HomeMy WebLinkAboutDEQ-CFW_00087018Page 29 of 46
TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT
For Calendar Year 2006
Terms and Conditions
Was
Source
Deviation a
or
Permit
Records
Non-
Method(s) of
Emission
Control
Condition
Condition Summary
Deviation
Maintained
compliance
Determining
Source
Device
Number
?
?
Issue?
Compliance
Description
ID No. s
es / No
es / No
es / No
Status
Comments
Fluoro-
The inspection and maintenance
products
requirement shall include a
polymer
manufact'
FS-A
2.1.D.1(d)(i)
monthly visual inspection of the
ductwork
No
Yes
NA
Monthly Fi lter
g
system and material
Inspection
development
collection unit for leaks.
facility
[2D .0515]
Fluoro-
products
The inspection and maintenance
polymer
requirement shall include an
An internal
manufact'g
FS-A
2.1.1).1(d)(ii)
annual internal inspection of the
No
Yes
NA
inspection was
development
bagfilter's structural integrity.
performed on
facility
[2D .0515]
07/12/2006
Fluoro-
products
The results of inspection and
polymer
maintenance shall be maintained
manufact'g
FS-A
2 . LD.1(e)
in a logbook on -site and made
No
Yes
NA
PIRec Area
development
available to an authorized agent
Records
facility
upon request. [2D .0515]
Fluoro-
products
polymer
L ® ®1 9
2.1.D.1e)
The logbook shall record the
PMDF Area
manufact' g
�
"
I"
date and time of each recorded
No
Yes
NA
development
I
;
,:;+ �� ] V
a n. [2D .0515]
J
Records
facility