Loading...
HomeMy WebLinkAboutDEQ-CFW_00086882CENTRAL OFFICE PERMIT TRACKING SLIP Facility Name ' �n-� �g .�/�t �'v��- Region: G Application Number: O `� D 6bo 7 : v 7A County0 Greenfield Facility: Yes U No)( (If YES, call region/fax Al Form for entry into IBEAM) Assigfl Application: Pa-t5evt-�d✓1 PART I - ACCEPTANCE CHECKLIST (Determines Acknowledgement Letter Content) Acknowledgement Letter: Already Sent 0 Please Send A 'Type Letter: Standard —p� Renewal ❑ Administrative Amendment ❑ Ownership Change ❑ Name Change 0 Application Not Accepted (Incomplete) ❑ (This event stops the clock until needed material is received and event is closed out in [BEAM) Application Fee Received ib 1. � Yes No NA PSD or NSR/NAA $13,488 Appropriate Number of Copies Received (minimum of 2) A ❑ ❑ PSD and NSR/NAA $26,235 Send Region Copy of Application 0 0 TV Greenfield $8,910 Consistency Determination Applied For El Source Recycling/Reduction Form Received 0 0 TV $86 ❑ ❑ % ership Change $62 PE Seal ❑ ❑ Renewal/Name Change — Not Applicable Authorized Signature PART II - IBEAM UPDATES (Sets Schedules) Permit Application Type Processing Schedule Additional Permit 0 Appeal ❑ TV — Administrative ❑ Administrative Amendment Cl Director Administrative Amendment ❑ TV — Expedited ❑ Appeal ❑ Expedited State ❑ TV — Greenfield Cl Greenfield Facility ❑ Permit Applicability Request ❑ TV — Minor ❑ Last MACT/Air Toxics 0 PSD ❑ TV — Ownership Change ❑ State 0 TV — Renewal 0 Modification X Name Change ❑ TV — Reopen for Cause ❑ Permit ❑ TV — Significant ❑ New TV — Significant (2Q .0501(c)(2)) 0 Ownership Change ❑ ❑ TV — State Only Renewal ❑ Renewal w/Modification ❑ TV — 502(b)(10) TV —1 a Time o PART III - COMPLETENESS CHECKLIST (For Engineers to Complete and Request Information if Necessary) Required Application Forms Submitted and Completed ❑ PE Seal (If 15A NCAC 2Q .0112) ❑ Modeling Protocol Acceptance D ES Form (Significant Modifications) ❑ Supporting Materials & Calculations Received ❑ Confirmation of Pollutants Modeled D PART IV - GENERAL COMMENTS }2� S� �'Cu vt. ►S i ci2 113 e� —y e ri rV_e s H7/r2(�L4 /lout `h.4 u1 1 %//a✓� f•ic 1s�r^�i+-v a"itr+�iYM/�i=* l '1/1 'vlil�l l/ /�Gt�Z✓ LbdV`Gt�� -- PART V - SUPERVISOR VIEW CHECKLIST P ESM Updated by Engineer, R14 TV Coordinator: 101q.01 c� SupervisorA�� � 2®®� C ESM Verified: PART VI - CLOSEOUT INFORMATION Regulations Applicable to This Application (indicate all new regulations) ISRS 0 NESHAP/MACT voidance ❑ 2D .1100 _ ❑ 2Q .05'ia�st ❑ Prohibito a ❑SIP 1\. y ❑ 2Q .0MA oxic After Before Permit Class Information Small 0 Synthetic Minor ❑ General ❑ Small ❑ Synthetic Minor ❑ General ❑ (check all that apply) Prohibitory Small 0 Title VXTransportation ❑ Prohibitory Small ❑ Title V�'Iransportation ❑ IIAP Major (10/25 tp) Majo Minor ❑ Not Determined ❑ PSD Status Major inor ❑ Miscellaneous Multiple Permits at Facility ❑ / Multi -Site Permit 0 Quarry Special Permit ❑ Recycled Oil Condition [I Dates Issue Effective Expiration �l c3 ] IBEAM Closed Out By: Permit Nu ber: 1 Revision Number: / to Document Manager Updated by Engineer: f i Tracking Slip V30 - rnic DEQ-CFW 00086882