Loading...
HomeMy WebLinkAbout20071826 Ver 1_Compliance Inspection Letter_200907109YX NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary July 10, 2009 Mr. Barry James American Asset Corporation 3700 Arco Corporate Dr., Suite Charlotte, NC 28273 Dear Mr. James: Subject: 401 Certification Compliance Shoffner, Hwy 73 DWQ# 07-1826 Cabarrus County, NC On July 8, 2009, staff of this office conducted a 401 Certification compliance inspection at the subject site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). As of the date of this letter, it appears that construction at the site has not yet commenced. Be reminded that once construction at the site begins DWQ shall be notified and if ownership of the property changes the certification goes with the property. Also payment to the Ecosystem Enhancement Program, for mitigation purposes, was required. Failure to make the required payment may result in the certification in being withdrawn. If you have any questions, please do not hesitate to me at (704) 663-1699. Sincerely, tan D. J nson' Surface,*ate`r Protection Sr. Env mental Specialist cc: Katie Merritt - Compliance/Enforcement Ian McMillan -Wetlands Group Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwateraualitv.ora NorthCarolina ,Xatimallty An Eaual ODDortunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper