Plan Detall7ncomplete -
^ Pleaso provide a location map for the project. •
^ Please Show all stream impacts including alt fill slopes, dissipaters, and bank stabilization on the site plan, •
^. Pleaao show atl wetland impacts including fill slopes on the alto plan.
^ Please indicate all buffer impacts on the alto plan.
^ Please indiaate proposed lot layout ea overlays on the site plan.
^ Please indicate the location of the piotxtod buffers as mverlays oa the site plpn.
^ Ploasa locate atI isolated. or non-isolated wotlands,streams and other waters of the State as ovorleys on the site plan.
^ Please provide cross section details showing tiro provisions for aquatic life passage.
^ Please locato any plannod•sower lines on the site plea.
^ Please provide the location of any proposed stormwater management practices as required by t3C
^ Please provido detail for the stormwatm• managemont practices as required by C3C
^ Ploaso specify the percent of project impa~rviousness aroa based on the estimated built-out conditions:
^ Please indicate all stormwat ~o~}tfalle on the site plait. •
^ Ploase indicate the diflbse flow provision measures can the site plan.
^ Please indicate whether •or not the proposed impacts already been conducted. •
Avoidance, and/or Minimiaatton Not Provided
• The labeled as on the pleas door not appear tb be necessary. Please eliminate the . or provldo additional
information as to why it is necessary for this p%~ect..
• . ^ This Office beliex+es that the labeled on the plans as can be moved, or rxonfigured to avoid the impacts to the
• . Ploage nsvise the plena to avoid thq impacts.
[]. This'Office boliev6s that the ,labeled on the plans as~ ~ can bo moved or rocr~nfigured to.;minimizo the irr~pects to'tho
• . Please revise the p18ae to minimize the impacts. ~ •
^ The etormwater discharges at the location on the plena labeled ~ will. not provide diflpse flow through the buffer because
. Please Feviae the plans and providq calculations to show that di8bse'flow t~lll bo.achieved through the ontirebuffrx. If it
• is not possible t4 achievo.diffuse flow through.tho entire buffee then it may bm necessary to' provide atonnwa ee raanagem~t
• practices that remove nutrients .before the atonnwater caa be discharged through the. buffer. •
Otlior i .
^•. The applic~tIon fee was insuf6eiont~because over 150 feet of stream and/or.over 1 acre of wetlaad'impacts were reigaested. Please
provide $ . ~ ?his additional fee must bo nxxivo¢ before your application caa be reviewed. .
^ Please complete Section(s) on theapplication. - .' ~ ~ ''
^ Pleasoprovide aligned copy of the application.' ~ •
^ Please provide copies of the application, . copies of ,the site plans ead other supporting informat{oa
_ ^ • Please submit electronic CAD files showizxg ;.via email to ian.mcmfllari(c~ncmail.net and CD; ~.
Mitigation ~ ~ .
• ^ of compensatory mitigation is required for this projbct. ~ Please provide'a c~npensatory mitigation plan.. The
plan must conform to tharequireanents in 15 A NCAC 2H •.0500 and must be appropriate to the typaof impacts proposed.
^ Please indicate which-404 Permit the USACE would use to authorize this project. ~ •