Loading...
HomeMy WebLinkAboutDEQ-CFW_00086945DuPont, 0900009 Subject: DuPont, 0900009 From: Robert Kennedy <Robert.Kennedy@ncmail.net> Date: Mon, 24 Sep 2007 08:45:50 -0400 To: Fern Paterson <Fern.Paterson@ncmail.net>, Jim Moser <Jim.Moser@ncmail.net> Fern, Here are my comments on the DuPont draft T31. Since I'm getting into this application late, let me know if these issues have already been discussed. Emission source table - in the body of the permit (2.1 Section C) emission sources controlled by NCD-Hdrl and NCD-Hdr2 are described as controlled by "and/or" or "or" these control devices, but the source table reads as if both control devices are attached to each emission source. 1 Section B. Butacite Process - the emission source table lists four emission sources (BS-B1.1 through BS-B1.4) controlled by BCD-B1, but in section B, th four 1/ sources are grouped into BS-B1. Ditto for BS-B2.1 thgough BS-B2.4. Page 9 jIx"d ,/-1 Section B. Butacite Process - BS-C is the 1lonly ou c in thisa(�c�ion wUth�tC.�..- particulate or VE requirements. Page 11-12 01- J�A �� — - AO G U' 9 2.1 Section E. APFO Manufacturing - inspection records for the wet scrubber must be t� kept, but there is nothing requiring the inspection toy�e completed or listi g( he 1 minimum frequency of the inspections. Page 20 — h0 ' O fvc Sye rp�tne�y�,( 2.1 Section G. Temporary Boiler - the sulfur dioxide emis�on i( limited to 40 tons, and DuPont is required to record and report the gallons of #2 burned, but the gallons and emissions are not tied together. Should there be a limit of the number of gallons of .5% sulfur oil burned? Should DuPont calucate sulfur dioxide emissions. Page 22 alK / wo a e� -- oQor�� 2.1 Section I. Polyvinyl Fluoride Polymer - if E is abov/Ita, al, DuPont can correct within the monitoring period. The monitoring period is 3; should the correction time be changed to 1 day or 5 days? Page 25 Y 4o cog +- 6- 2.2 Section B. Toxics - inspection records for the scrubbers must be kept, but there is nothing requiring the inspection to be completed or listing the minimum frequency of the insp �cti� ��,� ons� in this seciton. Page 31 / �4�• L 6I\tor- raK. I'm in a taff meeting starting at 0930. I'll call later in the AM. Thanks, Bob of 1 9/24/2007 9:27 AM DEQ-CFW 00086945