HomeMy WebLinkAbout20070478 Ver 2_Compliance Inspection Letter_20090710LT4
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
July 10, 2009
Mr. Matthew Wilson
Landcraft
1435 W. Morehead St.,Ste. 135
Charlotte, NC 28208
Subject: 401 Certification Compliance
Midland/Saddlebrook
DWQ# 07-0478
Cabarrus County, NC
Dear Mr. Wilson:
On July 8, 2009, staff of this office conducted a 401 Certification compliance inspection at the subject
site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). As of the
date of this letter, it appears that construction at the site has not yet commenced. Be reminded that once
construction at the site begins DWQ shall be notified and if ownership of the property changes the certification
goes with the property.
Also payment to the Ecosystem Enhancement Program, for mitigation purposes, was required. Failure
to make the required payment may result in the certification in being withdrawn.
If you have any questions, please do not hesitate to me at (704) 663-1699.
Sincerely,
Alan D. Jo inso
Surface W rotection
Sr. Environmental Specialist
cc: Katie Merritt - Compliance/Enforcement
Ian McMillan -Wetlands Group
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: www.ncwateraualitv.org
North Carolina
Naturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper