HomeMy WebLinkAboutDEQ-CFW_00061343Dupont
Subject: Dupont
From: Mark Brantley <Mark. Brantley @ncmail.net>
Date: Wed, 17 May 2006 15:07:38 -0400
To: Belinda Henson <Belinda.Henson@ncmail.net>
Belinda
I talked with Mike Jonhson just a few minutes ago about thier outfall line being
relocated. He told me they are in the process of drawing up a contact with Ch2m
(or is it C2hm?) about doing the environmental modeling. They are having some
problems doing it but he feels they should have a contract in about 2 weeks. Then
the modeling work can begin. He told then he will try and provide us with a
timeline for their project.
Chad was the lock and dam yesterday and he said the efflent was very turbid from
the erosin. Will the outfall issue need to be in the staff report for the permit
renewal?
Mark
Mark Brantley
Environmental Chemist
NC DENR-Division of Water Quality
Surface Water Protection Section
Fayetteville Regional Office
(910) 486-1541
I of I
5/18/2006 12:08 PM
DEQ-CFW 00061343