HomeMy WebLinkAbout20090802 Ver 1_401 Application_20090709Dewberry°
July 21, 2009
2301 Rexwoods Drive 919 881 9939
Suite 200 919 881 9923 fax
Raleigh, North Carolina 27607-3366 www.dewberry.com
Ms. Amy Chapman
Environmental Senior Specialist
NC Division of Water Quality
Wetlands and Stormwater Branch
1650 Mail Service Center
Raleigh, North Carolina 27699-1650
09-0802
Reference: City of Raleigh Public Utilities Department
Sanitary Sewer Easement Improvements - Buck Jones Road
PCN Application
Dewberry Project No. 50005267
Dear Ms. Chapman:
[9@90WL9
JUL 2 3 2009
DEW • WATER QUALITY
WETLANDS AWD STORfdWATER BRANCH
Enclosed are five copies of a Pre-Construction Notification (PCN) Application Form, USGS quadrangle
map, USDA soil map, site plan, and site photos for the project: Sanitary Sewer Easement Improvements -
Buck Jones Road.
The sanitary sewer easement improvements on Buck Jones Road included the installation of a "cattle gate,"
to prevent access by unauthorized vehicles, and stabilization of the driveway near a culvert outfall.
Please call with any questions regarding this after-the-fact permit application.
Sincerely,
Dewberry & Davis, Inc.
?U
Mary Brice, P.E., LEED AP
Project Engineer
Enclosures
c: Donna Jackson, P.E., City of Raleigh
P:\50005267\Adm\Permits\430 Buck Jones Rd\chapman.09.07.2 Ldoc
Dewberry & Davis, Inc.
09-0802
s O?O? I NA 7- RQ
? Cif P
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
El Section 404 Permit El Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? ? Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express N Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ? No For the record only for Corps Permit:
? Yes ? No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. if yes, answer 1 h
below. ? Yes ® No
1 In. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Sanitary Sewer Easement Improvements - Buck Jones Road
2b. County: Wake
2c. Nearest municipality / town: Raleigh
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no:
n. R
ar?um?R
3. Owner Information
3a. Name(s) on Recorded Deed: J UL 2 3 200
3b. Deed Book and Page No.
M(
3c. Responsible Party (for LLC if
applicable): WETUWDDENR - WATER QUAL
SANDSTU?MWATERBRANCH
City of Raleigh Public Utilities Department
3d. Street address: 222 West Hargett Street
3e. City, state, zip: Raleigh, NC 27602
3f. Telephone no.: 919-890-3400
3g. Fax no.: 919-890-3600
3h. Email address:
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: Mary T. Brice, P.E.
5b. Business name
(if applicable): Dewberry & Davis, Inc. (Dewberry)
5c. Street address: 2301 Rexwoods Drive, Suite 200
5d. City, state, zip: Raleigh, NC 27607
5e. Telephone no.: 919-881-9939
5f. Fax no.: 919-881-9923
5g. Email address: mbrice@dewberry.com
Page 2 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
within a sanitary sewer easement located on DOT right-
la. Property identification no. (tax PIN or parcel ID): of-way of Buck Jones Road near its intersection with
Bashford Road, and on property owned by City of Raleigh
(PIN 773975957)
Latitude: 35.777553 Longitude: -
1 b. Site coordinates (in decimal degrees): 78.732458
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to unnamed tributary of Walnut Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C: NSW
2c. River basin: Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Project site is an existing sanitary sewer easement located parallel to an unnamed tributary of Walnut Creek, partially
within the right-of-way of Buck Jones Road and partially on property owned by the City of Raleigh. Land use in the
vicinity of the project is commercial and residential.
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3d. Explain the purpose of the proposed project:
Driveway improvements at access to sanitary sewer easement at Buck Jones Road.
3e. Describe the overall project in detail, including the type of equipment to be used:
Driveway improvements included the installation of a driveway culvert pipe and a "cattle gate." Conventional construction
equipment (backhoe, dump truck, etc.) was used for the installation. The area was seeded and mulched immediately
upon completion of the work.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
? Yes ®No ? Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
? Preliminary ? Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for El Yes ? No ® Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 4 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ? Streams - tributaries ® Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P M T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - or
(PER)
(Corps - 404, 10
stream
length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (I NT)? other) (feet) feet)
S1 ? P ? T ? PER ? Corps
? INT ? DWQ
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number
- Permanent
(P) or
Temporary T 4b.
Name of waterbody
(if applicable) 4c.
Type of impact 4d.
Waterbody type 4e.
Area of impact (acres)
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a.
Pond ID 5b.
Proposed use or purpose of 5c.
Wetland Impacts (acres) 5d.
Stream Impacts (feet) 5e.
Upland
(acres)
number pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
K Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
® Neuse ? Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason for Buffer Zone 1 impact Zone 2 impact
Permanent (P) impact Stream name mitigation (square feet) (square feet)
or Temporary required?
T
61 ®P ? T driveway unnamed tributary to Walnut ? Yes
1
000
0
improvements Creek ® No ,
B2 ?P?T ?Yes
? No
B3 ? P ? T ? Yes
? No
6h. Total buffer impacts
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Driveway width was minimized to the extent possible for access to the existing sanitary sewer easement.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
By improving the driveway, access to the sanitary sewer easement has been stabilized and should result in less impact in the
buffer during vehicular access to the sanitary sewer easement in the future.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ? Yes ? No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
? Mitigation bank
2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ®No
Comments: Project does not necessitate stormwater collection.
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 0%
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: project disturbed «0.1 acres
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
® Other: not required
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a. Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply):
? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ? Yes ? No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ® Yes ? No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Project is improvements to the access to a sanitary sewer easement. The project will generate no wastewater.
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ? No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No
impacts?
?
Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ? No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
*? N'J 11k V-
1Z c •C, i•4
Pj. C • Z
. Z
o
I
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 11 of 11
PCN Form - Version 1.3 December 10, 2008 Version
478° 45' 0.00" Vy 978` 44' 0.00" Vy 1 978-43 0.00" VY
Z
i
71
r,Y/%�..r\i! ' P" /I 4 ,( ".'`'
r {
�`h i• -
.: T��}4 (
Z O
Q
w�l !✓
,t{f ,''�"
r3 .; :. y
coyf1�
co
\ -:. �, �"
I
t 4-.-^'� '/jr' �'`� 'r°/� 1 �
1 yY
\Ti ^. `4^"� � � r.1wq�Ei�.�"-� I( �'i
/J11 JP
f+/ "'� { { r� :1'•
«.
- !,.�
5#..# •"'ate
el .. W?C'f?(,�%", •,t
f �.% �^^'�'"fJj// f fj '�4 f
v,.'R . (lr�,.,, 1 M1r�`,.�;
ti�\SS,.,-�`+ lq�.P ''''/I'\Y
{ �L�. Y .c; 'y�
s f f
i
IW
w- � _ �-s... f � r
J« ifs �• -��.
,� .�;'. h,.•f. _._ � i « ,3 ,
liv, ., w. '� ,.'s
.. �t f�{ g �a ,� • "z _.
—
Y
47"', ��`'Vi-.:
:•}S 'V �:i �f { R ,i j .y Pi
�� .! � y }. �5 }/ j (d � f jAfjjfJ}�jq i
i«..s '^.-'� '- }.,t\ n } #`
O
ty, !
4�
of '
SITE
i 1i qq % y ^�, g♦ �B �� R
-'' '
-.. v � +�
� ��r ';isl �fi
.-- y, , ,
-ti f } � ' .. I t �+t. � �� '.. s i ; �\ +% --�` � � � R } .� t t � ��� • � 'v�"�
y
¢
tr
!`y
ice
\'4A.,,.,. ««+1.l14`�f
1\'4A,,,. -,
� A h
t` f .i ` f. IE"�-, � �:.: '.` t..• a �i�}� ��h: " g�" i; f %"� �i� s%� . TYd�,., .\ �i it
,�
4Yk
F IN
� .
a-0 �gy""7 / �� f � � ��s" +�"� � t1� ���E4 "�`♦-"'`'�'� n4' ,
j �`/ �/'! �,a ��
^• �}d SIS
��
I
;
Z.«.,,
f „�
+� is -.. �Y:."."`p.,1t I f '.r''H, {✓--•,£�J i �``y"�� ( J I
-« L r
,
e 1177
yr
Ko�-,r n 7
O
�
t `_��.
7A-R)
f , s 50 yf • — R
f
� v ���f /{{ •;`.�� 1,.��,''�;yt 3ai � f
A
� it �
t
� � 1
SCALE 1:24000 `
0 1 MILES
0 1000 YARDS
0 1 KILOMETER
� std
91 W
U(b- 4b' U.UU- VV 078' 44' 0.00" W ' I 1 078' 43' P
0.00" \At
Name: RALEIGH WEST Location: 035° 46'38.01" N 078° 43'55.3211 W
Date: 7/20/2009 Caption: Sanitary Sewer Easement Improvements - Buck Jones Road
Scale: 1 inch equals 2000 feet
Inc.
a
e
„ H L ,ZV .BL
„ZZ ZV .SL
0)2
0?
00
N ?
O N
N ?
r- cc
CL
N
7
N
N
N d
O
? O ? O
?0 0
Olt U3
O po
N N O
L ?
N
t
m
d
N
Q
C
O O
d O O
C O N
n
O
O
o p
v O O
N O O
ai
O O
Z -<
.,ZV ,SV .BL
O
7 j
f0
O N
fn p.
N O
3:U
m
0
f0
Z
N 2
?U)
7
N O
N +r
Co y
? N
w
co 0
O
z0
8?
a
cn
0
m ?
U
O 7
fC m
U w
•C c
m
Z aEi
c o
? a
0
U -
N c
m m
3 m
w
mW
Z 0
0 3
U m
co
m
m
z
O
G
O
LL
Z
Ca
L
Z
Lu
LU
J
a
co
O r
N
L L
N m >
(D
m
a N O /)
3 0 0
(D _
O U 2 cm
Z m
'a
O
O
O .C
O Q) m (n W
7 tr-
C O
N C O) E
_ U N
a C
U
O
CO
X m
E
N 2 U
M C
U)
C
?- (n .0 O
O O V)
i)
N L T Cl)
m m
0 U
z O r-
m 0 (O :5 .-. •-•
L
N
a f/)
C ?
Q
Z Z Lc°v o
a
) s o N
N 0 E U T o ao ?
c 3 m
v)
Q
Q
L
V o z
w y r
N L
U
= O N
Z
m a
m m
0 a) Q a)
C O N 7 m m O
t T? O N a y N
n
00 > C
O Ozi- o
p
N 3
o 0°i o E?`m y
cD
E
m
C
CL r- m
L o
-6
.? UC
N 'N a
N
` 0
>
m o y m
p_ E y m ?a
ID
a
? E
am
m lC J fn m
> vi L C ,?
p
a l6
w 9 Z
E N-
C ; O O N O
"'
a
V N m
w > n
rnm io
19 m E a
° °f( C
N
N
C Vl
C
a T
N m
.
0
? ,
O a m 0
O
c- O M O U) U a Q m m a a 4
m 'n i N O m
U) C -:o' .2
O Q m L -O a
7
a O
`n
m N
7
m N
n o
0
nm
w>
U) a)
- Z a
o'a0m
w E m E
H FL E inf o H- inch ? H u.? o
>m m ,
° m
O_ -° U r
N w `C a N w
c (D O O y m O O O
O a A U) o I)f
U) E
Ul L t W _ a) U
a) m - co
> O J C7 (n O U O fA o w S J
LL m t
m y O
A LL O
C y O
Ic,
•-O m `
a
o ? a
Q a
O_
N N E
H d m Z w m n
° i y o = > o o w o a
a o a CL 'L
a a >, _ -° o - M -ia w ' O ?, ° ? cn vii
U) 10 = N > w _ LL L ° Q) c m > o o` Q
Q° LL ° o
> Y 'D 'D O C
3: > ca m O N m c > f` C N N O C 10
N O
Q U) o m co U U C7 5 J J m w m m m cn N 0 m N
a a
c
A y ® x o o > +
CL
o U)
Q rn
O) M
O
O O
N N
O N
m
a
d
Z
>'o
W 2.U
3 m
N -
- m
0 0
U a
a o
U
m
0
m
z
N
_O
d
U N
7 N
O C
y
? m
a
m o
Z U
f
Soil Map-Wake County, North Carolina
Sanitary Sewer Easement Improvements - Buck Jones
Rd.
Map Unit Legend
Wake County, North Carolina (NC183)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AgC2 Appling gravelly sandy loam, 6 to 10 percent 1.9 2.6%
slopes, moderately eroded
ApD Appling sandy loam, 10 to 15 percent slopes 1.1 1.5%
AsB Appling fine sandy loam, 2 to 6 percent slopes 1.3 1.8%
Ce132 Cecil sandy loam, 2 to 6 percent slopes,
moderately eroded 6.2 8.5%
CeC2 Cecil sandy loam, 6 to 10 percent slopes,
moderately eroded 4.7 6.4%
CeD Cecil sandy loam, 10 to 15 percent slopes 5.6 7.7%
CgB Cecil gravelly sandy loam, 2 to 6 percent
slopes 9.1 12.5%
CgB2 Cecil gravelly sandy loam, 2 to 6 percent
slopes, moderately eroded 13.1 18.1%
CgC Cecil gravelly sandy loam, 6 to 10 percent
slopes 9.1 12.4%
CgC2 Cecil gravelly sandy loam, 6 to 10 percent
slopes, moderately eroded 3.5 4.9%
CmA Chewacla sandy loam, 0 to 2 percent slopes,
frequently flooded 10.0 13.7%
PaF Pacolet sandy loam, 15 to 45 percent slopes 0.8 1.1 %
PcE3 Pacolet clay loam, 10 to 20 percent slopes,
severely eroded 1.1 1.5%
UdD Udorthents loamy, 0 to 15 percent slopes 4.4 6.1%
W Water 0.9 1.2%
Totals for Area of Interest 72.8 100.0%
k'N1A Natural Resources Web Soil Survey 7/20/2009
;@" Conservation Service National Cooperative Soil Survey Page 3 of 3
??????? DATE TITLE SHEET NO.
??':?
''? Dewberr BANK STABILIZATION
•
y
D
b
& D 07-20-09
ew
avis, Inc.
erry
ry PROJ. NO. PROJECT C i
2301 REXWOODS DRIVE
SUITE 200
RALEIGH, NC 2]fW
BUCK JONES ROAD J I
PHONE: 915.881.9939
FAX 91 9.881.9921
FAX_ 91
50005267
BUFFER DISTURBANCE
Sanitary Sewer Easement Improvements - Buck Jones Road
Driveway improvements included stabilization near outfall of culvert under Buck Jones Road.
Gate was added to prevent access to sanitary sewer easement by unauthorized vehicles.