Loading...
HomeMy WebLinkAbout20090096 Ver 1_Staff Comments_2009072209-0096 Glencoe Mill AML comments July 22, 2009 Please provide the following items for the proposed Bioretention Cells per the Required Items Checklist: a. Delineated drainage basins for each cell. b. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. c. A construction sequence that shows how the cell will be protected from sediment until the entire drainage area is stabilized. d. A copy of the signed and notarized Operation and Maintenance Agreement. 2. Please install all level spreaders a minimum of 30 feet away from the stream. If it is not possible to provide a 30-foot separation, please discharge the overflow from the bioretention area directly to the stream.