Pre-Construction Notification (PCN) Form
September 29, 2018 Ver 3
Has this project met the requirements for acceptance in to the review process?*
F Yes
C' No
Is this project a public transportation project?"
� Yes r No
Change only rf needed.
BIMS # Assigned *
20190023
Is a payment required for this project?*
f No paymentrequired
� Fee received
f Fee needed - send electronic notification
Select Project Reviewer"
Kevin Barnett:eads\khbarnett
Information for Initial Review
1a. Name of project:
Ledford Street Park-n-ride culvert bore
1a. Who is the PrimaryContact?*
Dave McHenry
1b. PrimaryContact Email:*
dgmchenry@ncdot.gov
Date Submitted
1 /7/2019
Nearest Body of Water
Hiwassee Lake
Basin
Hiwassee
Water Classification
C
Site Coordinates
Latitude:
35.0853
A. Processing Information
County (or Counties) where the project is located:
Cherokee
Is this project a public transportation project?*
r Yes r No
Is this a NCDOT Project?*
G Yes r No
(NCDOT only) T.I.P. or state project number:
Ve rsion# *
1
Reviewing Office *
Asheville Regional Office - (S28) 296-4500
1c. PrimaryContact Phone:*
(82S)586-2141
Longitude:
-84.0248
::
WBS # (�)
15314.1020011
1a. Type(s) of approval sought from the Corps:
rJ Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
fJ Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified bythe Corps?
F Yes r No
Nationwide Permit (NWP) Number:
03 - Maintenance
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - Regular
r' Non-404 Jurisdictional General Permit
r Individual Permit
1e. Is this notification solelyfor the record because written approval is not required?
Forthe record onlyfor DWR401 Certification:
For the record onlyfor Corps Permit:
1f. Is this an after-the-fact permit application?*
� Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
C' Yes r No
1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
� Yes r No
Acceptance LetterAttachment
1h. Is the project located in any of NC's twenty coastal counties?
C' Yes r No
1j. Is the project located in a designated trout watershed?
� Yes r No
B. Applicant Information
1d. Who is applying for the permit?
fJ Owner r Applicant (other than owner)
1e. Is there an Agent/Consultant for this project?
f Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
NCDOT, Division 14
2b. Deed book and page no.:
2c. Responsible party:
2d. Address
Street Address
253 Webster Road
Address Line 2
�Y
Sylva
Fbstal / Zip Code
28779
2e. Telephone Number:
(828)586-2141
2g. Email Address:*
r 401 Water Quality Certification - E�ress
r Riparian Buffer Authorization
State / Aovince I F�gion
NC
Country
USA
2f. Fax Number:
x
C' Yes R No
C' Yes G No
dgmchenry@ncdot.gov
C. Project Information and Prior Project History " I
1. Project Information
1b. Subdivision name:
(rf appropriate)
1c. Nearest municipality/town:
Murphy
2. Project Identification
2a. Propertyldentification Number:
2c. Project Address
Street Address
Ledford Street (SR 1553)
Address Line 2
�Y
Murphy
Fbstal I Zip Code
2b. Property size:
1
State / Rovince I f�gion
NC
Country
3. SurFace Waters
3a. Name of the nearest body of water to proposed project:*
Hiwassee Lake
3b. Water Resources Classification of nearest receiving water:*
C
3c. What river basin(s) is your project located in?*
Hiwassee
3d. Please provide the 12-digit HUC in which the project is located.
060200221000
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The site is an existing commuter parking lot that is built on fill over a stream. The fill was placed several years ago byt an adjoining landowner and the culvert they used under the fill.
The area is on the edge of Town of Murphy.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
C' Yes r No C' Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
Cherokee County _US 64_Ledford Street_Map.pdf
757.35K6
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Cherokee County - U.S. 64-Ledford Street (Park & Ride) - NRCS Soil Map.pdf 421.41 KB
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
215
4h. Explain the purpose of the proposed project:*
The purpose of the project is to replace a failing culvert under an epsting commuter parking lot. The culvert is backing up water on the south side of US 129/74 and flooding private
property.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The project will involve boring a new culvert adjacent to the e�tisting. This will require relocating the stream below the exsting culvert once the new culvert ties into the stream at the
culvert inlet. A boring machine will be required along �nnth other standard earth-moving materials like a track-hoe and dump truck.
4j. Please upload project drawings for the proposed project.
100_005_4PLANSHEET_Impacts.pdf 404.61 KB
5. Jurisdictional Determinations
Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes f No �' Unknown
Comments:
Division 14 field surveyed the property
Sb. If the Corps made a jurisdictional determination, what type of determination was made?*
F Preliminary (' Approved r Not Verified r Unknown f' WA
Corps AID Number:
Sc. If Sa is yes, who delineated the jurisdictional areas?
Name (if known): Patrick Breedlove
Agency/Consultant Company: NCDOT Division 14
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
Sd1. Jurisdictional determination upload
Ledford Street Bore PJD.pdf
267.97KB
6. Future Project Plans
6a. Is this a phased project?*
C' Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activit�i?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands IfJ Streams-tributaries r Buffers
r Open Waters I� Pond Construction
3. Stream Impacts
3i. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
65 0
3i. Total stream and ditch impacts:
65
3j. Comments:
The relocation will not reduce the length of the e�sting stream.
E. Impact Justification and Mitigation ^
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The directional bore is being done as close to possible to the ewsting pipe to reduce the length of channel to relocate. The bore will have less
disturbance than would be necessary to excavate the old pipe because the old pipe is buried by about 20 feet of fill.
1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques:
The bore and newstream channel construction will be done in the dry before tie-in of the flow at the existing culvert inlet.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
C' Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
There is no loss of stream channel. Furthermore, the new channel will be constructed with a stable cross section and bed scour protection and planted with live stakes. This will
constitute a functional uplift (reduced erosion and improved aquatic habitat) compared to the ewsting stream reach.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
C' Yes r No
If no, explain why:
Not applicable
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
� Yes r No
Comments:
I G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?*
F Yes r No
�
"
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environme ntal Policy Act (NEPAISEPA)? *
C' Yes r No
Comments:
*
This project is CE underNEPA
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)?*
t' Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality? *
C' Yes � No
3b. If you answered "no," provide a short narrative description.
This is maintenance work.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?"
� Yes r No � fWA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
Sa. Will this project occur in or near an area with federally protected species or habitat? *
r Yes r No
Sb. Have you checked with the USFWS concerning Endangered Species Act impacts?*
G Yes r No
Sc. If yes, indicate the USFWS Field Office you have contacted.
Asheville
Sd. Is another Federal agency involved?*
C' Yes r No
Se. Is this a DOT project located within Division's 1-8?
� Yes r No
C' Unknown
Sf. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
Sg. Does this project involve bridge maintenance or removal?
f Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
C' Yes r No
Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
� Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Field surveys, NHP data, and USFWS consultation.
Consultation Documentation Upload
19-047_Concurrence_LedfordStreetUS1974.129_CherokeeCo.pdf 1.31 MB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
� Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
C' Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCDOT HEU Screening
7c. Historic or Prehistoric Information Upload
13-OS-0022 NoSu rveyUPDATE. pdf
PA 13-05-0022 Cherokee resubmit (NSR).pdf
8. Flood Zone Designation (Corps Requirement)
Sa. Will this project occur in a FEMA-designated 100-year floodplain?*
C' Yes r No
Sc. What source(s) did you use to make the floodplain determination?*
FEMA
Miscellaneous
Comments
Please see attached the project narrative and phot of ebsting culvert outlet and channel.
2.3MB
7.PMB
Miscellaneous attachments not previously requested.
Cherokee County - U.S. 64-Ledford Street (Park & Ride) - NWP 3 Narrative1.pdf 406.81 KB
existing culvert outlet channel.pdf 176MB
Signature
*
�7 By checking the box and signing below, I certify that:
• I have given true., accurate., and complete information on this form;
. I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Artide 40 of the NC General Statutes (the "Uniform Electronic Transactions AcY');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions AcP');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Dave McHenry
Signature
Sign
�
Date
1 /7/2019