Loading...
HomeMy WebLinkAbout19920043 Ver 1_COMPLETE FILE_19920101w STATF o u r J State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Governor George T. Everett, Ph.D. William W. Cobey, Jr., Secretary March 1_0, 1992 Director Mr. Haywood B. King Alley, Williams, Carmen and King P.O. Box 1179 Burlington, NC 27216 Dear Mr.. King : Subject: Proposed Fill in Headwaters or Isolated Wetlands Temporary access road for raw water intake on Haw River Chatham County DEM Project #92043 Upon review of your request for Water Quality Certification to place fill material in less than one acre of wetlands or water for temporary access road located at Haw River, in Chatham County, we have determined that the proposed fill can be covered by General Water Quality Certification No. 2666 issued January 21, 1992. A copy of the General Certification is attached. This Certification may be used in qualifying for coverage under Corps of Engineers' Nationwide Permit No. 14. If you have any questions, please contact John Dorney at 919/733-1786 or 919/733-1787. Sincerely, prge .Ever t GTE: JD Attachment CC: Wilmington District Corps of Engineers Corps of Engineers Raleigh Regional Office Raleigh DEM Regional Office Mr. John Dorney Central Files RFGIONAI. OFFICES Asheville Fayetteville Mooresville Raleigh Washintton Wilmington Winston-Sal(-m 704/251-6208 919/486-1541 704/663-1699 919/571-47(X) 919/946-6481 919/395-39(x) 919/89(;•7(X)7 Pollution Prevention Pays RO. Box 29535, Paleigh, North Carolina 27620-4)535 'Idephone 919-733-701s An 1XInal Oppuruuu[c ABirimm -c Attinn F.mph-T L A l% ? 2? v February 21, 1992 MEMORANDUM To: John Dorney Through: Arthur Mouberry, P. Regional Supervisor Tim Donnelly, P.E.- Regional Water Quality Supervisor From: V-? Karl Shaffer- Soil Scientist Subject: Water Quality Certifications 1) Sunset Lake 401; Project #91915- Wake County. I have not been to this site. The impacts are to three small wetlands and are for road crossings. No adverse impact is anticipated. The applicant has requested use of general certification concurrent with Nationwide 14 permit. The RRO is in concurrence with this request. Watershed classification for Sunset Lake is B-MSW. 2) Town of Pittsboro; Water Intake- Chatham County. This is being applied for "after the fact". The applicant was not aware of the requirements with us or the Corps of Engineers. The construction is nearly complete. A major impact was/is realized to the stream crossing of Brooks Creek in Haw River Basin (class B-NSW). I am not familiar with cost comparisons of subsurface crossings vs. aerial crossings with a bridge, but a bridge and aerial crossing would have much less impact on the creek. Erosion structures are in place and appear to be doing a good job. All other aspects of the project appear satisfactory. RRO recommends coordination with Corps of Engineers on their decision for permit issuance or request for possible mitigation. (I assume Brooks Creek crossing is below headwaters and would.require an individual permit) 3) Nash Brick site; Project No. 91914; Nash County. Site evaluation performed February 11, 1992. This wetland is a shallow inundated area as a result of taking soil for borrow material off the site. The area is partly vegetated with cattails and other wetland type vegetation. There are no fish in the "pond" as it probably seasonally dries up. This area was not rated but it is not particularly valuable. In its place will be a stormwater detention structure to collect and stabilize runoff _V It water from the site. As per City of Rocky Mount specs, post development runoff will not exceed pre-development runoff. The discharge from the stormwater control facility will be routed through the existing drainageway at non-erosive velocities. From there it will enter the Daniel property. That site will also be proposed for fill of existing inundated borrow areas, and similar controls will be used to protect water quality on that site. The projects are separate and distinct but happen to be adjacent to one another. A more valuable wetland associated with a natural drainageway exists at the eastern edge of the property. This area will possibly be impacted slightly with a little fill for the unloading area. The engineer is redesigning the area with a steeper toe slope to avoid this wetland as much as possible. The RRO recommends that a water qualtiy_certification-be- p l'IAi1 i cciiorl _?r+r..._f-ho c?..?h-ionf- r??or+i- Tho- r-mI n a__i nnl uric quality protection measures. - 4w. alley, williarns, carmen & king, inc. E N G I N E E R S & ARCH I T E C T S BURLINGTON OFFICE KANNAPOLIS OFFICE GREENSBORO OFFICE p.o. box 1179 1 740 chapel hill road p.o. box 1248 1 207 south main street 300 east wendover avenue, suite 403 burlington, north Carolina 27216 kannapolis, north Carolina 28082 greensboro, north Carolina 27401 telephone 9191226-5534 telephone 704193 a, telephone 9191378-2754 fax 9191226-3034 fax 70419 _ i$It® fax 9191378-2583 r.. P?a?4 J'r ms's \??'? PLEASE REPLY TO: January 21, 1992 Burlington cr, 8816 ?4? ??t,3 eay >_ c ria. Mr. John Dorney ,-1 Water Quality Section Division of Environmental Management Post Office Box 29535 Raleigh, North Carolina 27626-0535 Re: National Permit #14 - Creek Crossing - Brooks Creek National Permit #14 - Raw Intake from Haw River Town of Pittsboro Chatham County, North'Carolina National Permit NO.: 14 Name of Permittee: Town of Pittsboro Effective Date: Expiration Date: Dear Mr. Dorney : We are requesting the Corp of Engineers grant National Permit for a permanent pipeline crossing, a temporary access road to construction site of raw water intake and a raw water intake from Haw River. 1. Need: The Town,of Pittsboro is constructing an addition to their water filtration plant-. A new positive` intake location is required. This creates a necessity to cross Brooks Creek with two 24" ductile iron intake mains, a temporary access road to construction site and construction of new raw water intake. 2. Wetlands: Location of pipeline crossing, raw water intake and temporary access road not in wetlands designated area. 3. Location: Chatham County, North Carolina, Brooks Creek at Haw River, North of U.S. 15-501 4. Maps and Drawings: See Exhibit "A" and "B". If there are any questions or additional information that I can forward, please give me a call. LAURENCE A. ALLEY, P.E. JEFFERY D. MOODY, P.E. HERBERT A. CARMEN, A.I.A. HAYWOOD B. KING, P.E. WAYNE B. PERRY, R.L.S. DEMETREOS N. CALLINICOS, A.I.A., R.I.B.A. FRANZ K. HOLT, P.E. DARRELL L. RUSSELL, P.E. KENNETH D. STAFFORD, A.I.A. Mr. John Dorney Division of Environmental Management January 21, 1992 Page 2 88164 Not realizing that a Corp of Engineers Permit was needed for this type of construction, we have installed the two 24" mains under Brooks Creek and are in the process of constructing the intake structure. If there are additional forms to be forward. Please send me a copy and I will return with required information. If additional information is needed, please advise. Sincerely, ALLEY, WILLIAMS, CARMEN, & KING, INC. d Hayes B. King, P. E. HBK/sj encls. (Exhibit "A" and "B") cc: Town of Pittsboro alley, williams, carmen & king, inc. l >r? ????yyyy?y?y??{{{{{{' 1 I! 47'30" 3962 r- //???-? ?\.- `\ _'? J' `y^ /"7f' 11 if ?` .. ?? 5?.1? ? _ i ?''( ?.t 1 i? ? ? ?\527? : ?. •? - I ^` /''•: rj /111 4V CL ? ) )Ifs i ? ?"?'' ? =1 II(j( /???_? ?` \ .: ? ' T???(\ `,. ? -..1 •`i ??, ? ,\ _ ..y I ?\ ? l ? ? -. ? , ?.? -y. qtr ?` . 1e RUsW IaW 7: o ,J J ?1 i 3959 A_ \ '\ 1 / 350 \ 1 / ? jl - ? '?' ??^ \ ? ?.? ? ? ? ?/ ?-?Zl?f? ??1 '??? qtr' _ r`` ? ?? r t' f?rrr:;e ?KU1,ti . - /? 7 - ?'?' ?, :? ?.1.. '-. o is •.J ?? .. _ .. 665 :ANf-!,ra0 M1 r 10' .666 .667 •. e , . ?t ..:,.,9,., ?..;.?. .35".45' 668. s69«wmE 79°0.7'30 t>MfLE ROAD CLASSIFICATION . ' -= Primary hi IN') ghway all weathers' Light•duty road, all we " 7000 FEET ather, __.j hard surface improved surface ? K ?G!•tETER - - ; Unimproved road, fair or dry PROPOSED? CREEK CROSSING p weather T TSBORQ. U S. Route ;State Route r . EXHIBIT All:` BYNUM. N. C. S