Loading...
HomeMy WebLinkAbout19920505 Ver 1_COMPLETE FILE_19920101 °j DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS ' P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO December 1, 1992 Regulatory Branch Action ID. 199300559 and Nationwide Permit No. 12 (Utility Line Backfill and Bedding) AT&T Communications, Inc. Mr. Michael J. Knox Promenade Annex, PA-123 1200 Peachtree Street, N.E. Atlanta, Georgia 30309 Dear Mr. Knox: a lq? n q? Reference your application for Department of the Army authorization to install a subsurface fiber optic lightguide cable from Asheville to Johnson City, Tennessee through Buncombe and Madison County, North Carolina. The alignment will involve crossings of various waters of the United States, all tributary to the Tennessee River. The project has been reviewed by the N.C. Wildlife Resources Commission (WRC) for any potential adverse impacts to trout waters; and the US Fish and Wildlife Service for potential impacts to Federally listed threatened or endangered species. For the purposes of the U.S. Army Corps of Engineers' Regulatory Program, Title 33, Code of Federal Regulations (CFR), Part 330.6, published in the Federal Register on November 22, 1991, lists nationwide permits (NWP). Authorization, pursuant to Section 404 of the Clean Water Act, was provided for the discharge of material for backfill or bedding for utility lines, including outfall and intake structures, provided there is no change in pre-construction contours. Your work is authorized by this NWP provided it is accomplished in strict accordance with the enclosed conditions. This NWP does not relieve you of the responsibility to obtain any required State or local approval. Information regarding issuance of a Section 401 Water Quality Certification may be obtained through Mr. John Dorney, Division of Environmental Management, at (919) 733-1786. This verification will be valid for 2 years from the date of this letter unless the NWP authorization is modified, reissued, or revoked. Also, this verification will remain valid for the 2 years if, during that period, the NWP authorization is reissued without modification or the activity complies with any subsequent modification of the NWP authorization. If during the 2 years, the NWP authorization expires or is suspended or revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the NWP, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the NWP will remain authorized 01,16 • -2- provided the activity is completed within 12 months of the date of the NWP's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend, or revoke the authorization. Questions or comments may be addressed to Mr. David Baker in our Asheville Regulatory Office at (704) 259-0856. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure Copies Furnished (without enclosure): Mr. John Parker North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 SIATr F -v State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Governor October 5, 1992 A. Preston Howard, Jr., P.E. William W. Cobey, Jr., Secretary Acting Director Mr. Michael J. Knox Supervisor, Outside Plant Engineering AT&T Communications, Inc. Promenade Annex, PA-123 1200 PEachtree Street, N.E. Atlanta, Georgia 30309 Dear Mr. Knox: Subject: Proposed fill in Wetlands or Waters Proposed AT&T Lightguide Cable Route from Asheville, N.C. to Johnson City, TN Buncombe/Madison Counties DEM Project # 92505 Upon review of your request for 401 Water Quality Certification to place fill material in 0.3 acres of wetlands or waters for lightguide cable installation located as shown on your permit application in Buncombe and Madison Counties and directional bore under the French Broad River in Buncombe County, we have determined that the proposed fill can be covered by General Water Quality Certification No. 2664 issued January 21, 1992. A copy of the General Certification is attached. This Certification may be used in qualifying for coverage under Corps of Engineers' Nationwide Permit No. 12. If you have any questions, please contact John Dorney at 919-733-1786. S' ce , I reston Howard, r. P.E. jrd/at&tcable.ltr Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Asheville Field Office Asheville DEM Regional Office Mr. John Dorney REGIONAL OFFICES Asheville Cenfft)etllevftles Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 919/571-4700 919/946-6481 919/395-3900 919/896-7007 Ponutton Prevention Pays 11.0. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer ?ZS?S AT&T September 3, 1992 Michael J. Knox AT&T Communications, Inc. Promenade Annex, PA-123 1200 Peachtree Street, N.E. Atlanta, Georgia 30309 Mr. David Baker U.S. Army Corps of Engineers Room 75, Grove Arcade Building 37 Battery Park Avenue Asheville, North Carolina 28801-2714 01 SEP-ow WETLANDS c• WATER 011! t ; RE: Proposed AT&T Lightguide Cable Route from Asheville, North Carolina to Johnson City, Tennessee to Knoxville, Tennessee. Dear Mr. Baker: Enclosed is a permit application and applicable drawings for a directional bore under the French Broad River. Construction is scheduled to start October 5, 1992 and be complete June 1, 1993. Review of the cable route and questions concerning method of construction or scheduling may be directed to Allen Rodgers, Project Manager, Communication Design Services at (404) 926-3877. If I may be of assistance during this project, please contact me at (4040) 810-4484. Your expeditious assistance with this permit application is greatly appreciated as construction is scheduled to start very soon. Sincerely, Michael J. Knox Supervisor, Outside Plant Engineering SJJ:dvs enclosures i DEM ID: ACTION ID: JOINT APPLICATION FORM FOR NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO THE DISTRICT ENGINEER NATIONWIDE PERMITS THAT REQUIRE SECTION 401 CERTIFICATION CONCURRENCE NATIONWIDE PERMITS THAT REQUIRE INDIVIDUAL SECTION 401 CERTIFICATION WILMINGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 189o WILMINGTON, NC 28402-1890 ATTN: CESAW-CO-E Telephone (919) 251-4511 WATER QUALITY PLANNING DIVISION OF ENVIRONMENTAL MANAGEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES P.O. BOX 29535 RALEIGH, NC 27626-0535 ATTN: MR. JOHN DORNEY Telephone (919) 733-5083 ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT. PLEASE PRINT. 1. OWNERS NAME: AT&T Communications, Inc. 2. OWNERS ADDRESS: Promenade Annex, PA-123 1200 Peachtree Street, N.E. Atlanta, GA 30309 3. OWNERS PHONE NUMBER (HOME): (WORK): (404) 810-4484 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS PHONE NUMBER: Corporate Official: Michael J. Knox, Supervisor, Outside Plant tng. Agents: Allen Rodgers, Project Manager, Communication Design Services P .O. Box 2188, Woodstock, GA 30188-1176 5. LOCATION OF PLANNED WORK (ATTACH MAP). COUNTY: Buncombe NEAREST TOWN OR CI %. Craggy SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, VC.): Approximatel 60 feet North of the Craggy Bridge over the French Broad River. 6. NAME OF CLOSEST STREAM/RIVER: French Broad River 7. RIVER BASIN: French Broad River 8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW, WS I, OR WS II? YES ( I NO ( I 9. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES ( ] NO (X I IF YES, EXPLAIN. 10. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: None 2/3/92 '.f.4 -2- 11. NUMBER OF ACRES OF WETLAND IMPACTED BY THE PROPOSED PROJECT: FILLED: 0 DRAINED: FLOODED: EXCAVATED: TOTAL IMPACTED: Zero 12. DESCRIPTION OF PROPOSED WORK (ATTACH PLANS): 4" dia. directional bore under the French Broad River for subsurface installation of AT&T 1g gu1 e cable. 13. PURPOSE OF PROPOSED WORK: _To provide digital fiber optic service from Asheville, NC to Johnson City, TN to Knoxville, TN. 14. STATE REASONS WHY' THE APPLICANT BELIEVES CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES IMPACTS. Activity will not be in a Wetland min THAT THIS ACTIVITY MUST BE TAKEN TO MINIMIZE WETLAND '.mal impact on French RmAd t. River as we are borinc 15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. HAVE YOU DONE SO? YES [XI NO [ ) RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE ATTACHED. 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT? HAVE YOU DONE SO? YES [X] NO [ RESPONSE FROM THE SHPO SHOULD BE ATTACHED. 17. ADDITIONAL INFORMATION REQUIRED BY OEM: A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND-LAKES ON THE PROPERTY. B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH COPY. None E. WHAT IS LAND USE OF SURROUNDING PROPERTY? Residential, Commercial F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? No sewage generated. OWNER'S SIGNATURE' DATE ?? JLI Vi iJJL LJ 11 1 1\VI I 111 V 1 V V1V••.JGViVaJV p.A 0 ?M\ North Carolina Department of Cultural Resources James G. Martin, Governor Patric Dorsey, Secretary May 27, 1992 Michael J. Knox AT&T Communications, Inc. 1200 West Peachtree Street, NE Promanade 2, Loc.21E35 ,Atlanta, Georgia 30309 Re: AT&T Lightguide cable, Asheville, NC to Johnston City, Tennessee, Buncombe County, ER 92-8293 Dear Mr. Knox: Division of Archives and History William S. Price, Jr., Director Thank you for your letter of April 22, 1992, concerning the above project. There are no known archaeological sites within the proposed project area. Based on our present knowledge of the area, it is unlikely that any archaeological resources which may be eligible for inclusion in the National Register of Historic Places will be affected by the project construction. We, therefore, recommend that no archaeological investigation be conducted in connection with this project. The above comments are made pursuant to Section 106 of the National Historic Preservation Act of 1966 and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919/733- 4763. Sincerely, .6Y' David Brook jv?- Deputy State Historic Preservation Officer DB:slw 109 East Jones Street 9 Raleigh, North Carolina 27601-2807 IJAT&T ERIK ?' ? aunl'fAIN ? 23 ' N L (,O?jZl1(,?l0 I) 1 iW I41f A-r4T GIMW? I21u•• HVb jv NIL I` I.tel ?hf?K \ VI PICA NAM 01zM1A?.l M'11.1. `? NeIIaHT?i VICINITY MAP FRENCH BROAD RIVER / CRAGGY, NORTH CAROLINA ASHEVILLE - KNOXVILLE FTA LIGHTGUIDE CABLE PERMIT FOR PIPE / CABLE CROSSING AT FRENCH BROAD RIVER a • > Z 0 rLG N 251 RN ERSIDE DR. cD o oC0 o Z (m M** Ln C)o W N w SOUTHERN RAILROAD N O ' ? v L N ZmXZ °f o x c: ;u C;o ;o O;C N? n m n -a ?C703 C ? Z N I m o N --4 0 co D 0 zo z ;D o 9- m n r- o v o rM p m v P co m ° ° I - (A o? , z - m D FRENCH ZED Z c °_? r^ - BROAD mm D °" x A r • m F D m4 0 - RIVER 0 c? Z z r av rminc 0 o ern a o A G)Z W r-Dn C ?<r ? 5 N m S < a) v 0 o < m Q p o O c m Z A Z ll / II 9 Ao O z z O Dn A C 0 mm {? o =1 o N my 0 2 O N m ?U{??? ^R O p E N v o nv b _ m4 :v SOUTHERN RAILROAD -? I I rn ? I rn (D I I D ? O ? - HOCCIF \ ? m ?EL ? ? o 0 / CZ m Cc) 'm N n ? _ ?? 7C D ' Oz r r^ N m z3:FZi? O0= : r 51 xm ;'m >,;-,, 20300 C < nvZmM mm Om n ? O in rm• Z ;v ') m D MEMORANDUM INITIALS: Reviewer: TO: John Dorney p WQ Supv: Planning Branch Date: SUBJECT: WETLAND sAFF,REPORT AND RECOMMENDATIONS ***EACH ITEM MUST BE ANSWERED (N/A-NOT APPLICABLE)*** PERMIT_YR: 92 PERMIT-NO: 0000505 COUNTY: BUNCOMBE APPLICANT NAME: AT&T LIGHTGUIDE CABLE PROJECT-TYPE: PHONE LINES PERMIT-TYPE: NW12 COE_#: DOT-#: RCD_FROM_CDA: APP DATE_FRM_CDA: 09/09/92 REG_OFFICE: ARO RIVER-AND -SUB-BASIN-#: CJ¢? D.3 STREAM_CLASS : (slA.CAY? .tc SaLe v STR INDEX_NO: WL_IMPACT?: /N WL_REQUESTED : • 3 W44 HYDRO CNECT4Y N MITIGATION?: /N MITIGATION SIZE: WL_TYPE: WL_ACR_EST?( Y/O WL_SCORE(#): Qp, MITIGATION_TYPE: tJ 4 IS WETLAND RATING SHEET ATTACHED?: /N RECOMMENDATION (Circle One): ISSUE ISSUE/COND DENY COMMENTS : AL it.aybuou ?1 o??ck'• ? 7 `u LUa-Ct-c G- SG - s, ?a- etv?t 44 (7.kGr • F4 * f Taivis ?J2?7r.c(sy 4-4G-lo z-4) ; uud C?euw(l.•t (?t (1rkl? G•S4• /0.2•L? &u. (cc? 4 c (4Xs)) ,mew, . cc: Regional Office Central Files UT-, 64ZL4a.?n, zzqf? si r-,, 4,x 4U.0, 44 1 - ? is - `,,Y '• ? }. j-: ^? 1?-s. `J ? J r .•0 r AUT AT&T Communications, Inc. Michael J. Knox 1200 W. Peachtree Street, N.E. Promenade Annex, PA-123 Atlanta, Georgia 30309 Mr. John Dorney Water Quality Planning Division of Environmental Management North Carolina Dept. of Environment, Health and Natural Resources P.O. Box 29535 Raleigh, North Carolina 27626-0535 Sr-I? - ?? 1997_ JD ki f', RE: Proposed AT&T Lightguide Cable Route From Asheville, North Carolina to Knoxville, Tennessee Dear Mr. Dorney: Enclosed you will find 7 copies of two U. S. Army Corps of Engineers permit applications. One permit application is for a National Permit covering smaller streams, the other is for the directional bore under the French Broad River at Craggy, North Carolina. Review of the cable route and questions concerning method of construction or scheduling may be directed to Allen Rodgers, Project Manager, Communication Design Services at (404) 926-3877. If I may be of assistance during this project, please contact me at (404) 810-4484. Your expeditious assistance with this permit application is greatly appreciated as construction is scheduled to start very soon. Sincerely, t--A- J. KI0 e- Michael J. Knox Supervisor, Outside Plant Engineering SJJ:dvs enclosures 0 ... #1 \ ? 11 OANT Septembert, 1992 Michael J. Knox AT&T Communications, Inc. Promenade Annex, PA-123 1200 Peachtree Street, N.E. Atlanta, Georgia 30309 Mr. David Baker U.S. Army Corps of Engineers Room 75, Grove Arcade Building 37 Battery Park Avenue Asheville, North Carolina 28801-2714 SEp _ 91O RE: Proposed AT&T Lightguide Cable Route from Asheville, North Carolina to Johnson City, Tennessee to Knoxville, Tennessee. Dear Mr. Baker: AT&T Communications requests to do the aforementioned work under the new Nationwide Permit Number 14 for utility work. We believe we will be eligible for this permit and the applicable certification. AT&T proposes to install 1-4 inch steel pipe to a minimum depth of 48 inches, 48 inches under stream bed, by open trench method to house the new lightguide cable. Construction will be confined to a maximum corridor of 20 feet wide. Pre-project wetland elevations and contours will be restored. After extensive research from various map sources and detailed field surveys, we have identified the streams and wetlands listed to be within our construction corridor. Enclosed you will find a permit application, four (4) USGS Quadrangle Maps with the proposed route and all stream crossings highlighted for easy review. A typical stream crossing detail and detailed drawings of all major streams is also included for your review along with a complete list of each location. All crossings are numbered on the Quadrangle Sheets to coincide with the list. ? x v ? 4ANT Page 2 Construction is scheduled to start October 5, 1992 and be complete March, 1993. Review of the cable route and questions concerning method of construction or scheduling may be directed to Allen Rodgers, Project Manager, Communication Design Services at (404) 926-3877. If I may be of assistance during this project, please contact me at (404) 810-4484. Your expeditious assistance with this permit application is greatly appreciate as construction is scheduled to start very soon. Sincerely, Michael J. Knox Supervisor, Outside Plant Engineering SJJ:dvs enclosures I DEM ID: ACTION ID: JOINT APPLICATION FORM FOR NATIONWIDE PERMITS THAT REQUIRE NOTIFICATION TO THE DISTRICT ENGINEER NATIONWIDE PERMITS THAT REQUIRE SECTION 401 CERTIFICATION CONCURRENCE NATIONWIDE PERMITS THAT REQUIRE INDIVIDUAL SECTION 401 CERTIFICATION WILMINGTON DISTRICT ENGINEER CORPS OF ENGINEERS DEPARTMENT OF THE ARMY P.O. Box 18go WILMINGTON, NC 28402-1890 ATTN: CESAW-CO-E Telephone (919) 251-4511 WATER QUALITY PLANNING DIVISION OF ENVIRONMENTAL MANAGEMENT NC DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES P.O. BOX 29535 RALEIGH, NC 27626-0535 ATTN: MR. JOHN DORNEY Telephone (919) 733- '78r- ONE (1) COPY OF THIS COMPLETED APPLICATION SHOULD BE SENT TO THE CORPS OF ENGINEERS. SEVEN (7) COPIES SHOULD BE SENT TO THE N.C. DIVISION OF ENVIRONMENTAL MANAGEMENT. PLEASE PRINT. 1. OWNERS NAME: AT&T Communications, Inc. 2. OWNERS ADDRESS: Promenade Annex, PA-123 1200 Peachtree Street, N.E. Atlanta, GA 30309 3. OWNERS PHONE NUMBER (HOME): -- (WORK): (404 810-4484 4. IF APPLICABLE: PHONE NUMBER: rnr AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL. ADDRESS. 5. LOCATION OF PLANNED WORK (ATTACH MAP). COUNTY: $?3nco?& Madison NEAREST TOWN OR CITYS. Asheville SPECIFIC LOCATION (INCLUDE ROAD NUMBERS, LANDMARKS, C. _ Approximately along a line from Asheville, NC to Johnson city, TN 6. NAME OF CLOSEST STREAM/RIVER: See Attached 7. RIVER BASIN: French Broad River 8. IS THIS PROJECT LOCATED IN A WATERSHED CLASSIFIED AS TROUT, SA, HQW, ORW, WS I, OR WS II? YES [Xj NO ( j 9. HAVE ANY SECTION 404 PERMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROPERTY? YES [ ] NO [Xj IF YES, EXPLAIN. 10. ESTIMATED TOTAL NUMBER OF ACRES OF WETLANDS LOCATED ON PROJECT SITE: .3 Acre 2/3/92 v , O -2- 11. NUMBER OF ACRES OF WETLAND IMPACTED BY THE PROPOSED PROJECT: FILLED: p DRAINED: p FLOODED: p EXCAVATED: ,3 TOTAL IMPACTED: .3 12. DESCRIPTION OF PROPOSED WORK (ATTACH PLANS): Subsurface installation of a fiber optic lightguide cable. 13, PURPOSE OF PROPOSED WORK: To provide diaital fiber optic service from Asheville, NC to Johnson City, to Knoxville, TN. 14. STATE REASONS WHY THE APPLICANT BELIEVES THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS. ALSO, NOTE MEASURES TAKEN TO MINIMIZE WETLAND IMPACTS. The proposed route will be parallel to and within existing overhead mower right-of-ways and within several road riaht-of-wavs to minimize in estanlisning a route outside an existing easement. .T 15. YOU ARE REQUIRED TO CONTACT THE U.S. FISH AND WILDLIFE SERVICE (USFWS) AND/OR NATIONAL MARINE FISHERIES SERVICE (NMFS) REGARDING THE PRESENCE OR ANY FEDERALLY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. HAVE YOU DONE SO? YES [X) NO [ ] RESPONSES FROM THE USFWS AND/OR NMFS SHOULD BE ATTACHED. 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT? HAVE YOU DONE SO? YES [X] NO [ ) RESPONSE FROM THE SHPO SHOULD BE ATTACHED. 17. ADDITIONAL INFORMATION REQUIRED BY DEM: A. WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, AND-LAKES ON THE PROPERTY. B. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BY PROJECT. C. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE. D. IF A STORMWATER MANAGEMENT PLAN IS REQUIRED FOR THIS PROJECT, ATTACH COPY. None E. WHAT IS LAND USE OF SURROUNDING PROPERTY? Rural Communities F. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? No sewage generated ty OWNER'S SIGNATURLP- DATE w 5th'-101-177? 1J 14 t- Kum Htlu I U iJ4b47.?.ti1C3J r !o; ,o North Carolina Department of Cultural Resources )amts G. Martin, Governor Patric Dorsey, Secretary May 27, 1992 Michael J. Knox AT&T communications, Inc. 1200 West Peachtree Street, NE Promanade 2, Loc.21E35 Atlanta, Georgia 30309 Re: AT&T Lightluide cable, Asheville, NC to Johnston City, Tennessee, Buncombe County, ER 92-8293 Dear Mr. Knox: r. U4 Division of Archives and History Williams. Price, Jr., Director Thank you for your letter of April 22, 1992, concerning the above project. There are no known archaeological sites within the proposed project area. Based on our present knowledge of the area, it is unlikely that any archaeological resources which may be eligible for inclusion in the National Register of Historic Places will be affected by the project construction. We, therefore, recommend that no archaeological investigation be conducted in connection with this project. The above comments are made pursuant to Section 106 of the National Historic Preservation Act of 1966 and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106, codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919/733- 4763. Sincerely, ?)_6? David Brook jvr_a_?_ Deputy State Historic Preservation Officer DB:slw 109 East Jones Street 9 Raleigh, North Carolina 27601-2807 W 11 J I s ? a V A & ? W N ? O t0 0 V OI N A W N r O fO ? V ? N + W N ? O f0 00 V W U/ A W N J O t0 00 V Ol N ,. W N .+ W W N ? ... ? ? ? O ? tJI s W OD t ClI ++ 11 O 4 fO + W + --4 O + 4 ? c c .+. ?? ? p o+po ? + OD .A + ? ? c? c ii fD ? ii V Of ? + ? c c .+. ?? ? n pptpp A + W N+ +} O OD NN+ A N + O h a o 00 + N V J OD W m ? • c?np o aWaWOo W pp?? O ?a(pp A NN A pp?0popo A OWOWff IO l?((!OO!?? fl? pNno??? 0 tOtOJJ???? 01 (fi UN? 0 ? ? ?? +' N ? -4 - COO (( nn (l? ? pp Oo (fi j ? aa (n aa V 0 0 oo (fi 0o 0? (O N I ., pp A D O p ?? .p ? 1 V t r -I W C 2 W C z W C z w C Z W C z W C z W C Z w C z w C Z W C z W C z w C z W C z W C z W C z W C Z W C z w C Z C w z C w Z w C z W C Z w C z W C z w C z W C z C w z w C z w C z w C Z W C z w C z o 2 cn 2 cn 22 cncn 9 cn 9 in 2 cn 2 cn 2 uN 2 Cn 2 cn 9 uN 2 fn 2 rn 9 0 2 tn 2 tn 2 tn g 0 o 05 g o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o pp 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 o 0 3 0 0 3 0 2 3 0 0 3 0 0 3 0 0 3 0 0 3 0 0 0 3 0 0 3 0 0 3 0 0 3 0 0 3 0 0 3 0 z 0 z 00 zz 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z w w w w w w w w w w w w o w w w w m w w w ao oo a° a° a° °° m °° w w w m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m c z z C m m m z z c z ; z 0 z z a w w m a -n 5 p Z O p Z O v ? 0 ? 0 ? n D D z O = c- D O z O x W - 0 W - 0 w - 0 w - 0 m p T ? 3 D m 2 --I o (? O o (? O o 7C O o? 7C I Z p O x cn V cn -I r r A 0 F 0 F a C) 2 D 0 z D 0 Z z = w c Z c 2 c Z c Z Z 0 c 2 c Z M m o 0 s m .-o m ? O m m x m m x = D 2 r - T r - T p T < < p - 2 p T w w w w m m m v T - v 25 M < w m m x m m x p 0 O 0 m -< w D z T D z T n T r m r m w - m - w U w A ? M m m m w m x w m ;O w 0 -n w ? Z Z ? 3 = 0 O 3 D 3 2 o rri N ;u -i ;u m w z w z ? o m p z 0 z ? w 0 > z 0 z 0 z 0 z 0 v ? M o O ? w ? ? 0 ? 0 w UD w ? Z 0 - r- 0 - ? 0 -4 0 -i 0 T S T ? cn O z 0 O z Z n > Z C? r. O O ? ? ? ?n T ? p 3 m o m o m v m o T cn 3 x 0 m o m v n 8 O ? r- ;u ? 0 x n s Z o r C -? m C -i m m c? ? D 0 ;u D n w -n O z n z T 0 z x 0 = 0 x 0 x n 'i O r m ? -{ m m x ? z () x ? m ? m z (? Z C? n S = (? w w m m m m -q n -j n w w s x ? m m c? x c? x c? x ? O c? ? cn -1 X cn -4 X cn -I A cn ? X x ? m cn ? cn -1 ? 0 m m n Z n x m m c? M M m m z 5 m n x c? z S m m m m m m m m m w m m 1 O _ n x n ? n = (? _ _ n M m z O z O A X m M m M z O z O ? m ? m x c? m c? m c? m D n m x ? 3 l 3 2 m x m 3 3 ? c x m m M m O ? x x x O X Z ;u • m x x x A _ m m z G) z 0 0 0 m M x x X X M X 3 3 m m m m M T m O m O m m m 0 m m m m m r n x x v ;u x w ? ? ? ? `2 ?2 ? ? ? ? ?2 m? m? m? m? ?m m? {m2 ?rn D D D D D D g' V1 > fn N M fn m D m D m D m D m D m D m D m DC m D m D m D D D D D D D D< D w w w N N co y K E c c c r?r r5r r5r ? ? m ? ? ? ? ? ? ? ? A1 r5r m m m m m m O cn cn o o fA V1 V1 N N fn N N fn fA tA fA N N U1 V1 x cn x cn s n x v ? O V ? = P Fl = P r = P r x P r x P , r x P r s P r = P r x P r x P r x F' r x r- r , = F r x P r- x P r j r, r I P r P r P r 5 F m 5 F m 5 F m 5 F m 5 F m 5 F m 5 F m 5 F m 5 F m _ F m S F m S F m S F m S F m S F m S F m S F m S F m S r Fn r + F m F m F m F m F m ' N OI (4 N 4 G2 ul g ct N u1 A N '' q q -+ - R A _ ? R al Ol -t q . ? y 0 g Q g A cn R ol CQ C4 N ( 4 .4 N R R ul 4 -' - 8 2 4 4 4 R ?a IQ N R t 4 IQ -C2 4 t ;a X ;a w ;u ;u X z X ;a ;u X ;a W ;a ;a ;a X ;a m ;a m ;a m ;0 m z m ;u m ;o m ;o m z m z m ;u m ;u m z m ;u m x m m m m m z m x m x m z m z m m m z m m m m m m m w m z m x m m m m Z O m Z O m Z O p ;U M m Z O m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 m z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 z 0 x x x x x s s x x x x x x x x s x s x x x x x x x s x x x x x x s s s x x x x s s x x x x x x x c z X 0 0 0 0 c cn O M F a D M O M W O m m v ? r, r X (n T 0 O m 0 p e r- r F- r O 00 D x 0 p ? z -I D ? = T r O ? rT- > ? r 'U n 0 0 x 0 O n n n _ ? ? m ? m N (? cn 0 O cn § ? w G) 0 0 z cn ? cn ? n z cn ? c ? 0 0 -1 0 n 0 0 0 0 f o 1; ;U D ° ? C N z p ? cn ? D ? O N N n (n cn A m m ? S m m m m m m s x z x z p 2 r cn -- m i r r M v ? r r ? m tn -1 ? ? o r- F ? r- A D ? r- ? r- O D 0 o F M m F D F O F O F O ju m m m cn ? v 2 m D - -I 2 z o .i p z ?1 D O r (> ? m F ? g -I < v r x ? 0 v N ? 0 v x x x m c r -1 m D x m m O v m ? ??f1 m O u , 00 m M m M 2 O m M X m M ?rl n M m M x m 7mC m 7mC m 7mC m 7X x ? r ? D m m Z ? ? T z A N O m x m 7x z s H N -n > O "n . ?Mr -I O O 3 7 C O T 3 0 T W X -1 0 ? c? = m z 0 0 r x Z C C B O O c c D m z x N ? m v i m om z = 0 ; 0 ? O C rtf m V0 rt1 m I C X 0 m > ? n N ;u ;a w M v x X 1 1 1 1 m m m I l I I L 1 1 1 7 = UU U O O m LL LL m m LL LL N 0 0 00 0 a0 w H H 00 0w H cl: Ww > W ? > 0: x 0: 0 U > : J U U 0 0 0 00 0 " " 00 0 0 w J WW J o C7 o J ? to Q -JJ W co Q 0 0 000Coo CO U UU U X U x U x U 2 2 UU x x UU x U Z w Z W Z W Z Z w W Z Z W w Z w b b bb b S a a a n a a aa . . . S u co 0 ca 0 to m K U w w Of UUUw Y Y Y YYYw w w cj: O W W w w w w 000U w U w Z w U Y ZZZxw w LL LL Y ? O W Y R OOOUZwww WWw O x O xxx u ?z V Z Z Z ZZZ°J°0 rn ww o 0 w x 0 a O 0 w x »>wa aaax 000?Q U H U HHF-QQx 0 W 0 W W W w a a o w w WwW3: www U. LL LL LL 0 z 0 z 0 z 0 zzzzz 00000 to N N DOONO 0 0 0 00000 U M Co J v v CNI U I b a aaN?°ob mf ?C i ? m 0 t?O t?0 f ?0nnnn n A n? A ? a o c o a* ? 0?0 f o OO Oho a00o m o°? o? oNi OMI ?, Owl f o °i O~1 a0Di oO1i ? ?. °- ? ??„ ° ? H N J t. r ?A z L v O all r _ V D N 1 {„ R 7Q C? ? ? ? _ L ?p N CN ZT O 231377 Z O O n ?o N C (7 O Z V N A ? N R 40 ? ?3E ? Or!pAO'.j 1 ? ? ? eon 1 71 N ? ? W N D ern brag N ' S F? < r< T 4 - m r- ov -4 m w cn G) 0) c m Z O cZi 0 00 m m P ;a m X m r- f= m 0 u,u, ti N i 8 zoL+,r 'M•0.3 M 9L9+ ,r M'0'3 lam '8'0 t s ? V I? ? W N -q = X? d >+-?i ?mc? ;u 1>1 M m r S Y 3d U) m ;0 r. p N CA w , p ?oa O z m ;K o o '*1 c? m n z ?, gg m m o ]]177/ Z? a+ ss II ?I ?0--1 II =,m tl II z 10 II ? V) I I :A? II z00 ;u N1 W E.O.W. C m o I I E3+au U) -nz m I I a MADISON CO. a IVY CREEK BUNCOMBE CO. II ? II O.W. \\ a3+748O V ? \ A O a + V O N u It L, Z j D r n N ' - T S 0 ;u -4 m EASE* ? g I m? m r Aso m rn ' gl? ?I. n N N N 9 z N w w w U m W w ~ H z Nw O F- w (L O J V UnOa 7 N W t29 O K WOWSK-mr?i l" W J aw8m_ W X ap J 2 H W m w 00 Q 8$0 0 8 $og$z2 -Z-OOin fV in m N N M e O fV in m NN M O i O Ep O &E b ? 0 0 O ? 's .8 to e ? • W ? yg 7 «e. 2 1 nj 3 u EI W g W WO 0 2NJ Q H ? Q ? U J O d J Z y. U W Z W U li F- W Y. U) e NX:w 2 w 2 J W r Q 3 J w om3g? F°"?O7- w -0 ?3w J z w ¢ 3 tna.a0 J =~J U. z U V >xa 0000->rw-W H = Q ?QQ ~ z } K J ?wJ°300 No?x?1- o:9WF g F?=aut. LL 3 - = o ?n m a gUw w WU9 ~?JJJWQO wh-O?OQ U F? w U 0_ F- ?a ix tit aP r a 2 9 ag Z J ?ij 3Q 2 V y V dji YF e s W V Q i? O W aatet I Bill wig 111,111 till, P ? n O i N Q n O LL Q F- w ? 0 ? W ? W O p' ? o t M ° w O V ni i F? t O ` a? 14, W h H It ° po) bb ?? b 8 CL _? $ b W? mill?? l 8 will olo IIH Ill I i I ?-a M a R : „ ° -a7, t :?4 I tit Lz N 1j SEDIMENTATION CONTROL PLAN 1. CLEAN-UP AND RESTORATION 1.01 Initial clean-up shall consist of removing any unwanted soil, rocks, tree branches, and construction material. The entire work area shall be smoothed and graded. Also included are temporary soil erosion control measures. 1.02 Final clean-up shall follow construction within 30 working days. Final clean-up shall consist of preparation of ground, seeding, and fertilizing of all disturbed areas and will include hand raking as necessary, fence restoration, terraces, and berms. 1.03 The entire work area, including ingress-egress to construction site, shall be restored as nearly to its original condition as practical. 1.04 All complaints concerning clean-up and restoration of property disturbed by construction are to be handled immediately. If the situation warrants, the contractor will be expected to form an additional and separate clean-up crew to handle property owner complaints. 1.05 All areas disturbed by construction shall be leveled, fertilized with a 10-10-10 mixture at a rate of 100 pounds per acre, apply lime at a rate of two tons per acre, and seeded with KY-31 Fescue, (100 lbs/acre). Mulching at a rate of 2,000/4,000 pounds per acre will be required. The right-of-way in pastures and fields shall be seeded with like seed. Where any work disturbs the area outside the right-of-way, the contractor shall insure that the area is completely restored in a manner acceptable to the AT&T Communications, Inc. representative and property owner. Sod that is removed shall be replaced with the same type. Unsodded areas shall be graded and then seeded and mulched. The contractor is responsible for establishing a dense stand of permanent grass within a reasonable time. Shrubbery that is removed or destroyed shall be replaced with equal types and sizes. Grassing and mulching operations are to begin immediately after construction/installation has been completed. Page 1 of 4 Z SEDIMENTATION CONTROL PLAN 1.06 When crossing manicured grass areas of Centipede, St. Augustine, Zoysia, or like sod, sod is to be replaced with same as the undisturbed area. 1.07 The contractor shall be liable for all damage, injury, or loss to persons or property to any character arising from or resulting from any act of commission, omission, neglect or misconduct in the performance of work by the contractor, his employees or agents. The contractor shall be further liable for all damage, injury, or loss to persons or property arising from, or as a result of defective work or materials. 1.08 Trees scarred, nicked or damaged by construction in public areas are to be removed or have damaged areas painted over with an appropriate type of sealer. 2. SOIL EROSION, CORRECTIVE, PREVENTIVE, AND CONTROL DEVICES 2.01 Soil Erosion Control The entire work area shall be restored as nearly to its original condition and in accordance with current Department of Natural Resources requirements. Temporary erosion control measures, silt check dams, silt fences, temporary slope drains, brush barriers, or temporary seeding and mulching, shall be used as required. Erosion control measures shall be completed as soon as practical to minimize damage to disturbed and undisturbed areas. 2.02 Corrective Filling, repairing, or otherwise stabilizing existing surface conditions, ruts, washes or other disturbances which lead to soil erosion. This includes all existing or new right-of-way disturbed or undisturbed by construction. Filling, repairing, or otherwise stabilizing ground surface disturbed during construction. This will include filling and stabilizing of ruts which develop off the right-of-way as a result of construction activity. This also applies to public and private roads, private property, or driveways used for right-of-way across during construction activities. Page 2 of 4 V JO £ aSed •gouan algt,n app Buolm mollo3 Aew jortn lugs os `sasinoo aalva 3loolq io undo sTmq ?(IlnS so wmals ant,aj ION oQ *k mssonau umyl crow Aum paginlsip aq IOU llmgs .canon uonelaSan Sunsixg .k mSSaoau ajagm poumumw put pagsiwn3 aq llmgs 3uuogs aldurd •It,nn.ran lda)l sopts gl!m lno Slleau oq Ijegs sogoli(j •jt,nnotud se ease ut, llews se oq jlt,gs suont,nt,nxa JId •(paxonsop are s3Mq aragm pannbai aq IITM saainap lowoo Aq uonmiolsa-l) •wnwiutw t, of lda3l aq llt,gs `s*mq umoils put, AlIng `sagoltp `s.raplnogs peon 3o Suizopling •qof mp 3o uoneaado jadoid tp!m lualsmoo `wnwiuiw m of idol aq llugs Atm-3o-lggu algt,o aql uo o!jjvn luawdmbo io .rejnoigan annuanard £0•Z gvoilowd se uoos se ouop aq llegs `sa.mlxiu ss lr ojgelms glinn splai3 palmnnlno ump .raglo `smarm poganlsip 3o Suipoas agl `poljlDods ajagM •saoanosa-l jemlt,rl 3o luaurl.rt,daQ muiloimD tWoN oql Aq poloomp se jo paps mUl ql!m aq llegs Buipaasar `pagrnads si Suipaasaa azagM •paztl.J9j pUm `pa)lsip `palanal aq llegs salnlsed ljt, ui sum pogrnlsip aq,L •pa.nnba.r oq Amu sualgoad ogn mip oU!3ads anjos 01 SIIVMpt,ag glrM sadid Maw polr9nnoo to sodid alaanuoa panaojuraa 3o luawaot,ld oq,L •sgt,q puts 3o oomld ui pasn aq ,(ew („ZI of ,g 3low) de.r diN •olgeo Suimold jo Sutgouan aaglagm pasn aq Ilegs santnap aniluanaad uoiso o asags luiggvq puts put, sgnld gouan `sump `suuoq uoisaanip `sootual apnjoui sarnseaw asoq,L sguinnmrp uopeotjjoads ag1 uo umogs se samseau lonuoo of roads 3o Sutot,ld ag,L Nvrid 1011IN03 AIOLLVINHb1IIGas S , W 4P SEDIMENTATION CONTROL PLAN 2.04 Control Devices In addition to other measures that may be required, the following methods of typical control will be required as shown on specification drawings. A. Plugs Plugs are built into the trench to act as a barrier to keep water from flowing along the trench. The plug must extend into undisturbed earth regardless of the width of the trench. Trench widths will determine the arrangement and volume of plugs. Plugs will be required at all terraces through areas that have open trenches. B. Terraces A Terrace is a long shallow mound used to divert water away from the cable trench. Terraces shall be long enough and so constructed that they do not divert water to disturbed construction area. C. Diversion Berms Diversion berms are constructed at stream and creek banks to divert water run-off from surrounding areas from entering creeks or streams along cable trench. D. Retaining Walls Retaining walls are used to control and re-establish steep banks that have been disturbed during trench excavation. Place interlocked bags of earth or rip rap in trench and all disturbed areas to restore normal contour to the bank. Page 4 of 4