Loading...
HomeMy WebLinkAbout20060197 Ver 1_Approval Letter_20070129~CF W A TF9Q ~~ ~ r D ~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 29, 2007 Mr. Tim Smith, Manager Member Helmsdale Investors, LLC 100 Weston Estates Way Cary, NC 27513 Re: Helmsdale at Landfall; New Hanover County DWQ #20060197; USACE Action ID. No. SAW-2005-1184-065 APPROVAL of 401 Water Quality Certification Dear Mr. Smith: Attached hereto is a copy of Certification No. 3611 issued to Mr. Tim Smith of Helmsdale Investors, LLC, dated January 29, 2007. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. AWK/cbk Attachments: Certificate of Completion Sincere Alan W. Klimek, P.E. cc: Kim Williams, Land Management Group Mark Hargrove, Withers & Ravenel Jennifer Frye, U.S. Army Corps of Engineers, Wilmington Regulatory Field Office Noelle Lutheran, DWQ, Wilmington Regional Office Stephen Rynas, DCM Morehead City Becky Fox, EPA Region 4 DLR Wilmington Regional Office File Copy Central Files Filename: 060197HelmsdaleAt Landfall(NewHanover)40I_IC wt~~t n'--''-- 401 Oversight/Express Review Permits Unit ~Qtl[Cll~t/lf 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal OpportunitylAffinnative Action Employer- 50% Recycled/10% Post Consumer Paper Helmsdale Investors, LLC Page 2 of 5 January 29, 2007 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to Mr. Tim Smith of Helmsdale Investors, LLC to 6110.181 acres of jurisdictional wetlands in the Cape Fear River Basin, associated with the construction of access roads for a single family residential subdivision in New Hanover County, North Carolina, pursuant to an application filed on the 6th day of February of 2006, and in additional correspondence received June 7, September 15, and December 12, 2006. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions ftom the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts except the two bridge crossings: Amount A roved Units Plan Location or Reference Stream N/A feet 404 Wetlands 0.181 acres Road im acts 2, 3, 5, and 6 Waters N/A acres Buffers N/A s uare ft. Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. 11Vl1llV4MaV 11a~V.alVa ~, uuv Page 3 of 5 January 29, 2007 b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be'such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities;as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enr.state.nc.us/su/Forms Documents.htm. Continuing Compliance: 6. Mr. Tim Smith and Helmsdale Investors, LLC shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that!further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Tim Smith and/or Helmsdale Investors, LLC and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Tim Smith and/or Helmsdale Investors, LLC in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. Helmsdale Investors, LLC Page 4 of 5 January 29, 2007 Miti ag tion: 7. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR -Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5205 if you have any questions concerning payment into a restoration fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: Compensatory Mitigation Re uired River and Sub-basin Number Stream N/A feet Wetlands 0.181 acres CPF24 03-06-24) Waters N/A acres In addition, 8.98 acres of jurisdictional wetlands within the project limits and 37.61 acres of jurisdictional wetlands within the Landfall community on the south side of Arboretum Drive and west of Deer Island Lane must be placed in permanent preservation. Deed restrictions for the on- site preservation must be recorded and a Conservation Easement held by a third party must be placed on the off-site preservation tract. Language used to accomplish this preservation must be approved by the USACE prior to recording. Preservation of the wetlands described above in addition to payment to EEP will satisfy DWQ's mitigation requirements. A copy of the recorded documents and associated maps must be provided to DWQ's Wilmington Regional Office and 401 Oversight Unit in Raleigh prior to impacting any wetlands on the subject property. Road Crossings: 8. Culverts Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. ncuusuaro uivcswi~, L,L.~, Page 5 of 5 January 29, 2007 9. Construction Plans Any final construction plans for this project must include or reference the application and plans approved by the DWQ under this authorization letter and certification. Other conditions: 10. Wetland Boundary Identification The wetland boundary must be clearly identified on all lots that have jurisdictional wetlands present as depicted on the jurisdictional determination map signed by the US Army Corps of Engineers. The wetland boundary identification (flagging, fencing, etc.) must be maintained on each lot until the lot is sold. 11. Protective Fencing The outside wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities. 12. Sewer Systems The project shall comply with 15A NCAC 2H .0219(i)(2)(G) and all other State, Federal and local sewer system regulations. 13. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application :shall expire upon expiration of the 404 Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 29t day of Jan , 2007 D ION F T ALITY lan W. limek, P. . AWK/cbk 3611 Certification of Completion DWQ Project No.: Applicant: Project Name: Date of Issuance of Wetland Permit: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Agent's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly,. full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Date: hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, County: Signature: Registration No. Date