Loading...
HomeMy WebLinkAbout19920101 Ver 1_COMPLETE FILE_1992010141, State of North Carolina Department of Environment, Health, and Natural Resources Division of Coastal Management 1424 Carolina Avenue • Washington, North Carolina 27889 James G. Martin, Govemor William W. Cobey, Jr., Secretary 10 December 1991 MEMORANDUM TO: Dr. George T. Everett, Director Division of Environmental Management FROM: John R. Parker, Chief Major Permits Processing Section SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Charles Gilbert Gibbs Roger N. Schecter Director Project Location: Off SR 1100 on the north side of Far Creek at Engelhard Hyde County Proposed Project: Construct a 475' long by 10' wide dock along Far Creek and a 150' long by 5' wide dock along adjacent canal. 10' by 10' access ramps to be located every 100' along the dock. Three existing docks to be removed. r`1 r• cr inr?.:,. +! h.,,1-.. --11- ^.'-" . 11, ;+,nI-) nr l7?nt-,471+ n„ the proposed project and return this form by 31 December 1991. If you have any questions regarding the proposed project, please contact David W. Moye at 946-6481. When appropriate, in-depth comments with supporting data is requested. REPLY / This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. 5c-.e attached. This agency objects to the project for reasons described in the attached comments. Signed _ (Jll Date ?- Box 1507 • Washington, 2tunity h Carolina 27889 • Telephone 919-946-6481 An Equal Op Affirmative Action Employer DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA MAJOR PERMIT APPLICATION REVIEW PROJECT NAM , COUNTY: PROJECT fit: ?. - - c- STREAM OR ACENT WATER BODY : gad CLASS: BASIN: , OPEN OR CLOSED: (FOR SHELLFISHING) STORMWATER PLAN REQ'D: (Y OR N) IF YES, DATEA.FPROVED: PROJECT DESCRIPT?ON: -? ASSIG D T0: DATE APP. REC'D.: 911 1l/ (YY/MM/DD) JOINT NOTICE -IV _(Y/N) INITIAL REPORT: (YY/MM/DD) RECOMMENDATION:/ Sc FINAL REPORT: :pO (YY/MM/DD) (ISSUE/DENY/OTHER) WATER QUALITY CERT. (401) CERT. REQ'D: (Y OR N) IF YES: GENERAL CERT: (Y OR N) TYPE GEN: (INDIVIDUAL CERT:_ (BULKHEAD, BOAT RAMP, ETC.) SEWAGE DISPOSAL y/ .7 TYPE OF DISPOSAL PROPOSED: f1LP ( : .tr`??%?"" (EXISTING, PRO OSED SE C TANK, ETC.) TO BE PERMITTED BY: (DEM, DHS, COUNTY) IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE? (Y OR N) WATER/WETLAND FILL AREA OF FILL: WATER:O WETLAND : IS FILL ELIMINATING A SIGNIFICANT USE? (Y OR N) DREDGING IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? (Y OR N) AREA TO BE DREDGED IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? (Y OR N) MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? SEWAGE DISPOSAL: MARINA SERVICES: OXYGEN IN BASIN: CLOSURE OF SHELLFISHING WATER: (ATTACH A MARINA USE ATTAINABILITY EVAL.) RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: cc: WaRO - Dorney - Central Files - DCM: J. Parker, Morehead City, Washington, Elizabeth City PS Memorandum To: Jim Mulligan Deborah'Sawyer From: David W. Moye Dk1j Subj: Application for C.AMA Major Permit and/or Dredge & Fill Permit Charles Gilbert Gibbs Hyde County Date: 10 December 1991 Attached is an application for a CAMA Major and/or a Dredge & Fill Permit which was received by me on 27 November 1991. 1 am considering this application complete, have acknowledged receipt, and have begun processing. If you have any questions do not hesitate to contact me. -FIELD INVESTIGATION REPORT '- L..*- APPLICANT'S NAME C. Gilbert Gibbs 2. LOCATION OF PROJECT SITE Off SR 1100 on the north side of Far Creek at Engelhard in Hyde•County, North Carolina PHOTO INDX : 1989: NA, 1984: NA STATE PLANE COORDINATES: X: 2,894,200 Y: 653,550 Engelhard East Quad (lower left corner 3. INVESTIGATION TYPE: DREDGE & FILL CAMA X 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 12-2-91 (B) WAS APPLICANT PRESENT No 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 11-27-91 OFFICE Washington 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Hyde County - 1986 LAND CLASSIFICATION FROM LUP Developed .(land); Conservation water DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP None note (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS PUBLIC TRUST WATERS- X- ESTUARINE WATERS X OTHER (C) WATER DEPENDENT: YES X NO (D) INTENDED USE: PUBLIC PRIVATE COMMERCIAL X (E) TYPE OF WASTE WATER TREATMENT: EXISTING None PLANNED None (F) TYPE OF STRUCTURES: EXISTING Commercial fish house and 3 small docks PLANNED Mooring dock (G) ESTIMATED ANNUAL RATE OF EROSION 0 SOURCE Applicant 7. HABITAT DESCRIPTION: AREA (A) VEGETATED WETLANDS DREDGED FILLED OTHER (B) NON-VEGETATED WETLANDS: (C) OTHER: (D) TOTAL AREA DISTURBED: 8. PROJECT SUMMARY: The applicant proposes to remove the 3 existing docks and construct a + 475' long by 10' wide dock at the NWL along Far Creek. A + 150' long by 5' wide dock is proposed at the NWL along the adjacent canal. The applicant proposes 10' by 10' access ramps to be located each 100' along the dock. Project setting The applicant's property is located in Hyde County off SR 1100 on the north side of Far Creek in Engelhard, North Carolina. The site varies from 1.5' to 5.0' above mean sea level. The property is bordered on the east by coastal wetlands dominated by Distichlis spicata and has a mooring dock along the creek. The west end of the property is bordered by a manmade canal. The southern portion of the property fronts Far Creek and has several old piers and an existing fish house. This area is vegetated with upland grasses, shrubs and several mixed hardwoods. An approximately 30' by 40' area of coastal marsh containing D. spicata and Scirpus spp. is present approximately 50' upstream of the fish house. The western portion of the property fronts a manmade canal and is vegetated primarily with mixed hardwoods and shrubs. The remainder of the property is developed with several small homes and outbuildings and is vegetated with upland grasses and a few shrubs. Far Creek is classified as SC HQW by the Environmental Management Commission and as a Primary Nursery Area by the Marine Fisheries Commission. Project description The applicant proposes to remove the existing docks and construct an approximately 475' long by 10' wide dock at the NWL along Far Creek. An approximately 150' long by 5' wide dock is proposed at the NWL along the adjacent manmade canal. Also proposed are 10' by 10' access ramps located approximately every 100' along the entire dock. Anticipated impacts Localized turbidity is expected during the construction of the dock. This section of Far Creek is a commercial harbor of refuge and the proposed project will offer increased space for mooring of commercial fishing boats and their associated impacts. David W. Moye - Washington Office - 10 December 1991 Op,S C Boa . > o %SkCA ?Og ?e4?`s1a``o ofse Se ve? col IONS a44?'car? PIC". ens S?P'C a??aem XOO Coasv? 5 ?3?, ECG a?`U 9 ??agGS >>3.ti ee??f?caa°° Ns?,?ool ? ?' ?a?`?y Z?5 P?a`?? a? ?CGS•?Ltio4;?1? SQ?ct,Cjtste e ? ?e S 1A ets <? a oc %0099 00 C at c?,of avi$ab 6AO `?"0`Va P Ne ?e ? CGS cn°° ??? e<s i ?N o g` ate Coal sos?e s Co hey o p of oll? ? o?V'%%\as e? Pct Secs, ?teA?ol.77 e o`? at aieof 0', Woets ;??° a rAOQ s °f fo Sec?`° Ply C9,s? % Please type or print. Carefully describe all anticipated -development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name e-,P Arzi,c,G 2Tr 13L5,, Address TJ o • Epox M City (rL4 L"4 jeo State d c, . Zip,,201,g- Day phone Landowner or Authorized agent b. Project name (if any) t.J A c. If the applicant is not the landowner, also give the owner's name and address. ?? ?A 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number b. City, town, community, or landmark F,IJ(gtWAZD c. County HVD9. d. Is proposed work within city limits or planning jurisdiction? 14c) e. Name of body of water nearest project FM c -",K- 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier)- t??SjPGS?TrrJ? mrpr?l , If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an existing project, new work, or both? rJ W W tC& c. Will the project be for community, private, or commercial use? GC>MMG2L/AL d. Describe the planned use of the project. X20 V11 DC LEh680 jm lnJ T A: )j GC"mm a r.4L, 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract i? A cler S t b. Size of individual lot(s) _ 4/A- c. Elevation of tract above mean sea level or National Geodetic Vertical Datum 1S - 5-.0' d. Soil type(s) and texture(s) of tract e. Vegetation on tract 6 A61,. SNtzN>5?t Arl n A 2E/YfAi v9E5 C.iTpu/?-01Nb f. Man-made features now on tract&-,-Amwcrew r-Ltj nncc,, i g. What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation Transitional Developed Community Rural Other h. How is the tract zoned by local government? i. How are adjacent waters classified? Sc Now j. Has a professional archaeological survey been carried out for the tract? rJo If so, by whom? 12/89 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities, or structures proposed r.IA- b. Number of lots or parcels Q I A c. Density (Give the number of residential units and the units per acre.) ?s J A d. Size of area to be graded or disturbed ?s IA e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? X11 A f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. N1114 g. List the materials, such as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. J h. If applicable, has a stormwater management plan been submitted to the Division of Environmental Management? ,J)A i. Describe proposed sewage disposal and/or waste water treatment facilities. #JIn m. Water supply source Goy n?TY SYs i Em n. If the project is oceanfront development, describe the steps that will be taken to maintain established public beach accessways or provide new access. h.) ? a o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N) 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, mcoRjn>h boat ramp, voc K- rock jetty) Fill placed in wetland or below MHW Length Width Depth +?ts` t/o' (ISo' or 1S -m (3r-_5' ?-) :D c) 17 j. Have these facilities received state or local approval? Upland fill _ i JA- areas k. Describe existing treatment facilities. 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). ,w 64 pow J " _ 5ueFAc4r_, "40FF V-A FPorn CO%4T ( W OM sY5; em b. Amount of material to be excavated from below water level in cubic yards PJonSr, c. Type of material i-J) A- d. Does the area to be excavated include marshland, swamps, or other wetlands? e. High ground excavation, in cubic yards n1odk 2 12/89 f. Dimensions of spoil disposal area n).1 ,4 g. Location of spoil disposal area ?? h. Do you claim title to the disposal area? -d ]A- if not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? -rJ)A If so, where? _Ail A _ j. Does the disposal area include any marshland, swamps, or water areas? k. Will the fill material be placed below mean high water? iJ IA- 1. Amount of fill in cubic yards ?J 14 m. Type of fill material iJ 14 n. Source of fill material rJIA o. Will fill material be placed on marsh or other wetlands? rlo p. Dimensions of the wetland to be filled 01 A- q. How will excavated or fill material be kept on site and erosion controlled? r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? LF- pLnJE2 s. Will wetlands be crossed in transporting equipment to project site? ,Jo If yes, explain steps that will be taken to lessen environmental impacts. NIlk 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap v,? A b. Average distance waterward of mean high water or normal water level ") 4 c. Shoreline erosion during preceding 12 months, in feet -- D- d. Type of bulkhead material ? A e. Amount of fill, in cubic yards, to be placed below mean high water ? 4 f. Type of fill material to 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 1 l white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 12/89 flame n,Jjsio f oP Hi6AWA,11_, Address al-r-, a.o-: 'peg. t-ok A5w1 241 14,f ;71&11 Name Ct JFP cow&hY M.4N)4(1f_2 Address croukY-r4_1 r)e k4? i= Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A tsb A check for $W made payable to the Department of Environment, Health & Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the Z day of X Landowner or Authorized agent 4 12/89 Form DCM-MP-2 MARINA DEVELOPMENT Attach this form to Joint Application for CAMA Major Permit. Be sure to complete all other sections of the Joint Application which relate to this proposed project, including upland areas, even if duplicative. All shore- based facilities must be included in application and work plats. f. Describe the typical boats to be served (for example, open runabout, charter boats, sail boats, mixed types). epenftimcm L, r l,,01,0 j R?•q?'? g. Typical boat length 30'' So' CA 4_ 1 MARINA CHARACTERISTICS a. Check below the type of marina proposed. ? Commercial Public Residential b. Will the manna be open to the general public? oo C. If there is residential development associated with the marina, how many units or lots are planned? fJ? ? h. Maximum boat length 90' i. Are any floating buildings planned? rJ 0 If so, describe. ?J.j k 2 MARINA OPERATIONS a. Check each of the following sanitary facilities which will be included in the proposed project. Office toilets Toilets for patrons Number Location Showers Boat holding tank pumpout Type and location t J J A- d. Check all of the types of service to be provided. Full service, including travel lift and/or rail Dockage, fuel, and marine supplies ? Dockage ("wet slips") only Numbe r of slips .gve y I ne,ajg4-__v t mg;: R 6J,w v/AR{ Dry storage Number of boats I/ ,#-r sg&VN MAk. Of LI AT ?,W'L&JhP Boat ramp(s) Other (describe) W i w I,r-A6G a cr,mmLRC•IAL? b 0Mn JAzA 'NAT P0121 e. Check below the proposed type of siting. Land cut and access channel Open water with dredging for basin and/or channel V Open water, no dredging required Other (describe) Describe treatment type and location for all sanitary wastewater. 1 c. Describe solid waste, fish offal, and trash disposal. "o . ?T? J14f H D15IW?A L pacJ.Q lliL ROr3 b 4/89 d. How will overboard discharge of sewage from boats i. Give the location of fuel handling facilities and be controlled? describe the safety measures planned to protect area n1 /A waterquality. of 1* e. Give the location and number of "No Sewage Discharge si proposed. Ai " f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste, and petroleum products. j. Describe design measures that promote boat basin flushing or circulation and reduce water quality impacts..!] /k k. What will be the marina policy on overnight and live-board dockage? ,31A- 1. Is the proposed marina located near any shellfish leases? _t-Jo If so, give the name and address of theleaseholder. t j j h g. Where will residue be disposed of? m. If this project is an expansion of an existing marina, what types of services are currently provided? !J I ?- h. Give the number of channel markers and "No Wake" signs proposed. _ ,' /A Note: Regulatory signs such as these require additional n. How many slips are now available? ?Jc4t approval by the N.C. Wildlife Resources Commission. 4/89 c!::, r-J AV you f!,?, SPiu.E,? r3cc.T) 41 '}ate Vi c,wi-rV mqf) a "P2c?TECr ?Vr SITE `?'? ' " S MATTAmuSKZtT A "t eti Jj Er 4I LCHA2D ?? N X11 BP1?i P'r AMrrY 0 v V? Off rA QOr-i eJ. G . c. o u K)-r' 111A R . 2" x B" r??uG 0 0 X g' ?? i r1f??Eh 2" Onl ?JO" G112?j,