Loading...
HomeMy WebLinkAbout19920282 Ver 1_COMPLETE FILE_19920729 State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Governor A. Preston Howard, Jr., P.E. William W. Cobey, Jr., Secretary Acting Director July 29, 1992 Mr. Joseph B. Davenport 702 Winwood Drive Windson, N.C. 27983 Dear Mr. Davenport: Subject: Proposed Fill in Waters Boat ramp construction Bertie County DEM Project #92282, COE for Batchelor Bay subdivision Project #199202168 Upon review of your request for Water Quality Certification to place fill material in 400 square feet of water for boat ramp construction located at Batchelor Bay subdivision in Bertie County, we have determined that the proposed fill can be covered by General Water Quality Certification No. 2663 issued January 21, 1992. A copy of the General Certification is attached. This Certification may be used in qualifying for coverage under Corps of Engineers' Nationwide Permit No. 36. An additional condition is that 401 Certification must be obtained form the Division of Environmental Management for any activity authorized by the U.S. Army Corps of Engineers under Nationwide Permit 14 or 26 (greater than one-third of an acre). If you have any questions, please contact John Dorney at 919/733-1786. Sincerely, i ? Du?j P eston Howard, r P.E. GTE:JD Attachment cc: Wilmington District Corps of Engineers Corps of Engineers Washongton Regional Office Washington DEM Regional Office Mr. John Dorney Central Files Division of Coastal Management, Raleigh REGIONAL OFFICES Asheville Fayetteville Mooresville Raleigh Washington Wilmington Winston-Salem 704/251-6208 919/486-1541 704/663-1699 919/733-2314 9191946-6481 919/395-3900 919/896-7007 Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer it s e ? v , •,r .0 y1ASHiNG1u44 OFFICE ? ° ? ? ?l i ? J 1942' State of North Carolina D. E W Department of Environment, Health, and Natural Resources Division of Coastal Management 1424 Carolina Avenue • Washington, North Carolina 27889 James G. Martin, Governor William W. Cobey, Jr., Secretary 15 May 1992 MEMORANDUM T0: Dr. George T. Everett, Director Division of Environmental Management FROM: John R. Parker, Chief Major Permits Processing Section SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Joe B. Davenport (Batchelor Bay Subdivision) Roger N. Schecter Director Project Location: Off NC 45, Merry Hill Community, Batchelor Bay off Albemarle Sound, Bertie County Proposed Project: To develop a 22.0 acre, 30 lot, subdivision adjacent to Batchelor Bay. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05 June, 1992. If you have any questions regarding the proposed project, please contact Raleigh Bland at 733-2293. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. (-"This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the Signed Date ! d' Box 1507 • Washington, North Carolina 27889 • Telephone 919-946-6481 An Equal Opportunity AHirrnative Action Employer To: ohn Dorney P nning Branch DIVISION OF ENVIRONMENTAL MANAGEMENT » CAAMA MAJOR PERMIT APPLICATION REVIEW WaRO PROJECT # la - O 5F 3'" REVIEWER: SAWYER PERMIT YR: 92 PERMIT NO. PROJECT NAME : PROJECT TYPE: COE #: DOT#: RCD FROM CDA: Q REG OFFICE: WaRO RIN *STREAM OR ADJACENT WATER BODY: CLASS: `d Ars J *OPEN OR CLOSED: WQ SUPERVISOR: THOR E E a COU Y: tt QQ 1 ?n I?uTYPE C COE ?P 2 or'i3' T sIN#: 'Roo, v g STREAM INDER #: a? WL IMPACT : D WL TYPE : /Yde WL REQUESTED: 10 WL ACR EST: Z,01- HYDRO CNECT? : WL SCORE : MITIGATION: OVA- MITIGATION TYPE: r?A- MITIGATION SIZE:N& RATIN HEET ATTACHED?: RECOMMENDATION:(tSSUE SUE COND DENY STORMWATER PLAN REQ' D : IF YES, DATE APPROVED: PROJECT DESCRIPTION: ,ew 3 . WATER QUALITY CERT. 401 CERT. REQ'D: IF YES, TYPE: D OZ SEWAGE DISPOSAL TYPE OF DISPOSAL PROPOS %-/ (EXISTING, P OPOSED SEPTIC TANK ETC. TO BE PERMITTED BY: ?5r (DEM, DHS, COUNTY) IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE: WATER/WETLAND FILL AREA OF FILL: WATER: 400 WETLAND: IS FILL ELIMINATING A SIGNI ICANT USE?fVd DREDGING IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF RESOURCE? /4,/e" IS SPOIL DISPOSAL ADEQUATELY ADDRESSED? MARINA ARE THE FOLLOWING ADEQUATELY ADDRESSED? W4- SEWAGE DISPOSAL: MARINA SERVICES: OXYGENINBASIN: CLOSURE OF SHELLFISHING WATERS: Page Tv+o RECOMMENDED CONDITIONS OR PERMIT RESTRICTIONS: //V ?- At b Q?P . XAP a6 cc: Central Files Washington Regional Office Files DCM-John Parker Elizabeth City Morehead City Washington COE:Washington Field Office RECEIVED Y'ASHINGTON OFFICE y ?, - imAy 15 ?992: State of North Carolina °' E ?' Department of Environment, Health, and Natural ResoulrCP-S„ Division of Coastal Management 1424 Carolina Avenue • -Washington, North Carolina.27889 Roger N. Schecter James G. Marlin, Govemor Director William W. Cobey, Jr., Secretary 15 May 1992 MEMORANDUM TO: Dr. George T. Everett, Director Division of Environmental Management FROM: John R. Parker, Chief Major Permits Processing Section SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Joe B. Davenport (Batchelor Bay Subdivision) Project Location: Off NC 45, Merry Hill Community, Batchelor Bay off Albemarle Sound, Bertie County Proposed Project: To develop a 22.0 acre, 30 lot, subdivision adjacent to Batchelor Bay. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 05 June, 1992. If you have any questions regarding the proposed project, please contact Raleigh Bland at 733-2293. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. Signed Date Box 1507 • Washington, North Carolina 27889 • Telephone 919-946-6481 An Equal Opportunity Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT RECEIVER. . - ti'•AotiiNGTON FIELD INVESTIGATION REPORT OFFICE 1. APPLICANT'S NAME Joe B. Davenport (Batchelor Bay Subdivision) 2. 3. 4. LOCATION OF PROJECT SITE Bertie County, off of NC 45, Batchelor Bay off of Albemarle Sound, Merrv Hill _Community. - 12-1-89, 108-_15, B-10-14 12-18-84 103-916, S9-15, PHOTO INDX : 1989: C10-14 D10-14 1984: T9-15, U?-15 STATE PLANE COORDINATES: X:- 26,974,000 Y : 813 , 000 west over U.L. INVESTIGATION TYPE: DREDGE & FILL X CAMA -X INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 4-28-92 (B) WAS APPLICANT PRESENT Yes 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 8 May 1992 OFFICE MzM%kmdpdtbbgc Washington 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Bertie County LAND CLASSIFICATION FROM LUP Conservation DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP Review is being conducted by DCM planning staff to determine consistency. (B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS PUBLIC TRUST WATERS_ ESTUARINE WATERS X OTHER 7. HABITAT DESCRIPTION: (C) (D) (E) (F) (G) ESTIMATED ANNUAL RATE OF EROSION ±2' (A) VEGETATED WETLANDS None (B) NON-VEGETATED WETLA". (C) OTHER: Openwater Highground (D) TOTAL AREA DISTURBED: W--TER DEPENDENT: YES X NO X Boatramp Sub vision INTENDED USE: PUBLIC PRIVATE X COMMERCIAL TYPE OF WASTE WATER TREATMENT: EXISTING None PLANNED Septic Tank TYPE OF STRUCTURES: EXISTING None PLANNED Boatramp, pier with groins, single family residences. SOURCE DCM staff observation AREA DREDGED FILLED OTHER N/A N/A ±400 sq. ft. (boatramp) 6.8 acres in ini development ±400 sa ft 6.8 Acres- 8. PROJECT SUMMARY: The applicant is proRgsing to develop a 22.0 acre, 30 lot, subdivision adjacent to Batchelor Bay in Bertie County. 4 Environmental setting The applicant owns a 217.5 acre tract of land in the Merry Hill community, east of NC 45 and adjacent to the Albemarle Sound in Bertie County. The majority of the property is being used for agricultural practices, mainly row crops. A portion of the property consists of a large wetland system (Morgan Swamp) which enters the property near the eastern property line. The wetland system is vegetated with cypress, various species of gums and other wetland adapted trees. Upland wooded areas vegetated by various species of oaks and other hardwood trees were present on much of the property between the agricultural fields and wooded swamp. The majority of these areas have been timbered within the past year in preparation of the subdivision development. The applicants property extends approximately 1,800' along Bachelor Bay. The shoreline at the normal water line (NWL) varies from ±8.0' to ±20.0' in elevation. Most of the area is covered by natural vegetation which has somewhat retarded erosion. Most of the area at the top of the bluffs from the edge extending landward at some locations up to ±100' was vegetated by hardwood forest. This area has also been timbered in preparation of the subdivision development. Project proposal The applicant is proposing the following: 1) The development of a 22 acre subdivision on the property. The entire development other than the access road from NC 45 will be located within an area ±600' landward of the NWL along the ±1800' of shoreline of Bachelor Bay. Thirty (30) lots will be developed for single family residences. No multifamily units will be developed. Each residence will be served by a septic tank sewage disposal system, however a community potable water system is to be installed for the entire development. Details on that system are presently being finalized. 2) A portion of the lot preparation for the development will consist of extensive removal of the high bluffs at the NWL. Lot No.'s 4, 5, 6, 7, 8, 9 and portions of 10 and 11 will require the removal of the bank from 40' to 60' northwardly to achieve a desired 5:1 slope. Also it will be necessary to remove some of the bank on Lots 12 thru 15 but with much less severity as the previously mentioned lots. Lots 1 thru 3 will require slight stumping and grading. The applicant hopes to achieve a 5:1 slope along the entire shoreline when the grading is completed. No bulkheads are proposed at this time. Erosion will be controlled by silt fences, mulching and seeding. All of this shoreline sloping is shown on attached plots. 3) A portion of the property adjacent to Morgan Swamp has been established by the applicant as a corgi€3uuni y lot, on which will be located a concrete boatramp which will hcve:a w.dth of 16.0' and a total length of 42.0' of which 25.0' will exterld ne'cad the NWL. A 4.0' wide by 29'.6" pier will be located on each side of the ramp. 25.0' of the pier will extend beyond the NWL. A groin the same length of the piers will be attached to the piers in an attempt to keep sand off of the ramp. A gravel access road will provide access to the ramp. Also a ±230.0' long by ±60.0' wide gravel turn area will also be provided. Silt fences will be placed between the disturbed areas and Morgan Swamp. Environmental impacts Environmental impacts will be as follows: 1) Upland wildlife habitat has either already been modified or will be further modified as the subdivision is developed. 2) No wetland vegetation will be excavated or filled. No development is proposed within the Morgan Swamp system. 3) Severe erosion potential is present during the sloping of the bluffs if proper sedimentation and erosion control measures are not adheared to. This erosion could result in fill being deposited beyond the NWL of Bachelor Bay. 4) Approximately 4.8 cubic yards of fill (concrete) will be placed beyond the NWL of Bachelor Bay as a result of boatramp construction. Also ±460 cubic yards of material will be excavated near or beyond the NWL as a result of sloping the area for the boatramp placement. 5) Two small areas of wetlands have been authorized to be filled under COE Nationwide Permits No. 14 and 26 in the area of the access road which extends from NC 45 to the development. David Gossett - Washington Office - May 8, 1992 Please type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 14 and 8-9 attach Form DCM-MP-2. must be completed for all projects. b. Is the proposed activity maintenance of-an existing project, new work, or both? t new projec . I APPLICANT c. Will the project be for community, private, or a. Name Joseph -.3. Davenport commercial use? Community Address 702 ,,,'inwood )rive city Windsor State NC 27983 d. Describe the planned use of the project. Single family subdivision; waster Zip 27983 Dayphone919-794-2947 Eccess. x Landowner or Authorized agent b. Project name (if any) 3atchelor &y 4 LAND AND WATER c. If the applicant is not the landowner, also give the CHARACTERISTICS owner's name and address. a. Size of entire tract 217.5 acres-22 acres in su ivision. b. Size of individual lot(s) appr ox. i ac. c. Elevation of tract above mean sea level or ' National 1-codedc Vertical Datum ±t - l 2 LOCATION OF PROPOSED . p us 5 PROJECT d. Soil type(s) and texture(s) of tract Lenoir & Craven a. Street address or secondary road number On Batchelor 3E.-- area of I:1bemEx1ee. Vegetation ontract Subdivision area is OF '•o . . ?-oun agriculture, b. Ct??town co unit ,ioVandmai? ?+res`tommta. 1 y is erry Hill. f. ?Tone Man-made features now on tract in Bertie County. c. County g. What is the CAMA Land Use Plan Classification of d. Is proposed work within city limits or planning the site? (Consult the local land use plan.) jurisdiction? Yes (B er t i e ;; o .) yC Conservation -Transitional e. N?m vof body of water nearest project " '• Developed Community R l ound rlbem, E.rIe , ) ura Other h. How is the tract zoned by local government? °°-- --- V on e 3 DESCRIPTION AND PLANS+FD USE OF PROPOSED PROJECT i. How are adjacent waters classified? _.? sc a. Describe all development activities you propose (for j. Has a professional archaeological survey been example, building a home, motel, marina, bulkhead, carried o t f r the tract? Yes If so, by whom? or pier): 30 Lot Subd. - Boat lending Ivi,:r 4F this - :rc Ives and istory a' eig . 'PP1 Pp1i orP ro-nVar-satinn summer 191_. 12/89 1 f. Dimensions pf spoil disposal .area c. Shoreline erosion during preceding 12 months, in -- F-6rrox. 2 acres.. feet 1 foot ?? . g. Location of spoil disposal area to be spread d. Type of bulkhead material None in agriculturep l lands. Also in ditch across hots 4 & 5.• On Lots 10 & 1T.. Amount of fill, in cubic yards, to be placed below h. Do you claim title to the disposal area? Yes mean high water. -Tone If not, attach a letter granting permission from the f. Type of fill material None owner. i. Will a disposal area be available for future maintenance? will not be required. If so, where? j. Does the disposal area include any marshland, swamps, or water areas? N o 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: k. Will the fill material belaced below mean high A copy of the deed (with state application only) or other water? y'e s , o o a ? ramp-concrete s 1"-)D - instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be -A U 1. Amount of fill in cubic yards y :_, the owner of said property, then forward a copy of the m. Type of fill materi al n. Source of fill material '.concrete o. Will fill mat Abe placed on marsh or other wetlands? - No p. Dimensions of th?w?A and to befilled q. How will excavated or fill material be kept on site and erosion controlled? Silt screens will be ?1F. P -9 w?s shore line Cfer- of r. What type of construction equipment will be used (for example draQline, backhoe r hydraulic dredge)? tae oe, Bu dozer and. -ru c s . s. Will wetlands be crossed in transporting equipment to project site? No If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap -11 on e b. Average distance waterwar? of mean high water or normal water level c oncrbt;p deed or other instrument under which the-owner claims title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 73.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 12/89 x .q 1 `h/ 3984 .".F.- 1 s 5 00 1. 17 `.? J as ? ? Zo ? O \ - o 03983 20 -/ / ( \ .. U \ ? i2/ .: o Zoe - 2o u ;r X22 ?1 a? 3L - /? 22 i1 22 1. Foul 3982 w x33 n x22 C_ C_ X81 (e • \ `?J l; Foul Area ?. : ............ \71??, ?? ? 'sue i ?=- •?% 3980 y Foul Area Ila 13010' X79 .r "" 25 Terrapin POP t• '"--- ="?• y`.w,. -.y. +Y-ipier -r"-.,?w• ,r- ??? I a"!- ?. ?- - • "Ruins ?1. ,W -r $ r9;_ "? ,/a1 'Cas?Sol a ? <• _ .. '' • r: . < \ ._ • -4_. ... ...................... .... _ . _- _ +1111- .iJ• .. / / - \ - .,? ">'' .-n Y.,/ •, / _.1!- i .:1• r may. 1attt chment....1-A) - _ W. :.: Foul _ w _ e- 0 1z t ? sz - P? noi / N. C. G. S. SI01io/7 See" /V - 6/3283.51 E -.?6660,30.64 N. G'. G. s. Slotion "Taugh " N- 8145817.37 E-266,53/7 CL-5 N74 ° //'39 "E - 3/2. 06, S3 NB/°53'49"E - 2/4.03' S4 S 67 °58'26"E - 34&.73' S5 / 562°/5'44"E- 640.38' Emma N. CooAei Q O/hers COO,oer He/,-S /- 0`170' Farm" S6 "O/d WX17S10,-7 f,'. O. w - 60, S77 °46'44 "E- 416.80 S7 S85 °26'04 "E - /67. 76' S8 S 76°0334 "E - /35.04' S9 N77 "E - 4Z5.16' S /O exisl/np rood S/O PC, SQ9°3739'E - B3.B6' S/2?? S55°6, 9 " E - 6-42 N76°//'3 E -239. 65' ' " ' ?\? /3 N67027 E - BO. /5 SB7°24 20 E -.9.9. 63' S/3, G1 NBO°O/ 22"E - /24.6/' 1V69 °42 22'E -254.55' l 617- ? arid NCA O N stow / NOTE: -From S1o. / (S/ - .:ICS to Sta. /O IS 010.7g the IF of the axiS11,7g woods -oca; /,-om S/O to S18 IS 010:7g the South edge of the //.- /01 - - D/.SI017ce lh,-OUgh Ccope,-l ands -Gis/o.: s lh?o,;r Bond Lands - 2,14,;7884e -At S21,d 0 46 "x38'c0,-,-ugoled cooled Seel pipe- arch wi// b& 00S//!0/7&01 /n -the branch. - A t point '0', o /2/.7. pipe -d,-op w/// be p,-esc,-,-bed to e171,-0ped w01e,- //7 the w6I10170. NORTH CAROLINA. / 0 COUNTY A? aOTA$Y ?BUC OF THE COUKT'I A. D STATE AFORESAID. CERTIFY THAT [ ?/ H rQtPA REGISTERED L4',O SURVEYOR, PERSONALLY APPEARED BEFORE ME THIS DAY AND ACKNOWLEDGED THE EiECUT,GV Jr?F THE FOREGOING INSTRUMENT. WITNESS MY HAND AND OFFICAL SEAL. THISZZDAY OF I't X74 , l 19x/1 5 NOTARY PUBLIC lt" 11 MY COMMISION EXPIRES: y D a SANDRA C, BROWN NnTLpv PIIRI IR Loco//on /nt®f Showing general installation of silt screen. 36" silt screen spoil 1 foot-buried soil base APR 0 9 1992 o ^ .. Rock Filter 22' Existing Ditch Rock Basin Orainwag at Sta. 5 -- Use e"isting structure, add Rock Basin and Rock filter. APR .0 9 199? 1iot to >c,..le Pip ? Install at ion betvp¢n S 12 & S 1 3 bottom graolcr 2 :1 slope hilt SrYp?h i OX% CL y Rocked catch Basin Rip Rap Weir /Swale lead off ,:A : _?.chment s<o . 3 t- C&i1t SC1'2On APR 0 9 1992 0 Plot to sc?ile % f• ..r,r,r,,..; . L ? ? 13 60' Center Line 40 30' 20' ?-18 15 ? Cross Section of New Grader Road Construction Beginning at- S 10 through Station 25 with exception of area at S21A and pt. Q. (Refer to attachments No. 4 & 5. Dunning' surfaced rocked and 4 inches deep where clE,y mey creLlte rutting periods-to be determined after road bed h.a.s been APO n 0 1 ttE.cement P';o. 4 18 ft. wide sections of during wet by Landowner developed. . I Aj r•`I ? 41- 0 Sketch showing installation of 48" arch culvert to be installed at Station 21 A --Road bed to maintain 28' width at station. Silt Fence down stream S21 Class B a-4,- Riprap s22 grbdor ditch :1 slope Rock Check Dam Class B Riprap Culvert Design for 10 year /24 hour storm using Rational Method = 6 in.-area =180 ac. = 45.4 c.f.s. for .5 ft. of head. 48' Arch Culvert (coated Steel) 58' span 36' rise 28' , No, 57 rock :?•''? rack basin .f r. fiIllIll(? l (1I1 MM M (I -- 40' down stream PROFILE APR O 9 1992 :. tt? chrnr,nt I; o . 5 Point "Q" is located bets. een Sta. 222 and Stra. 23 at a point where the old e:;istina road bed had created a small darn holding water in a aura % vet- land -- To entrap this 'rater- and to maintain it's present level a 12" pipe - drop -.A ill be installed benath the new road fill with it's intake end positioned at the high .water- mark. High -'crater mark to control _ elevation of intake on pipe-drop. natural slo e 10. `•ilt fence this end elevated 4" ?,_ :,• ..- - -•- -;;'•:%..:. - =~' :?.ti?` above level. ::. ,.:: 4.. ,, ;,; : • • : ,,. ' silt fence -} -,•,. rip rap 12' ovulvert welded 90 elbo•'cr Drainage StrUrtUre -it Point °Q° Attachment r, rv PR 0 9 199 A?t,\kgq Cross Section of a Section along shore lfne. Hight of soil bank along Sound shore will very from 8 ft. to approximately 20 ft. above mean water level. Designed slope - 5 1. t: silt screen point of cut :::..:..:.: : ...::.:.....?'::: cut above mean waterline. i idercut:. :el,imiri e:-p.oZ'ry.:::;::::..--, _ - = - _ mean wa.ter- un:.?:fta::b..e:: F Attachment 9 APR 0 9 1992 Shore Line Excavation Not all sections along the shore line will require extensive removel of steep banks. Lots 1, 2 and 3 will primarily require stumping and grading only. Lots 4, 5, 6, 79 8, 9, and parts of 10 and 11'. will require removel of the steep bank from 40 to 60 feet northwardly to acheive a 5 to 1 slope. It will probably be necessary to remove some of the bEnk along lots 12 through 15 but with much less severity as lots 4 through 12. This section can primarily be stumped and graded to acheive the desired slope. Upon the completion of each section or lot the graded area will be fertilized and seed- ed according to the attached prescription by the S.C.S. office. The silt fence will be established and fi maintained orlon; -!nd just above the high water mark for the length of the disturbance. (Attachment 9A) Profile of Culvert and Drain Swales Location - Culvert "88" - Swale 13-1 to 13 41 ( Not to Scale) Profile View ele 11.2' elev. 11.0' dissipartor Mean Sound level excelsior mat _ sediment pond elev. 0.0 18" culy. ,i::i• N ..,.... elev. 4.0' ... Fm elev. 3.0' Class B Riprap Cross Section View 18" culvert check dam - --------------- -- flow flow bottom of down stream swale check dam dissipator fabric liner ?r Note Attachment 9E for detail spects for dissipat or excelsior mat grader ditches 3:1 slope 18' 30' 40' APR 0 9 1992 Attachment 9-B Note : All road sholders and grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) GAG J - Grader ditch 6? A? ,•\ ML i Profile of Culvert and Drain Swales Location - Culvert "AA" - Swale A-! to A-2 ( Not to Scale) Profile View ele 12.0' elev. 11.8' dissipartor ?.: excelsior ma 18" cult'. ,?:i• • N ,.,-. , I Class 8 Riprap 18 culvert check dam flow flow '*`:3: • ?'"' bottom of down stream swale check dam dissipator fabric liner r- Note Attachment 9E for detail spects for dissipat or Mean Sound level t sediment pond elev. 0.0' elev. 6.0' elev.5.0' Cross Section View Note : All road shol ders and grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18x` culvert ( Temporary until grass is mature) Grader ditch road bed. excelsior mat grader ditches 3:1 slope 18' 30' 40' N?R p 91992 Att<<chment-9C ? Ik V`'\ lqq L-- Cross Section Of Swale Points -- A-1 tc A-2 ?L L 7.5' 1.5' V •? ••? 1 Yr •? 1 fi'i ?w?.1 _?vi - Swal e to f o11 ow exi sti ng contours f ram Sts. - ,_-1 to A=2 - Weded Perimeter + 15.3'lf t. - Length of Swale- ?3r'+ - Slope - .03 I = 1.7"/Hr.l2 V. cterm -C=.40 - A= above culvert - 5.2 ac. APR Q 9 1997 below culvert - 4.5 ac. - Q = 6.65 - fit= 7.03 c.f.s. I? tta.chnent - 9D (A-1 to A-2) Cross Section Of Swale Points -- B-1 to B-2 7.5' 31- - Swale to follow existing contours from Sts. - B-1 to B-2 - etfed Perimeter + 15.3'/f t. - Length of Swale- 300'- - Slope - .027 - ( = 1.7"/Hr./2 yr., storm -C-.40 - A= above culvert - 4.2 ac. below culvert - 2.9 ac. APR 0 9 199 Q = 4.83 - V= 6.47 c.f.s. :,: ttachnent - 9-'-,',(i3-1 to B-2) 4 Dissipator Detail t (Location at A-1 & 13-1) Dissipator to be lined with tare resistant fabric and then hand place Class T" size ri prap a minimum of two stones deep, stones should not be smaller than 6"x6"x 10" (14 lb.) to prevent lifting by water through culvert. Minimum size of di ssipator will be 6 ft. x 6 ft. and a minimum of 3 ft. deep measured from the invert of the culvert. 18" e:ulve%rt J ( 3 ft. min. Flow '?'/f •rti top dissipatar %wall `.f* ?' Cti?y ? o f- 3' Greder ditch fl ow ?I Attachment 9E Fabric underl ayment FIow-?= APR 0 9 199? .e Begin excavation of pond 10 'north (above) high water mark. 6.0' t 6, el?v No 57 sizA s#cnp far filt&r Elevation of dam to be a minimum of one foot above mean ground elevation at point of location elov. dam no-an ave. water low-1 in sound. Elev. 0.00 class B riprap % , '``-?. water level I :.......... ..:::::::.....:,• No. 57 filter stone to. be planed 12" thick. PROFILE VIEW Sound :. .r .r? shore, line, Sediment Pond (",-1) . 16' No. 57 ston-e for filter 10- ........ za, Class B riprap dam & filter 'ra,?an ave. water level in sound - 0.00' TOP VIEW 3 All elevations are referenced to 0.00') AttGchment 9F (1A-2) APR 0 9 1994 flow` _ cloy. 5.0 .r Sediment Pond (B-2) Elevation of dam to be a minimum of one foot above mean ground elevation at point of location Begin excavation of pond 10 'north (above) high wratLsr mark. elev. dam 4.0' 16' elev. 3.0' mean ave. water level in I sound. Elev. 0.00 class B riprap 7 stone for filter. .."r ; ' • `?•,.ti E :?_?-:. ????? « ter; • • • ? ''%.?? j'??// i is ., '.? .,?•i . No. 57 filter stone to be plated 12" thick. PROFILE VIEW A Sound =} No. 57 ston-e for filter Short. line •? Class B riprap dam & filter mean ave. water level in sound - 0.00' TOP VIEW ( All elevations are referenced to 0.00') ttF chr.;ent 911. (B-2) flow` - elev. 3.0' 'AP a R 0 Q 1?g2 Cross Section showing placement of Excelsior Matting in Swal es A-1 to A-2 and B-1 to B-2. Depth of swal e 1.5 ft. with 5:1 slope. Excelsior Matting - 40" wide - 16 ft. lengths. 6 " staples - spaced minu. of 14" apart. 7.5' 1 1.5' 6 in. overlap X14 ; r ?" ? " tLI y(.1 1 •A :,;?ti ;.;??-:•'- } :i'1 Excelsior Map Staples Overlap exc. mat a minimum of 6 in. Place recommended Fertz. & Grass seed prescription prior,, to mat installation. Toe of Riprap at dissipator. Flow •r Staples Bury edge of mat next to culvert 6". Prafile showing placement of mat downstream. APR 0 9 199?,` ?'? --M- BOAT RAMP DETAIL SHORE LINE LAND, 4.0' _ . .::: 17' 0" 16' 042' - 42' ::Concrete Ram- Ramp-. R- :3t4' x4'x8' sand shield 4' loading peir space post 4' apart NOTE: Do not excvavate bottom position concrete slab on exist- i ng bottom after the two stump: U ?:re M W U ? have been removed. line 29' 6.. OVER HEAD VIEW OF BOAT RAMP 24' deck do%rrn awl.. waterlinmean water line ............... - post driven ielev. 0.00 concrete slab ground .. sand sheild 9rern WATER SIDE VIEW OF BOAT LANDING Profile Vier (yr..,") slope = .10 sand sheild 3 4 ,,...,' down ?? nd} treated plyN'..".0" 18 29' 6" lip 1 canc. slab jj water line elev. 0.00' -1.5' APR 09 ?qt bottom Vier of Access & Turn Around Area For Boat Ramp Not to Scale Cor. pipe 5-A ` elev. 1 ..K. N574926E 146.26' • .,,,. . .. . ?. AAA Metal Pipe ^ End silt fence % 6 • A " "!v. . .. i Class B riprap N 40 W 57'? temp. check dam'. 20' • A " Wetland 60:. .i . % Boundary S 50 E ..R.. ?: Grass N 18 30 W 40. :?. % 230' Grass ,.° Swale' .. •.=%: i:% Turn. Area % No. 57 Stone Lat 1 t ):: "Flaw N 1 30 W , 40' •.::: • Class B ri ra temp. check dam S 64 W 54' Shollow R <:A M1A"' " " Swa]e "^ - Silt Fence Riprap A A 16' . A silt fence - check dam' "KK'A "A A ?% shore line 17' - A = ?apier Albemarle Sound 0.00' elev. mean water level APR 0 9 1992 91 A t, ? `yq ti ? ry O 1A CL L U L 41 O p 7 p t? o a a o U ?. s > A c 0 3 In V .w C FL- y 4r L qy U N 1= X L z A +• A 3 ) a Y r t o O ' d r I d 1 1 I CNI ? t L 7 t 0 l?J -{ c l t O . •? ., v ?- O U) ? If U ^ J r d ° w U t O ?J x t J a < J t U? U E 1 ? U) O O W• O c t tf1 O m O p p0 O 4-I c„ ?1o 4-- t a, r d a) p ? co ? ' I t O O ? m p 0 O t C) 4- fZ CL FA O t ? (j i t Q1 (f1 p 9 •d t p O t N U c? ^ II - t N a r•-I r-I Pi t XA cz3ri rig r 1 u? -CC to t cd r 14 I tt] .? > c a t ? Y O a U C O L L 3 Qf O ? O a) .K-- o] U) O. c S` O OD N U q? J U7 V) N O U ?I ri:t I I o AAA EY y • rl ? O ? i I - f•1 U r] ?it Or I;? E v ? aa cli ?•:i U E f W L O •- m tt] C N 11 N .t S.. O ? If t U C7) L:l t? Q.- ° United Stat& Soil Post Office Lox 566 s Departmenf of Conservation Windsor, N. C. 21 AgricuiturE Service November 6, 1991 Mr. Joe B. Davenport 702 Winwood Drive Windsor, North Carolina 27983 Dear Mr. Davenport: The permanent vegetation for November establishment is KY-31 Fescue. Listed below are recommendations on seeding specifications per acre critical area seedings. 4,000 lbs/ac. 1,000 lbs/ac. 100 lbs/ac. 4,000 lbs/ac. 1 bushel I doubled KY-31 Fescue becaus All other recommendations are IV, Practice 342, Chapter II, lime 10-10-10 fertilizer Ky-31 Fescue (Tall) Mulch Peanut hay for slopes Wheat (temporary) e of joping topography. from SCS technical guide page 11. If you have any questions please feel free to call 919-794-5305. Sincerely, Brent Daniels Technician 1! ttachment 10 The Soil Conservation Service 4-j is an agency of the Department of Agriculture UNITE( STATES SOIL P 0. POX. 566 DEPAP*TMENT OF CONSERVATION A I hl 'SCR, N.C. 27983 AGR ULTURE SERVICE APRIL 21, 1992 1 ---------------------------------------------------------------- MR. JUE)EPH B. DAVENPORT, III 702 W I NIr.00D DRIVE WINDSOR, NORTH CARC!L I NA, 279'8-?c DEAR MR. DAVENPORT: THE. SEEDING; RATES THAT WE r'RE+'A?'E E FCif; YOU EA-,L.IER [URIf1 THE WERE BP.SICALLY FOR Fa,l_t_ =;EEDIPv!: S. i i A,VE DICU'S:;E_ TrIE`;r= i'A ULI 7 .h.V' otl--L. !r.fq/IC:VL`-f ^iF?L ? THE _.. `Li i t!E;•I I N'U MR. F F B +V(J J 1 'vt I F 1._ JFc i ?l7 _ k: H l c - ; Fur-, THE ACCESS S RHAD, T!? rR AD.- _ i i i I T CHI ' AwU THi_. G::,:. IN, AT _RWA.Ys ?``1dA,LEC/ l_lli?i'=i_i(_A -F YC!UR BA TIC HELI_IFi S BAY 1Li . FCit_LO(n I dG i.:(iN'_'TRiJ(--: T I U N D =;'r' ?!r• UTHER'v-+;I',` Fr•.r=r.: He `L; FERT %L i %?.R AN[I EED - - N ,2 TOf WORT, IN ,.'_ Cl F L t ?` I •/' ` A, i 00 L ' A - r=..--- .. ? :. ENT. OR E'01JIVAL . SEED TO A +E.r_!.) MI A X j., C _ J(ti v:i h - Hi.Ll REMOVED) UVMREMOVED) IL A.NL' L{.? i {. _ (_!I" ti it ,.I j-i I lt- I ? ^L _C l_IT 2 TI_!\`., (. ?•.f?_•. 'ITS ' i'•, ? ! R L L_ N1 ":i (_ !--. R-' :_; E _ ;_ _! t' A ? i A L ;. 1 E r: i FOP MULCH ivETTIrvi 0=' I"`__ +.. "T-RIAIN THE B!=iTT0 it-;A EPW'"" Y`-- FOR ADDED FRCi'_ l f-iN ANY /I.:- 1F; i I T I C iNA:_ GUEST i Of dS F'LE A.SE CAL-_ 9 1 9-794-5 j SINCERELY, _, JR. NIU_> fi.^ SELL DISTRICT CONSERVATIONIST CC: MR. CLIFF BROWN ROUTE 1, BOX 189 PLYI'+1CiiJTH, N.C. 27`.=1E;3 Division of Environmental Management - Groundwater Section P. a. Box 29535 - Raleigh; N.C. 27626-0535 QUAD. NO. SERIAL NO. _ 1 Phone (919) 733-3221. Lat. __- Long. ? Pc Minor Basis ' ELL CONSTRUCTION RECORD Basin Code DRILLING CO RACTOR: Header Ent. GW-1 Ent STATE WELL CONSTRUCTION DRILLER REGISTRATION NUMBER: PERMIT NUMBER: 1. WELL LOCATION: (S ?w sketchy of the location below) Nearest Town: County: -? (Road, mmunity,orSubdivisionand tN . DEPTH DRILLING LOG 2. OWNER From To Formation Description ADDRESS (Stre tor Route No. City or Town State C 3. DATE DRILLED USE 0 WELL?t 4. TOTAL DEPTH L;(: Jb' 5. CUTTINGS COLLECTED YES F-1 NO, 6. DOES WELL REPLACE EXISTING WELL? YES F_? NO? 7. STATIC WATER LEVEL Below Top of Casing: 25?-n FT. (Use "+" if Above Top of Casing) 8. TOP OF CASING IS FT. Above Land Surface* ' Casing Terminated aVor below land surface is illegal unless a variance is issued In accordance with 15A NCAC 2C .0118 < 9. YIE gpm): 6 0 METHOD OF TEST Q.yt10. WA ZONES (depth): 11. CHLCOINATION: Type /T-# Amount If additional space is needed use back of form 12. CASING: Wall Thickness LOCATION SKETCH Depth Diameter or Weight/Ft. M terial (Show direction and distance from at least two V e From To Ft. - - -&-?Za- U Roads, or other map reference points) From To Ft. From To Ft. 13. GROUT: Depth Matena Method From _Q- To 9- Ft.l ' From To Ft. 14. SCREEN: Depth _ Diameter Slot Size Material From 92 To Ft - in. in. ?UL-- YL?V From To Ft. in. in. W mss` r From To Ft. in. in. 15. SAND/GRAVEL PACK: Depth Size aterial 44- From To _ Ft. From Tc _ Ft. 16. REMARKS: I DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C, WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS RECORD HAS BEEN PROVIDED TO THE WELL OWNER. GW-1 REV. 5/91 Submit original to Division of Environmental Management and copy to well owner. BERTIE COUNTY HEALTH DEPARTMENT P.O. BOX 530 WINDSOR,NORTH CAROLINA FEBRUARY 7.8,1992. BETTY V. TYNCH ENVIRONMENTAL HEALTH HEALTI-fi DIRECTOR 919-794-5303 TO WHOM IT MAY CONCERN: I HAVE CHECKED 30 LOTS FOR JOB B. DAVENPORT III ON ALBEMARLE SOUND,KNOWN AS BACHELOR'S BAY, AND ALL HAVE PASSED FOR SEPTIC TANK SYSTEMS. SINCERELY, Uj., KEITH W. LEE ENVIRONMENTAL HEALTH SPECIALIST BERTIE COUNTY KWL/jCs Attachment 14 fi i DIVISION OF COASTAL MANAGEMENT v,'asH rv TON OFFICE FIELD INVESTIGATION REPORT ?,,;?; i 51992 --e. E - 1. APPLICANT'S NAME Joe- B. Davenport (Batchelor Bay Subdivisionp ) Mq 2. LOCATION OF PROJECT SITE Bertie County, off of NC 45, Batch elor•Bay off of Albemarle Sound, Merry Hill Comnmity•. 12-1-89, 108-15) B-10-14 12-18-84. 103-916, S9-153 PHOTO INDX 19 8 9 : C10-14, D10-12+ 1984: T9-15, U?-15 STATE PLANE COORDINATES: X: 26,974,000 Y: 813,000 west over U.L. 3. INVESTIGATION TYPE: DREDGE & FILL X CAMA X 4. INVESTIGATIVE PROCEDURE: (A) DATES OF SITE VISIT 4-28-92 (B) WAS APPLICANT PRESENT Yes 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 8 May 1992 OFFICE Mzzack? Washington 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN Bertie County LAND CLASSIFICATION FROM LUP Conservation DEVELOPMENT CONSTRAINTS IDENTIFIED IN LUP Review is being conducted by DCM planning staff to determine consistency. ^B) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS PUBLIC TRUST WATERS_ ESTUARINE WATERS X OTHER (C) WATER DEPENDENT:' YES X NO X Boatramp Subdivision (D) INTENDED USE: PUBLIC PRIVATE X COMMERCIAL (E) TYPE OF WASTE WATER TREATMENT: EXISTING None PLANNED Septic Tank (F) TYPE OF STRUCTURES : EXISTING None PLANNED Boatramp, pier with groins, single family residences. (G) ESTIMATED ANNUAL RATE OF EROSION ±2' SOURCE DCM staff observation 7. HABITAT DESCRIPTION: AREA (A) VEGETATED WETLANDS DREDGED FILLED OTHER None N/A N/A (B) NON-VEGETATED WETLANDS: (C) OTHER : Openwater Highground (D) TOTAL AREA DISTURBED: ±400 sq. ft. (boatramp) 6.8 acres in init: development ±400 sg, ft. 6.8 AcrP_R' 8. PROJECT SUMMARY: The applicant is pro op_sing to develop a 22.0 acre, 30 lot, subdivision adjacent to Batchelor Bay in Bertie County. tviromental setting The applicant owns a 217.5 acre tract of land in the Merry Hill community, east of NC 45 and adjacent to the Albemarle Sound in Bertie County. The majority of the property is being used for agricultural practices, mainly row crops. A portion of the property consists of a large wetland system (Morgan Swamp) which enters the property near the eastern property line. The wetland system is vegetated with cypress, various species of gums and other wetland adapted trees. Upland wooded areas vegetated by various species of oaks and other hardwood trees were present on much of the property between the agricultural fields and wooded swamp. The majority of these areas have been timbered within the past year in preparation of the subdivision development. The applicants property extends approximately 1,800' along Bachelor Bay. The shoreline at the normal water line (NWL) varies from ±8.0' to ±20.0' in elevation. Most of the area is covered by natural vegetation which has somewhat retarded erosion. Most of the area at the top of the bluffs from the edge extending landward at some locations up to ±100' was vegetated by hardwood forest. This area has also been timbered in preparation of the subdivision development. Project proposal The applicant is proposing the following: 1) The development of a 22 acre subdivision on the property. The entire. development other than the access road from NC 45 will be located within an area ±600' landward of the NWL along the ±1800' of shoreline of Bachelor Bay. Thirty (30) lots will be developed for single family residences. No multifamily units will be developed. Each residence will be served by a septic tank sewage disposal system, however a community potable water system is to be installed for the entire development. Details on that system are presently being finalized. 2) A portion of the lot preparation for the development will consist of extensive removal of the high bluffs at the NWL. Lot No.'s 4, 5, 6, 7, 8, 9 and portions of 10 and 11 will require the removal of the bank from 40' to 60' northwardly to achieve a desired 5:1 slope. Also it will be necessary to remove some of the bank on Lots 12 thru 15 but with much less severity as the previously mentioned lots. Lots 1 thru 3 will require slight stumping and grading. The applicant hopes to achieve a 5:1 slope along the entire shoreline when the grading is completed. No bulkheads are proposed at this time. Erosion will be controlled by silt fences, mulching and seeding. All of this shoreline sloping is shown on attached plots. 3) A portion of the property adjacent to Morgan Swamp has been established by the applicant as a community lot, on which will be located a concrete boatramp which will have a width of 16.0' and a total length of 42.0' of which 25.0' will extend beyond the NWL. A 4.0' wide by 29'.6" pier will be located on each side of the ramp. 25.0' of the pier will extend beyond the NWL. A groin the same length of the piers will be attached to the piers in an attempt to keep sand off of the ramp. A gravel access road will provide access to the ramp. Also a ±230.0' long by ±60.0' wide gravel turn area will also be provided. Silt fences will be placed between the disturbed areas and Morgan Swamp. nvironmental impacts ?r Environmental impacts will be as follows: 1) Upland wildlife habitat has either already been modified or will be further modified as the subdivision is developed. 2) No wetland vegetation will be excavated or filled. No development is proposed within the Morgan Swamp system. 3) Severe erosion potential is present during the sloping of the bluffs if proper sedimentation and erosion control measures are not adheared to. This erosion could result in fill being deposited beyond the NWL of Bachelor Bay. 4) Approximately 4.8 cubic yards of fill (concrete) will be placed beyond the NWL of Bachelor Bay as a result of boatramp construction. Also ±460 cubic yards of material will be excavated near or beyond the NWL as a result of sloping the area for the boatramp placement. 5) Two small areas of wetlands have been authorized to be filled under COE Nationwide Permits No. 14 and 26 in the area of the access road which extends from NC 45 to the development. David Gossett - Washington Office - May 8, 1992 Please ,type or print. Carefully describe all anticipated development activities, including construction, excava- tion, filling, Pa? vm*g, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 14 and 8-9 must be completed for all projects. 1 APPLICANT a. Name Joseph 3. Davenport Address 702 +inwood Drive City Windsor State NC 27983 Zip 27983 Dayphone9l9-794-2947 X Landowner or Authorized agent b. Project name (if any) Batchelor BL .y c. If the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of-an existing project, new work, or both? new project, c. Will the project be for community, private, or commercial use? Community d. Describe the planned use of the project. Single family subdivision; water access. 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract 217.5 acres-22 acres in su ivisi.on. b. Size of individual lot(s) approx. i ac. c. Elevation of tract above mean sea level or Natiejrlal qt detipclVer cal Datum 0 us d. Soil type(s) and texture(s) of tract Lenoir & Craven a. Street address or secondary road number On Batchelor 3ey area. of Albemarlee. OFF "OF oun . b. 976town co unit , Q landmai res't ?ommu. 1 y is .erry Hill. f in Bertie County. c. County 9- d. Is proposed work within city limits or planning jurisdiction? Yes (Bertie Co. ) e. Narjof body of water nearest project r`.1ber,sr e bound 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier): 30 Lot Subd. - Boat landing Vegetation on tract Subdivision area is agriculture. Man-made features now on tract None What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation _ Transitional Developed Community Rural Other h. How is the tract zoned by local government? None i. How are adjacent waters classified?. SC Has a professional archaeological survey been carried o t f ?,r th tract? Yes If so, by whom? Mar ?c g4etehis - irc fives and 111 ory e eig - Tel:pbonR nnnversati nn syyniner 1 91 12/89 s f. Dimensions pf spoil disposal .area c. Shoreline erosion during preceding 12 months, in . ? °°' &rrp-x 2 acres. feet 1 foot ??. v g. c Location of spoil disposal area to be s ,pr e a d d. Type of bulkhead material None in agriculturepl lands. Also in ditch across Lots 4 & 5.- On Lots 10 & 11?•. Amount of fill, in cubic yards, to be placed below None h. Do you claim title to the disposal area? Yps mean high water If not, attach a letter granting permission from the owner. f. Type of fill material None i. Will a disposal area be available for future maintenance? will not be required. If so, where? 8 ADDITIONAL INFORMATION j. Does the disposal area include any marshland, In addition to the completed application form, the follow- swamps, or water areas? T ing items must be submitted: o IT k. Will the fill materi be pplaced below mean hi h f n l W A copy of the deed (with state application only) or other oa t ramp-c oncr e s c e water? ' )res , 01 . instrument under which the applicant claims title to the 1. y Amount of fill in cubic yards • .... . ? affected property. If the applicant is not claiming to be ?t :_, ,;?. the owner of said property, then forward °copy of the m. Type of fill material = c dn?r i`; t deed or other instrument under which the owner claims title, plus written permission from the owner to carry out n. Source of fill material .concrete the project. o. Will fill mate?lAbe placed on marsh or other A k l i l wetlands? // No n accurate wor p at (inc ud ng plan view and cross sectional drawings) drawn to scale in black ink on an 8 p. Dimensions of the gA and to be filled 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) q. How will excavated or fill material be kept on site and erosion controlled? Please note that original drawings are preferred and Silt screens will be v 1 a e ElQrl a only high quality copies will be accepted. Blue-line shore line C f e e mot) a., kr J n I4V prints or other larger plats are acceptable only if 18 high ? quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's r. What type of construction equipment will be used use of larger drawings.) A site or location map is a part (for example dragiiine, backhoeY yrhydraulic $ae oe Bu dozer and of plat requirements and it must be sufficiently detailed , dredge)? -ru c s . to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and s. Will wetlands be crossed in transporting equipment the like. to project site? No If yes, explain steps that will be taken to lessen environmental impacts. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments 7 SHORELINE STABILIZATION on the proposed project to the Division of Coastal Management and should be advised by the applicant of a. Length of bulkhead or riprap T` one that opportunity. b. Average distance waterward mean high water or normal water level _ % 1% . s 12/89 %*I -V 5 UPLAND DEVELOPMENT R Complete this section if the project includes any land developmem a. Type and number of buildings, facilities or stricturespro sed 30 single Family residence units b. Number of lots or parcels 30 c. Density (Give the n Fiber of residential units and the unitspera?.m 3 residential units unl s sc. d. Size of area to be graded or disturbed 5 to 6 G.cres - includes road. construction on site. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? " . Y e s f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. None g. List the materials, such as marl, paver stone, asphalt, or con(V&A%be used for paved surfaces. - Access road and Boat P.=:p p a ski ng. h. If applicable, has a stormwater management plan been submitted to thf Division of Environmental Management? i. Describe proposed sewage disposal and/or waste water treatment facilities. Septic System J. Have these facilities received state or local approval? See atte.ched site insr)ection. k. Describe existing treatment facilities. Tone 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). None ?9?'6 I or? 2. G.,ri.h - CZ) well m. W?tersupply source nn A ('ntn?n»n i f vj !a crvi ng all L is. n. If the project is oceanfront development, describe the steps that will be taken to maintain established publi beach accessways or provide new access. 1y 7P o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Access channel (MLW) or (NWL) Boat basin Other (break- water, pier, 1;e&W j boas-------- rock jetty) Fill placed in wetland or below MHW Upland fill areas Length Width Depth bs tom C?e?c ?v w?- ??? 0.60 {.{. ' }:2ti+in f? :•i}Qk• b. Amount of material to be excayated from below water level in cubic yards _ !A c. Type of material d. Does the area to be excavated include marshland, swamps, or other wetlands? no e. High round excavation, in cubic yards !4, consist _6f reMoving_ ba.Ak aloAg sound s ore. approx. 120000 cu. y s. 0 . 5 a e-+ I.&,V?- T, 6 0 C. % 7- 4. . 12/89 ` f. Dimensions of svg l disposal .area . rrox. 2 acres. •'" • 17 n.?. r T C: j. Does the disposal area include any marshland, swamps, or water areas? No g. Location of soil disposal area to b e s ar e a d d. Type of bulkhead material None in a ricultureal lands. Also in ditch across Lots 4 & on Lots 10 & 1 g. Amount of fill, in cubic yards, to be placed below h. Do you claim title to the disposal area? vP ,q mean high water T3on e If not, attach a letter granting permission from the owner. L Type of fill material None i. Will a disposal area be available not b or future maintenance? will required. If so, where? k. 1. in. n. c. Shoreline erosion Burin; preceding 12 months, in feet 1 foot ?? . 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: Will the fill materibe placed below mean hi h A copy of the deed (with state application only) or other water? -)es , oat ramp-c oner eWen s l"ctib . instrument under which the applicant claims title to the Amount of fill in cubic yards y? affected property. If the applicant is not claiming to be the owner of said property, then forward a copy of the Type of fill material c onFr i5t deed or other instrument under which the-owner claims title, plus written permission from the owner to cant' out Source of fill material r_/,Concrete the project. o. Will fill mat be placed on marsh or other wetlands? . - No p. Dimensions of the g and to be filled NIA q. How will excavated or fill material be kept on site and erosion controlled? Silt screens will be X1,1. e shore line Cfee •?0c.,6-J_ n IM.-rs r. What type of construction equipment will be used (for example drasline, backho 4r hydraulic dredge)? $a c de , Bu dozer 2 n r. trucks . s. Will wetlands be crossed in transporting equipment to project site? No If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap 17, one b. Average distance waterward 9f mean high water or normal water level J' An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 12/89 Name James A. McGee Address 208 Pr i n o P Road Greenville N.C. 27858 Name John W. Bond Address ox urtental Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, pcrmittee, and issuing dates. u0 A check for $ W made payable to the Department of Environment, Health & Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in ttae application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the ? day of , 1 X owner or Authorize agent 1-1 4 12/89 :? 514 l u ^ \J ° .? 20 \ ) ?y? 00 1?0 2 r, ? N s 3983 20 0 ° ?- • I Ij Z0 rj _•?+1 201, X22 a • a 1. ? ?r -30 `te`a Foul 3982 4 ?. O W !.^ x33 20' ?_? l- ` .\ O 71- x22 ?•?. r.•• Y CIGC is5 h i-?? ( a 3981 I IS. 5713011 _ .45 _ ° ?l 11 Foul''Area :`. °s M°° R 20 R Y H I' 16 Foul Area mm- In- tic i 30 3919 3 y- Terrapin Point - •` pier + - -?-#Z Ruins - ?? .,,yam ..?. 5 -6;7 'C' of e- 46. ?? ` ?/ = . - _ f' ::.• G chment ........... A) W -„? ?', •,,,, „t .fig ... - _ _ _ •,W.,. .?-. ?"? e - - _- W foul ? . ? ? Creek fi 1,,:? - _ .? _.?•-_ _- .'' • 213 ?` QPCQ? >t s2 - RAr. nail p k5 .. /v N. C. G. S. S.'o.'1017 'See" /V - 8/3283.5/ E -,?66.60.50. 64 se .(0 ?I T 606. r y N. C. a• S. Slot/on llraugh 11 N- 8/4083.37 4--266 3/7.W N74 ° 11'39 "E - 3/2.08' S3 NB/ °53'49 "E - 2/4.03' S4 S 67 °58'26 "E - 344.73' 55 S62°/5'44"E- 640.38' E/nmc N. Coo oer & Others Cooper Heirs I -a,701 "O/d by/asto'? Form" R. O. Py - 60' S77°46'44"E- 4/6.80' S7 S85°26'04"E - /67.76' se S 76°03 34 "E - /35.04 S9 N77 055'16 "E - 426. 16' L,k?l 617- N- NOTE: -From sta. / /S/ - S/OJ to S/o. /O /S along the f of the exiS1A?.q woods rood; from S/0 to S/8 /S along the South edge of th e ele/d _ -Distance through COOPerl ands - -3,.5-62.7:_ .:t 8017040.70'$ - 2, /47.8(9ft. -At S21A a 46"x36'corrugoled cooled steel p/pe- arch Will be pos/t/oned in -the branch. -At oo/nt O o 12 in. p/,oe drop w/// be prescr/bed to retain e17tr0`pe0' woler M the wet/and. existing food NORTH CAROLINA, /A/06Gl1YfO?OH COUYTY _S/O Pe S/8 S//) I YOtA Y P F n?/1e 3 ,BLIC OF THE COUNTY A.9 STATE AFORESAID, CERTIFY THAT S? °37 39 "E - 83.86' v , ro W-PA REGISTERED LAND SUMIEYOR. PERSONALLY APPEARED BEFORE ME THIS DAY AND ACKNOWLEDGED THE EtECUTION AF THE FOREGOING INSTRUMENT WITNESS MY S55°6' 9 ' E - 86. 42' HAND AND OFFICAL SEAL. THIS2ZDAY OF at ?? I ?y? N76°//'3 " E -239. 65' N87°27%3"E - 80. /5' S87°24?o"E-99.63' SA3•d? ,'`? ?5 '? HOTARYPUBLIC N80 °0/'22 "E - /24.6/' b rB MY COMMISION EXPIRES: /V69 42 P2'e -254.55' S/4',11 N55°G3'le"E- e3.26' s,a?`, L?5 O{`Oc SANDRA C. BROWN ,• NOTARY PUBLIC p 00 WASHINGTON COUNTY, N. C 64 9 My Commission. Expire •,??? GOPACCESS RIGHT Ovc AYACROSS 00 0 0 I -ANDS OF E71WIVA N. COOPER $ 'R.-IASKE-W HE-IRS t7/7& W BOND a EMMA N. COOPER & N78 °09 26"E-249.`S? / BOND a COOPER/A SKEW HE/RS S33°59 34 "E 50. /o'rrom ?? 520 AS GRANTED TO S20 /o Gain Corner , COrnO/ gum ?' ?0SERH S. a ?lJNE `l! OA IiENPORT Se5°2706"E-2es.e2' and ASS/GINS anal ?AMES A. a ' I ?0A/V H, M COEE a ASSIGNS. kj sal 54.V0 0'PS"C- /eS.aO' The R/D/?Y Supports o 4%S2/,a SIXTY Ft. (60) Width for //'s ' Total Length, 3°7'C"4r /45.7' Q y ?? i?.O. N! 60 i sea° 2746E - 0/4.06 O MERRr H/LL i v??: -BERT/E CQ NC ?ohn Lt! Bond ,' B - V {/ P; 747 j Sc a/e 500 f1. 0174 ;,? • i _'--s- O' 500 /000 C//0017 L. Brown cert/fy .'hot /h/S mop was drown by me from on actual fie/d survey oa April 22, /?tiRI!f! ?? N88°06'34"E- 508.78' _ iron pips i? 0 0• 0 •f ? • ' i S79 °43'06 "E - 207. 32' " -1270 ? Ooven art 1 : ? ' %i • 8683 - P6 ' t t Showing general installation of silt screen. 36" silt screen spoi 1 1 foot-buried soil base APR 0 9 1992 ot o JjeE:'-!. Pitch Rock Filter Rock Basin Existing Ditch ____ 22' Dminway at Sta. S -- Use misting structure, add Rock Basin and Rock Filter. APR 0 9 199? ti T 18 Rocked catch Basin v Rip Rap Weir ,Swale lead off ( ;tpl;':r ,,lO?;n Y r_ttachment No. 3 bottom grac4c?- b2:1 slope shoulder 28 Z- silt rein ?<ot to :)c?'le Pip a Install at ion belvo-en S 12 & S 13 APR 09 1992 I 4 r Tot" to scale ;.• "•.?-}• .?ti• Center Line 40' I 30• 20' :i 15. ? F18 „ ':-•. Sri ' ) 3-1 X3:1-'%';;,:?;,.,. :i. ?•;.. -7,7. -- ::"?. ?, . , :? ... - I ? :-/ ??' ; % . ,, . . . . , Cross Section of New Grader Road Construction Beginning at S10 through Station 25 -with exception of area at S21A and pt. Q. (Refer to attachments No. 4 & 5. Running surfaced rocked 18 ft. wide and 4 inches deep where sections of clay may creete rutting during wet periods-to be determined by Landowner after road bed has been developed. APO I a ? kttacement No. 4 11 ? V. I I q 1I-- Sketch showing installation of 48" arch culvert to be installed at Station 21 A --Road bed to maintain 28' width at station. Silt Fence down stream .....:.......:. S21 Class B grader ditch S22 2:1 slope Oock Check Dam Class 8 Riprap Culvert Design for 10 year /24 hour storm using Rational Method = 6 in.;area =180 ac. = 45.4 c.f.s. for .5 ft. of head. 48' Arch Culvert (coated Steel) 58' span 36' rise 28' , A/h. 157 PROFILE APR 0 9 1992 1', ttEchment No. 5 40' downstream -:j is Point "Q is located between Sta. 22 and Stra. 23 at a point where the old existing road bed had created a small Barr, holding water in a gurr, wet- land -- To entrap this water and to maintain it's present level a 12" pipe - drop -will be installed benath the new road fill with it's intake end positioned at the high water mark. High water mark to control elevation of intake on pipe-drop. natural slo e ? is* ?,re#larA silt fence this end elevated 4" +•1!l ?•-•-•- • • a • • • 1!1!l! •i r ' ' •: . •.,;. • above level. .. -• ....;:. ' rr ,,?%t.. .; rr.••.. ":?•/ t '' =lit fence ~rr?ter ;;''?•.:%. 24" ". r:!: ` frrr t <- .ti. =•!?.?• 12" cvulvert _ p ? p %X X t.,:: ri%r - , /:, • ,r •• f_1'i- r.`:`r,' ' :•`i?: %i : ' r':;/t/ri ?rri / ' 71 welded 90aelbo ::r Drainage Structure at Point "0". Attachment 6 APR 0 9 1992 `t Av,\ lggz- ?r Cross Section of a Section along shore lfne. Hight of soil bank along Sound shore will very from 8 ft. to approximately 20 ft. above mean water level. Designed slope - 5 1. 0 77? silt screen o''•:e'l.iniiiie?e:-e*por9E o Attachment 9 point of cut T41above mean waterline. -, .. . mean water- 14 APR 0 9 1992 i SO Shore Line Excavation Not all sections along the shore line will require extensive removel of steep banks. Lots 1, 2 and 3 will primarily require stumping and grading only. Lots 4, 51 6, 7, 8, 9, and parts of 10 and 11 will require removel of the steep bank from 40 to 60 feet northwardly to acheive a 5 to 1 slope. It will probably be necessary to remove some of the bunk along lots 12 through 15 but with much less severity as lots 4 through 12. This section can primarily be stumped and graded. to acheive the desired slope. Upon the completion,of each section or lot the graded area will be fertilized and seed- ed according to the attached prescription by the S.C.S. office. The silt fence will be established and maintained along and just above the high water mark for the entire length of the disturbance. (Attachment 9A) g Profile of Culvert and Drain Swales Location -Culvert "88" -Swale 6-1 to B-2. ( Not to Scale) J Profile View ele 11.2' elev. 11.0' dissipartor excelsior mat 18" cul Mean Sound level sediment pond elev. 0.0' elev. 4.0' . F.- ro? elev. 3. o' '•' Class B Riprap Cross Section View 18 culvert check dam flow flow h ti ti,.tir? ; .:.:..:.:.:.... ti. ami. bottom of down stream swale check dam dissipator fabric liner Note Attachment 9E for detail spects for dissipat or Note : All road sholders and grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) 494C , Grader ditch excelsior mat grader ditches 3:1 slope 18' 30' 40' APR 0 9 V2 Attachment 9-B -------------- :.......................................... ... 6k to ?,.\ lqq L 4L Profile of Culvert and Drain Swal es Location - Culvert "AA" Swale A-! to A-2 ( Not to Scale) ?t) Prof ele 12.0' . elev. 11.81 dissipastor 18 cult'. ?%• ?' 'N' .?.•. . Mean Sound level sediment pond ev. 0.0' 77 elev. 6.0\-el elev. 5.0' Class B Riprap Cross Section View 18" culvert check dam flow flow "?`=C::: • bottom of down stream swale check dam dissipator fabric liner ?-;tr Note Attachment 9E for detail spects for dissipat or Note : All road sholders and grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) _ 4?r - Grader ditch grader ditches 3:1 slope 18' 30' 40' - I flow excelsior mat le View excelsior mat APR 9 91992 Attachment-9C \ Or f .\ kqq L R I Cross Section Of Swale Points -- A-1 to A-2 sr 7.5' ,r: Mvrr?r , Ma= ?Or' 110 - Swale to follow existing contours from Sta. - A-1 to k-1-2 - WetTed Perimeter + 15.37f t. - Length of Swale- 230'+ -Slope - .03 -• i = 1.7"1Hr.l2 07. storm -C=.40 - A= above culvert - 5.2 e c. APR 0 9 19V' below culvert - 4.5 ac. - Q = 6.65 - V= 7.03 c.f.s. ? 1 L littachnent - 9r (A-1 to A-2) t .r Cross Section Of Swale Points -- B-1 to B-2 7.5' 5 , .'-- ? ...tea ??,:? ? J•.• ? '_:... ?Y,?t-',if :+? ? ?. - Swale to follow existing contours from Sta. - B-1 to B-2 - Wetted Perimeter + 15.37f t. - Length of Swale- 300 1 + - Slope - .027 - I = 1.7"/Hr./2 yr. storm 44 - A= above culvert - 4.2 ac. bel ow' cul vert - 2.9 ac. APR 0 9 1992' - Q = 4.83 - V= 6.47 c.f.s. 1- rttachnent - 9.U to B-2) Dissipator Detail (Location at A-1 & B-1) Dissipator to be lined with tare resistant fabric and then hand place Class "B" size riprap a minimum of two stones deep, stones should not be smaller than 6"x6"x 10" (14 lb.) to prevent lifting by water through culvert. Minimum size of di ssipator will be 6 ft. x 6 ft. and a minimum of 3 ft. deep measured :IiII??iill?? from the invert of the culvert. 18" Culvert I II:: 3 ft. mina Flow ti•ti•?fti tap dissipator gall??'•? :•. ?ti ti tif'r• ?tip •+ 3• ' •f •ti• ti, , f• Fabric underl ayMent II r ditch flow I Attachment 9E `APR- 0 9 X92 :- _ .': Flow :?stp= Sediment Pond Elevation of dam to be a minimum of one foot above mean ground elevation at point of location ave. waiter leval in .. Elev -0.00 Begin a xoavation of pond 10 'north (above) high water mark. elev. darn 6.0' 16' elev. i class B riprap ?? ti No. 57 Size stone for filter. water level • ' No. 57 filtar stone to be :;;????•? planed 12" thick. I PROFILE VIEW - •( I 16, I Sound• =?} No. 57 ston# for filter _^------.... now ti; - - - - e lea. 5.0 shore. ling Class B riprap dam & filt*r mean ave. water level in sound - 0.00' TOP VIEW ( All elevations are referenced to 0.00') Att& chment 9F (1--2) APR 09j9p ..e Sediment Pond (B-2) Elevation of dam to be a minimum of one foot above mean ground elevation at point of location Begin exoavation of pond 10 ' north (above) high water mark. elev. dam. 0' 16' elev. 3.01 ave. waiter level in Elev. 0.00 I No. 57 size stone far filter. ?t class B riprap . ti ./ wator level No. 57 filter stone to. be planed 12" thick. PROFILE VIEW .A = - : 16' ( Sound No. 57 stone for filter 1 0 - shore line •?3 Class B riprap dam & filter mean ave. water level in sound - 0.00' TOP VIEW All elevations are referenced to 0.00') .tte..chment 91? (-3-2) elev. 3.0' Sri ? ?c?. R 0 9 1Q wg _f Cross,Section showing placement of Excelsior Matting in Swales A-1 to A-2 and 8-1 to 8-2. Depth of swale 1.5 ft. with 5:1 slope. Excelsior Matting - 48" wide - 16 ft. lengths. 6 " staples - spaced minu. of 14" apart. 7.5' 1.5' - 6 in. overlap J=a 1.1,1i' A 'lip Ay- -?=?- Excelsior Map Staples ta.,'... . j : - j S ,1 tit??•r•? t4" Overlap exc. mat a minimum of 6 in. Place recommended Fertz. & Grass seed prescription prior to mat installation. -WEL" Flow Toe of Riprap at dissipator. - t: g ??/.?' i:?:s:t ` t S:: c ?:.':?: j:;.:'?/? `?/ /?i :.. ?•. ?.! St 'tom Bury edge of mat next to culvert 6". Profile showing placement of mat downstream. 'APR 0 9 1992 rr w{. BOAT RAMP DETAIL SHORE LINE --4w LAND 4.0' T 17' 0 16' :. :42 0 I :Concrete Ramp P' 3J4x4`x8' sand shield:: 4' loading peir 121 0 ?:re line OVER HEAD VIEW OF BOAT RAMP Sound e post 4' apart NOTE: Do not excVavate bottom position concrete slab on exist- ing bottom after the two stump: have been removed. i 24' deck 4.0- down Nwl? waterline :16' 4,; mean water line ,?- .:: • : elev. 0.00' post driven into :concrete slab ground W sand sheild (1--o n MATER SIDE VIEW OF BOAT LANDING Profile View (y? ") slope =. 10 sand sheild 3!4"x4'x8' down treated pl ywood 18 1,4 29' B,. t canc. slab water line elev. 0.00' u BI APR 0 9 1O4? - 1% It e ri I, bottom ?` ?4 -?' ` t K View of Access & Turn Around Area For Boat Ramp Not-to Scale Cor. pipe 5-A elev. l .3 w' . N574'926E .I ??:?;,; ':??.. I 14626' w A Metal Pipe End silt fence ^ ^ ^ ^"`"• A A ,,AA• , /rte:' " ?1 /??? ass 8 riprap ,_'•,•' :;: _: _'.°' ; ; i=_• 'wA I A N 40 W 57' temp. check dam 20• r A ..RR.. ^ Wetland • 60:: Boundary A ? •w S50E °R . Grass N 18 30 W 230'}-) Grass ;. 40• Swale •.wAw; .I. ? . ,,:I.: ?:I A I urn. .Area w w" ` ••"A •' •?I?r Lot 15 •A A'A (No. 57 Stone):; j :% ^ Flow N1 30W 40*.*':- ; A :.j•: 7j :.: . w w w Class 8 riprap A A AAA J S 64 W 54' temp. check dam % "I w w w A w Swale Silt Fence A\ A w • A/? ,"w"w w w •\ A' A I' Riprap 16' A A w silt fence check dam "KK"•" A A ?? share lin - 'f 17' AAA - w -afn ', Pier - - •?-??' Albemarle Sound - - - f' ' 0.00' elev. mean water level APR 0 9 1992 Ok `y? ti • n CC v v . 4 PA a t •- +- o +• N 3 ? ?- w o a. E o N o ,o N c v 4 E 3 w (A d o? L - ar 0 a v IA m ?•ar d 0 d L ? w 2 ? Y ` ? £ , r t7 } 1 qr i 1 , N - $A t t o i c i O • to .v t O m OD CL U . O ... O W + N L a tJ E 03 3 rY ° ' If1 r 1 0 -H 3 ' 4-1 c1 l0 ' 9- i a ° Id CD •0 i • P4 o O a) 1 0 W p s o -P a J t F4 02 P 0 O , •r- 1 N M O P r O d 1 0 0 co ' r CD cL 1 N O P t 1^11 H H 1 x1 1 a) a ia)ca -N 4-1 ad •r-1 4-•i v d ? ? d v 0 a • ? N l Q7 'i! ? ? ?ial ti•t O CY 'a 3 ?-- a) _ E:3 R! i ? d v? ? O .OG o a) N ? _ ? o ti0 ?1 lf) ?? O o Or O ? J E ?p ? N p cn CO a G c N p t CL IMP Iv w 0 O M n v ?4 Cn I=D CY' CL . M! P??q United States q Department of Agriculture Soil Conservation Service Mr. Joe B. Davenport 702 Winwood Drive Windsor, North Carolina 27983 Dear Mr. Davenport: Post Office Box 566 Windsor, N.C. 27983 November 6, 1991 The permanent vegetation for November establishment is KY-31 Fescue. Listed below are recommendations on seeding specifications per acre critical area seedings. 4,000 lbs/ac. lime 1,000 lbs/ac. 10-10-10 fertilizer 100 lbs/ac. Ky-31 Fescue (Tall) 4,000 lbs/ac. Mulch Peanut hay for slopes 1 bushel Wheat (temporary) I doubled KY-31 Fescue because of sloping topography. All other recommendations are from SCS technical guide IV, Practice 342, Chapter II, page 11. If you have any questions please feel free to call 919-794-5305. Sincerely, Q)Xoi Z"S Brent Daniels Technician r Attachment 10 A The Soil Conservation Service is an agency of the Department of Agriculture •f UNITED STATES SOIL P. 0. BOX 566 DEPARTMENT OF CONSERVATION WINDSOR, N.C. 27983 AGRICULTURE SERVICE APRIL 21, 1992 ------------------------------------------------------------ MR. JOSEPH B. DAVENPORT, III 702 WINWOOD DRIVE WINDSOR, NORTH CAROLINA 27983 DEAR MR. DAVENPORT: THE SEEDING RATES THAT WE PREPARED FOR YOU EARLIER DUR I iVG THE YE. R WERE BASICALLY FOR FALL SEEDINGS. I HAVE DISCUSSED THESE RATES WITH MR. CLIFF BROWN THIS MORNING AND I RECOM1,1ENDED THE F OLLOWl I NG TO H I M FOR THE AC=CESS ROAD, SHOULDERS. THE GRADED DITCHES AND THE G!='A.SSF-f) WATERWAYS <SWALES) CONSTRUCTED AT YOUR BATCHELOR'S BAY SUBDIVISION, `' FOLLOWING CONSTRUC=TION: 1. DISK OR OTHERWISE PREPARE THE SEEDBED TO TAKE THE LIME FERTILIZER AND :=SEED. 2. WORK IN 2 TONS OF LIME AND 1000 LBS./AC. OF 10-10--.10 FERTILIZE=R OR EQUIVALENT. 3. SEED TO A SEED MIXTURE OF 3-10 LBS./A.C OF COMMON BERMUDA iHULLED -(HULL REMOVED) } AND '_'30 LE-C!/AC OF BAH I AGRASS . 4. MULCH WITH 2 TONS OF WHEA STRAW WITH 50-75'%` GRi_IUND i_.iJVCr' . TACK: THE STRAW Tt) THE GPO 1ND (W/D I SK. Bi ADES SET STRA 1 HT , i S I Ni_7 A. GRF., T N DRILL PUNNING ACROSS THE S, OPES OF M U L CH I " i. Ar`:L AS A STAL , CUTTEr=') FUG? SECURITY . 5. i =5E MULCH NETTING O SIMILAR MATERIAL I N THE BOTTOM OF THr_ WATERWAYS FOR ADDED EROSION CONTROL. ANY ADDITIONA_ QUESTIONS PLEASE CALL 919-794-5305. SINCERELY, K.?J? NIUS B. RUSSELL, JR. DISTRICT CONSERVATIONIST CC: MR. CLIFF BROWN ROUTE 1, BOX 189 PLYMOUTH, N.C. '2796-_3 North Carolina - Department of tnvlronment, Healtn, ano Natural Hesources Division of Environmental Management - Groundwater Section P.O. Box 29535 - Raleigh, N.C. 27626-0535 Phone (919) 733-3221 FOR OFFICE USE ONLY QUAD. NO. SERIAL NO.. Let Long. Pc Minor Basin WELL CONSTRUCTION RECORD Basin Code DRILLING CONTRACTOR: Mg.- I Header Ent. GW-1 Ent STATE WELL CONSTRUCTION DRILLER REGISTRATION NUMBER: PERMIT NUMBER: 1. WELL LOCATION: (S w sketch of the location below) Nearest Town: County: or Subdivision and 2. OWNER g'Z 4"_l ADDRESS ?- (Str t or Route No. City or own State &Vj Code 3. DATE DRILLED USE O WELL 4. TOTAL DEPTH Z;6 5. CUTTINGS COLLECTED YES ? NOCX 6. DOES WELL REPLACE EXISTING WELL? YES NO(] 7. STATIC WATER LEVEL Below Top of Casing: &Z) FT. (Use "+" if Above Top of Casing) TOP OF CASING IS FT. Above Land Surfaces Casing Terminated at/or below land surface is Illegal unless a variance is issued in accordance with 15A NCAC 2C .0118 9. YIELD (gpm):6_ METHOD OF TEST 44-t 10. WATER ZONES (depth): 11. CHLORINATION: Type & r-& Amount 12. CASING: Wall Thickness Depth Diameter or Weight/Ft. M terial From -To Ft.- - -? ? U From To Ft. From To Ft. 13. GROUT: Depth Materia Method From _ Togo Ft. From To Ft. 14. SCREEN: DEPTH DRILLING LOG From To Formation Description If additional space is needed use back of fort LOCATION SKETCH (Show direction and distance from at least two Roads, or other map reference points) ?\ %te Depth /? ??- Size aterial ?J From. Z) To ? Ft. 61C. d+ 1 From To Ft. 16. REMARKS: Depth _ Diameter Slot Size Material From -.39'0 To Ft K in. in. From To Ft. in. in. L ?4p_ #ivt From To Ft. in. in. 15. SAND/GRAVEL PACK: 4 ,,t I DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C, WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS RECORD HAS BEEN PROVIDED TO THE WELL OWNER. E4.a ? 5 _?- t /0 - ? AS(AAT'URE OF CONT ACTOR OR AGENT DATE GW-1 REV. 6/91 Submit original to Division of Environmental Management and copy to well owner. BERTIE COUNTY HEALTH DEPARTMENT P.O. BOX 530 WINDSOR,NORTH CAROLINA FEBRUARY 18,1992 BETTY V. TYNCH ENVIRONMENTAL HEALTH HEALTH DIRECTOR 919-794-5303 TO WHOM IT MAY CONCERN: I HAVE CHECKED 30 LOTS FOR JOE B. DAVENPORT III ON ALBEMARLE SOUND,KNOWN AS BACHELOR'S BAY, AND ALL HAVE PASSED FOR SEPTIC TANK SYSTEMS. SINCERELY, KEITH W. LEE ENVIRONMENTAL HEALTH SPECIALIST BERTIE COUNTY . KWL/jcs Y'll Attachment 14 i 16 i, .is 40 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO June 5, 1992 Regulatory Branch Action ID. 199202168 Mr. John Parker Division of Coastal Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Parker: f,AJ_T t''u Nr, ference the application of Mr. v t for a Department of e Army permit to construct a boatramp facility with pier and jetty on Albemarle Sound, Batchelor Bay, Merry Hill, _ P" unty, North Carolina. h The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: a. No vegetated wetlands will be excavated or filled. b. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not-be used. c. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. Use of the permitted activity must not interfere with the public's right to free navigation on all navigable waters of the United States. d. The .permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit., The permittee is not relieved of this requirement if he abandons the permitted activity without having it transfered to a third party. Questions or comments may be addressed to Ms. Laura Fogo, Washington Field Office, Regulatory Branch, telephone (919) 975-3609. Sincerely, 'JUN 1 -7 G. Wayne Wright Chief, Regulatory Branch ..% V Copies Furnished: /Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 U.S. Environmental Protection Agency - Region IV Wetlands Regulatory Unit 345 Courtland Street, N.E. Atlanta, Georgia 30365 Mr. Terry Moore Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 -2- 1* DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO May 20 , 1992 S: July 20, 1992 Regulatory Branch Action ID. 199202168 Mr. John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Dorney : t Y? ? ? Q v ?f MAY 2,5p I r1LITY g Enclosed is the application of Mr. Joseph B. Davenport for Department of the Army authorization and a State Water Quality Certification to construct a boatramp facility with pier and jetty on Albemarle Sound, Batchelor Bay, Merry Hill, Bertie County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification may be required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request by July 20, 1992, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to Ms. Laura Fogo, Washington Field Office, Regulatory Branch, telephone (919) 975-3609. Sincerely, V e Wri h hie ,Regulatory Branch Enclosure AOL, -2- Copies Furnished (without enclosure): Mr. John Parker Division of Coastal Management North Carolina Department of Natural' Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Terry Moore _ Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 - t -r F. s?k Pleasd" or print. Carefully describe all anticipated 'development activities, including construction, excava- lion, paving, land clearing, and stormwater con- trot If d information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name Joseph 3. Davenport 702 Winwood Drive Address City Windsor State TATC 27983 Zip 27983 Dayphone9l 9-794-2947 x Landowner or Authorized agent b. Project name (if any) atchelor Bey I A} c. If the applicant is not the landowner, also give the owner's name and address. If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of-an existing project, new work, or both? new project, c. Will the project be for community, private, or commercial use? Community d. Describe the planned use of the project. Single family subdivision; water &ccess I 4 LAND AND WATER CHARACTERISTICS a. b. 2 LOCATION OF PROPOSED PROJECT Size of entire tract 217.5 acres-22 acres In subdivision, . Size of individual lot(s) approx. -J ac. c. Elevation of tract above mean sea level or Nati - 1-5 C?t deUPluscal Datum d. Soil !yyppee(s) and texture(s) of tract Zenoir & Craven a. Street address or secondary road number On Batchelor ±'3&v area. of klbem&rlee. OFF leF IY.c.45 Sound . b. towne8irrmnit , o?landmaf res ommu. i y is .arty Hill. f. in Bertie County. C. County 9. d. Is proposed work within city limits or planning jurisdiction? Yes (Bertie 23o.) e. N e-of body of water nearest project l ribemar e .found 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT Vegetation on tract Subdivision area is agriculture. Man-made features now on tract Drone What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) Conservation _Transitional Developed Community Rural Other h. How is the tract zoned by local government? None i. How are adjacent waters classified? SC a. Describe all development activities you propose (for j. example, building a home, motel, marina, bulkhead, or pier): 30 hot Subd. - Boat landing 1289 Has a professional archaeological survey been carried o t fQ r tt?e?tract? Yes so, by whodm? l?ic3r Tea is - ?:rc lves an is ory eig . TelPVli?r?p ?f`nllVarsat,i,nr? si?x?mp?^ 19?i1 ? 1 r'+ f. Dimensions of spoil disposal .area K pFrox._ 2 acres. c. Shoreline erosion during feet 1 foot preceding 12 months, in ??. G.. g. Locatt'2n of spoil disposal area to be s ar ea d d. Type of bulkhead material None inW&iculturee.l lends. Also in ditch aeros s. Lots & .• On hots 10 & 1 g•. Amount of fill, in cubic yards, to be placed below h. Do you claim title to the disposal area? vs s, mean high water None If not, attach a letter granting penmission from the owner. i. Will a disposal area be available for future maintenance? will not be required. If so, where? j. Does the disposal area include any marshland, swamps, or water areas? No f. Type of fill material None 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: k. Will the fill materibe placed below mean hi h A copy of the deed (with state application only) or other `,?,ate? .yres , 0oa t ramp-coner e?e s l"')) -instrument under which the applicant claims title to the L Amount of fill in cubic yards affected property. If the applicant is not claiming to be t t -? the owner of said property, then forward a copy of the m. Type of fill material c °nFr ?t deed or other instrument under which the-owner claims title, plus written permission from the owner to carry out n. Source of fill material '-/.concrete the project. o. Will fill ma be placed on marsh or other wetlands? A - No p. Dimensions of thwot and to be filled NIA q. How will excavated or fill material be kept on site and erosion controlled? Silt screens will F,. shore line Cfee •? cktAwA1 Ale%'VLY- 9 r. What type of construction equipment will be used (for example dra lg t'ne, backhoe yyr ydraulic dredge)? $a c d e, '3u d z er n d. trucks. s. Will wetlands be crossed in transporting equipment to project site? ITO If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap K on e b. Average distance waterwalyf mean high water or normal water level % J-' An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 710203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 12/89 3 • United States Soil Post Office Box 566 Department of Conservation Windsor, N.C. 27983 *Agriculture Service November 6, 1991 Mr. Joe B. Davenport 702 Winwood Drive Windsor, North Carolina 27983 Dear Mr. Davenport: i The permanent vegetationfor November establishment is KY-31 Fescue. Listed below are recommendations on seeding specifications per acre critical area seedings. 4,000 lbs/ac. lime 1,000 lbs/ac. 10-10-10 fertilizer 100 lbs/ac. Ky-31 Fescue (Tall) 4,000-1bs/ac. Mulch Peanut hay for slopes 1 bushel Wheat (temporary) I doubled KY-31 Fescue because of sloping topography. All other recommendations are from SCS technical guide IV, Practice 342, Chapter II, page 11. If you have any questions please feel free to call 919-794-5305. Sincerely, Brent Daniels Technician 1, tta.chment 10 The Soil Conservation Service is en agency of the •? Department of Agriculture UNITED STATES SOIL DEPARTMENT OF CONSERVATION AGRICU-TURF SERVICE --------------------------------------- r MR. JUSEPH B. DAVENPORT, III 702 WINWOOD DRIVE WINDSOR, NORTH CAROLINA 2798c, DEAR MR. DAVENPORT: P. 0. BOX 566 WINDSOR, N.C. 27983 APRIL 21, 1992 THE SEEDING RATES THAT WE PREPARED FOR YO.J EARLIER DURINi" THE YEAR WERE BASICALLY FOR FALL SEEDING'. 1 HAVE DISCUS`3ED THESE RATES WITH MR. CL I. F BRNDWN THIS MOP I NG AND I RECO IENIDE THE 0 -t_C NC ? i F' l 1T -? - THE G?. FOR THE ACCESS .0. ,D , SHOULDERS HE C RADL_ D I ! ?HE`-? AND ! ?:?:=SF WATEPWAY'Z_: (SWA.LES)" CONSTRUCTED AT YOUR BATCHE_LOR S BAY S _iBCi I V 1 S 1 FOLLOWING COONS T RUC. T 1 ON : 1 Di _ 0P Ci T HER?ai S E PttLr-r'.h 'i HE JLEL• ,E 1 T (. '(A I H!- L , FERT I L i ?ER AN70 `)fl . 2 . WORD. IN 2 TON'S O LIME AND 1000 LBS. /AC . OF i 0-10 -' 0 FERT i *_ I Z_. p OR EQUIVALENT. S. SEED TO A SEE-) MIXTUPE OF S' 0 LB` AC. OF COMMON BERMUDA 4H+_LLE'D -{HULL REMOVEED) 'I AND _() Lam"'-;/ C- OF BAHIAGIRA''S"U. . h'UL C H l•?I TH E Ti !NF- OF b•HEA. S' va 'v:' I TH ^ T tai-.'(Ill `i iW/EI? k: Ei! AC HE _ I PAivgi 0 -THEE _ _ N` . AC IHE Si li F, E: ^ 7 ^ AL'.. t??,TTEr ? F10I L SLI_:i_;? _ T) . A .?l?-'7?..'c I7 k'i li_!it'Ll !_ ? ?1'v L k' i , .i_ h OF MU; CHE- °i 'EA c''-T` C - t __= M L -H NET-i°vI_ -IyIi ^-: `• TERIA.L IN THE v'ATERWAYS FOP ADDED EPOS I ON Ct_IN T ROL . ANY A.DD I T I GNA_ CiU`? T IONS PLEASE CALL S 19-7c14-5.30- . SINCERELY, N I US B . RUSSELL . JR. DISTRICT CONSERVATIONIST CC : MR. CLIFF BROWN ROUTE 1, BOX 189 PLYMOU-iH, N. C:. 2'7`91;_ Division of Environmental Management - Groundwater Section P.O. Box 29535 - Raleigh, N.C. 27626-0535 QUAD. NO. SERIAL NO. Phone (919) 733-3221 Lat Long. Pc Minor Basin WELL CONSTRUCTION RECORD Basin Code DRILLING CONTRACTOR: Header Ent. GW-1 Ent • T - 11? STATE WELL CONSTRUCTION DRILLER REGISTRATION NUMBER: PERMIT NUMBER: 1. WELL LOCATION: (S w sketch of the location below) Nearest Town: 7)q &ZeL County: or Subdivision and 2. OWNER g7 r ADDRESS 7n ?- DEPTH DRILLING LOG From To Formation Description (Str t or Route No. JAWI-L //J& City or Town State Code 3. DATE DRILLED :n WELL _Aj 4. TOTAL DEPTH h 5. CUTTINGS COLLECTED YES ? NO* 6. DOES WELL REPLACE EXISTING WELL? YES [:] NO?] 7. STATIC WATER LEVEL Below Top of Casing: !LZ FT. (Use "+' if Above Top of Casing) 8. TOP OF CASING IS FT. Above Land Surface` ' Casing Terminated sVor below land surface is Illegal unless a variance is issued In accordance with 15A NCAC 2C .0118 9. YIELD (gpm): 0 METHOD OF TEST a`- 10. WATER ZONES (depth): 11. CHLORINATION: Type T- Amount 12. CASING: Wall Thickness Depth Diameter or Weight/Ft. MRtenal From To d-9_0 Ft. -- - 6?D From To Ft. From To Ft. 13. GROUT: Depth Materia Method From _Q- To 9_ Ft.dEft4ft2_ From To Ft. 14. SCREEN: If additional space is needed use back of form LOCATION SKETCH (Show direction and distance from at least two Roads, or other map reference points)& ?II ?l Depth _ Diameter Slot Size Material From .?9 To Ft _gZ in. in. From To Ft. in. in. L+j' f ?ki? From To Ft. in. in. 15. SAND/GRAVEL PACK: Depth/ ??- Size aterial From j? To ?? Ft. 0C a' From To Ft. 16. REMARKS: rl .cbp Al 1 DO HEREBY CERTIFY THAT THIS WELL WAS CONSTRUCTED IN ACCORDANCE WITH 15A NCAC 2C, WELL CONSTRUCTION STANDARDS, AND THAT A COPY OF THIS RECORD HAS BEEN PROVIDED TO THE WELL OWNER. ATURE OF CONT ACTOR OR AGENT DATE GW-1 REV. 5/91 Submit original to Division of Environmental Management and copy to well owner. .. t w BERTIE COUNTY HEALTH DEPARTMENT P.Q. BOX 530 WINDSOR,NORTH CAROLINA FEBRUARY 18,1992 BETTY V. TYNCR HEALTH DIRECTOR ENVIRONMENTAL HEALTH 919-794-5303 TO WHOM IT MAY CONCERN: I HAVE CHECKED 30 LOTS FOR JOE B. DAVENPORT III ON ALBEMARLE SOUND,KNOWN AS BACHELOR'S BAY, AND ALL HAVE PASSED FOR SEPTIC TANK SYSTEMS. SINCERELY, KEITH W. LEE ENVIRONMENTAL HEALTH SPECIALIST BERTIE COUNTY KWL/jcs Attachment 14 • 3983 u? zJ r o • ) I 3° X .•. : 20 41- r \ 42 o I , j20 12? l/ ` o 22 % Foul. U? Ld 33 C, X22 ?ICCt55 h 3 981 ti a \ - rIt' / v Foul Area E R 20 R Y s H I /. N80 Foul Area 5 16 Wei. VY, % ' - \ '\ (( ? ? ire- .+? ? ? ... ..M•- i i ° C °?''?f w' _'+- .,e.- y` ? -Y" 'n` _. ' 3 r ?II'..YI: s• 3979 zz /w? .• .- . -?._'' "_' . '_ _?;- -,• - .? ..?,. ,,,;? :,,,w 'Terrapin PPiiit I\? I X11 -!:/'Mo-_ -Y? ... •w..r--•?._ .:. ""` -tPier i qlr ?n-.M h W ..-?a?,` .ail ?: _ ..t- .???., ..? ±- ?,•; - .. " ... ,-a,- -- --- - - ,. _ ./• ?: T,_ __ (, tta chment'..1-A W -dr'---?tt: e•._- ` \ .`... )?_ ,\'«i'' / N.}: Foul L,'''_ + ... . " .r ' .r-'•"?i•-al' :l!•; "?-•• _ ? r 1 it r'r:'w". _'_ ?± •? .r.-??y.? ?„'•1???r ? "1?' Showing general installation of silt screen. APR 0 9 1992 C( A{ i.\ \I I'- ? J i..0t 0 Rock Filter 221 Drainwag at Sta. S -- Use misting structure, add Rock Basin and Rock Filter. APR J 9 1992 S` _ot to Pipe Installation betveon S 12 & S1 3 T 18 Silt Sera m bottom gradcv, 2:1 slope -shoulder 28 Rocked catch Basin v Rip Rap Weir Z- Silt Sere-en /Swale lead off Y .-.tte.chment I.o. 3 APR 09 1992 lot- to smile Center Line 30',{' y„:• 40' ' 30. 20' .;' .:. , ?'? 1 i+ :.; . X3:1 . ,. • - • "' 1 '% ? ? ' ~ :' '' `'• -`?? : ? ? :./ ??• . . .. , -. • .: <• -'. r. • • :?,,, '%% - „ ; .• ,: f ' ' Cross Section of New Grader Road Construction Beginning at- S 10 through Station 25 with exception of area at S21A and pt. Q. (Refer to attachments No. 4 & 5. Dunning surfaced rocket?. 18 ft. wide and 4 inches deep where sections of clE-y mey cre??te rutting during wet periods-to be determined by Landowner after road bed has been developed. ?? oQ ? o ?ggL ,!.ttE_cement No. 4 L °l ???-1??i4?- Sketch showing installation of 48" arch culvert to be installed at Station 21 A --Road bed to maintain 28' width at station. Silt Fence down stream S21 Class B Riprap grader dtteh • 77-777", . 18 Ft. ader ditch S22 slope .. .........;. No. 57 5 5. Rock Check Dam ,Stone f Class B Riprap Silt Fence Culvert Design for 10 year /24 hour storm using Rational Method = 6 in.;area =180 ac. = 45.4 c.f.s. for .5 ft. of head. 48' Arch Culvert (coated Steel) 58' span 36' rise 28' , A& C7 40' down stream PROFILE APR 0 9 1992 1'.tt chnaent 110 . 5 Point "V " is located between Sta. 22 and Stra. 23 at a point where the old existing road bed had created a small darn holding water in a gurn 'wet- land -- To entrap this water and to maintain it's present level a 12" pipe - drop -will be installed benath the new road fill with it's intake end positioned at the high water mark. High water mark to control elevation of intake on pipe-drop. 20J - natural slo e 12'a{ we#lar+? Fitt fence this end elevated 4" .:, ......... .... ,:ti: ... ... above level. ' . • ,,,,, .. -• ... ?:.:' . i . .; .,: • •...'.:'l /- ?• silt fence 44 :?. ;'.:!•::. rip rap •.?_?.? 12' cvulvert - r! TTTTTT= +!. ' ??? :;'!'' !'• •''' .. .. ... ? f•:'+ /' .: -•. i:'i '% iii!. '.i ?. •/•. -• welded 9elbo : Drainage Structure at Point "0" Attachment 6 APR 0 9 1992 I AvAkgq Cross Section of a Section along shore line. Hight of soil bank along Sound shore will very from 8 ft. to approximately 20 ft. above mean water level. Designed slope - 5 1. silt screen :-tx dercut' to':`:e'Timi iia*te!-•:tLipo'-.g uaff**t4:;b:e:::xdd::px.ia::o; fi Attachment 9 point of cut t 4'above mean waterline. mean water- '.. =- line . APR 0 9 I9g? R Shore Line Excavation Not all sections along the shore line will require extensive removel of steep banks. Lots 1, 2 and 3 will primarily require stumping and grading only. Lots 4, 5, 69 7, 8, 9, and parts of 10 and 11'. will require removel of the steep bank from 40 to 60 feet northwardly to acheive a 5 to 1 slope. It will probably be necessary to remove some of the bank along lots 12 through 15 but with much less severity as lots 4 through 12. This section can primarily be stumped and graded to acheive the desired slope. Upon the completion.of each section or lot the graded area will be fertilized and seed- ed according to the attached prescription by the S.C.S. office. The silt fence will be established and maintained along and just above the high water mark for the entire length of the disturbance. (Attachment 9A) . i Profile of Culvert and Drain Swales Location - Culvert Swale 8-1 to 8-2 ( Not to Scale) Profile View ele 11.2' elev. 11.0' dissipartor ?: ?'% ?•: - excelsior mat Mean Sound level sediment pond elev. 0.0' elev. 4.0 elev. 3.0 . -- Cross Section View Class B Riprap 18" culvert check dam flow ..:. •. :: flow .h(?w •?• }'{ ?itiiy ?yr:• "'?-'-C bottom of down stream swale check dam dissipator fabric liner ?-Po" Note Attachment 9E for detail spects for dissipat or Note : All road sholders and Grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) [ NZ?- Grader ditch grader ditches 3:1 slope 18' 30' 40' flow umsipaiur excelsior mat APR 0 9 1992 Atta.chment 9-B f • Profile'of Culvert and Drain Swales Location - Culvert "AA" - Swale A-! to A-2 ( Not to Scale) Profile View ele 12.0' elev. 11.8' ?- dissipastor 1 Zr ;?.:- excelsior mat 18' culv..• vv Mean Sound level sediment pond elev. 0.0' elev. 6.0' elev. 5.0', Class B Riprap Cross Section View 18" culvert check dam flow flow bottom of down stream swale check dam dissipator fabric liner Note Attachment 9E for detail spects for dissipat or Note : All road sholders and grader ditches Overhead View to be seeded to S.C.S. Standards. i Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) C' Grader ditch grader ditches 3:1 slope 18' 30' 40' flow excelsior mat ti ttz, chnent-9C APR p 9 1V Cross Section Of Swale Points -- A-1 to A-2 X 7.5' S. ' ! ' ••a.: .rte .« .. ?-+'r,? - - Swale to follow existing contours from Sts. -A-1 to A=2 - WetTed Perimeter + 15.3'/f t. - Length of Swale- 2301 + -• Slope - .03 -' 1 = 1.7"/Hr.12 yt. storm -C=.40 - A= above culvert - 5.2 c• APR 0 9 1992 below culvert - 4.5 ac. - Q = 6.65 - V= 7.03 c.f.s. ?.tta.chnent - 91', (A-1 to A-2) `t ??,.1 ?yq L 7.5' • •iriCtr.. Cross Section Of Swale Points -- B-1 to B-2 - Swale to follow existing contours from Sts. - B-1 to B-2 - Wetfed Perimeter + 15.3'lft. - Length of Swale- 300 1 + - Slope - .027 - i = 1.7"/Hr.l2 yr. storm -?=.40 - A= above culvert - 4.2 ac. below culvert - 2.9 ac. APR 0 9 1992' - Q = 4.83 - V= 6.47 c.f.s. C? A ?,,1 ky? L- .ettachment - 9D(B-1 to B-2) Dissipator Detail f (Location at A-1 & 13-1) Dissipator to be lined with tare resistant fabric and then hand place Class "B" size ri prap a minimum of two stones deep, stones should not be smaller than 6"x6"x 10" (14 lb.) to prevent lifting by water through culvert. Minimum size of di ssipator will be 6 ft. x 6 ft. and a minimum of 3 ft. deep measured ???ll?? from the invert of the culvert. 18" culve-rt 3 ft. mina :i;?!. •?;;t:st ; Y Flow ti•ti•?fti tap dissipator gall 3, tifti_ K Fabric underlayment Greder ditch flow T' t r Excelsior Mat Culvo-rt t• ?I ? •1•,??, ?LJ' Inside of Dissipator ~• `''• Flaw err < II .... Depth 3 Ft. below 'j• `'''"'?F? bottom culvert." 16 f r '' Begging of Swale 6 ft. Attachment 9E ? ???.??kr1L APR 0 9' 199? r .r Sediment Pond Elevation of dam to be a minimum of one foot above mean ground elevation at point of location Begin exoavatlon of pond 10 ' north (above) high water mark. an ave. water level in .lnd. Elev. 0.00 class P riprap IrO. J ! 11/tCf D16 V11C tV vc planed 12" thiok. PROFILE VIEW 01mr,_n1 Sound. =-} No. 57 stone for filter =? - _- flow 10* _ ti; - - - elew.5. 01 shore lint •? Class B riprap dam & filar mean ave. water level in sound - 0.00' TOP VIEW All elevations are referenced to 0.00') Att& chment 9F (.11,--2) APR 0 9 199 i' .r Sediment Pond (B-2) Elevation of dam to be a minimum of one foot above mean ground elevation at point of location Begin exCavation of pond 10 'north (above) high water mark. v. 3 0 ' el ' . i 16, elev. dam ¢,0 ,.an ave. water level in ? I \ Elev 0.00 und No. 57 size stone for filter. . . class B riprap ti ?--- water level - tie :::::.::.: ? //i . /•i;i. ::: ?•;- ? , . : . No. 57 filter stone to be planed 12" thick. PROFILE VIEW 16, Sound- =?} No. 57 stone for filter - -=r ..: - - _ - flow •, ''' ?: ,<:>. _ _ _ - - elec. 3.0' shore lint Class B riprap dam & filar mean ave. water level in sound - 0.00' 70P VIEW ( All elevations are referenced to 0.00') i:tt?.cha;ent O (B-2) 'APR 0 9 Tag? 6 Cross Section showing placement of Excelsior Matting in Swales A-1 to A-2 and B-1 to 8-2. Depth of swale 1.5 ft. with 5:1 slope. Excelsior Matting - 48" wide - 16 ft. lengths. 6 " staples - spaced minu. of 14" apart. 7.5' 1.5' - 6 in. overlap X111 ? 1'•J•%T. ??•'1 w , 14 Sta 1 es :_ ;r?• r Excelsior Map .•2 r1.. 7 >•O 14" Overlap exc. mat a minimum of 6 in. Place recommended Fertz. & Grass seed prescription prior to mat installation. Flow Toe of Riprap at dissipator. ,X, ma -------------- Bury edge of mat next to culvert 6". Profile showing placement of mat downstream. 'APR 0 9 1292 Attachment 9G N M'? SHORE LINE -? BOAT RAMP DETAIL AND 4.0' 17 0" 42:' 0:; = ::Contrato RamP' '>retcR C ::3I4"x 4'x8' sa nd s hied...: Sound ace post 4' apart ?4' loading pei r NOTE: Do not excvavate bottom. position concrete slab on exist- i ng bottom after the two stump! U1 Lv dv Uv Lo have been removed. ?:re line 29. 6" OVER HEAD VIEW OF BOAT RAMP I 24' ?.0 low deck down VW.. waterline mean water line elev. 0.00' post driven into :concrete slab ground 9re!?7 MATER SIDE VIEW OF BOAT LANDING slope = .10 _ down 18 t conc. slab ... . Profile View (9#-rift) sand sheeld 3l4"x4'x8' treated pi ywood ?- 29' 6" b. I J Nw?&,- water line elev. 0.00' -1.5' 'APR 0 9 1.aQq bottom III* . View of Access & Turn Around Area For Boat Ramp Not to Scale € ;::;• Cor. pipe 5-A elev.15. 3' N574926E 14626 Metal Pipe ? " End silt fence " ""• -w• w . nib: Class B riprap N 40 W 57 .. :._ 20, - temp. check dam '.•`. A i"' "- "RR" 20A " wAw Wetland 60:: l ?- Boundary A S 50 E 'Rill ; :. Grass N 18 30 W 123o-(+-) Grass 40' w? _ .= +w Swale` Turn. + rea%x - Lat 15 "A (No. 57 Stonej w: ; ^'•" :•w ??. " Flow • N 1 30W 40': ' • , " .w 111 Class B riprap • Jill/ S 64 W 54' temp. check dam Shollow ` 1{:A ` "• ?w • w w ?? % Swale Silt Fence ,{ " A w w A A ? w w` w ? w' rap silt fence check dam- "VK" w w shore lin - 7'? - - % afn ?• pier _ -- -?' Albemarle Sound _ ,. 0.00' elev. mean water level APR 0 9 W ``14 ti r? CC . i 3 c N d t ++ V ? 3 +' 0 N 3 ? ? w o a 3 A o o w o 0 ob L. o -W 0 a N c C a E 3 Ipn L- i a a a S Q. V RA - E d d a 1 Z A ?. ? O p 1 a 1 1 , N • ? r .?. J rI c 1 O •H to v O O . O o, r ? n C] J Op ^ a 4-1 U • ° O w ? X t ? Q ° ' J 1 m U E N ~ ?d14 t ?r-I U o ' ° -H F- m?o pPO 0 1 4p O ~ Y 1 ? ? CD 1 • 0 CD p 1 O O C O t ? ? 1 1 O M t p O o U co ' ? 1 r J p a N 0 r1 O r r-i a 1 vl cz rig ? • 1 • 3 1 ? a? ,cc V) i cd -H 4-i a 1 W O 0 a I V: d .. d Q7 •{•? 0 IF !; Sul 1 ?I s .a VI :?J p al O = t:a 65 L '1 ep •°r N O (D E e_ J ? ] a N N Q1 Q ? [iy N . o m v In N ? o ?o N 0 03 s_ ? t.' Or a i U) J ?? 0 p to cn ?? ? 4 U : ? If14 a L O, •- a? c .r 117 N a 1N CL. W L M U7 i n U t? IV+ t if CM) C)f 0- 1 Boa 34.3 no// /O S/ / A6 /v G. S. Station `Sea" N -161"83.5/ E -2666030.64 S62°/5'44"E- 640.30' S5 R.q.W•60' Se Z"Tough N- 9/458.3.57 11w,%90 v Bo ? Bo°ro?. y Ne4s 1 r. A R N74 ° 11'39 "E - 3/2.08' S3 NB/ 003'49 "E - 2/4.03' Location Inset S4 S 67 °58'26 "E - 340.73' Emjwc N. Cooper 49 Others Cooper Heirs Land "Old Winsto.7 Form" N c,qG. 0 6? NOS N• NOTE: -From SIo. / (S/ - SICV to Sta. /0 IS olo.?g the f of ?he existing woods rood; from s77°4s'44"E- 416.80' S/O to S116iS along the South edge of Me field - - Distance through Cooper 1 ands - 3,3E?. ?; .'t. Bond Lands Say °26'04 ".E - /67. 76' „ , -Ar S21A o 416 x38 corrugated cooled S8 s/ee/ pipe- arch will be positioned in S 76°03'34 "E - /35.04' -the branch. S9 - At point "0" o 12 /n. pipe drop w111 b e prescribed to retai.o entraped water M the wet/and. N77 °473'/6 "E - 426. /6' S/0 exist/np load NORTH CAROLINA COUNTY S/O I° S/8 S//)?y I 1NOTAgY PBLIC OF THE COUNTY AN9L x L:- D STATE AFORESAID. CERTIFY THAT Ft K?(.. a?/VA REGISTERED LAND SUfi/EYOR. PERSONALLY APPEARED BEFORE ME Sag °3739 "E - 83. se, S/2 ; N ,'.1 THIS DAY AND ACKNOWLEDGED THE EXECUTION 6F THE ?OREGOING INSTRUME!IL WITNESS MY S.?5 06' 9 ' E - as. 42' :0NAND AND OFFICAI SERI. THIS?.ZOAY OF v n' N76°//'3 " E -239. 65' •.? ; (((j--I /sv N87°27%3"E - 80. /5' .0 04 4787°24 20"E - 99. 63' Su' • ?; ' ?. 6?5 NOTARY PUBLIC .ry 2 N80°O / 22 "E - 124.61' it, C.1 MY COMMISION EXPIRES: --?eT N69 4222'E -254.55• .?? py 0 6 SANDRA C. BROWN 0 NOTARY PUBLIC 0? op WASHINGTON COUNTY, >N?.,C/ s/6 •,P" e 9 my Commission Expires V_ N •'?? OOQ ?t? 9 ACCESS RIGHT OF lY.•9YAC/iOSS 50%,&, G ?0 (81 LANDS Oc VIA N. COOPER a COOPER/ASKEW HE/RS and?OHN \ {'Y. 901VO c9 EMMA N. COOPER & N78 °09 26"E 249. ,P% / BOND a COOPER,-`ASKEW HE/RS 4733°s9 34 "E 50. /0'fioi» %?l s26 AS GRANTED TO S20 to 611M Coiner , Corner /o " p",,, ?OSEPH a a ?vlve w DAv?ENPORT Se5°27'01"E 286.82' and ASS161 S 017d ?AMES A. a ?i ?0AN H. McGEE a ASSIGNS X! - ' vs"? 2,°.IO'ps "E- /15.,10 • The R/D/kY Supports a g%s2/-a SIXTY Ft. (60,) Width for /1's To/o/ L enylh. ?'? '?S\3°T '6"?' • /45.7' p0 Q y ?? R.O. w - 60' `ji Ses°27'46"E • 0/4.06' 0 MERRr H11-4 /vr'a: •BERT./E CQ NC ?ohn W Bond ; SCO/e / M. s 500 f1. B - V V P; 447 ? 1 d 000 01 ' /000' ?- „ Clifton L. Brown certify that this mop b S a woS. drown by me fromg on actual 11e1d survey on April 22` j7iT??1h//r N88°O6'34'E- 508.78' %%%% DII• iron ptpo e •e7„• . y19 ?/'yam' ? ?' . (? e• n J o vy ,, = i Cf ?? S24 0 • 0 li S79°43'00"E - 207.32' • r L-12' N: ?Oe B. Q ?une W. (T 6. J Jo n- Y Davenport i? 4725 ••/ 8683 - P6 ° ?q?l'aaM•he„? ?? %} ol$%ii'lE?.? OI ••....•o• "111 1- B R0`+'1 `?';: DIVISION'OF COASTAL MA i6l-EMENT .?? FIELD INVESTIGATION O T ' tg Q E 1. &LICANT' S NAME Joe- B. Daven rt (Batch BONUMon 2. LOCATION OF PROJECT SITE Bertie Count ff `of - NC 45, Batchelor Day off of Albemarle Sound, Merry Hill Community. - 12-1-89, 108=15, B-10-14 12-18-84 103-916, S9---15, PHOTO INDX : 1989: C10-14, D10-1-47- 1984: 8 4 : T9-15, U?-15 STATE PLANE COORDINATES: X: 26,974,000 Y: 813,000 west over U.L. 3. INVESTIGATION TYPE: DREDGE & FILL X CAMA .X 4. INVESTIGATIVE PROCEDURE : (A) DATES OF SITE VISIT 4-28-92 (B) WAS APPLICANT PRESENT Yes 5. PROCESSING PROCEDURE: APPLICATION RECEIVED 8 May 1992 OFFICE Washington 6. SITE DESCRIPTION: (A) LOCAL LAND USE PLAN. Bertie County LAND CLASSIFICATION FROM LUP Conservation DEVELOPMENT' CONSTRAINTS IDENTIFIED IN LUP Review is being conducted by DCM planning staff to determine consistency. (s) AEC(S) INVOLVED: OCEAN HAZARD ESTUARINE SHORELINE X COASTAL WETLANDS PUBLIC TRUST WATERS ESTUARINE WATERS X OTHER (C) WATER DEPENDENT:; YES X NO X Boatramp Sub ivision (D) INTENDED USE:. PUBLIC PRIVATE X COMMERCIAL (E) TYPE OF WASTE WATER TR .ATNENr: EXISTING None PLANNED Septic Tank (F) TYPE OF STRUCTURES : EXISTING None PLANNED Boatramp, pier with groins, single family residences. (G) ESTIMATED ANNUAL RATE OF EROSION ±2' SOURCE DCM staff observation 7. HABITAT DESCRIPTION: (A) VEGETATED WETLANDS None AREA DREDGED FILLED OTHER N/A -N7-A- (B) NON-VEGETATED WETLANDS: (C) OTHER : Openwater Highground (D) TOTAL AREA DISTURBED: ±400 sq. ft. (boatramp) 6.8 acres in initia'. development ±400 sa, ft. 6.9 AcrPs- 8. PROJECT SUMMARY: The applicant is proposing, to develop a 22.0 acre, 30 lot, subdivision adjacent to Batchelor Bay in Bertie County. Environmental setting .40 The applicant owns a 217.5 acre tract of land in the Merry Hill community, east of NC 45 and adjacent to the Albemarle Sound in Bertie County. The majority of the property is being used for agricultural practices, mainly row crops. A portion of the property consists of a large wetland system (Morgan Swamp) which enters the property near the eastern property line. The wetland system is vegetated with cypress, various species of gums and other wetland adapted trees. Upland wooded areas vegetated by various species of oaks and other hardwood trees were present on much of the property between the agricultural fields and wooded swamp. The majority of these areas have been timbered within the past year in preparation of the subdivision development. The applicants property extends approximately 1,800' along Bachelor Bay. The shoreline at the normal water line (NWL) varies from ±8.0' to ±20.0' in elevation. Most of the area is covered by natural vegetation which has somewhat retarded erosion. Most of the area at the top of the bluffs from the edge extending landward at some locations up to ±100' was vegetated by hardwood forest. This area has also been timbered in preparation of the subdivision development. Project proposal The applicant is proposing the following: 1) The development of a 22 acre subdivision on the property. The entire development other than the access road from NC 45 will be located within an area ±600' landward of the NWL along the ±1800' of shoreline of Bachelor Bay. Thirty (30) lots will be developed for single family residences. No multifamily units will be developed. Each residence will be served by a septic tank sewage disposal system, however a community potable water system is to be installed for the entire development. Details on that system are presently being finalized. 2) A portion of the lot preparation for the development will consist of extensive removal of the high bluffs at the NWL. Lot No.'s 4, 5, 6, 7, 8, 9 and portions of 10 and 11 will require the removal of the bank from 40' to 60' northwardly to achieve a desired 5:1 slope. Also it will be necessary to remove some of the bank on Lots 12 thru 15 but with much less severity as the previously mentioned lots. Lots l thru 3 will require slight stumping and grading. The applicant hopes to achieve a 5:1 slope along the entire shoreline when the grading is completed. No bulkheads are proposed at this time. Erosion will be controlled by silt fences, mulching and seeding. All of this shoreline sloping is shown on attached plots. 3) A portion of the property adjacent to Morgan Swamp has been established by the applicant as a community lot, on which will be located a concrete boatramp which will have a width of 16.0' and a total length of 42.0' of which 25.0' will extend beyond the NWL. A 4.0' wide by 29'.6" pier will be located on each side of the ramp. 25.0' of the pier will extend beyond the NWL. A groin the same length of the piers will be attached to the piers in an attempt to keep sand off of the ramp. A gravel access road will provide access to the ramp. Also a ±230.0' long by ±60.0' wide gravel turn area will also be provided. Silt fences will be placed between the disturbed areas and Morgan Swamp. Environmental impacts w0, Environmental impacts will be as follows: 1) Upland wildlife habitat has either already been modified or will be further modified as the subdivision is developed. 2) No wetland vegetation will be excavated or filled. No development is proposed within the Morgan Swamp system. 3) Severe erosion potential is present during the sloping of the bluffs if proper sedimentation and erosion control measures are not adheared to. This erosion could result in fill being deposited beyond the NWL of Bachelor Bay. 4) Approximately 4.8 cubic yards of fill (concrete) will be placed beyond the NWL of Bachelor Bay as a result of boatramp construction. Also ±460 cubic yards of material will be excavated near or beyond the NWL as a result of sloping the area for the boatramp placement. 5) Two small areas of wetlands have been authorized to be filled under COE Nationwide Permits No. 14 and 26 in the area of the access road which extends from NC 45 to the development. David Gossett - Washington Office - May 8, 1992 • Please type or print. Carefully describe-all anticipated development activities, including construction, excava- tion, filling, paving, land clearing, and stormwater con- trol. If the requested information is not relevant to your project, write N/A (not applicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name Joseph :3. Davenport Address 702 'n inwood Drive city Windsor State NC 27933 Zip 27983 Dayphone919-794-2947 x Landowner or Authorized agent b. Project name (if any) i3atchelor BL..y c-. If the applicant is not the landowner, also give the owner's name and address. If you plan to build a marina, also complete and . attach Form DCM-MP-2. b. Is the proposed activity maintenance of-an existing project, new work, or both? new project. c. Will the project be for community, private, or . . commercial use? Community . d. Describe the planned use of the project. Single family subdivision; water access. 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract 217.5 acres-22 acres in su ivisi.on. b. Size of individual lot(s) approx. ac. c. Elevation of tract above mean sea level or Nati 1 C?etodetplus cal Datum 2 LOCATION OF PROPOSED 7 PROJECT d. Soil type(s) and texture(s) of tract TYenoir & Craven a. Street address or secondary road number On Batchelor 13Uy area of Albemarlee. 3t 7., oun . b. Cd town co unit, A?landmai N?.res'tommu. i y is ?`.erry Hill. f. in Bertie County. c. County 9. d. Is proposed work within city limits or planning jurisdiction? Yes (Bertie Co.) e. N of body of water nearest project ribemarle .vound 3 DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier): 30 Lot Subd. - Bolt land ina 12/89 Vegetation on tract Subdivision area is agriculture. Man-made features now on tract Drone What is the CAMA Land Use Plan Classification of the site? (Consult the local land use plan.) 4 Conservation Transitional Developed Community Rural Other, h. How is the tract zoned by local government? T.,one i. How are adjacent waters classified? j. Has a professional archaeological survey been carried o t f ?,r the tract? Yes If so, by whom? Tv7arc ??lethis - rchives and History a eig. • mPlPpl, _ r nnyarF6; ti nr suYnTner 1 qq1 , ` 1 4 4 5 UPLAND DEVELOPMENT Complete this section if the project includes any land development. a. Type and number of buildings, facilities or . structuresgroposed 30 single Ta.mily residence units b. Number of lots or parcels . 30 c. Density (Give the number of residential units and the units per acre.) 30 residential units t unl s Fc. d. Size of area to be graded or disturbed 5 to 6 Gcres - includes road construction on. site. e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources?--. Yes f. Give the percentage of the tract within 75 feet of mean high water to be covered by impermeable surfaces, such as pavement, buildings, rooftops. None g. List the materials, such as marl, paver stone, asphalt, or cone %A%be used for paved surfaces. Access road and Boat Ramp-,erg h. If applicable, has a stormwater management plan been submitted to the, Division of Environmental Yes Management?_ i. Describe proposed sewage disposal and/or waste water treatment facilities. Septic System j. Have these facilities received state or local approval? See. atte.ched site ins7)ection. k. Describe existing treatment facilities. TTone 1. Describe location and type of discharges to waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down"). None P/rp, CJ) ID 0-) Y well m. W?ter supply source nnP ,hhmmll n ; tirl --q Arv, ng all L ts, n. If the project is oceanfront development, describe the steps that will be taken to maintain established publi beach accessways or provide new access. l? 7A o. If the project is on the oceanfront, what will be 1he elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excavation or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth '• Access channel (MLW) or (NWL) Boat basin Other (break- - ' water, pier, boas-------- rock jetty) Fill placed in wetland or below MHW Upland fill areas ? ?bD ?xa b. Amount of material to be excavated from below water level in cubic yards c. Type of material N/1 d. Does the area to be excavated include marshland, swamps, or other wetlands? no e. High ground excavation, in cubic yards p, consist .6f f6iaoving_bank aloAg sound s ore. approx. 1Z,UUU cu. Y US, _ ?a ov? r•an?J T60 ?K r?ls . 12/89 .. . _ it f. Dimensions pf spoil disposal .area c. Shoreline erosion during preceding 12 months, in 777 a+n rox. 2 acres. feet 1 foot ??. g. Location of spoil disposal area to be spread d. Type of bulkhead material None in agricultureal lands. Also in ditch across Lots 4 & 5.. On Lots 10 & 1f% Amount of fill, in cubic yards, to be placed below h. Do you claim title to the disposal area? vP s mean high water -Non e If not, attach a letter granting permission from the owner. f. Type of fill material None L Will a disposal area be available for future maintenance? will not be required. If so, where? j. Does the disposal area include any marshland, swamps, or water areas? No 8 ADDITIONAL INFORMATION In addition to the completed application form, the follow- ing items must be submitted: k. Will the fill materibe laced below mean hi h A copy of the deed (with state application only) or other water? -?' s q boat. ramp-c oner e Wen s lc'Lp -instrument under which the applicant claims title to the ?y .,.. _, 1. Amount of fill in cubic yards m. Type of full material c oxi?r.ist c n. Source of fill material `:"/.concrete o: Will fill mat be placed on marsh or other wetlands"? A - No p. Dimensions of the f A and to be filled affected property. If the applicant is not claiming to be the owner of said property, then forwatd ?a.copy of the deed or other instrument under which thebwner claims' title, plus written permission from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on an 8 1/2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 18 high quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. q. How will excavated or fill material be kept on site and erosion controlled? Silt screens will be ?la shore line CSee at)aAeJ A IK'?s r. What type of construction equipment will be used (for example dra! l ne, backho?, Tr hydraulic dredge)? $ae oe, Bu d.ozc;r ?.nd. trucks. s. Will wetlands be crossed in transporting equipment to project site? No If yes, explain steps that will be taken to lessen environmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap ?'-: o ri e b. Average distance wateiwar q>r mean high water or normal water level " X' A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit comments on the proposed project to the Division of Coastal Management and should be advised by the applicant of that opportunity. 12/89 'i • Name James A. McGee Address 08 Prince Road Greenville N.C. 27858 Name John W. Bond Address ox 59 rten :Name Address A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Department of Environment,. Health & Natural Resources to cover the costs of processing the application. A signed AEC hazard notice for projects in oceanfront and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, attach a state- ment documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 4 9 CERTIFICATION AND PERMISSION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in 4 application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's ap- proved Coastal Management Program and will be con- ducted in a manner consistent with such program. . I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of project. This is the day of X o-,d owner or Authorizeif agent 12/89 i s/ 0x/s1/ng rood /Y. C. 47 S. $Iahoa "Tough " N• 914583,37 E- 266LC3/7. Q3 >, r I d Q ? ®orC Loeof/on /ns?1 , N• A' O' O--'- NOTE: -From SID. / /S/ - S/0.) to S/a. /O /S '710'.7g the f of the axis//.?g woods rood; from S/0 to S/8 /s 7/0.7g the sculh edge Of the 1/old - - D/stance through Cooper/ 0,7.0'S -Gisto.: s /Ara?;h 80,70'Loads - 2, /47.88 /1. At S21A o 4B"x36'coriugated coated Steel pipe- orch will be pos/lioned is */he branch. -At point 'O" a /247. pipe-drop will be prescr/bed t0 reto/:o 0alraped water M the wel/ond. NORTH CAROLINA, 5/o COUNTY 1 /1.?NOTAgY P???I1BLIC OF THE COUNTY ASTATE AFORESAID. CERTIFY THAT (' r ° -tS PA REGISTERED LANG SURVEYOR, PERSONALLY APPEARED BEFORE ME THIS DAY AND ACKNOWLEDGED THE EfECVrION IF THE FOREGOING INSTRUMENT. WITNESS MY HAND AND OFFICAL SEAL, THISZZOAY OF n , I I BQL s ?0 (8 I-ANOS OFEM/NA N. COOPER q 5 NOTARY PUBUC 1%, 11 AIY COMMISION EXPIRES:?VQ,7_ py OT TOG SANDRA C. BROWN (GL U 9 5S NOTARY PUBLIC Fie/d,•• Bti DOd WASHINGTON COUNTY,` PEf 9 - .. My Commission. Expire BO 11 i9 AC ESS RIGHT OF hY.?YAClOSS COOPER/ASArFW HEIRS and ?OHN W 501V0 B E/LIM. A N. COOPER Qr N7d 09 26"E-249. s / ` 60NO B COOPER/A SKEW HE/RS S33°5934 "E 50. /o'from ?? s20 S20 1o 64VMCOr70/ AS GRANTED TO ., Gornsr .r /o"gums' „ ' " ?OSEPH S. & ?!/NE W. OAVeVPORT ' / 1' S85°27 06 E- 266.8 2 and ASS/GA/S and ?AMES A. a ?OA/V H. M COEE a ASS/GNS. SRI s4w°i4v'B6"E- /85.80' The r7/O/6Y Suppor/s o %s2/a SIXTY F/, 160.) W/dlh for //'s / ' Tolol L vaglh• szz P I pCe Q y ;; R. 60' i S65°27'y6"? .g/4,06' O ' ?ohn W. Bond MERRY H141- /v?>: -BER ,TIE C(2 NC I P- v7) ,6-VV Sca/e / in. 500 fJ. +•'s J/and ?' ?-s- - O' 9010' /000' b S23 'a /, C/if/on L. Brown certify /hot /his map ? b was, drown by me /ram an oct4101 110101 I ; survey oa April 22, /f1qj 0t sit, ?, N66°06'34"E- 50 B. 7B' _ ,• iron pipe ,r Q 'p' 524 SE1K ?Oe B. aa,,eW\ i? ST9°43'08"E-207.32' °-t[/Q - rt _ ePcaKr S? - P. K. ? n oi/ o i•YA •? ? .(0 P a? 0050 1. r 1J• 5 s3 N, C. G. S. Station 'Sae" /V - 8/3283.5/ E -2666030.64 S6 Ne/ °53'49 "E - 1/4.03 S4 N74 ° / / '39 "E - 3 /2.06 S 67 °58'26 "E - 34d. T3' S3 S 6.p 0/3'44"E• 640,38' E,77 mo N. Cooper E Others Cooper Heirs 40/701 "Old 4Y1*17S10.7 Form" R. O. w - 60' • S77°46'44"E- 4/6.80' s7 ' S65 °26'04 "E - /67. 76' s6 S 76°03'34 "E - 135.04' _ S9 N77 426. /6' S/0 xTM fo S16 S//))- ' SQ9°3739"E - 63.66' S/2 555 °6' 9 " E - as. 42' \?'\ N76°//'3 " E -239. 65' '?\\ \ S87°2420"E-99.63' S/3•?1, NBO °O/ P2 "E - 124.61' N69 °42 22'E -254.55' ., N55°/5'/6"E- 63.26' S/5,p• ?o \\' ?? spy k'l 20 \ ? ? `yU 3984 X20\\) ?* - -II?_ . • r, N % 39b 20 k U V 11 \ p C? 17 I`___o= • \ X22 30 $ 22 U?c 3982 Foul _ 20 ?1 •?I • ?\ W X33 C-(CUSS H ?^-?-?'? ?•• 2 `? N / s. o 3981 57!301/ n ,'?I?li ) Foul /area 1 h M .? 120 ,\ - 3980 Foul Area 5 - ~+,\: L/C 30 -moo • _ - II JJ ? ....w. 'w'. ? ..??-? ? ? ' + .W-.?ul,• -w? ?, -.w- 3979 3 - Terrapin Wit °r ier I1??? ??i ?•= ri ?- Ruins oke • - " -- .... 3 /:?,. ..w - -+w• • _ Foul ? .Creek ?:' ?,,?; ? ... .,....?. _ .,,.: -w•?.x? Showing general installation of silt screen. 36" silt screen spoil 1 foot-buried ?. ..?<: soil base APR 0 9 1992 • r` O t -L II c J_ r' I.,e,-:,d I/1tc11 Rock Filter 22' Rock Basin Existing Ditch - Drainwag at Sta. S -- Use enisting structure, add Rock Basin and Rock filter. APR 0 9 1ffl"? • I of to Sc?.le Pipe Installation belve-en S 12 & S1 3 T 18 crush & Install 15 steel cult'. bottom gradcr 2:1 slope shoulder 28 Rocked catch Basin e Silt Sr?p pn ' Rip Rap Weir ?- Silt Screen /Swale lead off 1 ( 1 r ttachment No. 3 C l Ap S, \ ? ti k 71_-- APR 0 9 1992 f ? Tot- to scale 60' Center Line 30' r 40' 30. 20' 15 18, 3.1 •,: /? ,•? ? ?'% ?/ _. •:? .•/i/?////.•.Y,•, iii . ? _,,i i.•,•.;•. /?/• Cross Section of New Grader Road Construction Beginning at S 10 through Station 25 with exception of area at S21A and pt. Q. (Refer to attachments No. 4 & 5. Running surfaced rocked. 18 ft. wide and 4 inches deep where sections- of clay may creElte rutting during wet periods-to be determined by Landowner after road bed. h.,'..s been developed. pQ n a i:!..ttE.cement 1':o. 4 • Sketch showing installation of 48" arch culvert to be installed at Station 21 A --Road bed to maintain 28' width at station. Silt Fence down stream S21 :.;.:.. Class B ? Riprap S22 grader ditch tiftif. .f.f.ftif ....:...................................... .r. 2:1 slope No. 57 Rock Check Dam .tie- Stone' grader ditch - ? ... Class B Riprap Silt 'Fence Culvert Design for 10 year 124 hour storm using Rational Method = 6 in.;3rea =180 ac. = 45.4 c.f.s. for .5 ft. of head. 40' PROFILE APR 0 9 1992 1'. tt&chrnent No. 5 down stream T 48' Arch Culvert (coated Steel) 58' span 36' rise 28' , c Nn. S7 k Point "Q" is located between Sta. 22 and =tra. 23 at a point where the old existing road bed had created a small darn, holding water- in a guru wet- land -- To entrap this water- and to maintain it's present level a 12" pipe drip shrill be installed benath the new road fill with it's intake end positioned at the high water mark. High water mark to control elevation of intake can pipe-drop. natural slo e we#larrr silt fence -?' this end elevated 4" above level. 2-1 silt fence ..-:'' i i?r.r : ;fff. :::%. r •' vrater ,?',.•• ff'/ . 24" fr,J. ? ?- - 12" cvuiver.t rip rap '?!'f'?f, r. '•.• •? r ;= is .':''? r;%J `? . r;::: ••..:: .: -: .•'?.: ' off . •!f/': 'r•{f,.:ff .. .. ... : J: f'' .: •. i.'i? f ` fii !.:: ? f-f. f,•.:•.•. welded Welbo-:v Drainage Structure -it Point "4„ Attachment 6 APR 0 9 199 • Cross Section of a Section along shore lf.ne. Hight of soil bank along Sound shore will very from 8 ft. to approximately 20 ft. above paean water level. Designed slope - 5 1. - .. s: -rut: silt screen :. . point of cut cut 4' above mean waterline. i- derciz mean water- u:ta:be;:<grdd°::x.ioo - line. Attachment 9 APR 0 9 199' w I Shore Line Excavation Not all sections along the shore line will require extensive removel of steep banks. Lots 1, 2 and 3 will primarily require stumping and grading only. Lots ¢, 59 69 79 81 9, and parts of 10 and 11 will require removel of the steep bank from ¢0 to 60 feet northwardly to acheive a 5 to 1 slope. It will probably be necessary to remove some of the bank along lots 12 through 15 but with much less severity as lots ¢ through 12. This section can primarily be stumped and graded. to acheive the desired slope. Upon the completion.of each section or lot the graded area will be.f ertilized and seed- ed according to the attached prescription by the S.C.S. office. The silt fence will be established and maintained along and just above the high water mark for the entire length of the disturbance. (Attachment 9A) Profile of Culvert and Drain Swales Location -Culvert "88"- Swale 13-1 to 8-2 ( Not to Scale) Profile View eley._ 1 1 .2' elev. 11.01 dissipartor Mean Sound level sediment pond :: excelsior ma 18' culv.:; ........ .:.... elev. 0.0' • :' • .:::.. ? elev. 4.0. ?v elev. 3.0 Class B Riprap Cross Section View 18 culvert check dam flow flow bottom of down stream swale check dam dissipator fabric liner --'' Note Attachment 9E for detail spects for dissipat or Note : All road sholders and grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) Cam- Grader ditch flow excelsior mat grader ditches 3:1 slope 18' 30' 40' APR 0 9 1992 Attachment 9-B A ? r' ` tai q 1-- C Profile of Culvert and Drain Swales Location - Culvert "AA" - Swale A-! to A-2 ( Not to Scale) Profile View elev. 12.0' elev. 1 1 .8' dissipartor excelsior mat 18' cult'. ?ni N ..•-.. --` Mean Sound level sediment pond elev. 0.0' Y elev.6.0' T 44 elev. 5.0' Class B Riprap Cross Section View 18" culvert check dam flow flow s.•+ ,ti.ti•ti. bottom of down stream swale check dam dissipator fabric liner --'` Note Attachment 9E for detail spects for dissipat or Note : All road sholders and grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) CY.WZ -- Grader ditch grader ditches 3:1 slope 18' 30' 40' excelsior mat AttF,chment-9C NPR 0 9 I Cross Section Of Swale Points -- A-1 to A-2 C- • •y 7.5' :.bra»? f„S:'? f, '• ..- +r- - Swale to follow existing contours from Sta. - A-1 to A=2 - Wet'Ted Perimeter + 15.3'/f t. - Length of Swale- 230'+ - Slope -- .03 - I = 1.7"/Hr./2 yk. storm -C = .40 - A= above culvert - 5.2 ac. APR 0 9 1992 below culvert - 4.5 ac. - Q = 6.65 - V= 7.03 c.fas. ttra chnent - 91) (A-1 to A-2) r Cross Section Of Swale Points -- B-1 to B-2 r? v ?1_('.iY ??ll.???.Z'• ••?1. -I?ti'r?? ?•} - Tea. - Swale to follow existing contours from Sta. - B-1 to B-2 - Wetfed Perimeter + 15.37f t. - Length of Swale- 300 1 - Slope - .027 - I = 1.7"1 Hr.12 yr. storm -C= .4Q A= above culvert - 4.2 ac. below culvert - 2.9 ac. APR 0 9 1992' Q = 4.83 - V 6.47 c.f.s. 1? ?? `lyr1? l4.ttachment - 91"(3-1 to B-2) • Dissipator Detail (Location at A-1 & B-1) Dissipator to be lined with tare resistant fabric and then hand place Class "B" size ri prap a minimum of two stones deep, stones should not be smaller than 6"x6"x 10" (14 lb.) to prevent lifting by water through culvert. ,•.?,.: ;; Minimum size of dissipator will be 6 ft. x 6 ft. and a minimum of 3 ft. deep measured !.11!ij?• 1111 from the invert of the culvert. 18" culvert • 3 ft..min.. N. Flow tap dissipater wall ' ?tirti ?ti ?ti •r r• tir• rti• Fabric underlayment tir•• r• ti. 'f?• •ti• Greder ditch f 1 ow j s Excelsior Mat TMM Culvert •ti ti f, : ;• :tit,, `:;:???.-.,. ?• :mad„ Inside of Dissipator ?• FIow Depth 3 Ft. below l• ;?'; : ?;:ti!•°1' bottom culvert. r• L; :pc•5r4•`rri}i"`?'•?• rti? ..Bogging O-f Swale 6 f t. Attachment 9E APR 0 9 VV r Sediment Pond Elevation of dam to be a minimum of one foot above mean ground elevation at point of location ge?in excavation of pond 10 'north (abawp) high water mark. elev. dam 6.0' 16' elev.:: .p+ mean ave. wbte•r love-1 in sound. Elev. 0.00 No. 57 Size Stone for filter. class B riprap ,/--- water level , No. 57 filter stone to be .,?., planed 12" thiok. PROFILE VIEW .A Sound No. 57 Stone for filter __ _:l • ?; .. ?-:'.."::fix. shore line •? Glass B riprap dam & filter mean ave. water level in sound - 0.00' TOP VIEW ( All elevations are referenced to 0.00') ntt&chrnent 9F (1_-2) APR 0919 flow elev. 5.0 q AA?;k0g1-- .t' Sediment Pond (B-2) Elevation of dam to be a minimum of one foot above mean ground elevation at point of location Begin excavation of pond 10 'north (above) high watcsr mark. elev. dam .0' 16' mean ave. water level in \ sound. Elev. 0.00 class B riprap stone for filter. ti water level :: 4 .... ........... :::: 57 f'lt t t b /%': ": ,; ?. •: elev. 3.0' U. er Z, one a e planed 12" thick. PROFILE VIEW 16' Sound. ==} No. 57 stme for filter flow ;:?__... ... 10. . ..... •?. .d. ••K. . - ....... ?'? -- shore line Class B riprap darfi & filter mean ave. water level in sound - 0.00' TOP VIEW ( All elevations are referenced to 0.00') l:ttF.chment 9. (13-2) APR 0 %0j 96 luawg3Qlll7 -uaeaalsumop lew to luawooeid buLmous allload '..9 ?.JaAwo o} lxau }ew jo a6pa A.ine top ao#edLssip le deadia jo aol ma1j 3339W 'U0118(1B1sul leua of aol.ad uoildlaosa.ad peas sseaS V 'zl-A8J p8pu8wwO38a aosld ?`'?+?-•??••/.? r. ??•.?!-rim.'{ . ? <, `ice-` • ?"?"?`1+?1' qy T? taox3 r =• deW JO LS 1 1• T. r.{ jj Y 1 1I -? •TT. ? •? ?•? 1 /? ul 9 ;o wnualulua a leua •oxa de[aaAp r;;. sat elS trry.i' , de1aaAO 'Ul 9 _ rS l S, Z. laede „ 7I jo •nulua paoeds - saidels „ o •sUl6u81 'll 9l - @P!M .r9t7 - 5Ut11eW aots[8ox3 adols J :C3 qj?m •lj c3-1 aIgms ,to UldaO •7,-9 of i -9 pug -'d of t -b sa iems ul 6uilleW aotstaax3 to luawaaeld bulmous uoiloaS ssoa-I F LAND MIN 16' N wf,. SHORE LINE --15- BOAT RAMP DETAIL 4.0' 17' 0" . :.25 42' 0° I4"x4'x8' sand shield: :Concrete Ramp Sound ace past 4' apart ?4' loading pei r NOTE: Do not excVavate bottom position concrete slab on exist- i ng bottom after the two stumpi ?ZW tN N have been removed. re line, 296.. _.4 OVER HEAD VIEW OF BOAT RAMP 24' - deck p down waterline mean water line w elev. 0.00' past driven into ::concrete slab ground .................. ha u sand sheild (9re7h? WATER SIDE VIEW OF BOAT LANDING slope = .1 O Profile View (9?'°j") sand sheild 3!4"x4'x8' down treated pl ywood 18 ?. -29' 6" b 1 canc. slab wa#er line elev. 1 0'05. 'APR 0 ??? -? bottom View of Access & Turn Around Area For Boat Ramp Not-to Scale Cor. pipe 5-A elev. 15.3' ?w .,K.. N574926E .,- ..::. ,. ? ?. • 146.26. Metal Pipe ^ End silt fence Class B riprap = ` : _; :,''• .-. `•`._• ;_::.' " - w N 40 W 57' : temp. check dam 20. ..RR" 20' Wetland :s Boundary w S 50 E ..R..,` Grass N 18 30 W 230' C+-) Grass .r` Swale` Turn. Area "IN ...... Lot 15 (No. 57 Stone):':*:** Flaw "•, '" N 1 30 W f 40' Class 8 riprap temp. check dam S 64 W 54' Shollow ??^ lJ . • w ^ Swale- Silt^ Fence silt fence check dam ;'KK ^ w w shore lin - 7'f - - ^ - *'* pier '-' Albemarle Sound - - - 0.00' elev. mean water level APR 09 199 C? ``?? DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO August 24, 1992 Regulatory Branch L5 M Action ID. 199202168 and State Permit No. 78-92 Mr. Joseph B. Davenport SEP - 702 Winwood Drive Windsor, North Carolina 27983 WAWEIIANDS GROUP Dear Mr. Davenport: Reference your application for a Department of the Army permit to construct a boatramp facility with pier and jetty on Albemarle Sound, Batchelor Bay, Merry Hill, Bertie County, North Carolina. Your proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. CESAW-C080-N-000-0291. Therefore, you may commence construction activity in strict accordance with applicable State authorization and the enclosed plan. Failure to comply with the State authorization or conditions of the general permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Ms. Laura Fogo, Washington Field office, telephone (919) 975-3609. Sincerely, G. Wayne Wright Chief, Regulatory Branch Enclosure r '. Copies Furnished with enclosure: Director, Atlantic Marine Center National Ocean Service ATTN: MOA 232X1 439 West York Street Norfolk, Virginia 23510-1114 John Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 U.S. Environmental Protection Agency - Region IV Wetlands Regulatory Unit 345 Courtland Street, N.E. Atlanta, Georgia 30365 Mr. John Parker ` Division of Coastal Management North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 -2- Ms. L. K. (Mike) Gantt U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Larry Hardy National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. Terry Moore Washington Regional Office North Carolina Division of Coastal Management Post Office Box 1507 Washington, North Carolina 27889 ORIGINAL PLANS U Action I.D. f T 5 ;, a a = !? $ 4 3994 20- 0 % '20 20 31M 30 22 Foul lop 3982 in I jj 0-, 127 3981 S 5713011 Foul Area .......... ... 20 Ak.- 80 z. 10 Foul Area 30 3 3979 Terrapin Poi*6t 5, 5 3 oke - ... . ........... ding- ....... ................. ..... LU 1 -A (.?.tt.?Chment w" Foul Showing general installation of silt screen. J6" silt screen spoil 1 foot-buried soil base APR 0 9 1992 _ 1;ot to ;.,,,.le Pip a Install at ion betwre*n S 12 & S 13 bottom gradcr 2 :1 slope -shoulder 28 Silt Gw? eh y Rocked catch Basin Rip Rap Weir t- Silt Screen f Swale lead off C r? _tte'.chm.ent .'.o. 3 APR 09 199T. Not. to sc".le :.a. ".:;. Center Line . 4 0' t 30' 20' :'^?L•.:.;.? ,,. X3:1 .,.; .. ;' .?::..,.., '/,.,. •,, , , . Cross Section of New Grader Road Construction Beginning at- S 10 through Station 25 with exception of area at S21A and pt. Q. (Refer to attachments No. 4 & 5. .cunning surfaced rocket?. 18 ft. wide and 4 inches cee-p where sections of clFy mey crez to rutting during wet periods-to be determined by Landowner after road bed has been developed. ADO no I992' i:ttz•cement E.o. 4 j? o1 f A?V.? ?yz' Sketch showing installation of 48" arch culvert to be installed at Station 21 A --Road bed to maintain 28' width at station. Silt Fence down stream S21 ::.;.:.. Class 8 ?- Riprap s22 ti 1f. .t.f.ry grbder ditch r 18 Ft. .............................. 2 :1 slope .......... a;" No. 57 Rock Check Dam Stone grader ditch •.. ... Class B Riprap Silt 'Fence Culvert Design for 10 year /24 hour storm using Rational Method = 6 in.;area =180 ac. = 45.4 c.f.s. for .5 ft. of head. 48' Arch Culvert (coated Steel) 58' span 36' rise 28' , No. 57 rock ..,.,,,;....,,: ?-,,,;:• ; .i....:. ?..... ti• rock basin r• NIL! 40' down stream -?j PROFILE APR 0 9 1992 ttz chment I:O. 5 V. Point "Q" is located between Sta. 22 and t tra. 2= at a point where the old existing road bed had crested a small dam holding water in a gum %,/et- land -- To entrap this water and to maintain it's present level a 12" pipe - drop will be installed benath the new road fill with it's intake end positioned at the high water mark. High water mark to control elevation of intake on pipe-drop. It 01 na#ural sla e 2e' 1 ^ _H V wetlara silt fence this end elevated 4- r•, ..:?...._...,.,r_.,r_..above level. 22 =• silt fence ;.i!•::. rip rap • _? _? 1 evulvert - Iz •:! i? lilJ. :•ii%i%J/i?? ••••;/,.. cfl'f•f- ' /?'?i .'i?. li ?:': .:`; ?/• : :i ??r: /,•? welded 90 elbow Drainage Structure -it Point "Q". Attachment 6 APR 0 9 1992 `l A ? I.\ ?q q 2, Cross Section of a Section along shore line. Hight of soil bank along Sound shore will very from 8 ft. to approximately 20 ft. above mean water level. Designed slope - 5 ?• b silt screen ercut:'::o':el.iaii:rrae teipor a rur: af97. R Attachment 9 point of cut cutl 41above mean waterline. mean water- line APR 0 9 1992 , 41$ Shore Line Excavation Not all sections along the shore line will require extensive removel of steep banks. Lots 1, 2 and 3 will primarily require stumping and grading only. Lots 4, 5, 6, 7, 8, 9, and parts of 10 and 1T. will require removel of the steep bank from 40 to 60 feet northwardly to acheive a 5 to 1 slope. It will probably be necessary to remove some of the bznk along lots 12 through 15 but with much less severity as lots 4 through 12. This section can primarily be stumped and graded to acheive the desired slope. Upon the completion of each section or lot the graded area will be fertilized and seed- ed according to the attached prescription by the S.C.S. office. The silt fence will be established and maintained along and just above the high water mark for the entire length of the disturbance. (Attachment 9A) Profile of Culvert and Drain Swales Location -Culvert -Swale 8-1 to 6-2 ( Not to Scale) Profile View ele 11.2' elev. 11.0' dissipartor excelsior mat 18' culv.:i:i ny..... Mean Sound level sediment pond elev. 0.0' elev. 4.0 elev. 3.0 Cross Section View Class B Riprap check dam 18" culvert },:,? `.fir' •...•. ...,. flow flow bottom of down stream swale check dam dissipator fabric liner Note Attachment 9E for detail spects for dissipat or excelsior mat APR 0 9 1992 1.tte chment 9-B Note : All road sholders and Grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18 culvert (Temporary until grass is mature) Grader ditch grader ditches 3:1 slope 18' 30' 40' • •road bed 1 6k A, ,.\ 02-- s Profile of Culvert and Drain Swal es Location - Culvert "AA" - Swale A-! to A-2 ( Not to Scale) Profile View ele 12.0' elev. 11.8' dissipartor excelsior mat 18 culv.i• N Mean Sound level sediment pond elev. 0.0' elev. 6.0' elev.5.0' Class B Riprap Cross Section View 18" culvert check dam flow flow bottom of down stream Swale check dam dissipator fabric liner Note Attachment 9E for detail spects for dissipat or Note : All road sholders and grader ditches Overhead View to be seeded to S.C.S. Standards. Class "B" riprap check dams 18" culvert ( Temporary until grass is mature) c 4;? Grader ditch grader ditches 3:1 slope 18' 30' 40' excelsior mat jittzchmcnt-9C APR g g W l Arf?,.\ kgkL Cross Section Of Swale Points -- A-1 to A-2 7.5' ?..Y. ?iwR•' •• • IY .Y•J ? - Swale to follow existing contours from Sta. - A-1 to A=2 - Wet'Ted Perimeter + 15.3'/f t. - Length of Swale- 230'+ -Slope - .03 -• I = 1.7'/Hr.12 yt. storm -C=.40 - A= above culvert - 5.2 ac. APR 0 9 1992* below culvert - 4.5 ac - Q = 6.65 - V= 7.03 c.f.s. litta.chment - 9D (A-1 to A-2) Cross Section Of Swale Points -- B-1 to B-2 Y 7.5' S: , . - Swale to follow existing contours from Sta. - B-1 to B-2 - Wetted Perimeter + 15.3'/f t. - Length of Swale- 3001 + - Slope - .027 - I = 1.7'tHr.l2 yr. storm -?-.40 - A= above culvert - 4.2 ac. below culvert - 2.9 <<c. APR 0 9 1992 Q = 4.83 - V= 6.47 c.f.s. C? IR rttachnent - 91.)(3-1 to B-2) Dissipator Detail (Location at A-1 & !?-1 ) Dissipator to be lined with tare resistant fabric and then hand place Class "B" size riprap a minimum of two stones deep, stones should not be smaller than 6"x6"x 10" (14 lb.) to prevent lifting by water through culvert. Minimum size of dissipator will be 6 ft. x 6 ft. and a minimum of 3 ft. deep measured from the invert of the culvert. 19" culvert 3 ft. min.- F1 o?I:i•11?? ? w tap dissipator wall V;?" of Fabric underlayment Greder ditch flow J rti. ?.? tirti• tiff ??f;. f• ::7 n?? Excelsior Mat Cult'(6rt ti . f• ??;,r, .ti; .;,? . . Inside of Dissipator ,?`} Flow .of % `?;:?!:; . Depth 3 Ft. below f • bottom culvert. b.;. V. ' f;? Bogging of SWA16 6 f t. Attachment 9E APR 0 9' IM w '. .r Sediment Pond Elevation of dam to be a minimum of one foot above mean ground elevation at point of location Begin excavation of pond 10 ' north (above) high water mark. elev. darn 6.01 16, elev. mm ave. waite-r love-1 in Sund. Elev. 0.00 class B riprap ti No. 57 size stone fair filter. water level No. 57 filter stone to be '' :':,,;.,?..,• planed 12" thick. PROFILE VIEW `?0'1 l Sound• ==} No. 57 stomp for filter flow 10. -_ ?; - - - - elea.5.0 r -' R shore. ling •? Class B riprap dam & filter mean ave. water level in sound - 0.00' 70P VIEW ( All elevations are referenced to 0.00') Attz chment OF (1_-2 ) APR 0 9 1992 .r Sediment Pond (B-2) Elevation of dam to be a minimum of one foot above mean ground elevation at point of location Begin excavation of pond 10 'north (above) high wratar mark. elev. dam 4.0' 16, elev. 3 pan ave. wbt#•r level in und. Elev. 0-.00 \ I No. 57 size stone far filtt6r. I class B riprap water level No. 57 filte-r stone to be planed 12" thick. PROFILE VIEW Sound :a No. 57 jtan# for filter short lint • Class B riprap dam & filter mean ave. water level in sound - 0.00' 70P VIEW ( All elevations are referenced to 0.00') r:ttFchr.;ent 91 (B-2) Or flow elec. 3.0' "APR 0 9 I,?r, Cross Section showing placement of Excelsior Matting in Swal es A-1 to A-2 and 8-1 to 8-2. Depth of swale 1.5 ft. with 5:1 slope. Excelsior Matting - 48" wide - 16 ft. lengths. 6 " staples - spaced minu. of 14" apart. 7.5' 1 5' - 6 in. overla Staples • 14" Overlap exc. mat a minimum of 6 in. .i4f, t Excelsior Map u?• Place recommended Fertz. & Grass seed prescription prior to mat installation. Flow Toe of Riprap at dissipator. ` m .!'/?•"?'\'r:?l•. .:C- : ??'???' . ice' ;l :? Bury edge of mat next to culvert 6". Profile showing placement of mat downstream. 'APR 0 9 1292 ?r w{. SHORE LINE -? BOAT RAMP DETAIL .AND 4.0' N11 NN NN - - -- -------------- 25' :=:' '=::::' :::'::::':• 17 0" nd ou S 4 0" Ramp... rete one C .:r:::::: space nd shield: post 4' apart :3I4"x4'x8'sa::•.: ::.::: •:::^;' :::::::::::::::::::::: NOTE: Do not excvavate bottom 4' loading pei r position concrete slab on exist- i ng bottom after the two stump: have been removed. ?:re line 29' 6" OVER HEAD VIEW OF BOAT RAMP 1 24' - H ? 0 deck A down ywL weterl i ne :16' mean water line Y elev. 0.00' post driven into :concrete slab ground sand sheild (9rein MATER SIDE VIEW OF BOAT LANDING slope = .10 _ down 18 1 conc. slab Profile View (9 r'•1 ") sand sheild 3J4"x4'x8' treated pl ywood 6" b I I ki VJ L. water line elev. 0.00' -1.5' 'A nn n n @,,. I hnttnm 7 View of Access & Turn Around Area For Boat Ramp Not to Scale - Cor. pipe 5-A elev. 15.3- N 57 49 26 E 14626' " - Metal Pipe -" • " " " End silt fence Class B riprap ;,{: ".; ,::_.:;: ' '.`•' `•'_:_;..' " N 40 W 57' .,;. temp. check dam 20' :.-- '? 20' Wetland 60:: 1 Bounder - - = y S 50 E ." .RNA:. ? . •" . Grass N 18 30 W +- Grass 230 C ) 40' .: •• ??•• Swale' ;;: ?:;::::? .. ' .." • , :. • : :: .:Turn. Area ?:- :€'' L8t 1 (No. 57 Stone) " Flow N 1 30 W 40': ' Class B riprap •"" temp. check dam S 6 4' % ?7??? Shollow Swale Silt Fence 101 silt fence check dam:.. „KK„ shore lin - afn ?., pier - - •t-??' Albemarle Sound - - 0.00' elev. mean water level APR 0 9 1992 91 rA t, ``14 ti ` - -`` V r> 3 v ~ N 3 c . a t ., v .. Vt O CL. O O E Q d L A C .1. Z > a O V d a d m c L Go o? .. v c? ? •? d d .? a L ? d o .. 2 ? Y f 2 ? Y ' o t fy t i r ? r to r . m CO) vb t ?: n m m 4-r U 44 ° O W d ' an d m d CL t 'L7 v E O t ? U) O O . O : 1 If1 -- t ? I T ?•• V. C ?? ? t d ? F V O ` ,, t • i CD t (? N • a = w O o m t 1 o o 0 m 0 CL J O r •r I O t N m t .n f?" 'd t O t 0 U td ? O 1 N a o ? m ? ? Q+ t u • 3 t .},, ? t a? m cd -H 4-t m o 0 Y ,•: d .. 4-2 0 m c w O O 0 O O L d O L ~ m O m . = c Co 43. o ao 0 /? ? C a) J W N (A O V ?I G:t G;t O N ?f m r:? N L:y N . 4Fs Z v O ? is t ! Or L W C*j ?? n i h 41 L L x O Ln t:lb c .r N n to WE ? O M 4) W) nn Clb w C'? -; `'r >11 C.7 C=) a T,.?E? -3 61{{?/? N.C..G.3. Station "TouyA" ,K fi N- 614•?63.37 E-P66 ?3/7.Gt3 40 ?PC p ? S2-P.K..// S3 r nail ?0 S/ .-- A6 ?.G• /? s3 N91 °?3'49 "E - e/4.03' N. C. G. S. 5/171/0,7 'See" S4 N - 8/3283.5/ E - 2666030.64 S 67 0?9'26 "E - 340.73' S-4 \ M lie Q ' ??? o yrO' .\\ taco/ion /n: S62°/?'44"E- 640.30' NC A. f7 arid E7now N. Cooper a Others N• Cooper Heirs L 47,7d s6 "O/d WMSt07 Form" NOTE: -From SID. S/OJ /o 5/0. /O is 010/7g /?'.O. W • 60' the f of the existi.70 woods rood; from S77°46'44"E- 416.90' 5/0 to S/B/s 010:7g the south edge of the lie /01 - -Visloace through Ceoper.1 ands - 3,96?. ;,?.; .'I. ST - Gis/? : s r /rro?; h Bond L ands - 2, /47.88 ft. S9?°26'04"E - /67.76' "' -At S21A 0 46x3B corrugated tooted Se Ste e/ pipe- arch Will be pas///0/7910' in S7600334"E- -the branch. 59 - At 0047/ "0" o /2 !?. p/pe -drop will be prescribed to rejoin enlroped water /n the we//and. N77 055'16 "E - 426. /6' 5/0 •xitlinp food s//lp NORTH CAROLINA._d&jjJUn jpj1 COUNTY sw to 519 1 JL.NDIAgY P? BLIC OF THE COUNTY A49 STATE AFORESAID. CERTIFY THAT ' C /?!i!K?. ?t-Q-WVA REGISTERED LA!.D SUmjEYOR. PERSONALLY APPEAREO BEFORE ME S49 °37 :?9 "E - 93.66' S/Z ; `N\' THIS DAY AND ACKNOWLEDGED THE L(ECUTION ?F THE OREGOING INSTRUMENT. WITNESS MY 9 " E - as. 42 HAND AND OFFICAL SEAL. THIS ZZOAY OF n Gi _ ?g? N97°27'/3 "E so. /?' I.099.63' UBLIC ? T 6 MY COMMISION EXPIRES' 2/9 ¢/93 1V90 °O/ :22 "E - /24.61' h { N69°4222'E -Z?4.?.•l' s/4,0, 0? o? SANDRA C. BROWN N?1°/1'/6"E- 913'26' S/1b• ?L?y 9 gSl NOTARY PUBLIC ,•,?, F/s/d ••• ptr ?Dd WASHINGTON COUNTY, N. C 5/6 Ea 0 My Commission Expires ooQ 0dBy9 ACL-ESS R/GHT Oc- WAYAC/-FOSS ?O ( LANDS OF EM. V1A N. COOPER ' = ?? •s /e , COOPER /ASKEW HE/RS and ?OHN W SOND B EMM. A N. COOPER Q• N78 °09 26 "E-Z49. 6,', / BOND & COOPER/A SKEW HE/RS S33°?9 34 "E do. /0'lrom %% s- AS GRANTED TO S20 to sum Corner , Cornsr •' ?; ?OSEPN S. S ?[/NE N! DAVENPORT 11 &71//" i/o I? s9s°2T 06' E• 266.91?' and ASSICAS anal ?AMES A. Q• ?i ?OA/1/ H. MCGEE a• ASS/GNS. SOP/ The R/O/{-V Supports a / S/XTY Ft. (60) Width for it's se/A To1a/ L ength. T'6"fit /4J.7' ,s f ?4 -. S?? P 0 L! V T r, W. - 60' ?? S9?°917'46"E • B/4.06' 0 A1ER8Jy H11-1- C(2 NC ?0h7 W Hand ,; SC010 / in. 500 ft. B-VV P;4471L p - ? - - . ? T ??,•, O' ?GO' /000' b S23 L. Brown cerl/fy that /h/s mop was, drown by me froman actual field survey oa April 22` /TT?IITFF?// ?? N99°06'34'E' - 0'O B. T9' -? ?,? O //'• iron P1P0 ?? J • '•?+. ?p 7y? ?\ ? ? ?L /? V • w \' ?SZ4 ` i v?`l?l i '• 0 L i 579 °43'09 "E - 207.32' -127o 8663 - P6 ?q•N'acbr?e„? ? J '. l?' . Jr,1•• •• \ .