Loading...
HomeMy WebLinkAboutDEQ-CFW_00079259From: Munger, Bridget [/D=EXCHANGELABS/OU=EXCHANGEADMINISTRATIVE GROUP (FYD|BOHF2]SPDLT)/CN=REOP|ENTS/CN=C54[IF65OCEA499G8A5ABA689C2O4F61'BCPWUNGER] Sent: 6/26/I0I710:2454PM To: Kritzer, Jamie [/o=ExchangeLabs/ou=ExzhanXeAdministrative Group (FYD|8OHFZ33PDO)/cn=Redpient$cn=cee93c49d01445a3b541bb3Z7dcdc84O-jbkritzer] Subject: FVV:Today'scall plus unrelated questions Goyes, there isaconference call with theEtaFNews reporter tomorrow? From: Sink, Marla Sent: Monday, June Z6,JOl75:OOPM To: Kritzer, Jamie <jamie.kritzer@ncdenr.Bov> Cc: Munger, Bridget <brid8et.mun8er@ncdenr.8ov>;Grzyb,Julie ^ju|ie.grzyb@ncdenr.8ov>;Brower, Connie <connie.broxver@ncdenr.gou' Subject: FVV:Today'scall plus unrelated questions R9 Marla Sink Public Information Officer Department ofEnvironmental Quality Division ofWater Resources 9197079033 office S12North Salisbury Street 1811Mail Service Center Raleigh, NC 27899-1811 From: Sink, Marla Sent: Monday, June 26,2Ol7458PM To: 'Vaughn Hagerty' Subject: FVV:Today'scall plus unrelated questions HiVaughn, Sorry so late... please see the responses to your questions below. Marla Sink Public Information Officer Division of Water Resources 9197079033 office From: Vaughn Hagerty Sent: Monday, June 26ZO17O:O8AM To: Sink, Marla < Subject: Today'scall plus unrelated questions Hi, Marla. It probably would be helpful for you guys to have a copy of the Chemours' most recent NPDES permit application, since we'll be referring to it. The one I have has a cover sheet dated April 27, 2016. Please let me know if there's a later one or any subsequent submissions that I should be aware of Otherwise, I'll look for your call at 11: 15 a.m. Again, my number is (910) 264-8338. Meanwhile, I'm working on a separate story with a deadline of 4 p.m. today that updates the water testing. Among other things, I'm hoping to get answers to these: 1) What's the status of the testing -- what's been done so far? What's coming up this week and later? When might we expect results? And, can you tell me, specifically, when CFPUA's ASR well is being tested? Sent the sampling schedule press release. 2) Can DEQ confirm that Chemours has, in fact, been operating the process that results in GenX as a byproduct throughout the testing period? We've had a number of questions from folks wondering about this since the company said it was an intermittent process and it would be great to put that to bed. Chemours has indicated the process (the vinyl ether process) that results in GenX as a byproduct has Teen ongoing throughout the testing sampling process. On June 23, DEQ requested operating information to show when the process had been in production so we can compare that information to the date when sampling occurred, 3) Has DEQ confirmed definitively that Chemours has ceased discharging GenX into the Cape Fear? When did that actually occur? Does it include the other "novel" compounds? How is Chemours keeping the wastewater from being discharged? Mike Johnson mentioned something about needing three tanker trucks a day to handle it. is that what they're doing? Is that being hauled off for incineration? If so, where? If not trucks, what is the process? Also, has DEQ visited to plant to inspect this process? Chemours has told us it has stopped discharging what's known as GenX into the Cape Fear as of June 21. Chemours has indicated. it is keeping the wastewater from being discharged by using temporary storage tanks to hold the waste as they are working on final out-of-state disposal options. Chemours made one shipment to an Arkansas commercial incinerator on June 22 for a trial bum. DEQ staff plan to visit Chemours this week to verify that Chemours is containing the wastewater discharge from its vinyl ether process, Our samples, which have been sent to the EPA lab — the same one Dr. Knappe used. in his study — will be analyzed for other compounds included in the study report. DEQ is working with EPA's Toxic Substance Control Act staff to gain access to information submitted 4 to the EPA thatwill help the state evaluate all manufacturing processes and potential chemicals that need to be included in the NPDES permit renewal before the upcoming site visit. Are those questions you can help me address? -Vaughn Hagerty DEQ-CFW-00079260