Loading...
HomeMy WebLinkAboutDEQ-CFW_00071372DIVISION OF AIR QUALITY Technical Services Section August 22, 2013 MEMORANDUM Bladen County To: Steven Vozzo, Fayetteville Regional Office (FRO) From: Gregg O'Neal, P.E., Stationary Source Compliance Branch (SSCB) Subject: E.I. du Pont de Nemours and Company, DBA, DuPont Company — Fayetteville Works Duart Township, Bladen County, NC, Facility ID 0900009, Permit No. 03735T37 Protocol for CFR 98.124(g)(2)(i), Hydrogen Chloride Emissions Testing of Nafion Process (Source ID Nos. NS-A, NS-B, NS-D, NS-E, NS-F), Tracking No. 2013-127ST Nafion Vinal Ether South (Source ID No. NC-C), Tracking No. 2013-128ST Testing to be Performed by Entec Services, Inc. on August 13 through 14, 2013 Note the required testing is for the Part 98 Mandatory Greenhouse Gas Reporting Subpart L Fluorinated Gas Production. The administrator at this time for the required testing is the EPA in Washington DC. The test protocols NCDAQ Tracking Nos. 2013-127ST and 2013-128ST are for the 10 year testing requirement listed in CFR 98.124(g)(2)(i). NCDAQ is not the administrator for this subpart and therefore cannot give an approval. The e-mail on the next page was sent to the facility to direct them to the correct contact person with authority to approve DuPont's request for testing deviations. If there are any questions concerning this matter, please contact me at (919) 707-8415 or gregq. oneal(a_ncdenr.gov. cc: Central Files, Bladen County IBEAM Documents - 0900009 DEQ-CFW 00071372 Oneal, Gregg From: Oneal, Gregg Sent: Wednesday, July 31, 2013 2:52 PM To: 'dianne,l.fields@dupont.com';'kpoole@entecservices.com' Cc: Reeves, Gregory W; Vozzo, Steven Subject: Method 26 Destruction device performance testing for CFR 98.124(g)(2)(i) (August 2013) Dianne, I just got off the phone with Debbie Otinger with EPA. I believe she is the correct administrator contact for the proposed testing. You submitted two testing protocols to NCDAQ for review and approval in order to meet the every 10 year testing requirement listed in CFR 98.124(g)(2)(i). Since we are not the administrator for this subpart I do not have the authority to approve your request for both Method 26 deviations and your request to waive the Method 26 audit. Debbie's phone number is 202-343-9149. Please feel free to contact me if l can be of any further assistance. Thanks, Gregg O'Neal Thomas Gregg O'Neal, III, P.E., Environmental Engineer Stationary Source Compliance Branch NC DENR, Division of Air Quality Technical Services Section NC DENR, Division of Air Quality 1641 Mail Service Center Raleigh, NC 27699-1641 Phone/Fax:919-707-841S Fax:919-707-0718 www.ncair.ore grese.oneal@ncdenr.eov Email correspondence to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties unless the content is exempt by statute or other regulation. DEQ-CFW 00071373 7/26/13 Protocol Tracking Form - SSCB Internal Page 1 of 1 Facility Name: DuPont Company - Fayetteville Works Facility ID: 0900009 Tracking No.: 2013-128ST Proposed Test Date: 08/14/2013 Permit No.: 03735 Revision No.: T37 County: Bladen Region: FRO Protocol Reviewer: Gregg O'Neal Protocol Review Assigned Date: 07/26/2013 Emission Sources: NS-C Nafion Vinyl Ethers South process [MACT FFFF] NS-C Nafion Vinyl Ethers South process [MACT FFFF] NS-C Nafion Vinyl Ethers South process [MACT FFFF] Draft Submitted: (1) (2) Draft Returned: (1) (2) Final Draft Approval: Final Letter/Memo Issued:�c ZR�' Notes: (3 )_ (3 )_ Date:_ /�%r DEQ-CFW 00071374 7-ZO -13 K ne Fc�rney 9r 30 g 5:, rZ J� k4__ C�—S:�' o�Q �e Z'i�x,c 7 Z b-Z 3;4�; - � I &//14 5,v:4 7-3/- 3 -- DEQ-CFW 00071375 j TO: SHANNON VOGEL Protocol Transmittal Form - from Region to SSCB Facility Name: DuPont Company - Fayetteville Works Tracking No.: 2013-128ST Permit No.: 03735 Revision No.: T37 Protocol Received in Region: 06/28/2013 Protocol Sent to SSCB: 07/16/2013 Proposed Test Date: 08/14/2013 Assigned Inspector: Gregory Reeves Comments: 0 w M L JUL 1 13 t it AIR QUALITY ;. ^PY SOURC'F cU�api „P„ 7/16/2013 Facility ID: 0900009 County: Bladen U_ J U L 1 7 2013 Region: FRO DEQ-CFW 00071376 r.rw.r L PROTOCOL SUBMITTAL FORM (Rev. 2010a) HCDENR Dm.g1rnN OF Ant OUALITY PAGE 1 OF 2 Purpose: The goals of the Protocol Submittal Form are to initiate communication between representatives of the permitted facility, the testing consultants, and the DAQ as well as to identify and resolve any specific testing concerns prior to testing. Instructions: Use Guidance Document to fill out this form. Submit all forms and additional information to the DAO Regional Supervisor at Ieast 45 days prior to testing. Complete one form for each sampling location. If this form does not supply sufficient space to completely answer all questions or if additional relevant information is necessary, attach additional documentation and/or information to the original form. Questions and/or comments should be directed to the appropriate Regional Supervisor. This form and its Guidance Document are available from the DAQ website (http://daq.state.ne.us/enf/soureetesv) Specify Appropriate Regional Office: (check one) ❑ Asheville ® Fayetteville ❑ Mooresville ❑ Raleigh ❑ Washington ❑ Wilmington ❑ Winston-Salem Facility Name: Dupont Fayetteville Works Testing Company: Entec Services, Inc. Facility ID No: 0900009 Facility Contact Person / mailing address & email: Testing Company Contact Person / mailing address & email: Ms. Dianne Fields Mr. Keith Poole RECEIVED DuPont Inc. Entec Services, Inc. 22828 NC Hwy 87 West 301 Brookdale Street JU 2 ���3 Fayetteville, NC 28306 Kannapolis, NC 28083 Email Address: kpooIe@entePW4.tFJaVILLE REGIONAL OFFICE Email Address: dianne.l.fields@dupont.com Phone:910-678-1384 Fax:910-678-1261 Phone:704-933-0244 Fax: Mobile No.: Mobile No.: 704-796-73, Air Permit Number & Revision: 03537T37 Permitted Source Name and ID No.: Nafiong Vinyl Ethers South Process (ID No. NS-C) Permitted Maximum Process Rate: Maximum Normal Operation Process Rate: Target Process Rate for Testing: not applicable 60.4 kg/hr 60.4 kg/hr 1.1) What is the Mecific purpose for the proposed testing? (permit condition, NSPS, NESHAP, etc, see gui "ee do c : 9 ' ulQtia� �y �} jj �/ requires an emissions test every 10 years to determine the destruction efficiency of this wet scrubber. Is this an initial performance test? ❑ Yes or ®No 1.2) List all state and federal regulations that apply to the proposed testing (see guidance doc): 40 CFR 98.1 )(i) JUL 2011 1.3) Will the test results be used for other regulatory purposes (e.g., emission inventories, permit application, 9:1, W&1h50t11td&Ab-dW, J ® Yes or ❑ No If yes, explain. Emitted quantities of acid fluoride compounds, reported as hydrogen fluoride on the annual emissions inventory, are based on the control efficiency of this wet scrubber. 1.4) How will production/process & control device data be documented during testing (list specific control equipment, process parameters, instrumentation that will be used, frequency of data collection, collected by computer/manually, etc.)? TEST WILL NOT BE ACCEPTED WITHOUT APPROPRIATE PRODUCTION/PltOCESS & CONTROL DEVICE OPERATION DATA. Data will be collected using computer historian IP21 and/or DCS backup historian on documented on frequency of every 5 minutes. The following process tags will be used in IP21 to document production/process & control device data: VE-S PM: 1883FT production flow; VE-S PE: 1858FT production flow; VES WGS recirculation flow 2223FC; VES WGS inlet flow 2205FG; VES WGS outlet flow 2243FG 1.5) Provide a brief description of the source (including control equipment) and attach source or process flow diagram from source through stack exit: Nafion® Vinyl Ethers South process controlled by a baffle -plate scrubber (control device ID No. NCD-Hdr2) 1.6) Provide a brief description of the sampling location, attach schematic of sampling location, and indicate whether concurrent testing will be conducted at other sampling locations (Approval of protocol without this data will not exempt you from -Method 1 criteria): The sample locations are on the inlet to the WGS immediately downstream of inlet flow 2205FG and the exhaust of WGS immediately downstream of outlet flow 224317G. DEQ-CFW 00071377 PROTOCOL SUBMITTAL FORM (Rev. 2010a) NCDENR. DIVISION OF AIR QUALITY PAGE 2 OF 2 2.1) Provide the following information for each test parameter. Comments Target Proposed Number of Test Run # of Sampling Pollutant Test Method Test Runs Duration Points BF Modified 26* 3 60 min N/A Inlet and outlet Testing Very High Concentration on Inlet. 2.2) Will all testing be conducted in strict accordance with the applicable test methods? If answer is no, attach ❑ yes ® No complete documentation of all modifications and/or deviations to the applicable test methods. 2.3) Does the proposed sampling location meet the minimum EPA Method 1 criteria for acceptable measurement sites? ®Yes El No Attach supporting documentation. 2.4) Has cyclonic flow been documented at this source (EPA Method 1 Section 11.4)? ❑ Yes ®No ABSENCE OF CYCLONIC FLOW MUST BE VERIFIED DURING CURRENT TESTING. 2.5) Will the oxygen concentration be determined by ❑ EPA Method 3 via Orsat or ❑ strict EPA Method 3A (specify) ❑Yes ®No If answer is no, see Question 2.2 above. (Fyrites are NOT allowed per 15A NCAC 2D .2606) 2.6) Do any of the proposed test methods require analysis of EPA audit samples? If yes, notify Regional Office ® yes ❑ No a minimum of 45 days prior to testing to allow for audit sample preparation and shipment. 2.7) Has all testing equipment been calibrated within the past year? If answer is no, explain. Yes ❑ No 2.8a) Have all calibration gases been certified by EPA Protocol 1 procedures? (Answer only as applicable) ❑ Yes ❑ No 2.8b) Is a dilution system (via EPA Method 205) proposed? (Answer only as applicable) ❑ Yes ❑ No 2.8c) Attach a summary of e4cted calibration gas concentrations for all proposed instrumental test methods. 2. = i , prr ssed test schedule? DAO Regional Supervisor must be notified a minimum of 15 days prior to the actual test dates) OES NO CONSTITUTE 15 DAY REGIONAL OFFICE NOTIFICATION Wednesday August 14, 013 Additional Comments: Flows ill be determined by installed flow meters. **Inlet Method 26 modified to large teflon impingers due to high concentrations expected. Signatures: Representatives from the permitted facility and the contracted testing company must provide signatures below certifying that the information provided on this form and any attached information is accurate and complete. c DigitallyW. Keith DN:m= .Keitgned byW. ole,o=h Poole '; DN: rn=, In,, h Poole, is Enter ,Services, Inc, ou=Technkal Writer, email="Ie@entecserAces.com, Poole / D;te: 1.013.06.2611'.0057.04W PermittedIlacility Representative Date Testing Company Representative Date Name: Dianne Fields Name: W. Keith Poole RECCC IVED Title: Nafion/Fluoromonomers Manufacturing Title: Carolinas Operations M013 Technical Sr Engineer Company: DuPont Inc. Company: Entec Services, Inc. ENR-FAYETTEMLLE REGIONAL OFFICE DEQ-CFW 00071378 Outlet Sample Point Inlet Knock out pot TO VENT STACK �� k*Ewmm CES, SII'+11 . STACK TESTING AND POLLUTION CONTROL. SYSTEM EVALUAnON July 19, 2013 Ms. Shannon Vogel NCDENR — Technical Services 1641 Mail Service Center Raleigh, NC 27699 Dear Ms. Vogel, The Dupont Chemical Company plant in Fayetteville, NC has scheduled compliance testing for August 13 and 14 on two scrubbers (Permit IDs NCD-HDR-1 and NCD-HDR-2). Entec Services, Inc. has been subcontracted to perform this sampling. Protocols were submitted earlier this week outlining the sampling. In researching this project, it was discovered that the concentrations of HF were extremely high, approximately 800,000 ppm on the inlet and exhaust concentrations averaging about 3,000 ppm. An approved audit provider (ERA) was contacted but informed us that the only available audits ranged from 5 — 500 ppm. Based on this information, Entec would like to submit a request for a variance on the audit requirement for this project. If you have questions or need additional information, please call either Keith Poole or Dan McCombs at 704.933.0244. Sincerely, Entec Services, Inc. U �o-�, W. Keith Poole Carolinas Operations Manager Cc: Ms. Diane Fields — Dupont Chemical Mr. Steven Vozzo — Fayetteville Regional Office Entec File 301 Brookdale St., Kannapolis, NC 28083 P.704.933.0244 ENTECSERVICES.COM DEQ-CFW 00071380 ff da "' PROTOCOL SUBMITTAL FORM (Rev. 2010a) NCDENR DIVISION OF AIR QUALITY PAGE 1 OF 2 Purpose: The goals of the Protocol Submittal Form are to initiate communication between representatives of the permitted facility, the testing consultants, and the DAQ as well as to identify and resolve any specific testing concerns prior to testing. Instructions: Use Guidance Document to fill out this form. Submit all forms and additional information to the DAO Retionai Supervisor at least 45 days prior to testing. Complete one form for each sampling location. If this form does not supply sufficient space to completely answer all questions or if additional relevant information is necessary, attach additional documentation and/or information to the original form. Questions and/or comments should be directed to the appropriate Regional Supervisor. This form and its Guidance Document are available from the DAQ website (http://daq.state.nc.us/enVsoureetest/) Specify Appropriate Regional Office: (check one) ❑ Asheville ® Fayetteville ❑ Mooresville ❑ Raleigh ❑ Washington ❑ Wilmington ❑ Winston-Salem Facility Name: Dupont Fayetteville Works Testing Company: Entec Services, Inc. Facility ID No: 0900009 Facility Contact Person / mailing address & email: Testing Company Contact Person / mailing address & email: Ms. Dianne Fields Mr. Keith Poole DuPont Inc. Entec Services, Inc. 22828 NC Hwy 87 West 301 Brookdale Street Fayetteville, NC 28306 Kannapolis, NC 28083 Email Address: dianne.l.fields@dupont.com Email Address: kpoole@entecservices.com Phone:910-678-1384 Fax:910-678-1261 Phone:704-933-0244 Fax: Mobile No.: I Mobile No.: 704-796-7308 Air Permit Number & Revision: 03537T37 Permitted Source Name and ID No.: Nafion® Vinyl Ethers South Process (ID No. NS-C) Permitted Maximum Process Rate: Maximum Normal Operation Proce�Rate:Target Process Rate for Testing: not applicable 60.4 kg/hr 60.4 kg/hr 1.1) What is the s ep cific purpose for the proposed testing? (permit condition, NSPS, NESHAP, etc, see guidance doc): Part 98 Subpart L requires an emissions test every 10 years to determine the destruction efficiency of this wet scrubber. Is this an initial performance test? ❑ Yes or ® No 1.2) List all state and federal regulations that apply to the proposed testing (see guidance doc): 40 CFR 98.124(g)(2)(i) 1.3) Will the test results be used for other regulatory purposes (e.g., emission inventories, permit application, etc.) beyond that stated above? ® Yes or ❑ No If yes, explain. Emitted quantities of acid fluoride compounds, reported as hydrogen fluoride on the annual emissions inventory, are based on the control efficiency of this wet scrubber. 1.4) How will production/process & control device data be documented during testing (list specific control equipment, process parameters, instrumentation that will be used, frequency of data collection, collected by computer/manually, etc.)? TEST WILL NOT BE ACCEPTED WITHOUT APPROPRIATE PRODUCTION/PlbCESS & CONTROL DEVICE OPERATION DATA. Data will be collected using computer historian IP21 and/or DCS backup historian on documented on frequency of every 5 minutes. The following process tags will be used in IP21 to document production/process & control device data: VE-S PM: 1883FT production flow; VE-S PE: 1858FT production flow; VES WGS recirculation flow 2223FC; VES WGS inlet flow 2205FG; VES WGS outlet flow 2243FG 1.5) Provide a brief description of the source (including control equipment) and attach source or process flow diagram from source through stack exit: Nafion(V Vinyl Ethers South process controlled by a baffle -plate scrubber (control device ID No. NCD-Hdr2) 1.6) Provide a brief description of the sampling location, attach schematic of sampling location, and indicate whether concurrent testing will be conducted at other sampling locations (Approval of protocol without this data will not exempt you from Method 1 criteria): The sample locations are on the inlet to the WGS immediately downstream of inlet flow 2205FG and the exhaust of WGS immediately downstream of outlet flow 2243FG. DEQ-CFW 00071381 w AVONVA MV� NCDENA� PROTOCOL SUBMITTAL FORM (Rev. 2010a) R 11NIC1rnN nr A m nin A T M.-., PAGE 2 OF 2 2.1) Provide the following information for each test parameter. -- Comments Target Pollutant Proposed Test Method Number of Test Runs Test Run Duration # of Sampling posts BF Modified 26* 3 60 min N/A Inlet and outlet Testing Very High Concentration on Inlet. 2.2) Will all testing be conducted in strict accordance with the applicable test methods? If answer is no, attach complete documentation of all modifications and/or deviations to the applicable test methods. ❑ Yes ® No 2.3) Does the proposed sampling location meet the minimum EPA Method 1 criteria for acceptable measurement sites? Attach supporting documentation. ® Yes ❑ No 2.4) Has cyclonic flow been documented at this source (EPA Method 1 Section 11.4)? ABSENCE OF CYCLONIC FLOW MUST BE VERIFIED DURING CURRENT TESTING. Yes ®No 2.5) Will the oxygen concentration be determined by ❑ EPA Method 3 via Orsat or ❑ strict EPA Method 3A (specify) If answer is no, see Question 2.2 above. (Fyrites are NOT allowed per 15A NCAC 2D .2606) ❑ Yes ® No 2.6) Do any of the proposed test methods require analysis of EPA audit samples? If yes, notify Regional Office a minimum of 45 days prior to testing to allow for audit sample preparation and shipment. ®Yes ❑ No 2.7) Has all testing equipment been calibrated within the past year? If answer is no, explain. ® Yes ❑ No 2.8a) Have all calibration gases been certified by EPA Protocol 1 procedures? (Answer only as applicable) ❑ Yes ❑ No 2.8b) Is a dilution system (via EPA Method 205) proposed? (Answer only as applicable) ❑ Yes Q No 2.8c) Attach a summary of expected calibration gas concentrations for all proposed instrumental test methods. 2.9) What is proposed test schedule? DAO Regional supervisor must be notified a minimum of 15 days prior to the actual test date(s) THIS FORM DOES NOT CONSTITUTE 15 DAY REGIONAL OFFICE NOTIFICATION Wednesday August 14, 2013 Additional Comments: Flows will be determined by installed flow meters. **Inlet Method 26 modified to large teflon impingers due to high concentrations expected. Signatures: Representatives from the permitted facility and the contracted testing company must Provide signatures below certifying that the information provided on this form and any attached information is accurate and complete. Permitted acility Representative Date Testing Company Representative Date Name: Dianne Fields Name: W. Keith Poole Title: Nafion/Fluoromonomers Manufacturing Technical Sr EngineerTitle: Carolinas Operations Manager Company: DuPont Inc. Company:. Entec Services, Inc. DEQ-CFW 00071382