Loading...
HomeMy WebLinkAbout20070478 Ver 2_Compliance Inspection Letter_20090710LT4 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary July 10, 2009 Mr. Matthew Wilson Landcraft 1435 W. Morehead St.,Ste. 135 Charlotte, NC 28208 Subject: 401 Certification Compliance Midland/Saddlebrook DWQ# 07-0478 Cabarrus County, NC Dear Mr. Wilson: On July 8, 2009, staff of this office conducted a 401 Certification compliance inspection at the subject site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). As of the date of this letter, it appears that construction at the site has not yet commenced. Be reminded that once construction at the site begins DWQ shall be notified and if ownership of the property changes the certification goes with the property. Also payment to the Ecosystem Enhancement Program, for mitigation purposes, was required. Failure to make the required payment may result in the certification in being withdrawn. If you have any questions, please do not hesitate to me at (704) 663-1699. Sincerely, Alan D. Jo inso Surface W rotection Sr. Environmental Specialist cc: Katie Merritt - Compliance/Enforcement Ian McMillan -Wetlands Group Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwateraualitv.org North Carolina Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper