HomeMy WebLinkAbout20071826 Ver 1_Compliance Inspection Letter_200907109YX
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Division of Water Quality
Coleen H. Sullins
Director
Dee Freeman
Secretary
July 10, 2009
Mr. Barry James
American Asset Corporation
3700 Arco Corporate Dr., Suite
Charlotte, NC 28273
Dear Mr. James:
Subject: 401 Certification Compliance
Shoffner, Hwy 73
DWQ# 07-1826
Cabarrus County, NC
On July 8, 2009, staff of this office conducted a 401 Certification compliance inspection at the subject
site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). As of the
date of this letter, it appears that construction at the site has not yet commenced. Be reminded that once
construction at the site begins DWQ shall be notified and if ownership of the property changes the certification
goes with the property.
Also payment to the Ecosystem Enhancement Program, for mitigation purposes, was required. Failure
to make the required payment may result in the certification in being withdrawn.
If you have any questions, please do not hesitate to me at (704) 663-1699.
Sincerely,
tan D. J nson'
Surface,*ate`r Protection
Sr. Env mental Specialist
cc: Katie Merritt - Compliance/Enforcement
Ian McMillan -Wetlands Group
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: www.ncwateraualitv.ora
NorthCarolina
,Xatimallty
An Eaual ODDortunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper