Loading...
HomeMy WebLinkAboutDEQ-CFW_00087018Page 29 of 46 TITLE V AIR PERMIT COMPLIANCE SUMMARY REPORT For Calendar Year 2006 Terms and Conditions Was Source Deviation a or Permit Records Non- Method(s) of Emission Control Condition Condition Summary Deviation Maintained compliance Determining Source Device Number ? ? Issue? Compliance Description ID No. s es / No es / No es / No Status Comments Fluoro- The inspection and maintenance products requirement shall include a polymer manufact' FS-A 2.1.D.1(d)(i) monthly visual inspection of the ductwork No Yes NA Monthly Fi lter g system and material Inspection development collection unit for leaks. facility [2D .0515] Fluoro- products The inspection and maintenance polymer requirement shall include an An internal manufact'g FS-A 2.1.1).1(d)(ii) annual internal inspection of the No Yes NA inspection was development bagfilter's structural integrity. performed on facility [2D .0515] 07/12/2006 Fluoro- products The results of inspection and polymer maintenance shall be maintained manufact'g FS-A 2 . LD.1(e) in a logbook on -site and made No Yes NA PIRec Area development available to an authorized agent Records facility upon request. [2D .0515] Fluoro- products polymer L ® ®1 9 2.1.D.1e) The logbook shall record the PMDF Area manufact' g � " I" date and time of each recorded No Yes NA development I ; ,:;+ �� ] V a n. [2D .0515] J Records facility