Loading...
HomeMy WebLinkAboutDEQ-CFW_00078337Me Md- 3 lij�jiliiiii 011111111 In �lll What I can tell you is that based on the best available data from sampling in 2013 and 2014, the Department of Health and Human Services has determined there was a minimal health risk associated with exposure to R R-3 rem ff 067 me • Based on their evaluation, we believe this to be a low risk situation, but must have more current data and will make sound decisions based on that data. At the Governor's direction, The N.C. Department of Environmental Quality, in consultation with the Department of Health and Human Services, is leading a state investigation regarding the report of the unregulated MOM-94-�= I am seeking answers and solutions to a situation that has prompted understandable concern among the citizens who live and work in Wilmington and the lower Cape Fear region ... some of which are my own Department of Environmental Quality regional staff and their families ... • Although we are searching for more answers, we are also taking action immediately ... DEQ-CFW-00078337 The United States Environmental Protection Agency is the lead agency responsible for establishing drinking water standards. They have informed us that they are working to gather more information on GenX, which is a compound not regulated under the Clean Water Act or Safe Drinking Water Act. Given the chemical is unregulated, we are also taking a hard look at all options we have, within our regulatory and legal authority, to reduce or eliminate the discharge of this chemical as it makes its way to the river until MCMMMr,-= We met with the company Chemours earlier this week and they informed DEQ staff that their engineers are working to assess the waste streams at the facility in Fayetteville. My department is strongly encouraging Chemours to voluntarily identify any measures that can be taken to reclu�m or eliminate the discharges of the chemical to the river until the state I-Wo I R IT-2 WO, R W4 ff= R R 7-1111 NINA I Starting as early as next week, we will begin a water collection and testin regimen in the Cape Fear River. We will be working with a specialized lab Colorodo capable of analyzing the samples. 11 We expect to receive sampling supplies from the laboratory this week and our staff are prepared to mobilize as soon as we have that equipment. DEQ-CFW-00078338 IMZ� • The four intakes • the five water treatment plants (Cape Fear Public Utility Authority, Pender County, Brunswick County, International Paper, and Smithfield Packing), • the Cape Fear Public Utilities Authority Aquifer Storage and Recovery ml- Ilms counterparts and appreciate the cooperation the company has demonstrated thus far. It is our goal to help bring clarity to this situation as soon as possible and will be vigilant in doing so. 0 Intl • Our agency received a renewal application for the Chemours NPIDES Permit (NCO003573) on May 3, 2016. • Since the renewal application was received 180 days prior to expiration, the permit is automatically continued until a new permit is issued. • We are currently working thru the permit process and will not issue a DEQ-CFW-00078339