Loading...
HomeMy WebLinkAboutDEQ-CFW_00085789NEDENR North Carolina Department of Environment and Natural Resources DIVISION OF AIR QUALITY Michael F, Easley, Governor January 9, 2009 Ms. Karen Wrigley, Plant Manager DuPont Company - Fayetteville Works 22828 NC Highway 87 West Fayetteville, NC 28306 SUBJECT: Title V Annual Compliance Certification DuPont Company - Fayetteville Works Fayetteville, Bladen County Facility ID: 0900009; Permit No. 03735T33 Dear Ms. Wrigley: William G. Ross, Jr., Secretary B. Keith Overcash, P.E., Director Our records indicate that DuPont Company - Fayetteville Works, Fayetteville, Bladen County, has been issued a Title V Permit, which requires the submittal of an annual compliance certification (ACC) each year by the date specified in General Condition 3.P. of your Title V Permit. The ACC must be signed by a responsible official (as defined under 40 CFR 70.2), and signed copies must be submitted to the following: a. Two copies to the Fayetteville Regional Office of the Division of Air Quality (DAQ) at: Systel Building, 225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5094 b. One copy to the EPA at: Air and EPCRA Enforcement Branch, EPA, Region 4, 61 Forsyth Street, Atlanta, GA 30303 We recommend that, as a minimum, you send the ACC to the EPA via certified mail. The DAQ has developed forms that meet the requirements for the ACC. The DAQ forms are available for download on the DAQ web site (http•//www.ncair.org/enf/certification/). Instructions and examples to assist you in properly completing the DAQ forms are included within the compliance certification forms themselves. You may opt to use the DAQ forms or you may supply the information required for compliance certification in your own format. If you choose to use the DAQ forms, please note that these forms have been modified slightly from versions you have used in previous years. The current version is Revision 2.8, as noted in the bottom right hand corner of the forms. If you choose to use your own format, the compliance certification must include all the required information to be considered complete. The required information is specified in the instruction section of the DAQ forms and is also specified in General Condition 3.P. of your Title V Permit. Finally, please remember to include in your ACC all violations cited in any Notices of Violation issued to your company during calendar year 2008. / If you have any questions with regard to the annual compliance certification, please do not hesitate to contact Robert Hayden at (910) 433-3365. Si erel�, FSteven F. Vozzo Regional Air Quality Supervisor cc: Central Files Fayetteville Regional Office Files Fayetteville Regional Office Systel Building, 225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5094 Phone: (910) 433-3300 / TAX: (910) 485-7467 / Internet: http://daq.state.ne.us/ An Equal Opportunity / Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarohil'At 7 } DEQ-CFW 00085789