Loading...
HomeMy WebLinkAbout20051321 Ver 4_Approval Letter_20090721ea A, NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 21, 2009 Mr. Bob Jones Sandler at Amberly, LLC 4011 Westchase Boulevard, Suite 175 Raleigh, NC 27607 Re: Sandler at Amberly, Chatham County DWQ Project # 20051321, Ver. 4; USACE Action ID. No. 200520319 Nancy Branch [030605, 16-41-1-17-3-2, WSIV, NSW] APPROVAL of 401 Water Quality Certification with Additional Conditions - MODIFICATION Dear Mr. Jones: Dee Freeman Secretary Attached hereto is a copy of Certification No. 3534 issued to Mr. Bob Jones of Sandler at Amberly, LLC, Inc., dated July 21, 2009. This Certification replaces the Certification issued to you on August 13, 2007. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. Sincerely, ?? I / C4 Coleen Sullins CHS/cbk/Um Attachments: Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 U.S. Army Corps of Engineers, Raleigh Regulatory Field Office, Wilmington District Lauren Witherspoon, DWQ Raleigh Regional Office DLR, Raleigh Regional Office File Copy Bob Zarzecki, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 051321 Ver4Amberly(Wake_Chatham)401_IC_MOD.doc 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:l/h2o.enr.state,nc.us/ncwetlands/ NorthCarolina A I atumffi An Equal Opportunity 1 Affirmative Action Employer Sandler at Amberly, LLC Page 2 of 6 July 21, 2009 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to Mr. Bob Jones of Sandler At Amberly, LLC to fill 0.212 acre of wetlands and 1,421 linear feet of stream channel, including 456 linear feet of perennial streams and 965 linear feet of intermittent streams, in the Cape Fear River Basin, associated with the construction of the Sandler at Amberly residential and commercial development in Wake and Chatham Counties, North Carolina, pursuant to an application filed on the 22°d day of March of 2006 with additional correspondence received April 4, 2005, and a modification request received on March 12, 2007 and issued on August 13, 2007, and the most recent modification request dated June 4, 2009 and received by DWQ on June 8, 2009. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Type of Impact Amount Approved Units Plan Location or Reference 404/401 Wetlands 0.212 (acres) Modification Request, Application, and Public Notice Stream (perennial) 456 (linear feet) Application and Public Notice Stream (intermittent) 965 (linear feet) Application and Public Notice Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: Sandler at Amberly, LLC Page 3 of 6 July 21, 2009 a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 5. Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities. Continuing Compliance: Mr. Bob Jones and Sandler at Amberly, LLC shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Bob Jones and Sandler at Amberly, LLC and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Bob Jones and Sandler at Amberly, LLC in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; Sandler at Amberly, LLC Page 4 of 6 July 21, 2009 7. Construction Stormwater Permit NCG010000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http •//h2o. enr.state. nc. tis/su/Forms Documents. htm. 8. Stormwater Management Plan (SMP) Approval Required Before the impacts specified in this Certification may occur, the applicant must meet all of the provisions set forth in the document Stormwater Management Plan (SMP) Requirements for Applicants other than the North Carolina Department of Transportation, available at: http://h2o enr state nc us/newetlands/documents/SMPRequirementsforAppIicantsotherthanNCDOT.p d£ The required SNIP documentation must be submitted within 60 days of the issuance of the 401 Water Quality Certification to the DWQ (401 Oversight and Express Permitting Unit, 2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604). SMP approval and implementation procedures shall be as follows: The SMP must be approved in writing by either the 401 Oversight/Express Unit or, if the project is subject to another state stormwater program, a copy of the approval letter and approved SMP must be submitted before any impacts authorized in this certification occur. If a development is phased, then the SMP for each future phase must approved by the 401 Oversight/Express Unit or, if the project is subject to another state stormwater program, a copy of the approval letter and approved SMP must be submitted before any impacts associated with that phase may occur. The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. The approved SMP as well as drainage patterns must be maintained in perpetuity. The SMP may not be modified without prior written authorization from the SMP approval authority. If the SMP falls under another state stormwater program, then a copy of the approval letter and the modified SNIP must be submitted to the 401 Oversight/Express Unit prior to the commencement of the modifications. 10. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http://www.ncdot.org/doh/operations/BMP manual/downloadBMP Manual.pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Sandler at Amberly, LLC Page 5 of 6 July 21, 2009 Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re- established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. 11. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the Sandler at Amberly, LLC Page 6 of 6 July 21, 2009 modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 2151 day of July 2009 DIVISION OF WATER QUALITY OA? '?'a4 Coleen Sullins CHS/cbk/Um 3534