as a boat launching
area. The Wilmington District, Construction Operations Division,
Plant Section, coordinated the construction of the project with
the North Carolina Wildlife Resources Commission (NWCRC) by letter
dated November 25, 1991, and received a response from the NCWRC
on February 6, 1992 (copies enclosed). However, no formal review
of the work was performed in accordance with the North Carolina
Coastal Management Program.
The project was required to provide berthing and refueling of
Corps' vessels during dredging at Carolina Beach Inlet. There are
no other near refueling areas available. The work required the
construction of two seven-pile dolphin clusters and construction
of a dock, as described in the enclosed drawings. The work was
performed by the Corps' vessel SNELL and was completed in late
February 1992. The project did not require placement of fill
material or dredging of sediment nor did it involve impact to
wetlands. The work has been discussed, after construction, with
Mr. Bob Stroud, North Carolina Division of Coastal Management,
Wilmington Field Office, by telephone on March 17, 1992.
-2-
We have determined that the proposed work is consistent with
the North Carolina Coastal Management Program and request your
consistency concurrence/nonconcurrence for the proposed action.
If you have any questions regarding the project, please contact
Mrs. Trudy Wilder of the Environmental Resources Branch at
(919) 251-4581.
Sincerely,
alter S. Tulloch
Colonel, Corps of Engineers
District Engineer
Enclosures
Copy Furnished (with enclosures):
Mr. Steve Benton
Division of Coastal Management
North Carolina Department of Environment,
Health, and Natural Resources
Post Office Box 27687
Raleigh, North Carolina 27611-7687
;T
• DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
. v` ^.
J - P.O. BOX 1890
WILMINGTON, NORTH CAROLINA 28402-1890
November 25,1991
IN REPLY REFER TO
Plant Section
Mr. Charles Fullwood
Executive Director
Wildlife Commission
512 North Salisbury Street
Raleigh, North Carolina 27604-1188
Dear Mr. Fullwood:
Reference the telephone conversation between Mr. Bob Tobaben and Mr. Jack
Russ on November 21, 1991.
The U.S. Army Corps of Engineers has in the past had refueling privileges
at the N.C. Wildlife Ramp at Snows Cut, Carolina Beach, North Carolina.
However, since ballast has been placed along the bulkhead to prevent erosion,
our vessel cannot utilize the ramp area for refueling.
The Wilmington District requests permission to install two dolphin
clusters of seven pilings each and a dock at the N.C. Wildlife Ramp. This
would provide berthing and refueling of our vessel during dredging at Carolina
Beach Inlet. As it now stands, the vessel has to run to the Bridge Tender at
Wrightsville Beach, North Carolina, to take on fuel. This run consists of 1
to 2 hours each way. In addition to taking on the fuel, the vessel is away
from the dredging site approximately 5 or 6 hours.
Our plan is to install dolphin clusters approximately 30 feet from the
bulkhead into deeper water (6 feet). A dock will be built and an electrical
distribution cable will be installed to provide shore power. The facility
will be marked appropriately with U.S. Army Corps signs indicating Government
Property to prevent any misunderstanding by the boating public. The
Wilmington District will be responsible for this facility.
'a T -2-
We will arrange an "on-the-site tour" if you desire and will discuss this
request with you and any members of your staff at your convenience. At the
same time, the Wilmington District will answer any questions you may have
regarding this request.
Sincerely
R. E. Sattin
Chief, Plant Section
0 North Carolina Wildlife Resources Coininission 0
512 N. Salisbury Street, Raleigh, North Carolina 27604-1188, 919-733-3391
Charles R. Fullwood, Executive Director
February 6, 1992
R.E. Sattin, Chief
Plant Section
District Corps of Engineers
P.O. Box 1890
Wilmington, NC 28402-1890
Dear Mr. Sattin:
This letter will authorize the Corps of Engineers to construct and maintain
two dolphin clusters of seven pilings each and a dock to be used for refueling Corps
vessels at the Wildlife Resources Commission's Snow's Cut Boating Access Area in
New Hanover County. The location of these structures will be at sites determined
during our visit in mid-January 1992. The pilings and docks will be properly marked
with signs indicating no trespassing and that the facility is for government use only.
If problems develop with unauthorized uses of this site, the Corps may be required
to secure the area with proper fencing and gating of the facility.
We look forward to working with you on this project. Please call if you have
any questions or need additional information.
Sincerely,
DJT/gw
cc: Bob Curry
Jack Henderson
Tony M. Williams
Donald J. Tobaben, Program Manager
Division of Boating and Inland Fisheries
Phone (919) 733-3634
FEB 1 1992
DISPOSITION FORM
For. use of thks form, see AR 340-15; the proponent agency is TAGO.
RtcFERENCE OR OFFICE SYMBOL SUBJECT
r
TO
:Zmcfl
_ " VlFhl
FROM
r 1
\?1 f
DATE
i
i
i
i
/ Jfil
PRA r :' S ?-, i> ! _?
pl ?:tJ
--- -- lo
w;
o?
CM 1
S/P,f V/E6
EE---
l i
I
V?'lv S
i
L.
V11-141 :r,4 -2-
- ; ? i r ?- rXISr/NC
1 ?' r :? ,yu?1CNl?=D
Ex1 rl? 6cTTo,)
><
P2oPOS`D PIE
ne FORMS 9AQA
PREVIOUS EDITIONS WILL BE USED
>r GPO 1987 O - 17Q-4
? w+,G C
Y ? `i? w
`
f O
?.
cxo
O
z
'NOIONIWIIM 01
/'
t
z d a
Z v)
_ oc
0
Z w CO
Y
\ Q Q C) a
\ +
i
V. y w y
'?` \ y O
O 1 ??
\ 1
O ? \ 1?
OQ:
t L) 'ice
9L Sl 'b'$ ---_ ?)?1 ?Nlb WBbJ
8n
Mod Q e
?Hd3? O
N
V) cv, Z
O V)
a
?- a ?_ ? U
N ~ O Oix Q
v V
- m0 ce
- Z y4 Q u-
Q 0 w
?- U
a Q V
a a
C7 V Q
3
N N C-)
N
d-
d, 1
\ \ I
1 b .S
a p
Q
a \
.a \ 1
a
\ W I
rJ 1
;' ' i 1 \ W I