Loading...
HomeMy WebLinkAbout20181249 Ver 1_Attachment 5- NCDOT Projects List_20181217PROJECTS LIST NORTH CAROLINA BOARD OF TRANSPORTATION RALEIGH, NORTH CAROLINA December 5-6, 2018 Delegated Authority ................................................................................... Secretary Trogdon (Item C) Award of Highway Construction Contracts from November 2018 Letting (Item D) Award of Contracts to Private Firms for Engineering Services (Item E) (Item H) (Item L) Funds for Secondary Road Improvement Projects — Highway Fund and Highway Trust Fund Funds for Division-wide Small Construction, Statewide Contingency, Public Access, and Economic Development Funds for Specific Spot Safety Improvement Projects Action................................................................................................................ Chairman Fox (Item G) Additions, Abandonments, and Road Name Changes to State Secondary Road System (Item I) Public Transportation Program (Item I-1) Public Transportation (No Item this month) (Item I-1A) Public Transportation (No Item this month) (Item I-2) Rail Program (No Item this month) (Item I-3) Bicycle and Pedestrian (No Item this month) (Item I-4) Aviation (Item J) (Item K) Specific State Funds for Construction Projects (Item K now replaces Item J) North Carolina Highway Trust Funds (Item M) Funds for Specific Federal-Aid Projects (Item N) (Item O) (Item P) (Item R) (Item S) (Item T) (Item V) Revisions to the 2018-2027 STIP Municipal and Special Agreements Municipal Street System Changes Right of Way Resolutions and Ordinances Maintenance Allocations (No Item this Month) Submission of Comprehensive Transportation Plans for Mutual Adoption by the Board of Transportation (No Item this month) NCDOT Board of Transportation Agenda ITEM C November 2018 According to Executive Order No. 2 and G.S. 143B-350(g), the Board is requested to concur with staff recommendations and delegate authority to the Secretary to award the following highway construction projects. HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00003 C204271 2019CPT.03.02.10671, 2019CPT.03.02.20671 STATE FUNDED ONSLOW PROPOSAL LENGTH 36.510 MILES TYPE OF WORK MILLING, RESURFACING, AND SHOULDER RECONSTRUCTION. LOCATION 1 SECTION OF US-17 AND 25 SECTIONS OF SECONDARY ROADS. EST CONST PROGRESS.... FY-2019..49% OF BID FY-2020..51% OF BID RPN 003 3 BIDDER(S) DBE GOAL 7.00 % ESTIMATE 8,600,731.09 DATE AVAILABLE JAN 08 2019 INTER COMPLETION MAY 10 2019 COMPLETE ALL WORK REQUIRED ON MAP #1 FINAL COMPLETION MAY 15 2020 PAGE : 1 of 10 ITEM C $ TOTALS % DIFF ONSLOW GRADING & PAVING INC JACKSONVILLE, NC 8,657,315.46 +0.7 BARNHILL CONTRACTING COMPANY ROCKY MOUNT, NC 8,904,098.75 +3.5 ROSE BROTHERS PAVING CO INC AHOSKIE, NC 9,974,938.87 +16.0 HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00005 C204263 176P.5.R.96 STATE FUNDED WAKE B-4833 PROPOSAL LENGTH 0.259 MILES TYPE OF WORK GRADING, DRAINAGE, PAVING, AND STRUCTURE. LOCATION BRIDGE NO 376 OVER LITTLE BLACK CREEK ON SR-1761 (WIMBERLY ROAD). EST CONST PROGRESS.... FY-2019..100% OF BID RPN 004 5 BIDDER(S) DBE GOAL 7.00 % ESTI MATE 1,164,138.53 PAGE:2of10 ITEM C DATE AVAILABLE DEC 31 2018 THRU MAY 01 2019 INTER COMPLETION COMPLETE ALL WORK EXCEPT PLANTING, REFORESTATION OR PERMANENT VEGETATION ESTABLISHMENT 180 DAYS AFTER START DATE FINAL COMPLETION 360 DAY(S) AFTER START DATE NATIONAL BRIDGE BUILDERS LLC KERNERSVILLE, NC DANE CONSTRUCTION INC MOORESVILLE, NC FSC II LLC DBA FRED SMITH COMPANY RALEIGH, NC UNITED CONTRACTORS, INC. DBA UNITED CONTRACTORS INC. OF IOWA JC S T WOOTEN CORPORATION WILSON, NC $ TOTALS 1,080,185.80 1,104, 839.50 1,215,121.00 1,344,753.69 1,395,208.94 % DIFF -7.2 -5.1 +4.4 +15.5 +19.8 HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00005 C204267 2020 C PT. 05. 08. 20731.1 STATE FUNDED PERSON PROPOSAL LENGTH 25.610 MILES TYPE OF WORK MILLING, RESURFACING, AND SHOULDER GRADING. LOCATION 15 SECTIONS OF SECONDARY ROADS. EST CONST PROGRESS.... FY-2019..69% OF BID FY-2020..31% OF BID 1:7�►<IZIF", 2 BIDDER(S) DBE GOAL 9.00 % ESTIMATE 4,555,795.98 DATE AVAILABLE DEC 31 2018 FINAL COMPLETION NOV 30 2019 PAGE:3of10 ITEM C $ TOTALS % DIFF CAROLINASUNROCK LLC RALEIGH, NC 4,123,554.26 -9.5 ADAMS CONSTRUCTION COMPANY ROANOKE, VA 4,986,765.00 +9.5 HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00005 C204197 35516.3. GV 1 NHP-0540(043) JOHNSTON, WAKE R-2828 PROPOSAL LENGTH 8.617 MILES TYPE OF WORK DESIGN BUILD. PAGE:4of10 ITEM C LOCATION NC-540 - TRIANGLE EXPRESSWAY SOUTHEAST EXTENSION FROM EAST OF US-401 (FAYETTEVILLE RD) TO EAST OF I-40. EST CONST PROGRESS.... FY-2019..11% OF BID FY-2020..29% OF BID FY-2021..28% OF BID FY-2022..19% OF BID FY-2023..12% OF BID FY-2024..01% OF BID RPN 009 3 BIDDER(S) DBE GOAL 10.00 % ESTIMATE 355,208,000.00 DATE AVAILABLE DEC 31 2018 INTER COMPLETION SEP 01 2023 COMPLETE ALL WORK REQUIRED OF ITS/AET INFRASTRUCTURE ONE HUNDRED TWENTY (120) DAYS PRIOR TO PROJECT'S COMPLETION DATE FINAL COMPLETION JAN 01 2024 PROPOSAL THE LANE-BLYTHE CONSTRUCTION JV THE ARCHER-UNITED JV ZACHRY-S.T. WOOTEN-WRIGHT PROPOSAL QUALITYADJUSTED PRICE RANKING TECH QUALITY ACTUAL ACT % QUALITY CONT AWARD SCORE CREDIT CONTAMT DIFF VALUE BASIS % (PRICE (ADJ PRICE) PROP) 96.40 22.00 403,200,000.00 +13.5 88,704,000.00 314,496,000.00 92.30 18.58 402,282,800.00 +13.3 74,744,144.24 327,538,655.76 86.70 13.91 399,348,360.00 +12.4 55,549,356.88 343,799,003.12 THE LANE-BLYTHE CONSTRUCTION JV THE ARCHER-UNITED JV ZACHRY-S.T. WOOTEN-WRIGHT BROTHERS JV PROPOSED COMPLETION DATE NOV 24 2022 OCT 03 2023 JUN 29 2023 ADJ % DIFF -11.5 -7.8 -3.2 HIGHWAY LETTING PAGE : 5 of 10 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ITEM C DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00009 C204175 45901.3.1 NHPIM-0040(073) FORSYTH I-5952 PROPOSAL LENGTH 6.226 MILES TYPE OF WORK DRAINAGE, CONC MEDIAN BARRIER, AND PAVEMENT REHABILITATION. LOCATION I-40 FROM SR-1101 (HARPER RD) IN CLEMMONS TO EAST OF US-421/ I-40 BUS IN W INSTON-SALEM. EST CONST PROGRESS.... FY-2019..30% OF BID FY-2020..62% OF BID FY-2021..08% OF BID RPN 006 2 BIDDER(S) DBE GOAL 6.00 % ESTIMATE 16,230,913.60 DATE AVAILABLE MAR 01 2019 FINAL COMPLETION OCT 01 2020 $ TOTALS % DIFF SHARPE BROTHERS A DIVISION OF VECELLIO & GROGAN INC GREENSBOF 17,558,977.21 +8.2 APAC - ATLANTIC INC THOMPSON ARTHUR DIVISION GREENSBORO, NC 21,736,932.75 +33.9 HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00010 C204259 156PR.43, 39922.3.1 STATE FUNDED STANLY B-4974 PROPOSAL LENGTH 0.327 MILES TYPE OF WORK DESIGN BUILD. LOCATION BRIDGES 830050 AND 830051 OVER THE PEE DEE RIVER ON NC-24/NC-27/NC-73. RPN 010 EST CONST PROGRESS.... FY-2019..27% OF BID FY-2020..44% OF BID FY-2021..26% OF BID FY-2022..03% OF BID 3 BIDDER(S) DBE GOAL 0.00% ESTIMATE 17,784,950.00 PAGE:6of10 ITEM C DATE AVAILABLE JAN 03 2019 INTER COMPLETION MAY 20 2019 COMPLETE DEFINED BRIDGE REHABILITATION WORK ON BRIDGE 830050 PRIOR TO PLACING TRAFFIC IN A TWO-LANE, TWO-WAY PATTERN FINAL COMPLETION SEP 01 2021 QUALITYADJUSTED PRICE RANKING PROPOSAL TECH QUALITY ACTUAL ACT % QUALITY SCORE CREDIT CONTAMT DIFF VALUE % (PRICE PRnPI PCL CIVIL 90.50 10.25 20,154,128.00 +13.3 2,065,798.12 CONSTRUCTORSINC * IMPROPER BID BOND FORM * INCORRECT CONTRACT NUMBER LEE CONSTRUCTION 7g.00 4.50 29,901,550.00 +68.1 1,345,569.75 COMPANY OF THE CROWDER 77.00 3.50 37,652,150.00 +111.7 1,317,825.25 CONSTRUCTION * IMPROPER BID BOND FORM * TITLE NOT MARKED THROUGH ON CORP SIGNATUR PROPOSAL PCL CIVIL CONSTRUCTORS INC LEE CONSTRUCTION COMPANY OF THE CAROL PROPOSED COMPLETION DATE APR 30 2021 AUG 15 2021 CONT AWARD ADJ % BASIS DIFF (ADJ PRICE) 18,088,329.88 +1.7 28,555,980.25 +60.6 36,334,324.75 +104.3 HIGHWAY LETTING PAGE : 7 of 10 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ITEM C DIVISION OF HIGHWAYS RALEIGH N.C. �:Z�lli�y_1� NOVEMBER 20, 2018 PROPOSED COMPLETION DATE CROWDER CONSTRUCTION COMPANY SEP 01 2021 HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00012 C204262 45342.3.14 HS I P-0279(10) GASTON W-5212N PROPOSAL LENGTH 7.850 MILES TYPE OF WORK GRADING, DRAINAGE, PAVING, CULVERTS, AND RESURFACING. LOCATION NC-279 FROM SR-1438 TO NC-275. EST CONST PROGRESS.... FY-2019..38% OF BID FY-2020..53% OF BID FY-2021..09% OF BID RPN 007 2 BIDDER(S) DBE GOAL 12.00 % ESTIMATE 13,612,479.31 PAGE:8of10 ITEM C DATE AVAILABLE JAN 02 2019 INTER COMPLETION NOV 01 2020 COMPLETE ALL WORK EXCEPT PLANTING, REFORESTATION OR PERMANENT VEGETATION ESTABLISHMENT FINAL COMPLETION APR 30 2021 $ TOTALS % DIFF SLOAN CONSTRUCTION A DIVISION OF REEVES CONSTRUCTION CO DUNC, 15,853,698.43 +16.5 BLYTHE CONSTRUCTION INC CHARLOTTE, NC 18,149,579.52 +33.3 HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00013 C204232 156PR.28 STATE FUNDED MADISON, MITCHELL PROPOSAL LENGTH 0.350 MILES TYPE OF WORK BRIDGE PRESERVATION. PAGE:9of10 ITEM C LOCATION SR-1151 OVER FRENCH BROAD RIVER, SR-1346 OVER BIG LAUREL CREEK, AND NC-226 OVER NORTH TOE RIVER. EST CONST PROGRESS.... FY-2019..42% OF BID FY-2020..53% OF BID FY-2021..05% OF BID RPN 008 7 BIDDER(S) DBE GOAL 0.00% ESTIMATE 4,893,846.30 DATE AVAILABLE DEC 31 2018 FINAL COMPLETION SEP 01 2020 SOUTHERN ROAD & BRIDGE LLC TARPON SPRINGS, FL AMERICAN CONTRACTING & SERVICES INC JEFFERSONVILLE, IN GLF CONSTRUCTION CORPORATION MIAMI, FL LANFORD BROTHERS CO INC ROANOKE, VA BUCKEYE BRIDGE LLC CANTON, NC NHM CONSTRUCTORS LLC ASHEVILLE, NC PROSHOT CONCRETE INC FLORENCE, AL $ TOTALS 3,458,720.75 3,493,408.50 3,516,326.50 3,530,618.81 3,590,816.00 4,470,426.70 6,038,243.01 % DIFF -29.3 -28.6 -28.1 -27.9 -26.6 -8.7 +23.4 HIGHWAY LETTING NORTH CAROLINA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS RALEIGH N.C. NOVEMBER 20, 2018 DIVISION 00014 C204130 176P.14.R.154, 50192.3.1 STATE FUNDED MACON R-5734A PROPOSAL LENGTH 1.113 MILES TYPE OF WORK GRADING, DRAINAGE, PAVING, SIGNAL, CULVERT, AND STRUCTURE. PAGE:10of10 ITEM C LOCATION US-23/441 FROM US-64 TO SR-1652 (WIDE HORIZON DR)/SR-1152 (BELDEN CIR) & BRIDGE NO. 314 OVER CARTOOGECHAYE CREEK. EST CONST PROGRESS.... FY-2019..38% OF BID FY-2020..53% OF BID FY-2021..09% OF BID RPN 002 3 BIDDER(S) DBE GOAL 7.00 % ESTIMATE 11,678,325.14 DATE AVAILABLE JAN 02 2019 INTER COMPLETION NOV 01 2020 COMPLETE ALL WORK EXCEPT PLANTING, REFORESTATION, OR PERMANENT VEGETATION ESTABLISHMENT OCT 01 2019 COMPLETE ALL WORK REQUIRED FOR STEPS #1 THRU #4 FOR 17P6.14.R.154 FINAL COMPLETION APR 30 2021 BUCHANAN AND SONS INC WHITTIER, NC WATSON CONTRACTING INC FRANKLIN, NC NHM CONSTRUCTORS LLC ASHEVILLE, NC ESTIMATE TOTAL LETTING TOTAL $ TOTALS % DIFF 14,032,805.00 +20.2 15,600,000.00 +33.6 16,036,716.79 +37.3 433, 729,179.95 488,119,384.91 +12.5 ITEM D Page 1 of 14 NCDOT December 2018 Board of Transportation Agenda According to Executive Order No. 2 and G. S. 143B-350 (g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to award contracts to private firms for engineering services. Professional Services Management Chief Operating Officer Chief Engineer Deputy Chief Engineer Facilities Management The following is a supplemental contract to a previous contract approved by the Board with the same engineering firm. This supplemental contract was necessary due to approved additional work that was unknown at the inception and is required of the firm to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. STATEWIDE Project: Scope of Work: Estimated Construction Cost Firm: Original Engineering Fee: Supplemental Fee: Supplemental Work: SPSF Utilization: 51208 Statewide Roadway Lighting Project Inspection Services $32,303,412.00 LJB Inc, Miamisburg, OH $1,500,000.00 $750,000.00 Inspection Services 100% Design-Build The Secretary of Transportation awarded a Design-Build contract in October 2018 to widen I-440 / US 1 from south of SR 1313 (Walnut Street) to SR 1728 (Wade Avenue), a distance of approximately 6.5 miles, providing a six-lane divided facility with reconfigured interchanges, in Wake County. The project will also provide grade separations on Beryl Road, Norfolk Southern Railway / North Carolina Railroad / CSX Railroad and NC 54 (Hillsborough Street) at SR 1664 (Blue Ridge Road). In accordance with the policies and procedures adopted by the Board, a Design-Build team who was not awarded the project can request payment of a stipend to recover part of the expense of preparation of their proposal. We have received a request for payment of the stipend from the following firms. These are for information only. Project: Firm: Stipend Amount: SPSF Utilization: (35869.3.1 & 35868.3.4) (U-2719 / U-4437) Archer Western Construction LLC, Raleigh, NC $125,000.00 0% December 6, 2018 ITEM D Page 2 of 14 Project: Firm: Stipend Amount: SPSF Utilization: (35869.3.1 & 35868.3.4) (U-2719 / U-4437) Granite Construction Company, Watsonville, CA $125,000.00 0% Materials &Tests Unit The following is a supplemental contract to a previous contract approved by the Board with the same engineering firm. This supplemental contract was necessary due to approved additional work that was unknown at the inception and is required of the firm to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. STATEWIDE Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: 2017 Inspection, Testing, and Analysis of Materials and Pavements LSC Brannan Inspection Services Inc, Selma, NC $850,000.00 $1,000,000.00 0% Divisions Divisions 1-4, and 6 The following are supplemental contracts to previous contracts approved by the Board with the same engineering firms. These supplemental contracts were necessary due to approved additional work that was unknown at the inception and is required of the firms to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. DIVISIONS 1-4, and 6 Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Atkins North America Inc, Raleigh, NC $3,000,000.00 $4,000,000.00 Time extension only (6 months) N/A December 6, 2018 ITEM D Page 3 of 14 Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: DBE/WBE/SPSF Utilization SPSF Utilization: DBE/WBE/SPSF Utilization 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Calyx Engineers and Consultants Inc, Raleigh, NC $3,000,000.00 $7,000,000.00 $1,000,000.00 & Time extension (6 months) Carolina Land Acquisitions Inc 1 % / $10,000.00 Ecological Engineering LLP 5% / $50,000.00 Hinde Engineering Inc 2% / $20,000.00 Planning Communities, LLC 2% / $20,000.00 SPSF Utilization: Ramey Kemp & Associates, Inc. 2% / $20,000.00 SPSF Utilization: Commonwealth Heritage Group Inc 1 % / $10,000.00 Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC CDM Smith Inc, Raleigh, NC $3,000,000.00 $5,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC HDR Engineering Inc of the Carolinas, Chicago, IL $3,000,000.00 $8,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC HNTB of North Carolina PC, Raleigh, NC $3,000,000.00 $14,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC H. W. Lochner, Inc., Raleigh, NC $3,000,000.00 $2,000,000.00 Time extension only (6 months) N/A December 6, 2018 ITEM D Page 4 of 14 Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: DBE/WBE/SPSF Utilization; DBE/WBE/SPSF Utilization SPSF Utilization: DBE/MBE/SPSF Utilization DBE/WBE/SPSF Utilization SPSF: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Kimley-Horn & Associates Inc, Raleigh, NC $3,000,000.00 $5,000,000.00 $1,000,000.00 and Time extension (6 months) CH Engineering PLLC 8% / $80,000.00 Three Oaks Engineering 6% / $60,000.00 Carolina Land Acquisitions Inc 5% / $50,000.00 Vistabution LLC 5% / $50,000.00 New South Associates Inc 2% / $20,000.00 SpanishSpeaking, LLC 2% / $20,000.00 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Michael Baker Engineering, Inc., Cary, NC $3,000,000.00 $15,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Mott MacDonald I&E LLC, Pittsburgh, PA $3,000,000.00 $2,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Parsons Transportation Group, Raleigh, NC $3,000,000.00 $2,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC RS&H Architects-Engineers-Planners, Inc., Charlotte, NC $3,000,000.00 $7,000,000.00 Time extension only (6 months) N/A December 6, 2018 ITEM D Page 5 of 14 Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: DBE/WBE/SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Rummel Klepper & Kahl LLP, Raleigh, NC $3,000,000.00 $12,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Sepi Engineering & Construction Inc., Raleigh, NC $3,000,000.00 $8,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Stantec Consulting Services Inc, Raleigh, NC $3,000,000.00 $12,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC STV Engineers, Inc., Charlotte, NC $3,000,000.00 $3,000,000.00 $1,000,000.00 and Time extension (6 months) Falcon Engineering Inc 5% / $50,000.00 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Summit Design and Engineering Services PLLC, Hillsborough, NC $3,000,000.00 $4,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC TGS Engineers, Shelby, NC $3,000,000.00 $2,000,000.00 Time extension only (6 months) N/A December 6, 2018 ITEM D Page 6 of 14 Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of Work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC The Louis Berger Group Inc, Morristown, NJ $3,000,000.00 $2,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC VHB Engineering NC, P.C., Watertown, MA $3,000,000.00 $8,000,000.00 Time extension only (6 months) N/A 2015 Eastern Region Highway Divisions (Divisions 1, 2, 3, 4, and 6) Planning and Design LSC Wetherill Engineering, Inc., Raleigh, NC $3,000,000.00 $12,000,000.00 Time extension only (6 months) N/A Division 14 The following is a supplemental contract to a previous contract approved by the Board with the same engineering firm. This supplemental contract was necessary due to approved additional work that was unknown at the inception and is required of the firm to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. DIVISION 14 Description of work: Firm: Original Engineering Fee: Supplemental Fee: DBE/WBE/SPSF Utilization SPSF Utilization: DBE/MBE/SPSF Utilization SPSF Utilization: 2018 Western Divisions' Planning & Design Engineering Services Consultant (P&DSC) and General Engineering Services Consultant (GESC) LSC HNTB of North Carolina PC, Raleigh, NC $6,000,000.00 $3,000,000.00 CH Engineering PLLC 5% / $150,000.00 Hinde Engineering Inc 5% / $150,000.00 MA Engineering Consultants Inc 5% / $150,000.00 MI Engineering PLLC 5% / $150,000.00 December 6, 2018 ITEM D Page 7 of 14 Divisions - Statewide The following are supplemental contracts to previous contracts approved by the Board with the same engineering firms. These supplemental contracts were necessary due to approved additional work that was unknown at the inception and is required of the firms to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. STATEWIDE Description of work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: 2017 Statewide On-Call Construction Engineering & Inspection Services LSC Summit Design and Engineering Services PLLC, Hillsborough, NC $15,000,000.00 $10,000,000.00 $10,000,000.00 100% 2017 Statewide On-Call Construction Engineering & Inspection Services LSC Volkert Inc, Birmingham, AL $15,000,000.00 $10,000,000.00 0% Technical Services Roadway Design Unit The following are supplemental contracts to previous contracts approved by the Board with the same engineering firms. These supplemental contracts were necessary due to approved additional work that was unknown at the inception and is required of the firms to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. STATEWIDE Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: SPSF Utilization: DBE/WBE/SPSF Utilization 2016 Planning and Design LSC AECOM Technical Services of North Carolina Inc, Chicago, IL $8,000,000.00 $3,000,000.00 and Time extension (6 months) Summit Design and Engineering Services PLLC 2.5% / $75,000.00 Mattern & Craig Inc 1 % / $30,000.00 CH Engineering PLLC 1.5% / $45,000.00 December 6, 2018 ITEM D Page 8 of 14 Description of work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: SPSF Utilization: DBE/WBE/SPSF Utilization 2016 Planning and Design LSC Atkins North America Inc, Raleigh, NC $5,000,000.00 $3,000,000.00 and Time extension (6 months) $3,000,000.00 Hinde Engineering Inc 3% / $90,000.00 MI Engineering PLLC 3% / $90,000.00 Planning Communities, LLC 5% / $150,000.00 Description of work: 2016 Planning and Design LSC Firm: Calyx Engineers and Consultants Inc, Raleigh, NC Original Engineering Fee: $8,000,000.00 Supplemental Fee: Time extension only (6 months) SPSF Utilization: N/A Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: SPSF Utilization: DBE/WBE/SPSF Utilization SPSF Utilization: SPSF Utilization: DBE/MBE/SPSF Utilization DBE/WBE/SPSF Utilization Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: 2016 Planning and Design LSC Dewberry Engineers Inc, Raleigh, NC $8,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC DRMP Inc, Charlotte, NC $3,000,000.00 $2,000,000.00 and Time extension (6 months) Hinde Engineering Inc 2% / $40,000.00 Patriot Transportation Engineering PLLC 5% / $100,000.00 Planning Communities, LLC 7% / $140,000.00 SpanishSpeaking, LLC 1 % / $20,000.00 Sungate Design Group PA 6% / $120,000.00 Tech Engineering Group PLLC 2% / $40,000.00 Three Oaks Engineering 8% / $160,000.00 2016 Planning and Design LSC HDR Engineering Inc of the Carolinas, Chicago, IL $8,000,000.00 Time extension only (6 months) N/A December 6, 2018 ITEM D Page 9 of 14 Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: SPSF Utilization: DBE/WBE/SPSF Utilization DBE/MBE/SPSF Utilization DBE/MBE/SPSF Utilization SPSF Utilization: Description of work: Firm: Original Engineering Fee: Supplemental Fee: DBE/WBE/SPSF Utilization SPSF Utilization: Description of work: Firm: Original Engineering Fee: Supplemental Fee: DBE/WBE/SPSF Utilization DBE/WBE/SPSF Utilization DBE/WBE/SPSF Utilization SPSF Utilization: DBE/MBE/SPSF Utilization SPSF Utilization: 2016 Planning and Design LSC HNTB of North Carolina PC, Raleigh, NC $8,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC Johnson Mirmiran & Thompson Inc, Hunt Valley, MD $3,000,000.00 $2,000,000.00 and Time extension (6 months) MI Engineering PLLC 12% / $240,000.00 Ramey Kemp & Associates, Inc. 4% / $80,000.00 Southeastern Right of Way LLC 2% / $40,000.00 Neighborhood Solutions LLC 2% / $40,000.00 Baseline Mobility Group Inc 2% / $40,000.00 LJB Inc 4% / $80,000.00 2016 Planning and Design LSC KCI Associates of North Carolina PA, Baltimore, MD $5,000,000.00 $3,000,000.00 and Time extension (6 months) Planning Communities, LLC 20% / $600,000.00 Sungate Design Group PA 15% / $450,000.00 2016 Planning and Design LSC Kimley-Horn & Associates Inc, Raleigh, NC $8,000,000.00 $3,000,000.00 and Time extension (6 months) CH Engineering PLLC 10% / $300,000.00 Falcon Engineering Inc 5% / $150,000.00 Wetherill Engineering, Inc. 8% / $240,000.00 Patriot Transportation Engineering PLLC 4% / $120,000.00 Neighborhood Solutions LLC 2% / $60,000.00 SpanishSpeaking, LLC 1 % / $30,000.00 December 6, 2018 ITEM D Page 10 of 14 Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee: Supplemental Fee: DBE/MBE/SPSF Utilization SPSF Utilization: DBE/MBE/SPSF Utilization Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: DBE/MBE/SPSF Utilization SPSF Utilization: DBE/WBE/SPSF Utilization DBE/MBE/SPSF Utilization Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee: Supplemental Fee: DBE/MBE/SPSF Utilization SPSF Utilization: DBE/WBE/SPSF Utilization DBE/MBE/SPSF Utilization 2016 Planning and Design LSC H. W. Lochner, Inc., Raleigh, NC $8,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC Mead & Hunt Inc, Raleigh, NC $3,000,000.00 $2,000,000.00 and Time extension (6 months) John Davenport Engineering Inc 13% / $260,000.00 EEE Consulting Inc 4% / $80,000.00 Neighborhood Solutions LLC 5% / $100,000.00 2016 Planning and Design LSC Moffatt & Nichol Incorporated, Raleigh, NC $5,000,000.00 $3,000,000.00 and Time extension (6 months) Clearbox Forecast Group PLLC 1 % / $30,000.00 John Davenport Engineering Inc 4.5% / $135,000.00 Joyner Keeny PLLC 2.5% / $75,000.00 Falcon Engineering Inc 2% / $60,000.00 Vistabution LLC 4% / $120,000.00 2016 Planning and Design LSC Mott MacDonald I&E LLC, Pittsburgh, PA $5,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC Rummel Klepper & Kahl LLP, Raleigh, NC $8,000,000.00 $3,000,000.00 and Time extension (6 months) Accelerate Engineering PLLC 1 % / $30,000.00 Patriot Transportation Engineering PLLC 1 % / $30,000.00 Falcon Engineering Inc 4% / $120,000.00 MM/I and Associates LLC 1 % / $30,000.00 December 6, 2018 ITEM D Page 11 of 14 Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: DBE/WBE/SPSF Utilization SPSF Utilization: SPSF Utilization: SPSF Utilization: SPSF Utilization Description of work: Firm: Original Engineering Fee: Supplemental Fee: DBE/MBE/SPSF Utilization Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: DBE/WBE/SPSF Utilization SPSF Utilization: DBE/WBE/SPSF Utilization SPSF Utilization: SPSF Utilization: Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: 2016 Planning and Design LSC RS&H Architects-Engineers-Planners, Inc., Charlotte, NC $8,000,000.00 $3,000,000.00 and Time extension (6 months) Carolina Ecosystems Inc 2.5% / $75,000.00 Planning Communities, LLC 2.5% / $75,000.00 Commonwealth Heritage Group Inc 2% / $60,000.00 Progressive Design Group, Inc. 4% / $120,000.00 Clearbox Forecast Group PLLC 1 % / $30,000.00 Angler Environmental 2% / $60,000.00 2016 Planning and Design LSC Simpson Engineers & Associates PC, Cary, NC $5,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC Stantec Consulting Services Inc, Raleigh, NC $5,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC Stewart, Philadelphia, PA $5,000,000.00 $3,000,000.00 and Time extension (6 months) Patriot Transportation Engineering PLLC 8% / $240,000.00 Ecological Engineering LLP 15% / $450,000.00 Ramey Kemp & Associates, Inc. 6% / $180,000.00 Planning Communities, LLC 4% / $120,000.00 MI Engineering PLLC 3% / $90,000.00 Municipal Engineering Services Company PA 2% / $60,000.00 2016 Planning and Design LSC STV Engineers, Inc., Charlotte, NC $8,000,000.00 Time extension only (6 months) N/A December 6, 2018 ITEM D Page 12 of 14 Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee: Supplemental Fee: DBE/WBE/SPSF Utilization Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: Description of work: Firm: Original Engineering Fee Supplemental Fee: SPSF Utilization: SPSF Utilization: SPSF Utilization: DBE/WBE/SPSF Utilization SPSF Utilization: 2016 Planning and Design LSC Summit Design and Engineering Services PLLC, Hillsborough, NC $3,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC TGS Engineers, Shelby, NC $8,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC Three Oaks Engineering, Durham, NC $5,000,000.00 $3,000,000.00 and Time extension (6 months) 100% 2016 Planning and Design LSC VHB Engineering NC, P.C., Watertown, MA $8,000,000.00 Time extension only (6 months) N/A 2016 Planning and Design LSC WSP USA Inc, Raleigh, NC $5,000,000.00 $3,000,000.00 and Time extension (6 months) Carolina Ecosystems Inc 3% / $90,000.00 Utility Coordination Consultants 3% / $90,000.00 EEE Consulting Inc 2% / $60,000.00 Morton & Morton Design Services PLLC 1 % / $30,000.00 SpanishSpeaking, LLC 1 % / $30,000.00 December 6, 2018 ITEM D Page 13 of 14 Turnpike Authority Turnpike Authority The following is a supplemental contract to a previous contract approved by the Board with the same engineering firm. This supplemental contract was necessary due to approved additional work that was unknown at the inception and is required of the firm to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. STATEWIDE Description of work: Firm: Original Engineering Fee: Previous Supplemental Fee Supplemental Fee: SPSF Utilization: 2015-2018 Traffic & Revenue Services LSC Stantec Consulting Services Inc, Raleigh, NC $3,000,000.00 $2,000,000.00 $2,000,000.00 Patriot Transportation Engineering PLLC 3% / $60,000.00 Turnpike Authority The following is a supplemental contract to a previous contract approved by the Board with the same engineering firm. This supplemental contract was necessary due to approved additional work that was unknown at the inception and is required of the firm to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. STATEWIDE Description of work: Firm: Original Engineering Fee: Previous Supplemental Fee: Supplemental Fee: SPSF Utilization: 2015-2018 Toll Operation Services LSC Atkins North America Inc, Raleigh, NC $3,000,000.00 $3,000,000.00 $2,500,000.00 0% December 6, 2018 ITEM D Page 14 of 14 Turnpike Authority The following is a supplemental contract to a previous contract approved by the Board with the same engineering firm. This supplemental contract was necessary due to approved additional work that was unknown at the inception and is required of the firm to complete the project. Our staff has completed the actions in accordance with the policies and procedures adopted by the Board on May 7, 2009. This is for information only. STATEWIDE Description of work: Firm: Original Engineering Fee Supplemental Fee: DBE/WBE Utilization: SPSF Utilization: On-Call General Professional and Engineering Services for oversight of Public Private Partnership and other Innovatively Delivered Projects RS&H Architects-Engineers-Planners, Inc., Charlotte, NC $2,000,000.00 $2,000,000.00 B Reese Advisory LLC 5% / $100,000.00 Forge Communications LLC 5% / $100,000.00 END of ITEM D. December 6, 2018 NCDOT DECEMBER 2018 BOARD OF TRANSPORTATION AGENDA Secondary Road Improvement Projects (Highway and Trust Funds) According to G.S. 143B-350(g), the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve funds for Secondary Road Improvement projects Item E-1 Div / County SR No. / Road Description Amount Name Div 7 SR 2019 Grade, Base, Drain, & Pave $380,000.00 Rockingham Jarrell Road Establish Funds 7C.079242 Div 11 Countywide Countywide Spot Stabilization, $3,475.30 Caldwell Paved Road Improvements, Safety Projects Increase Funds W BS 11 C.014020 Div 14 SR 1199 Grade, Base, Drain & Pave Clay Emily Lane Establish Funds $80,000.00 WBS 14C.022056 Item E Summary: 2 Project to Establish Funds $460,000.00 Projects to Increase Funds $3,475.30 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Additions to the State Highway System: County Pet. No. Length Description Added (Miles) Division 2 Carteret 51743 0.03 Extend SR 1170, West Beaufort Road Pitt 51744 Davis Farm 0.10 Cox Farm Road Pitt 51745 Wellington West 0.38 Derbyshire Lane 0.05 Hardaway Place Pitt 51754 0.56 Sugg Parkway Division 3 Onslow Pender Division 4 Johnston Division 7 Guilford Guilford Guilford Division 8 Lee Lee Randolph 51746 0.49 51747 0.61 0.10 51748 0.23 0.07 51749 51750 51751 0.26 0.17 0.16 51752 51753 51755 0.09 0.40 0.30 Rockford Forest McCall Drive Holly Hill Estates Holly Hill Road S. Kingfisher Lane Taft Woods East Extend SR 3258, Rockport Drive Mosswood Court Galewood Acres Galewood Drive Kellam's Creek Kellam's Creek Court Stonebridge South Stoneway Court Mount Joy Place (Naugle) Mount Joy Place Quail Ridge Lark Lane Patriot Woods Patriot Woods Drive Date of Report 1 /23/18 7/2/18 7/12/18 5/8/18 9/7/18 9/10/18 10/3/ 18 10/18/18 9/24/18 9/12/18 7/30/18 8/15/18 9/6/18 G-1 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Additions to the State Highway System: County Pet. No. Length Description Added (Miles) Division 10 Cabarrus 51756 0.20 Bill McGee Road Division 12 Iredell Iredell Iredell Division 13 Burke 51757 51758 51759 51760 0.83 0.12 1.00 0.13 0.22 0.04 0.07 Anniston Walking Horse Trail Overlook Ridge Lane Bells Crossing S. San Augustin Drive Abbeville Lane Campanile Drive The Harbour Windy Run Lane Lakeridge Lakeridge Court Date of Report 10/8/ 18 10/17/18 7/15/18 10/31/18 10/29/18 G-2 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Abandonments from the State Highway System: County Pet. No. Length Description Abandoned (Miles) Division 2 Beaufort 51761 0.50 All of SR 1169, Sawyer Road Division 3 Onslow 51762 0.07 All of SR 1384, Water Plant Road Division 10 Cabarrus 51763 Cabarrus 51764 Summary: 0.03 Portion of SR 1446, Quay Road 0.17 Portion of SR 1170 Crozier Branch Road Number of roads petitioned for addition — 24 Number of roads petitioned for abandonment - 4 Minutes Corrections: County Requested Action None None Date of Report 9/27/18 10/5/ 18 10/22/18 10/8/2018 G-3 December 6, 2018 NCDOT DECEMBER 2018 BOARD OF TRANSPORTATION AGENDA Funds Request Division-wide Small Construction, Statewide Contingency, Public Access, Economic Development, High Impact/Low Cost ITEM H According to Executive Order No. 2 and G.S. 143B-350(g), the Board is requested to concur with staff recommendation and delegate authority to the Secretary to approve funds for specific Division-wide Small Construction / Statewide Contingency projects. Count Description T pe Amount Div 2 WBS 49032 was established (02/18) for High Impact / Beaufort widening, resurfacing, shoulder reconstruction, Low Cost ($200,000.00) pavement markings & markers on NC-306 from NC 33 to the Beaufort/Pamlico Co. line TOTAL ($200,000.00) Reduce funds Div 2 WBS 49031 was established (02/18) for High Impact / Jones widening, resurfacing, and shoulder Low Cost ($92,808.78) reconstruction on SR 1116 (White Oak River Rd) from SR 1117 to SR 1115 TOTAL ($92,808.78) Reduce funds Div 3 Relocate two Wendell Murphy Freeway signs, Duplin including new supports, along I-40 Contingency $12,000.00 TOTAL $12,000.00 WBS 48440 Div 4 Town of Mount Olive — Construct a connector Small Wayne road between NC-55 and Talton St and turn Construction $95,000.00 lanes on NC-55 Public Access $75,000.00 Contingency $750,000.00 WBS 80093 TOTAL $920,000.00 Div 7 WBS 47426 was established (06/17) for Rockingham widening, turn lanes, and resurfacing on US- Contingency $16,239.56 158 and SR 2350 (Hudson Rd) at Bethany Charter School TOTAL $16,239.56 Increase & close Div 9 Replace two sections of concrete median Forsyth barrier on I-40 between US-52 and Old Small Lexington Rd in Winston-Salem Construction $125,000.00 WBS 48439 TOTAL $125,000.00 December 6, 2018 Page 1 of 2 NCDOT DECEMBER 2018 BOARD OF TRANSPORTATION AGENDA Funds Request Division-wide Small Construction, Statewide Contingency, Public Access, Economic Development, High Impact/Low Cost ITEM H Count Description T pe Amount Div 12 City of Claremont — WBS 45858 was Catawba established (06/16) to grade, drain, base, & pave approximately 1,400 ft of industrial Contingency $141,000.00 access road for new industrial facility; Project Longbow TOTAL $141,000.00 Increase funds Div 14 WBS 47415 was established (06/17) to extend Small Cherokee existing turn lanes at US-64 & NC-294 and Construction $29,806.72 US-64 at crossover just west of Murphy TOTAL $29,806.72 Increase funds Deletion: Div 2, Beaufort County — WBS 46386.2.1 was established (09/15) as a Scope revision to expand a project on SR 1306 (15th St) from US-17 Business (Carolina Ave) to Brown St & widen to multi-lanes; associated with TIP project U-5860; ROW currently unavailable Summary: Number of Divisions Number of Projects Small Construction Commitment Public Access Commitment Contingency Commitment Economic Development Commitment High Impact/Low Cost Commitment TOTAL: 7 8 $249,806.72 $75.000.00 $919,239.56 $0.00 ($292,808.78) $951,237.50 December 6, 2018 Page 2 of 2 Item I - 1 1 of 1 NCDOT December 2018 Board of Transportation Agenda Public Transportation Program Town/County Project Description Estimated Division Cost There will be no items presented for approval at the December 6, 2018, Board of Transportation meeting. ITEM I- 1 SUMMARY — NO PROJECTS December 6, 2018 Item I-2 1 of 1 NCDOT December 2018 Board of Transportation Agenda Rail Program Town/County Project Description Estimated Division Cost There will be no items presented for approval at the December 6, 2018 Board of Transportation meeting. ITEM I-2 SUMMARY — NO PROJECTS December 6, 2078 Item I - 3 1 of 1 NCDOT December 2018 Board of Transportation Agenda Division of Bicycle and Pedestrian Transportation Town/County Project Description Estimated Division Cost There will be no items presented for approval at the December 6, 2018, Board of Transportation meeting. ITEM I- 3 SUMMARY — NO PROJECTS December 6, 2018 Item I - 4 1 of 1 NCDOT December 2018 Board of Transportation Agenda Aviation Program Division Airport County Division 8 Raleigh Executive Jetport Lee County Project Description Parking Lot and Access Road (Construction) This project will reconstruct old failing terminal area parking and airfield access road pavements. [PR# 4049] ITEM I-4 SUMMARY — 1 PROJECT —(TOTAL STATE and FEDERAL COST) $904,500. � Project selection and approval for award. Costs are estimated. Only eligible costs within the project scope of work will be reimbursed. December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Bertie Co. WBS 46976.1.1 Div. 1 NC 45 from Hertford County Line to Washington County Line. R-5809 $819,333.00 has previously been approved for preliminary DIVISION engineering. Additional funds are requested for planning and design. Northampton WBS 44709.1.1 Co. NC 305 from Seaboard Town Limits to Hertford County Line. Div. 1 $737,952.00 has previously been approved for preliminary R-5757 engineering. Additional funds are requested for planning and DIVISION design. Tyrrell Co. WBS 46478.3.1 Div. 1 Bridge # 7 over Alligator River on US 64. $18,250,000.00 has B-5936 previously been approved for construction. Additional funds are STATEWIDE needed to cover expenditures that have or will exceed the previously authorized budget. K-1 Estimated Cost $500,000.00 $600,000.00 $500,000.00 Carteret Co. WBS 44678.1.1 $1,000,000.00 Div. 2 US 70 (Arendell Street) from 4th street to SR 1175 U-5876 (Radio Island Road). $300,000.00 has previously been STATEWIDE approved for preliminary engineering. Additional funds are requested. Lenoir Co. WBS 46375.2.1 $750,000.00 Div. 2 NC 148 (Harvey Parkway) from NC 58 to NC 11. $6,690,000.00 R-5703 has previously been approved for full right of way. Additional REGIONAL funds are needed to cover expenditures that have or will exceed the previously authorized budget. December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Brunswick/ WBS 34491.2.3 New Hanover US 17 (Wilmington Bypass) from US 74-76 east of Malmo in Cos. Brunswick County to US 421 north of Wilmington in New Div. 3 Hanover County. $32,050,000.00 has previously been approved R-2633B for right of way and utilities. Additional funds are requested for STATEWIDE legal settlements. This is a Strategic Transportation Investments Transition project. This project has previously been identified as a Trust Fund Urban Loop project. Brunswick Co. WBS 45942.1.1 Div. 3 US 17 at NC 211. $1,000,000.00 has previously been approved U-5932 for preliminary engineering. Additional funds are requested. STATEWIDE Brunswick Co. WBS 48350.1.1 Div. 3 US 17 (Shallotte Bypass) at US 17 Business South U-6104 (Main Street). $10,000.00 has previously been approved for REGIONAL preliminary engineering. Additional funds are requested for planning and design. New Hanover WBS 40238.1.2 Co. US 17 Business (Market Street) from CSX Railroad to Cinema Div. 3 Drive and from Jacksonville Street to north of US 117/NC 132 U-4902B (College Road). $1,750,000.00 has previously been approved REGIONAL for preliminary engineering. Additional funds are requested. New Hanover WBS 40238.1.3 Co. US 17 Business (Market Street) from north of US 117 / NC 132 Div. 3 (College Road) to Station Road. $3,500,000.00 has previously U-4902C been approved for preliminary engineering. Additional funds are STATEWIDE requested. K-2 Estimated Cost $3,300,000.00 $300,000.00 $750,000.00 '.:�� ��� �� $650,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY New Hanover Co. Div. 3 U-4902D STATEWIDE New Hanover Co. Div. 3 U-5710A STATEWIDE New Hanover Co. Div. 3 U-5729 REGIONAL/ STATEWIDE New Hanover Co. Div. 3 U-5863 REGIONAL Project Description WBS 40238.1.4 US 17 Business (Market Street) from SR 1403 (Middle Sound Loop Road) to SR 2290 (Mendenhall Drive)/ SR 2734 (Marsh Oaks Drive). $2,500,000.00 has previously been approved for preliminary engineering. Additional funds are requested. W BS 50115.2.2 New location from SR 1409 (Military Cutoff Road) at Drysdale Drive to US 74 (Eastwood Road). Initial funds are requested for full right of way and utilities. WBS 54020.1.1 US 421 (Carolina Beach Road) from US 421 (Burnett Avenue) to US 117 (Shipyard Boulevard) in Wilmington. $1,600,000.00 has previously been approved for preliminary engineering. Additional funds are requested using Statewide Tier funding. WBS 46388.1.1 NC 133 from I-140/US 17, Wilmington Bypass to SR 1310 (Division Drive). $1,000,000.00 has previously been approved for preliminary engineering. Additional funds are requested. New Hanover WBS 44695.1.1 Co. NC 132 (College Road) from SR 2048 (Gordon Road) to Div. 3 SR 1272 (New Centre Drive). $750,000.00 has previously been U-5881 approved for preliminary engineering. Additional funds are STATEWIDE requested. K-3 Estimated Cost $775,000.00 $6,422,000.00 $200,000.00 $300,000.00 $250,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description New Hanover WBS 48351.1.1 Co. US 76 (Oleander Drive) at Greenville Loop Road and Greenville Div.3 Avenue. $10,000.00 has previously been approved for U-6128 preliminary engineering. Additional funds are requested for REGIONAL planning and design. K-4 Estimated Cost $250,000.00 Onslow Co. WBS 48353.1.1 $1,000,000.00 Div. 3 NC 24 (West Corbett Avenue) from Belgrade-Swansboro Road R-5885 to Front Street. $10,000.00 has previously been approved for REGIONAL preliminary engineering. Additional funds are requested for planning and design. Onslow Co. WBS 54019.1.1 Div. 3 US 17 Business (Marine Boulevard) at SR 1308 U-5728 (Bell Fork Road) in Jacksonville. $551,711.00 has previously REGIONAL been approved for preliminary engineering. Additional funds are requested. Onslow Co. WBS 54025.1.1 Div. 3 US 17 (Wilmington Highway) at SR 1130 U-5735 (Old Maple Hurst Road). Construct interchange. $1,400,000.00 REGIONAL has previously been approved for preliminary engineering. Additional funds are requested. Onslow Co. WBS 54026.1.1 Div. 3 NC 53 (Western Boulevard) from US 17 (Marine Boulevard) to U-5736 NC 24 (Lejuene Boulevard). $2,000,000.00 has previously been REGIONAL approved for preliminary engineering. Additional funds are requested. $150,000.00 $500,000.00 $500,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Onslow Co. WBS 54028.1.1 Div. 3 US 258 (Richlands Highway) from SR 1212 (Pony Farm Road) U-5739 to SR 1213 (Blue Creek Road). $1,500,000.00 has previously REGIONAL been approved for preliminary engineering. Additional funds are requested. Onslow Co. WBS 44359.1.1 Div. 3 SR 2715 (Trade Street) from NC 53 (Western Boulevard) to U-5787 McDaniel Drive. $500,000.00 has previously been approved for DIVISION preliminary engineering. Additional funds are requested. Onslow Co. WBS 44694.1.1 Div. 3 Commerce Drive, from Commerce Drive to SR 1406 U-5878 (Piney Green Road). $750,000.00 has previously been DIVISION approved for preliminary engineering. Additional funds are requested. Onslow Co. WBS 46896.1.1 Div. 3 NC 210 from US 17 to South of SR 1518 (Old Folkstone Road). U-5949 $1,000,000.00 has previously been approved for preliminary REGIONAL engineering. Additional funds are requested. Onslow Co. WBS 45870.1.1 Div. 3 US 17 at US 17 Business (Marine Boulevard). $750,000.00 has U-5951 previously been approved for preliminary engineering. REGIONAL Additional funds are requested. K-5 Estimated Cost $500,000.00 $300,000.00 $500,000.00 $150,000.00 $600,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Onslow Co. WBS 48352.1.1 Div. 3 US 258 / NC 24 at SR 1329 (Rhodestown Fire Department U-6148 Road). $10,000.00 has previously been approved for REGIONAL preliminary engineering. Additional funds are requested for planning and design. New Hanover/ WBS 40237.1.1 Pender Cos. US 17 Hampstead Bypass from US 17 to US 17 north of Div. 3 Hampstead. $4,033,500.00 has previously been approved for R-3300 preliminary engineering. Additional funds are requested. STATEWIDE This project has previously been identified as a Trust Fund Intrastate System project. Pender Co. WBS 48354.1.1 Div. 3 US 17 at NC 210 (Surf City). $10,000.00 has previously been R-5877 approved for preliminary engineering. Additional funds are REGIONAL requested for planning and design. Pender Co. WBS 48355.1.1 Div. 3 NC 210 at SR 1560 (Watts Landing Road). $10,000.00 has R-5899 previously been approved for preliminary engineering. REGIONAL Additional funds are requested for planning and design. Pender Co. WBS 48356.1.1 Div. 3 NC 50 / NC 210 at SR 1534 (Belt Road). $10,000.00 has R-5900 previously been approved for preliminary engineering. REGIONAL Additional funds are requested for planning and design. K-6 Estimated Cost $250,000.00 $3,250,000.00 $250,000.00 $250,000.00 $250,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description K-7 Estimated Cost Pender Co. WBS 54023.1.1 $2,650,000.00 Div. 3 US 17 from SR 1582 (Washington Acres Road) to SR 1563 U-5732 (Sloop Point Loop Road). Convert to superstreet. $2,500,000.00 REGIONAL has previously been approved for preliminary engineering. Additional funds are requested. Sampson Co. WBS 48328.1.1 Div. 3 NC 24 (Southwest Boulevard/MLK JR. Boulevard) at U-6126 Butler Road/Tram Road. $10,000.00 has previously been REGIONAL approved for preliminary engineering. Additional funds are requested for planning and design. Edgecombe/ WBS 44908.3.2 Nash Cos. CSX A Line Intermodal Terminal. Initial funds are requested for Div.4 construction. P-5711 A STATEWIDE Edgecombe WBS 39062.1.2 Co. NC 111 (Wilson Street) from US 64 Alternate Div.4 (Western Boulevard) to NC 122 (McNair Road). $315,000.00 U-4424 has previously been approved for preliminary engineering. DIVISION Additional funds are requested. Wayne Co. WBS 34461.2.7 Div. 4 US 70 (Goldsboro Bypass) from east of SR 1300 R-2554BA (Salem Church Road) to east of SR 1556 STATEWIDE (Wayne Memorial Drive). $12,187,000.00 has previously been approved for right of way and utilities. Funds need to be decreased ($1,372,748.43). WBS will be closed. $250,000.00 $50,000,000.00 $720,000.00 -$1,372,748.43 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Durham Co. WBS 46393.1.31 Div.5 Blackwell / Mangum grade separation. Initial funds are P-5602EC requested for preliminary engineering. STATEWIDE Durham Co. WBS 50166.3.1 Div.5 NC 751 (Hope Valley Road) at SR 1183 (University Drive) U-5745 intersection in Durham. $1,815,000.00 has previously been REGIONAL approved for construction. $1,000,000.00 of Regional Strategic Transportation Investments funds will be replaced with Build NC Bonds funds. Durham Co. WBS 50166.1.1 Div.5 NC 751 (Hope Valley Road) at SR 1183 (University Drive) U-5745 intersection in Durham. $400,500.00 has previously been REGIONAL approved for preliminary engineering. $356,000.00 of Regional Strategic Transportation Investments funds will be replaced with Build NC Bonds funds. Franklin Co. WBS 46957.1.1 Div. 5 US 401 / NC 39 from NC 56 / NC 581 (Nash Street) to SR 1229 R-3608 (Main Street). $250,000.00 has previously been approved for REGIONAL preliminary engineering. Additional funds are requested for planning and design. Franklin Co. WBS 47151.1.1 Div. 5 US 401 / NC 39 from Burke Boulevard to NS 56 / NC 581 U-6024 (Nash Street) in Louisburg. $250,000.00 has previously been DIVISION approved for preliminary engineering. Additional funds are requested for planning and design. K-8 Estimated Cost $100,000.00 G,� �� $0.00 $600,000.00 $500,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Wake Co. Div. 5 P-5602EA STATEWIDE Wake Co. Div. 5 P-5602EB STATEWIDE Project Description WBS 46393.1.29 Wolfpack Lane grade separation. Initial funds are requested for preliminary engineering. W BS 46393.1.30 Jones Sausage Road grade separation. Initial funds are requested for preliminary engineering. Wake Co. WBS 48000.1.1 Div. 5 US 401 from south of SR 1006 (Old Stage Road) to south of U-5302 SR 2538 (Mechanical Boulevard) in Garner. $795,000.00 has REGIONAL previously been approved for preliminary engineering. Additional funds are requested to complete final design. K-9 Estimated Cost $150,000.00 $100,000.00 $350,000.00 Wake Co. WBS 44384.1.1 $1,500,000.00 Div. 5 SR 1002 (Aviation Parkway) from NC 54 to I-40 in Morrisville. U-5811 $500,000.00 has previously been approved for preliminary DIVISION engineering. Additional funds are requested for preliminary engineering. Wake Co. WBS 44398.2.1 $1,000,000.00 Div. 5 SR 2000 (Falls of Neuse Road) from I-540 to SR 2006 U-5826 (Durant Road). Initial funds are requested for full right of way DIVISION and utilities. December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ Project County Description Division PROJ. CATEGORY Wake Co. WBS 44706.1.1 Div.5 NC 50 (Creedmoor Road) from I-540 to north of NC 98. U-5891 $300,000.00 has previously been approved for preliminary REGIONAL engineering. Additional funds are requested for planning and design. Alamance Co. WBS 46393.1.26 Div. 7 Buckhorn road grade separation. Initial funds are requested for P-5602GA preliminary engineering. STATEWIDE Greensboro/ WBS 34821.2.SU3 Guilford Co. Greensboro Eastern Loop from north of US 70 to US 29 north of Div. 7 Greensboro. $3,000,000.00 has previously been approved for U-2525B utilities. Funds need to be decreased ($1,836,259.49). This is a STATEWIDE Strategic Transportation Investments Transition project. WBS will be closed. Guilford Co. WBS 44674.2.1 Div. 7 US 29 / US 70 / Business 85 at SR 1009 (South Main Street) in U-5896 High Point. Funds are requested for advanced acquisition of DIVISION Specific Parcel 605 (Property of John A. Herke and wife Margaret) for $577,875.00. Carrboro/ WBS 34860.2.1 Orange Co. SR 1919 (Smith Level Road) from Rock Haven Road to Bridge Div.7 88 over Morgan Creek. $3,602,826.00 has previously been U-2803 approved for right of way and utilities. Funds need to be DIVISION decreased ($2,082,585.54). This project has previously been identified as a Trust Fund Specific State Funds Construction project. WBS will be closed. K-10 Estimated Cost $2,000,000.00 $100,000.00 -$1,836,259.49 $577,875.00 -$2,082,585.54 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Statewide WBS 46404.1.12 Div. 7 Greensboro Western Loop MapAct lawsuit. $200,000.00 has M-0488L previously been approved for preliminary engineering / legal REGIONAL services. Funds need to be decreased ($200,000.00). WBS will be closed. Guilford/ Randolph Cos. Div. 7/08 U-5864A DIVISION Lee Co. Div. 8 AV-5856 DIVISION W BS 46389.1.2 SR 1595 / SR 4053 (Surret Drive) from I-85 in Trinity to SR 1300 (West Fairfield Road) in High Point. $400,000.00 has previously been approved for preliminary engineering. Additional funds are needed to cover expenditures that have exceeded the previously authorized budget. WBS will be closed. WBS 47209.1.1 Sanford-Lee County Regional Airport (TTA), corporate hangar apron expansion. Initial funds are requested for preliminary engineering. Lee Co. WBS 38887.2.2 Div. 8 NC 42 / SR 1579 from US 421 in Sanford to SR 1538 R-3830 (East Harrington Avenue) in Broadway. Initial funds are DIVISION requested for utilities. Moore Co. WBS 47208.1.1 Div. 8 Moore County Airport (SOP), construct hangar taxiways and AV-5855 internal airfield service road. Initial funds are requested for DIVISION preliminary engineering. K-11 Estimated Cost -$200,000.00 $111, 337.44 $350,000.00 $6,000,000.00 $300,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Forsyth Co Div. 9 AV-5832 DIVISION Forsyth Co Div. 9 AV-5832 DIVISION Project Description WBS 47185.1.1 Smith Reynolds Airport (INT). Construct new taxilane. Initial funds are requested for preliminary engineering. WBS 47185.4.1 Smith Reynolds Airport (INT). Construct new taxilane. Initial funds are requested for project mitigation for taxilane. Cabarrus/ WBS 46378.1.1 Mecklenburg NC 73 (Davidson Highway) from SR 2693 (Davidson-Concord Cos. Road) to US 29. $750,000.00 has previously been approved for Div. 10 preliminary engineering. Additional funds are requested for R-5706 design. REGIONAL Cabarrus Co. WBS 47896.3.1 Div. 10 Various, extend left turn lane at NC 73 and SR 1430. Construct U-6098 right and left turn at access road on NC 73. Construct DIVISION roundabout at SR 1620 and SR 1621 (Barr Road). Construct 200 feet southbound on-ramp right turn lane at I-85 and extend storage to northbound off ramp. Initial funds are requested for construction. Mecklenburg WBS 53063.1.1 Co. I-85 from SR 2472 W. Mallard Creek Church Road) to 0.8 mile Div. 10 north of SR 2467 (Mallard Creek Road). $560,000.00 has I-5860 previously been approved for preliminary engineering. Funds STATEWIDE need to be decreased ($560,000.00). Project will be accomplished under project I-5826. WBS will be closed. K-12 Estimated Cost $250,100.00 $4,300,937.00 $600,000.00 $1,700,000.00 -$560,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Mecklenburg Co. Div. 10 P-5602JA STATEWIDE Mecklenburg Co. Div. 10 P-5602J B STATEWIDE Mecklenburg Co. Div. 10 R-2632AB REGIONAL Project Description WBS 46393.1.27 Old Dowd Road grade separation. Initial funds are requested for preliminary engineering. WBS 46393.1.28 Orr Road grade separation. Initial funds are requested for preliminary engineering. WBS 38824.1.2 NC 73 from NC 115 to SR 2693 (Davidson-Concord Road). $343,768.00 has previously been approved for preliminary engineering. Additional funds are requested for design. K-13 Estimated Cost $30,000.00 $75,000.00 $400,000.00 Union Co. WBS 46398.3.1 $8,200,000.00 Div. 10 CSX SF Line, Milepost 311.8 to Milepost 316.9. 10,000 feet P-5704 track siding extension at Stouts in Union County. Initial funds REGIONAL are requested for construction. This is a Cash Flow project with $3,500,000.00 in SFY 19 and $4,700,000.00 in SFY 20. Union Co. WBS 50129.2.1 $800,000.00 Div. 10 US 74 (Roosevelt Boulevard) and SR 1514 (Rocky River Road) U-5703 intersection. $400,000.00 has previously been approved for full STATEWIDE right of way and utilities. Additional funds are requested. December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Union Co. WBS 50129.1.3 Div. 10 US 74 (Roosevelt Boulevard), realign James Hamilton Road to U-5703B intersect with SR 1514 (Rocky River Road) at Myers Road. STATEWIDE Initial funds are requested for preliminary engineering. Alleghany Co. WBS 34605.2.RU1 Div. 11 US 21 (Sparta Western Loop) from SR 1172 (Grandview Drive) R-4060 to US 21. $130,000.00 has previously been approved for REGIONAL utilities. Funds need to be decreased ($85,605.84). WBS will be closed. Surry Co. WBS 47998.1.1 Div. 11 I-74 & I-77 interchange/ramps. Initial funds are requested for I-6050 preliminary engineering. STATEWIDE Yadkin Co Div. 11 U-5809 DIVISION WBS 44382.2.1 US 601 (State Street) from US 421 to SR 1146 (Lee Avenue). Initial funds are requested for full right of way and utilities. Mount Holly/ WBS 37649.2.RU2 Gaston Co. NC 273 (South Main Street) from Tuckaseege Road Div. 12 (at Beatty Drive) to Highland Street. $60,567.00 has previously U-3633 been approved for utilities. Funds need to be decreased REGIONAL ($59,417.31). WBS will be closed. K-14 Estimated Cost $10, 000.00 -$85,605.84 $10,000.00 $1,700,000.00 -$59,417.31 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Iredell Co. WBS 41890.1.2 Div. 12 SR 1109 (Williamson Road) from I-77 to SR 1100 R-5100A (Brawley School Road). Initial funds are requested for DIVISION preliminary engineering. Rutherford WBS 50225.1.1 Co. SR 2241 (Oak Street) from SR 2159 (Pine Ridge Road) to Div.13 US 74. $624,978.00 has previously been approved for U-5833 preliminary engineering. $624,978.44 of Division Strategic DIVISION Transportation Investments funds will be replaced with Build NC Bonds funds. Additional funds of $49,022.00 of Build NC Bonds funds are requested. Rutherford WBS 50225.3.1 Co. SR 2241 (Oak Street) from SR 2159 (Pine Ridge Road) to Div.13 US 74. $4,459,810.00 has previously been approved for U-5833 construction. $4,000,000.00 of Division Strategic Transportation DIVISION Investments funds will be replaced with Build NC Bonds funds. K-15 Estimated Cost $500,000.00 $49,022.00 $0.00 Cherokee Co. WBS 50193.1.1 $2,500,000.00 Div. 14 US 19 / US 74 / US 64 / US 129 from the end of 4-lane divided R-5735 section to SR 1556 (Martins Creek Road). $1,678,393.00 has DIVISION previously been approved for preliminary engineering. Additional funds are requested. Cherokee/ WBS 47090.1.1 $450,000.00 Clay Cos. US 64 Business west of Hayesville to east of NC 141. Widen to Div. 14 four lanes divided. $1,400,000.00 has previously been approved R-5847 for preliminary engineering. Additional funds are requested. DIVISION December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Clay Co. WBS 46325.1.D1 Div. 14 NC 175 from Georgia State Line to US 64, upgrade roadway. R-5742 $1,608,893.00 has previously been approved for preliminary DIVISION engineering. Additional funds are requested. Clay Co. WBS 46325.2.1 Div. 14 NC 175 from Georgia State Line to US 64, upgrade roadway. R-5742 $2,200,000.00 has previously been approved for full right of way DIVISION and utilities. Additional funds are requested. Clay Co. Div. 14 R-5863 DIVISION WBS 47516.1.1 US 64 Business from Main Street to US 64. $700,000.00 has previously been approved for preliminary engineering. Additional funds are requested. Graham Co. WBS 34508.1.2 Div.14 NC 143 from west Buffalo Creek to NC 143 Business. R-2822B $605,000.00 has previously been approved for preliminary REGIONAL engineering. Additional funds are requested. Graham/ Swain Cos Div. 14 R-5839 DIVISION WBS 47109.1.1 NC 28 (Fontana Road) from NC 143 to US 129. Upgrade roadway. $250,000.00 has previously been approved for preliminary engineering. Additional funds are requested. K-16 Estimated Cost $340,000.00 $550,000.00 $150,000.00 $400,000.00 �,.:� ��� �� December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Haywood Co. WBS 50230.1.1 Div. 14 US 276 (Russ Avenue) from US 23/74 to US 23 Business U-5839 (Main Street). $2,443,401.00 has previously been approved for DIVISION preliminary engineering. Additional funds are requested. Henderson WBS 50231.3.1 Co. SR 1547 (Old Airport Road) from US 25 to Mills Gap Road. Div. 14 $4,100,000.00 has previously been approved for construction. U-5840 $4,100,000.00 of Division Strategic Transportation Investments DIVISION funds will be replaced with Build NC Bonds funds. Additional funds of $2,900,000.00 of Build NC Bonds funds are requested per the latest estimate. Henderson WBS 50231.1.D1 Co. SR 1547 (Old Airport Road) from US 25 to Mills Gap Road. Div. 14 $1,130,000.00 has previously been approved for preliminary U-5840 engineering. $1,101,000.00 of Division Strategic Transportation DIVISION Investments funds will be replaced with Build NC Bond funds. Additional funds of $52,367.95 are requested. Henderson WBS 44710.1.1 Co. SR 1170 (White Street) from SR 1171 (Willow Road) to US 176 Div.14 (Spartanburg Highway). $720,000.00 has previously been U-5886 approved for preliminary engineering. Additional funds are DIVISION requested. Jackson Co. WBS 47084.1.2 Div. 14 NC 107 from NC 281 to Tuckaseegee Lake. $100,000.00 has R-5841A previously been approved for preliminary engineering. DIVISION Additional funds are requested. K-17 Estimated Cost $300,000.00 $2,900,000.00 $52,367.95 $750,000.00 '.�:� ��� �� December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Jackson Co. WBS 47084.1.3 Div. 14 NC 107 from 1000 feet North of the Lake Tuckaseegee Dam to R-5841 B approximately 1 mile North of SR 1157 (Pine Creek Road). DIVISION $500,000.00 has previously been approved for preliminary engineering. Additional funds are requested. Macon Co. WBS 50192.1.1 Div. 14 US 23/ US 441 from US 64 to SR 1652 (Wide Horizon Drive) / R-5734A SR 1152 (Belden Circle). $1,781,319.00 has previously been DIVISION approved for preliminary engineering. Additional funds are requested. Macon Co. WBS 50192.1.2 Div. 14 US 23 / US 441 from SR 1652 (Wide Horizon Drive) / SR 1152 R-5734B (Belden Circle) to SR 1649 (Prentiss Bridge Road). $545,000.00 REGIONAL has previously been approved for preliminary engineering. Additional funds are requested. Polk Co. WBS 34243.2.2 Div. 14 I-26 / US 74 / NC 108 interchange. $940,000.00 has previously I-4729A been approved for full right of way and utilities. Additional funds REGIONAL are requested. Polk Co. WBS 34243.1.5 Div. 14 Construct improvements on NC 108 at exit 67. $780,000.00 has I-4729B previously been approved for preliminary engineering. REGIONAL Additional funds are requested. K-18 Estimated Cost $810,000.00 $110,000.00 $430,000.00 '.:�� ��� �� $300,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Polk Co. Div. 14 R-5840 DIVISION Swain/ Jackson Cos. Div. 14 R-4751 REGIONAL Transylvania Co. Div. 14 R-5763 DIVISION Transylvania Co. Div. 14 R-5799 REGIONAL Project Description WBS 47083.1.1 NC 9 from US 74 to NC 108. Add paved shoulders. $625,000.00 has previously been approved for preliminary engineering. Additional funds are requested. WBS 40115.1.2 US 19 from SR 1152 (Hughes Branch Road) in Bryson City to SR 1195 (US 19A). $1,170,000.00 has previously been approved for preliminary engineering. Additional funds are requested. WBS 44638.1.1 SR 1540 (Wilson Road) from SR 1504 (Old US 64) to US 276. $1,420,000.00 has previously been approved for preliminary engineering. Additional funds are requested. WBS 44984.1.1 Intersections of US 64, US 276 previously been approved Additional funds are requested. and NC 280. $705,000.00 has for preliminary engineering. Statewide WBS 34634.4.6 R-9999 Mitigation for Little Tenn 0204. Initial funds are requested to STATEWIDE purchase private mitigation bank credits. K-19 Estimated Cost $390,000.00 $130,000.00 $350,000.00 $820,000.00 $2,511,600.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Strategic Transportation Investments Funds Town/ County Division PROJ. CATEGORY Project Description Statewide WBS 34634.4.7 $14,318,118.00 R-9999WM Mitigation for Pasquotank 0205. Initial funds are requested to STATEWIDE/ purchase private mitigation bank credits using 40% Statewide REGIONAL/ ($5,727,247.20) / 30% Regional ($4,295,435.40) / 30% Division DIVISION ($4,295,435.40) Tier funding. Statewide WBS 34634.4.8 $6,471,648.00 R-9999WM Mitigation for Watauga 0103. Initial funds are requested to STATEWIDE/ purchase private mitigation bank credits using 40% Statewide REGIONAL/ ($2,588,659.20) / 30% Regional ($1,941,494.40) / 30% Division DIVISION ($1,941,494.40) Tier funding. K-20 Estimated Cost Statewide WBS 34634.4.9 $10,167,998.00 R-9999WM Mitigation for Cape Fear 0005. Initial funds are requested to STATEWIDE/ purchase private mitigation bank credits using 40% Statewide REGIONAL/ ($4,067,199.20) / 30% Regional ($3,050,399.40) / 30% Division DIVISION ($3,050,399.40) Tier funding. STATEWIDE STRATEGIC TRANSPORTATION 23 PROJECTS $66,564,592.08 INVESTMENTS REGIONAL STRATEGIC TRANSPORTATION INVESTMENTS 35 PROJECTS $24,834,976.85 DIVISION STRATEGIC TRANSPORTATION INVESTMENTS REGIONAL/STATEWIDE STRATEGIC TRANSPORTATION INVESTMENTS STATEWIDE/REGIONAL/DIVISION STRATEGIC TRANSPORTATION INVESTMENTS STRATEGIC TRANSPORTATION INVESTMENTS 36 PROJECTS 1 PROJECT 3PROJECTS 98 PROJECTS $30,189,053.85 $200,000.00 $30,957,764.00 $152,746,386.78 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-1 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Bertie Co. WBS 48284.3.1 Div. 1 NC 308 (Governors Road) between the Lewiston Town Limits SS-4901 BJ and SR 1134 (Griffins Quarter Road). Initial Spot Safety construction funds are needed for rumble strip installation and pavement marking revisions. File 01-18-53520C Bertie Co. WBS 48285.3.1 Div. 1 US 13/17 between the Roanoke River Bridge and SR 1521 SS-4901 BK (Cedar Landing Road). Initial Spot Safety construction funds are needed for widening, rumble strip installation, and pavement marking revisions. File 01-18-53585C Jones Co. WBS 48287.3.1 Div. 2 NC 41 at SR 1002 (Wyse Fork Road/Ten Mile Fork Road). SS-4902CY Initial Spot Safety construction funds are needed for actuated flasher installation and Stop Sign upgrades. File 02-18-53676C Kinston/ WBS 48286.3.1 Lenoir Co. US 70 Bus./258 Bus. (Vernon Avenue) at SR 1570 Div.2 (College Street); US 70 Bus./258 Bus. (Vernon SS-4902CX Carey Road; and US 70 Bus./258 Bus. (Vernon Greenbrier Road. Initial Spot Safety construction needed for traffic signal revisions. File 02-18-52800C Avenue) at Avenue) at funds are Greenville/ WBS 48288.3.1 Pitt Co. US 264 (Greenville Boulevard) at SR 1523 (Whichard Road). Div. 2 Initial Spot Safety construction funds are needed for offset right SS-4902CZ turn lane construction. File 02-18-51509C $38,000.00 $400,000.00 $35,000.00 $150,000.00 $135,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-2 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Pitt Co. WBS 48289.3.1 Div. 2 US 264 Alternate at SR 1139 (Moye-Turnage Road). SS-4902DA Initial Spot Safety construction funds are needed for intersection improvements. File 02-18-51660C Greenville/ WBS 48445.3.1 Pitt Co. SR 1707 (Charles Boulevard) 630' south of SR 1703 Div. 2 (14th Street). Initial Spot Safety construction funds are needed SS-4902DB for Rectangular Rapid Flashing Beacons installation at existing crosswalk. File 02-18-54508C Brunswick Co. WBS 48295.3.1 Div. 3 NC 904 (Seaside Road) and NC 179/SR 1163 SS-4903DX (Old Georgetown Road). Initial Spot Safety construction funds are needed for traffic signal revisions. File 03-18-48386C Brunswick Co. WBS 48297.3.1 Div. 3 SR 1115 (Stone Chimney Road/Old Ferry Connection) and SS-4903DZ SR 1119 (Stanley Road). Initial Spot Safety construction funds are needed for Stop Sign upgrades. File 03-18-53711 C New Hanover WBS 48290.3.1 Co. US 17 Business (3rd Street) at Castle Street. Initial Spot Safety Div. 3 construction funds are needed for traffic signal revisions and SS-4903DU High Visibility Crosswalk installation. File 03-18-48960C $253,000.00 $30,000.00 $16,000.00 $5,000.00 $133,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-3 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Wilmington/ WBS 48294.3.1 New Hanover US 17-76 (Dawson Street) and US 421 (3rd Street). Co. Initial Spot Safety construction funds are needed for traffic Div. 3 signal revisions. SS-4903DW File 03-18-52326C Sampson Co. WBS 48291.3.1 Div.3 US 13 at SR 1472 (Wrench Road). Initial Spot Safety SS-4903DV construction funds are needed for actuated flashing beacon installation. File 03-18-53721 C Sampson Co. WBS 48296.2.1 Div. 3 SR 1918 (Matthis Road) at SR 1919 (Old Warsaw Road). SS-4903DY Initial Spot Safety right of way and utilities funds are needed for actuated flasher installation with warning signs and sight distance improvements. File 03-17-47761 R Sampson Co. WBS 48296.3.1 Div. 3 SR 1918 (Matthis Road) at SR 1919 (Old Warsaw Road). SS-4903DY Initial Spot Safety construction funds are needed for actuated flasher installation with warning signs and sight distance improvements. File 03-17-47761 C Clayton/ WBS 48441.3.1 Johnston Co. US 70 Business at SR 1553 (Shotwell Road). Div. 4 Initial Spot Mobility construction funds are needed for right turn SM-5704B lane construction. File 04-18-52127C $12,000.00 $77,000.00 $36,000.00 $92,000.00 $229,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-4 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Clayton/ WBS 48441.1.1 Johnston Co. US 70 Business at SR 1553 (Shotwell Road). Div. 4 Initial Spot Mobility preliminary engineering funds are needed SM-5704B for right turn lane construction. File 04-18-52127P Clayton/ WBS 48441.2.1 Johnston Co. US 70 Business at SR 1553 (Shotwell Road). Div. 4 Initial Spot Mobility right of way and utilities funds are needed SM-5704B for right turn lane construction. File 04-18-52127R Johnston Co. WBS 48298.3.1 Div. 4 SR 1934 (Old Beulah Road) at SR 2127/2149 (Shoeheel Road). SS-4904ES Initial Spot Safety construction funds are needed for Stop Ahead sign and pavement marking installation, and channelization island installation. File 04-18-53496C Johnston Co. WBS 48299.3.1 Div. 4 SR 1700 (Covered Bridge Road) at SR 1720 SS-4904ET (Applewhite Road/Thanksgiving Fire Road). Initial Spot Safety construction funds are needed for All-Way Stop installation. File 04-18-53494C Nash Co. WBS 48300.3.1 Div.4 NC 58 at NC 97. Initial Spot Safety construction funds are SS-4904EU needed for left turn lane construction and traffic signal revisions. File 04-18-52619C $50,000.00 $471,000.00 $2,500.00 $35,000.00 $145,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-5 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Nash Co. WBS 48300.2.1 Div.4 NC 58 at NC 97. Initial Spot Safety construction funds are SS-4904EU needed for left turn lane right of way and utilities and traffic signal revisions. File 04-18-52619R Durham/ WBS 48301.3.1 Durham Co. NC 55 (Apex Highway) at I-40 Eastbound Exit Ramp Div.5 (Exit 278)/Park Forty Plaza. Initial Spot Safety construction SS-4905FM funds are needed for traffic signal revisions. File 05-18-53851 C Vance Co. WBS 48302.3.1 Div. 5 SR 1501 (Allison Cooper Road) at Fishing Creek Bridge. SS-4905FN Initial Spot Safety construction funds are needed for bridge guardrail installation. File 05-18-53853C Wake Co. WBS 48442.1.1 Div.5 NC 50 at SR 2711 (Buffaloe Road). Initial Spot Mobility SM-5705U preliminary engineering funds are needed for traffic signal installation. File 05-18-53889P Wake Co. WBS 48442.3.1 Div.5 NC 50 at SR 2711 (Buffaloe Road). Initial Spot Mobility SM-5705U construction funds are needed for traffic signal installation. File 05-18-53889C $40, 000.00 $25,000.00 $25,000.00 $5,000.00 $75,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-6 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Angier/ WBS 48303.2.1 Harnett Co. NC 55 (Raleigh Street) at SR 1441 (W. Williams Street). Div. 6 Initial Spot Safety right of way and utilities funds are needed for SS-4906DX concrete island installation. File 06-18-52382R Angier/ WBS 48303.3.1 Harnett Co. NC 55 (Raleigh Street) at SR 1441 (W. Williams Street). Div. 6 Initial Spot Safety construction funds are needed for concrete SS-4906DX island installation. File 06-18-52382C Alamance Co. WBS 48306.3.1 Div. 7 NC 62 at SR 2029/SR 2030. Initial Spot Safety construction SS-4907CK funds are needed for All-Way Stop installation and overhead flasher revisions. File 07-18-863C Greensboro/ WBS 48304.3.1 Guilford Co. US 29 at Lakeview Memorial Park Cemetery Entrance. Div. 7 Initial Spot Safety construction funds are needed for directional SS-4907C1 crossover construction. File 07-18-835C Guilford Co. WBS 48305.3.1 Div. 7 SR 2819 (McLeansville Road) and bridge 4000156 over SS-4907CJ Reedy Fork Creek. Initial Spot Safety construction funds are needed for bridge guardrail installation. File 07-18-839C $10, 000.00 $64,500.00 $110, 000.00 $300,000.00 $41,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-7 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Moore Co. WBS 48307.3.1 $10,000.00 Div. 8 SR 1803 (Vass Carthage Road) at SR 1802 (Niagara Carthage SS-4908BZ Road). Initial Spot Safety construction funds are needed for All- Way Stop installation. File 08-18-51364C Davidson Co. WBS 48309.3.1 Div. 9 SR 1232 (Odell Owen Road) approximately 441 feet north of SS-4909CG SR 1230. Initial Spot Safety construction funds are needed for guardrail installation. File 09-18-861 C Davidson Co. WBS 48311.2.1 Div. 9 SR 2097 (Mount Zion Church Road) at SR 2183 (Denton Road). SS-4909C1 Initial Spot Safety right of way and utilities funds are needed for post mounted Vehicle Entering when Flashing sign and flasher installation. File 09-18-921 R Davidson Co. WBS 48311.3.1 Div. 9 SR 2097 (Mount Zion Church Road) at SR 2183 (Denton Road). SS-4909C1 Initial Spot Safety construction funds are needed for post mounted Vehicle Entering when Flashing sign and flasher installation. File 09-18-921 C Winston- WBS 48443.3.1 Salem/ SR 3210 (Transou Road) at SR 1525 (Yadkinville Road). Forsyth Co. Initial Spot Mobility construction funds are needed for right turn Div. 9 lane construction and traffic signal revisions. SM-5709E File 09-18-534C $26,000.00 $26,000.00 $60,000.00 $245,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-8 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Winston- WBS 48443.1.1 Salem/ SR 3210 (Transou Road) at SR 1525 (Yadkinville Road). Forsyth Co. Initial Spot Mobility preliminary engineering funds are needed Div. 9 for right turn lane construction and traffic signal revisions. SM-5709E File 09-18-534P Winston- WBS 48443.2.1 Salem/ SR 3210 (Transou Road) at SR 1525 (Yadkinville Road). Forsyth Co. Initial Spot Mobility right of way and utilities funds are needed Div. 9 for right turn lane construction and traffic signal revisions. SM-5709E File 09-18-534R Kernersville/ WBS 48310.3.1 Forsyth Co. SR 2643 (Union Cross Road) at SR 2640 Div. 9 (Shields RoadNVhicker Road). Initial Spot Safety construction SS-4909CH funds are needed for traffic signal revisions. File 09-18-3897C Kernersville/ WBS 48310.2.1 Forsyth Co. SR 2643 (Union Cross Road) at SR 2640 Div. 9 (Shields Road/Whicker Road). Initial Spot Safety right of way SS-4909CH and utilities funds are needed for traffic signal revisions File 09-18-3897R Rowan Co. WBS 48308.3.1 Div. 9 SR 1503 (Grace Church Road) at SR 1506 (Shue Road). SS-4909CF Initial Spot Safety construction funds are needed for post mounted Vehicle Entering when Flashing sign and flasher installation. File 09-18-870C $30,000.00 $75,000.00 $45,000.00 $65,000.00 $60,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-9 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Rowan Co. WBS 48308.2.1 Div. 9 SR 1503 (Grace Church Road) at SR 1506 (Shue Road). SS-4909CF Initial Spot Safety right of way and utilities funds are needed for post mounted Vehicle Entering when Flashing sign and flasher installation. File 09-18-870R Pineville/ WBS 47843.3.1 Matthews/ US 74 signal system between US 601 (South) and Fowlers Monroe/ Secrest Road/Williams Road; NC 51, Polk Street, Carolina Mecklenburg/ Place Parkway and Park Road (Pineville signal system); and Union Cos. John Street, NC 51 and US 74 corridors (Matthews signal Div. 10 system). $580,000.00 in Spot Mobility construction funds has SM-5710D previously been approved for traffic signal system improvements. Additional funds are needed due to scope change. Scope needs to be revised to include additional traffic signal system improvements on numerous routes in Division 10. File 10-17-242-2 Pineville/ WBS 47843.1.1 Matthews/ US 74 signal system between US 601 (South) and Fowlers Monroe/ Secrest Road/Williams Road; NC 51, Polk Street, Carolina Mecklenburg/ Place Parkway and Park Road (Pineville signal system); and Union Cos. John Street, NC 51 and US 74 corridors (Matthews signal Div. 10 system). $120,000 in Spot Mobility preliminary engineering SM-5710D funds has previously been approved for traffic signal system improvements. $120,000.00 in Spot Mobility preliminary engineering funds has previously been approved for traffic signal system improvements. All funds will not be needed, therefore, reduce funds. File 10-17-242-1 Gastonia/ WBS 48314.3.1 Gaston Co. SR 2329 (Redbud Drive)/ SR 2446 (Hoffman Road) at SR 1255 Div. 12 (E. Hudson Boulevard). Initial Spot Safety construction funds SS-4912CV are needed for Be Prepared to Stop warning signs and flashers installation, radius revisions, and pavement marking upgrades. File 12-18-223C $26,000.00 $50,000.00 -$50,000.00 $197,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects L-10 According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Gastonia/ WBS 48314.2.1 Gaston Co. SR 2329 (Redbud Drive)/ SR 2446 (Hoffman Road) at SR 1255 Div. 12 (E. Hudson Boulevard). Initial Spot Safety right of way and SS-4912CV utilities funds are needed for Be Prepared to Stop warning signs and flashers installation, radius revisions, and pavement marking upgrades. File 12-18-223R Mooresville/ WBS 48313.3.1 Iredell Co. NC 150 at SR 1164/SR 2397 Div. 12 Drive/Overhead Bridge Road). SS-4912CU funds are needed for advance signs and beacons installation. File 12-18-224C (Oakridge Farm Hwy at Selma Initial Spot Safety construction Vehicle When Entering flashing Mooresville/ WBS 48313.2.1 Iredell Co. NC 150 at SR 1164/SR 2397 (Oakridge Farm Hwy at Selma Div. 12 Drive/Overhead Bridge Road). Initial Spot Safety right of way SS-4912CU and utilities funds are needed for advance Vehicle When Entering flashing signs and beacons installation. File 12-18-224R Lincoln Co Div. 12 SM-5712E WBS 48444.3.1 NC 73 and NC 16 funds are needed signal revisions. File 12-18-219C Business. Initial Spot Mobility construction for intersection improvements and traffic Lincoln Co. WBS 48444.1.1 Div. 12 NC 73 and NC 16 Business. Initial Spot Mobility preliminary SM-5712E engineering funds are needed for intersection improvements and traffic signal revisions. File 12-18-219P $3,000.00 $21,000.00 $1,000.00 $150,000.00 $60,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Spot Safety Improvement Projects and for Specific Spot Mobility Projects n Clay County to right of way and rumblestrips, and According to Executive Order No. 2 and G.S. 143B-350(g) the Board is requested to concur with staff recommendations and delegate authority to the Secretary to approve Funds for Specific Spot Safety and Spot Mobility Improvement Projects Town/ Project Estimated County Description Cost Division PROJ. CATEGORY Burke Co. WBS 48315.3.1 Div. 13 NC 126 from SR 1308 to SR 1281, near Nebo. SS-4913CW Initial Spot Safety construction funds are needed for guardrail installation. File 13-18-215C Burke Co. WBS 48315.2.1 Div. 13 NC 126 from SR 1308 to SR 1281, near Nebo. SS-4913CW Initial Spot Safety right of way and utilities funds are needed for guardrail installation. File 13-18-215R Clay/ WBS 48316.3.1 Macon Cos. US 64 from SR 1349 (western intersection) in Clay County to Div. 14 0.1 mile west of SR 1448. Initial Spot Safety construction funds SS-4914D0 are needed for rumblestripes, rumblestrips, and long life pavement marking installation. File 14-18-210C Clay/ WBS 48316.2.1 Macon Cos. US 64 from SR 1349 (western intersection) i Div. 14 0.1 mile west of SR 1448. Initial Spot Safety SS-4914D0 utilities funds are needed for rumblestripes, long life pavement marking installation. File 14-18-210R ITEM L SUMMARY 53 PROJECTS L-11 $35,000.00 $1,000.00 $280,000.00 $2,000.00 $4,458,000.00 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 1 Enhancement Town/ County/PROJ CATEGORY Northampton Co. E R-5600AA STATEWIDE Project Description 46305.3.58, STP-0095(055) I-95 Northampton Welcome Center. Funds are needed for landscape renovations. Urban Pasquotank Co. U-5942 REGIONAL 45861.2.1, STBG-0111(025) Elizabeth City Signal System Upgrades. Funds are needed for utilities. Bridge Martin Co. 55003.3.3, BRSTP-0125(006) B-5503 Replace Bridge #53 over Collie Creek on SR 1142 (Prison DIVISION Camp Road). Funds are needed for construction to replace bridge. Rural Martin Co. 38932.2.2, STP-1142(011) R-4705 SR 1142 (Prison Camp Road) from NC 903 to SR 1182 DIVISION (East College Road). Funds are needed for full right of way and utilities. December 6, 2018 M-1 Estimated Cost $470,000.00 Cost $376,000.00 Fed. $94,000.00 State $80,000.00 Cost $64,000.00 Fed. $16,000.00 State $2,050,000.00 Cost $1,640,000.00 Fed. $410,000.00 State $5,500,000.00 Cost $4,400,000.00 Fed. $1,100,000.00 State NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 2 Bridge Town/ County/PROJ CATEGORY Pitt Co. B-4605 DIVISION Project Description 38430.2.1, BRZ-1777(007) Replace Bridge #5 over Chicod Creek on SR 1777. Funds are needed for full right of way and utilities. December 6, 2018 M-2 Estimated Cost $10,000.00 Cost $8,000.00 Fed. $2,000.00 State NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 3 Urban Town/ Project County/PROJ Description CATEGORY New Hanover 34932.1.4, STP-1175(011) Co. SR 1175 (Kerr Avenue) at the US 74 (Martin Luther King, Jr. U-3338C Parkway) interchange in Wilmington. $1,000,000.00 has REGIONAL previously been approved for preliminary engineering. Additional funds are needed as requested. New Hanover 50113.1.2, NHP-0132(011) Co. NC 132 (College Road) from SR 1272 (New Centre Drive) to U-5702A US 117 (Shipyard Boulevard) in Wilmington. $1,000,000.00 STATEWIDE has previously been approved for preliminary engineering. Additional funds are needed as requested. New Hanover 50114.1.FS1, NHPP-0076(012) Co. NC 132 (College Road) at US 76 (Oleander Drive) in U-5704 Wilmington. $800,000.00 has previously been approved for STATEWIDE preliminary engineering. Additional funds are needed as requested. New Hanover 50115.1.FS1, NHPP-0074(159) Co. US 74 (Eastwood Road) at SR 1409 (Military Cuttoff Road). U-5710 $1,700,000.00 has previously been approved for preliminary STATEWIDE engineering. Additional funds are needed as requested. Bridge Brunswick Co. 45584.1.1, BRZ-1515(011) B-5629 Replace Bridge #40 over Mills Creek on SR 1515. DIVISION $100,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Duplin Co. 45587.1.2, BRZ-1828(001) B-5632 Replace Bridge #187 over Back Swamp on SR 1828. Funds DIVISION are needed for preliminary engineering. M-3 Estimated Cost $750,000.00 Cost $600,000.00 Fed. $150,000.00 State $200,000.00 Cost $160,000.00 Fed. $40,000.00 State $300,000.00 Cost $240,000.00 Fed. $60,000.00 State $1,000,000.00 Cost $800,000.00 Fed. $200,000.00 State $100,000.00 Cost $80,000.00 Fed. $20,000.00 State $100,000.00 Cost $80,000.00 Fed. $20,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 3 (Continued) Bridge Town/ County/PROJ CATEGORY Duplin Co B-5647 DIVISION Project Description 45602.1.2, BRZ-1135(011) Replace Bridge #52 over Rock Fish Creek on SR 1135. Funds are needed for preliminary engineering. Sampson Co. 46024.1.2, BRZ-1817(001) B-5310 Replace Bridge #188 over Ward Swamp on SR 1817. Funds DIVISION are needed for preliminary engineering. Safety Onslow Co. 50139.3.1, HSIP-0172(013) W-5602 NC 172 from the Camp Lejeune gate to NC 210. Funds are REGIONAL needed for construction based on the estimate from the 12- Month Tentative Letting List published October 12, 2018. Rural Brunswick Co. 41582.1.1, STP-0211(021) R-5021 NC 211 from SR 1500 (Midway Road) to NC 87. DIVISION $8,000,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. M-4 Estimated Cost $100,000.00 Cost $80,000.00 Fed. $20,000.00 State $100,000.00 Cost $80,000.00 Fed. $20,000.00 State $10,631,958.00 Cost $8,785,566.00 Fed. $1,846,392.00 State $2,500,000.00 Cost $2,000,000.00 Fed. $500,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 4 Bridge Town/ Project County/PROJ Description CATEGORY Wilson Co. 48193.2.1, BRZ-1339(006) B-5998 Replace Bridge #92 over Town Swamp on SR 1339. Funds DIVISION are needed for full right of way and utilities. Safety Halifax Co. 44850.3.13, HSIP-0043(030) W-5704M NC 43 / NC 561 at SR 1329 (Evans Road) and SR 1333 REGIONAL (Lynch Road). Funds are needed for construction to install all-way stop. M-5 Estimated Cost $53,000.00 Cost $42,400.00 Fed. $10,600.00 State $15,000.00 Cost $13,500.00 Fed. $1,500.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 5 Interstate Town/ Project County/PROJ Description CATEGORY Wake Co. 46307.1.1, NHP-0440(023) I-5870 I-440 / US 1 Improvement project from west of Ridge Road STATEWIDE to east of US 70 (Glenwood Avenue) in Raleigh. $2,000,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Wake Co. 53074.3.1, NHP-0040(084) I-5873 I-40 at the NC 54 interchange in Raleigh. Funds are needed REGIONAL for construction to improve interchange. Congestion Mitigation Wake Co. 43714.1.16, CMAQ-0503(035) C-56041D Higgins Greenway Phase 3, approximately 0.8 miles of EXEMPT greenway toward downtown Cary. Funds are needed for preliminary engineering. Wake Co. 43714.3.4, CMAQ-0520(056) C-56040B Raleigh Bike Share System. $1,381,682.00 has previously EXEMPT been approved for construction. Additional funds are needed for the installation of bike racks and equipment. M-6 Estimated Cost $1,000,000.00 Cost $800,000.00 Fed. $200,000.00 State $4,100,000.00 Cost $3,280,000.00 Fed. $820,000.00 State $15,000.00 Cost $10,500.00 Fed. $4,500.00 Local $97,388.00 Cost $77,910.00 Fed. $19,478.00 Local December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 5 (Continued) Urban Town/ Project County/PROJ Description CATEGORY Wake Co. 44796.3.2, STPDA-2768(003) U-5927A North Judd Parkway - SR 2768 / SR 5056 (North Judd DIVISION Parkway North East) from SR 3736 (Old Honeycutt Road) to SR 5056 and SR 1402 (East Broad Street). $1,686,300.00 has previously been approved for construction. Additional funds are needed per the supplemental local agreement to widen roadway to multi-lanes. Wake Co. 47899.1.1, STPDA-0520(121) U-6094 SR 1152 (Holly Springs Road) from east of NC 55 to Flint DIVISION Point Lane in Holly Springs. Funds are needed for preliminary engineering. Safety Divisionwide 44851.1.26, HSIP-OOSS(023) W-5705Z Upgrade guardrail end units along various Interstate and STATEWIDE National Highway System routes in Highway Division 5. Funds are needed for preliminary engineering. Wake Co. 44851.1.25, HSIP-1313(007) W-5705Y SR 1313 (Walnut Street) at SR 1349 (Dillard Drive) in Cary DIVISION Funds are needed for preliminary engineering. Municipal Bridge Wake Co. 50148.3.1, BRSTP-0520(053) B-5556 Replace Bridge #490 over Walnut Creek on Lake Dam Road DIVISION in Raleigh. $1,307,240.00 has previously been approved for construction. Additional funds are needed as requested to replace bridge. M-7 Estimated Cost $2,276,000.00 Cost $1,138,000.00 Fed. $138,000.00 State $1,000,000.00 Local $25,000.00 Cost $20,000.00 Fed. $5,000.00 Local $5,000.00 Cost $4,500.00 Fed. $500.00 State $25,000.00 Cost $22,500.00 Fed. $2,500.00 State $360,000.00 Cost $288,000.00 Fed. $72,000.00 Local December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 5 (Continued) Rural Town/ Project County/PROJ Description CATEGORY Wake Co. 37673.1.TA2, STP-0540(019) R-2721 Future NC 540 - Southern Wake Freeway / Triangle STATEWIDE Expressway Southeast Extension (Raleigh Outer Loop) from NC 55 South to US 401 South. $3,566,964.00 has previously been approved for preliminary engineering. Additional funds are needed to cover expenditures that have or will exceed the previously authorized budget. Wake Co. 35516.1.TA1, STP-0540(027) R-2828 Future NC 540 - Southern Wake Freeway / Triangle STATEWIDE Expressway Southeast Extension (Raleigh Outer Loop) from US 401 to I-40. $2,643,283.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Wake Co. 35516.1.TA2, STP-0540(020) R-2828 Future NC 540 - Southern Wake Freeway / Triangle STATEWIDE Expressway Southeast Extension (Raleigh Outer Loop) from US 401 to I-40. $7,735,734.00 has previously been approved for preliminary engineering. Additional funds are needed to cover expenditures that have or will exceed the previously authorized budget. Wake Co. 35517.1.TA1, STP-0540(021) R-2829 Future NC 540 - Eastern Wake Freeway / Triangle STATEWIDE Expressway Southeast Extension (Raleigh Outer Loop) from I-40 to the US 64 / US 264 Bypass south of Garner. $7,346,062.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. M-8 Estimated Cost $7,200,560.00 Cost $5,760,448.00 Fed. $1,440,112.00 State $2,000,000.00 Cost $1,600,000.00 Fed. $400,000.00 State $2,983,568.00 Cost $2,386,854.00 Fed. $596,714.00 State $2,000,000.00 Cost $1,600,000.00 Fed. $400,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 5 (Continued) Bicycle and Pedestrian Town/ Project County/PROJ Description CATEGORY Wake Co. 47291.1.1, TAP-0505(094) EB-5894 Black Creek Greenway Phases I, II and V from West DIVISION Dynasty Drive to Old Reedy Creek Road in Cary. $4,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Wake Co. 44111.3.15, STPDA-0505(085) U-55300A Sidewalk Overpass Project along SR 1348 (Trailwood Drive) DIVISION to fill sidewalk gaps between Thistledown Drive / SR 1572 (Main Campus Drive) and Canine Tech Way / SR 1355 (Lineberry Drive) and across I-40. $595,200.00 has previously been approved for construction. Additional funds are needed as requested to install sidewalks. M-9 Estimated Cost $5,000.00 Cost $4,000.00 Fed. $1,000.00 Local $528,000.00 Cost $264,000.00 Fed. $264,000.00 Local December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 6 Safety Town/ Project County/PROJ Description CATEGORY Cumberland 50138.3.171, HSIP-1108(019) Co. SR 1108 (Lakewood Drive) at SR 3670 (Middleton Court) W-5601 FN and SR 3671 (Lullwater Drive). Funds are needed for DIVISION construction to widen turn lanes. Rail Program Robeson Co. 44803.1.26, RR-1006(050) Z-5700FD Railway-Highway Grade Crossing Safety Project at SR 1006 DIVISION (Morgan J Road / Great Marsh Church Road) and CSX Crossing 629 584M in Rennert. $20,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. M-10 Estimated Cost $552,500.00 Cost $497,250.00 Fed. $55,250.00 State $10,000.00 Cost $9,000.00 Fed. $1,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 7 Congestion Mitigation Town/ Project County/PROJ Description CATEGORY Orange Co. 46289.1.1, CMS-0702(021) C-5181 Jones Creek Greenway Project to fill gaps between the EXEMPT Carrboro Upper Bolin Trail and Twin Creeks Greenway, and to implement a program to support on-vehicle trips to Morris Grove Elementary School. $80,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Bridge Caswell Co. 45681.1.2, BRZ-1710(008) B-5725 Replace Bridge #7 over Hyco Creek on SR 1710. Funds are DIVISION needed for preliminary engineering. Guilford Co. 45679.1.2, BRZ-1158(013) B-5723 Replace Bridge #54 over Richland Creek on SR 1158. DIVISION Funds are needed for preliminary engineering. Rail Program Guilford Co. 44803.1.41, RR-0710(038) Z-5700GC Railway-Highway Grade Crossing Safety Project at Ogden DIVISION Street and Norfolk Southern Crossing 713 784A in High Point. Funds are needed for preliminary engineering. M-11 Estimated Cost $84,000.00 Cost $67,200.00 Fed. $16,800.00 Local $100,000.00 Cost $80,000.00 Fed. $20,000.00 State $100,000.00 Cost $80,000.00 Fed. $20,000.00 State $40,000.00 Cost $36,000.00 Fed. $4,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 7 (Continued) Bicycle and Pedestrian Town/ Project County/PROJ Description CATEGORY Alamance Co. 47280.1.1, TAP-0087(042) EB-5884 NC 87 (South Main Street) from SR 2183 (Ivey Road) to DIVISION SR 2100 (East Gilbreath Street). Funds are needed for preliminary engineering. Orange Co. 50417.1.1, TAP-0708(107) EB-5721 Orange County Bicycle Route 1- from Cleland Drive to DIVISION Willow Drive in Chapel Hill. $71,200.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. M-12 Estimated Cost $55,200.00 Cost $44,160.00 Fed. $11,040.00 Local $31,000.00 Cost $24,800.00 Fed. $6,200.00 Local December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 9 Congestion Mitigation Town/ Project County/PROJ Description CATEGORY Rowan Co. 44008.3.10, CMS-0914(022) C-4908G Salisbury Mall Area Sidewalks - along US 70 (Statesville EXEMPT Boulevard) and US 601 (Jake Alexander Boulevard). Funds are needed for construction to install sidewalks. Safety Forsyth Co W-5709H DIVISION 44855.1.8, HSIP-4000(001) SR 4000 (University Parkway) at Cherry Street in Winston- Salem. Funds are needed for preliminary engineering. Rowan Co. 44855.1.5, HSIP-0153(007) W-5709E NC 153 (Rice Street) at SR 1197 (Cannon Farm Road) in REGIONAL China Grove. $100,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. M-13 Estimated Cost $388,000.00 Cost $310,400.00 Fed. $77,600.00 Local $100,000.00 Cost $90,000.00 Fed. $10,000.00 State $150,000.00 Cost $135,000.00 Fed. $15,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 10 Interstate Town/ Project County/PROJ Description CATEGORY Mecklenburg 50128.1.FS1, NHPP-077-1(220)29 Co. I-77 at the NC 73 interchange. $500,000.00 has previously I-5715 been approved for preliminary engineering. Additional funds STATEWIDE are needed as requested. Mecklenburg 52024.1.1, NHPP-0277(018) Co. I-277 / US 74 from I-77 to Brevard Street. $200,000.00 has I-5746 previously been approved for preliminary engineering. STATEWIDE Additional funds are needed as requested. Mecklenburg 50470.3.1, NHPIM-0485(050) Co. I-485 from Idlewild Road to US 74. $3,300,000.00 has I-5827 previously been approved for construction. Additional funds STATEWIDE are needed as requested for pavement rehabilitation. Congestion Mitigation Mecklenburg 43735.2.12, CMAQ-1001(082) Co. Lakeview Road Improvements - SR 2112 (Lakeview Road) C-5613H at SR 2110 (Reames Road) and along Lakeview Road from EXEMPT Beatties Ford Road to Reames Road in Charlotte. Funds are needed for full right of way and utilities. M-14 Estimated Cost $4,000,000.00 Cost $3,200,000.00 Fed. $800,000.00 State $1,900,000.00 Cost $1,520,000.00 Fed. $380,000.00 State $450,000.00 Cost $360,000.00 Fed. $90,000.00 State $2,777,778.00 Cost $1,000,000.00 Fed. $1,777,778.00 Local December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 10 (Continued) Bridge Town/ Project County/PROJ Description CATEGORY Union Co. 46091.1.FD1, BRZ-1681(003) B-5376 Replace Bridge #21 over Stewarts Creek on SR 1681. DIVISION $100,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Union Co. 46092.3.3, BRZ-2170(006) B-5377 Replace Bridge #157 over Pole Cat Creek on SR 2170 DIVISION Funds are needed for construction to replace bridge. Safety Stanly Co. 44856.3.20, HSIP-1494(003) W-5710T SR 1494 (West Main Street) from US 52 to Railroad Street DIVISION in Albemarle. Funds are needed for construction to install pedestrian crossings. Union Co. 44856.2.11, HSIP-0200(007) W-5710K NC 200 (Lancaster Highway) and SR 1128 (McWhorter REGIONAL Road / Tom Starnes Road). Funds are needed for full right of way and utilities. Union Co. 44856.2.12, HSIP-0016(062) W-5710L NC 16 (Providence Road) and Gray Byrum Road near REGIONAL Waxhaw. Funds are needed for full right of way and utilities. M-15 Estimated Cost $100,000.00 Cost $80,000.00 Fed. $20,000.00 State $675,000.00 Cost $540,000.00 Fed. $135,000.00 State $30,000.00 Cost $27,000.00 Fed. $3,000.00 State $75,000.00 Cost $67,500.00 Fed. $7,500.00 State $100,000.00 Cost $90,000.00 Fed. $10,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 11 Urban Town/ County/PROJ CATEGORY Caldwell Co U-4700CA REGIONAL Project Description 35993.2.5, NHP-0321(037) US 321 at SR 1160 (Mount Herman Road). Funds are needed for full right of way and utilities. Caldwell Co. 35993.2.9, NHP-0321(046) U-4700CB US 321 at SR 1809 / 1952 (Pine Mountain Road). Funds are STATEWIDE needed for full right of way and utilities. Caldwell Co. 35993.2.10, NHP-0321(045) U-4700CC US 321 at SR 1108 (Mission Road). Funds are needed for STATEWIDE full right of way and utilities. M-16 Estimated Cost $420,000.00 Cost $336,000.00 Fed. $84,000.00 State $500,000.00 Cost $400,000.00 Fed. $100,000.00 State $550,000.00 Cost $440,000.00 Fed. $110,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 12 Congestion Mitigation Town/ Project County/PROJ Description CATEGORY Gaston Co. 43728.1.2, CMAQ-2093(001) C-5606A Belmont Mount Holly Sidewalk Project - SR 2093 (Belmont EXEMPT Mount Holly Road) between the existing sidewalks at the Circle K Gas Station and Margaret Avenue. $22,307.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Enhancement Gaston Co. ER-5600LB DIVISION 46305.3.55, STBG-0085(049) I-85 at the US 274 interchange. Funds are needed for construction for landscaping. Bridge Lincoln Co. B-6042 REGIONAL 48327.1.1, NHPB-0150(047) Replace Bridge #26 over the Seaboard Air Line Railway on NC 150. Funds are needed for preliminary engineering. Safety Catawba Co. 44858.3.23, HSIP-0040(081) W-5712W US 321 from the Lincoln-Gaston County Line to I-40 and STATEWIDE including the I-40 interchange in Catawba County. Funds are needed for construction to upgrade guardrail end units. Cleveland Co. 44858.3.16, HSIP-0085(048) W-5712P I-85 from the South Carolina Line to Exit 17 and also US 74 STATEWIDE from I-85 to Harmon Road. Funds are needed for construction to upgrade guardrail end units. M-17 Estimated Cost $31,142.00 Cost $24,602.00 Fed. $6,540.00 Local $89,600.00 Cost $71,680.00 Fed. $17,920.00 State $100,000.00 Cost $80,000.00 Fed. $20,000.00 State $250,000.00 Cost $225,000.00 Fed. $25,000.00 State $250,000.00 Cost $225,000.00 Fed. $25,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 13 Interstate Town/ Project County/PROJ Description CATEGORY Buncombe 36030.1.2, IMNHF-026-1(086)9 Co. I-26 from NC 280 (Exit 40) to I-40 in Asheville. I-4700 $1,060,000.00 has previously been approved for preliminary STATEWIDE engineering. Additional funds are needed as requested for planning and environmental studies. Buncombe 36030.1.FS4, NHPP-026-1(198)3 Co. I-26 from NC 280 (Exit 40) to NC 146 / Long Shoals Road I-4700A (Exit 37). $750,000.00 has previously been approved for STATEWIDE preliminary engineering. Additional funds are needed as requested. Buncombe 36030.1.FS3, NHPP-026-1(199)6 Co. I-26 from NC 146 / Long Shoals Road (Exit 37) to I-40. I-4700B $750,000.00 has previously been approved for preliminary STATEWIDE engineering. Additional funds are needed as requested. Burke Co. 41497.2.1, IMF-0401(184)111 I-5008 I-40 at SR 1734 / SR 1826 (Exit 111). Funds are needed for REGIONAL full right of way and utilities. Burke Co. 53075.2.1, NHP-0040(045) I-5874 I-40 at SR 1142 / Jamestown Road (Exit 100). Funds are REGIONAL needed for full right of way and utilities. National Highway Burke Co. I-5875 REGIONAL 53076.2.1, NHP-0040(046) I-40 at SR 1712 (Drexel Road). Funds are needed for full right of way and utilities. M-18 Estimated Cost $4,200,000.00 Cost $3,360,000.00 Fed. $840,000.00 State $1,200,000.00 Cost $960,000.00 Fed. $240,000.00 State $3,500,000.00 Cost $2,800,000.00 Fed. $700,000.00 State $4,595,000.00 Cost $3,676,000.00 Fed. $919,000.00 State $1,740,000.00 Cost $1,392,000.00 Fed. $348,000.00 State $3,620,000.00 Cost $2,896,000.00 Fed. $724,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 13 (Continued) Safety Town/ Project County/PROJ Description CATEGORY Rutherford 44861.3.18, HSIP-0221(049) Co. US 221 Alternate from the South Carolina Line to SR 2018 W-5713R (Old Main Street) near Cliffside. Funds are needed for REGIONAL construction to install guardrails. Bicycle and Pedestrian Burke Co. 45972.1.1, STBGDA-OOOS(916) EB-5827 Fonta Flora Trail Extension - from Laurel Ridge Court and DIVISION North Powerhouse Road to the proposed Trailhead at Harris Whisnant Road and Cobb Road in Burke County. Funds are needed for preliminary engineering. M-19 Estimated Cost $785,000.00 Cost $706,500.00 Fed. $78,500.00 State $300,000.00 Cost $240,000.00 Fed. $60,000.00 Local December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 14 Interstate Town/ Project County/PROJ Description CATEGORY Henderson 34232.1.1, NHF-26-1(62)23 Co. I-26 from NC 225 (US 25 Connector) to NC 280. I-4400 $8,583,193.54 has previously been approved for preliminary STATEWIDE engineering. Additional funds are needed as requested for planning and environmental studies. Henderson 34232.1.5, NHP-0026(016) Co. I-26 at the US 64 (Exit 49) interchange. $1,000,000.00 has I-4400BA previously been approved for preliminary engineering. STATEWIDE Additional funds are needed as requested. Henderson 34232.1.FS4, NHPP-026-1(200)13 Co. I-26 from US 25 Business (Exit 44) to NC 280 (Exit 40). I-4400C $750,000.00 has previously been approved for preliminary REGIONAL engineering. Additional funds are needed as requested. Enhancement Cherokee Co. 46305.3.57, STBG-0074(219) ER-5600NB US 74 Site Development in Murphy. Funds are needed for REGIONAL construction for landscaping. Urban Haywood Co. 47166.3.1, STBGDA-0110(013) U-6055 NC 110 (Pisgah Drive) at Locust Street. Funds are needed EXEMPT for construction to improve intersection. Haywood Co. 47166.2.1, STBGDA-0110(013) U-6055 NC 110 (Pisgah Drive) at Locust Street. EXEMPT previously been approved for right of Additional funds are needed as requested. $221,000.00 has way and utilities. M-20 Estimated Cost $4,000,000.00 Cost $3,200,000.00 Fed. $800,000.00 State $1,800,000.00 Cost $1,440,000.00 Fed. $360,000.00 State $2,200,000.00 Cost $1,760,000.00 Fed. $440,000.00 State $320,000.00 Cost $256,000.00 Fed. $64,000.00 State $800,000.00 Cost $640,000.00 Fed. $160,000.00 State $550,000.00 Cost $440,000.00 Fed. $110,000.00 State December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Division 14 (Continued) Rural Town/ Project County/PROJ Description CATEGORY Cherokee Co. 44999.1.1, NHP-0074(196) R-5803 US 74 at the end of the divided highway in Cherokee County REGIONAL to the beginning of the divided highway in Almond. $545,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Divisionwide 44910.3.5, TAP-1420(009) R-5794C ADA ramps (Americans with Disabilities Act) for areas with a DIVISION population < 5,000. $735,000.00 has previously been approved for construction. Additional funds are needed as requested to construct concrete curb ramps and retrofitting existing ramps. Henderson 34473.1.3, STP-0191(014) Co. NC 191 from SR 1381 (Mountain Road) to NC 280 just R-2588B south of Mills River. $1,560,000.00 has previously been DIVISION approved for preliminary engineering. Additional funds are needed as requested. Jackson Co. 45818.1.FR1, STP-0107(013) R-5600 NC 107 from NC 116 to US 23 Business and US 23 REGIONAL Business from SR 1432 (Skyland Drive) to Municipal Drive in Sylva. $2,550,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Swain Co. 32572.1.FS10, APD-0074(178) A-0009 Future US 74 Corridor "K" from US 19 / US 74 / US 129 in EXEMPT Andrews to NC 28 east of Almond. $500,000.00 has previously been approved for preliminary engineering. Additional funds are needed as requested. Bicycle and Pedestrian Haywood Co. 47631.1.1, STBGDA-0019(060) EB-5926 US 19 (Soco Road) from US 276 to Fie Top Road in Maggie DIVISION Valley. Funds are needed for preliminary engineering. M-21 Estimated Cost $900,000.00 Cost $720,000.00 Fed. $180,000.00 State $170,000.00 Cost $136,000.00 Fed. $34,000.00 State $2,000,000.00 Cost $1,600,000.00 Fed. $400,000.00 State $150,000.00 Cost $120,000.00 Fed. $30,000.00 State $450,000.00 Cost $450,000.00 Fed. $175,000.00 Cost $140,000.00 Fed. $35,000.00 Local December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Funds for Specific Federal - Aid Projects Statewide Rail Program M-22 Town/ Project Estimated County/PROJ Description Cost CATEGORY Statewide 44806.1.1, RR-OOSS(024) $500,000.00 Cost Z-5800 Railway-Highway Grade Crossing Safety Projects at various $450,000.00 Fed. DIVISION locations across North Carolina. Funds are needed for $50,000.00 State REGIONAL preliminary engineering. STATEWIDE ITEM M SUMMARY - 81 PROJECT(S) -(TOTAL FEDERAL AND STATE) $92,087,758.00 December 6, 2018 ITEM N HIGHWAY PROGRAM STIP ADDITIONS DIVISION 9 * EB-5952 FAIRLAWN DRIVE, NC 67 (REYNOLDA ROAD) TO SR ENGINEERING FORSYTH 1528 (SILAS CREEK PKWY) IN WINSTON-SALEM. PROJ.CATEGORY CONSTRUCT SIDEWALK. RIGHT-OF-WAY DIVISION PROJECT ADDED AT REQUEST OF MPO. CONSTRUCTION * EB-5953 SR 4000 (UNIVERSITY PARKWAY), SR-1686 FORSYTH (SHATTALON DRIVE) TO ROBIN WOOD LANE IN PROJ.CATEGORY WINSTON-SALEM. CONSTRUCT SIDEWALK. DIVISION PROJECT ADDED AT REQUEST OF MPO. * EB-5954 GRIFFITH ROAD, KIMWELL DRIVE TO BURKE MILL FORSYTH ROAD IN WINSTON-SALEM. CONSTRUCT SIDEWALK. PROJ.CATEGORY PROJECT ADDED AT REQUEST OF MPO. DIVISION * EB-5955 SR 1348 (ROBINHOOD ROAD), SPEAKS FARM ROAD TO FORSYTH MUDDY CREEK GREENWAY IN WINSTON-SALEM. PROJ.CATEGORY CONSTRUCT SIDEWALK. DIVISION PROJECT ADDED AT REQUEST OF MPO. * EB-5956 SR 1992 (SULLIVANTOWN ROAD), US 311 AT HARLEY FORSYTH DRIVE TO WALKERTOWN HIGH/MIDDLE SCHOOL IN PROJ.CATEGORY WALKERTOWN. INSTALL BICYCLE AND PEDESTRIAN DIVISION FACILITIES AND CONSTRUCT SIDEWALK. PROJECT ADDED AT REQUEST OF MPO. * INDICATES FEDERAL AMENDMENT ENGINEERING CONSTRUCTION ENGINEERING RIGHT-OF-WAY CONSTRUCTION ENGINEERING RIGHT-OF-WAY CONSTRUCTION ENGINEERING RIGHT-OF-WAY CONSTRUCTION FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - $79,000 $20,000 $198,000 $50,000 $593,000 $148,000 $1,088,000 $76,000 $19,000 $508,000 $127,000 $730,000 (STBG) (L) (STBG) (L) (STBGDA) (L) (STBG) (L) (STBG) (L) FY 2019 - $181,000 (STBG) FY 2019 - $45,000 (L) FY 2019 - $34,000 (STBG) FY 2019 - $8,000 (L) FY 2019 - $1,296,000 (STBG) FY 2019 - $324,000 (L) $1,888,000 FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - $56,000 $14,000 $53,000 $13,000 $376,000 $94,000 $606,000 (STBG) (L) (STBG) (L) (STBG) (L) FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - $56,000 $14,000 $8,000 $2,000 $440,000 $110,000 $630,000 (STBG) (L) (STBG) (L) (STBGDA) (L) Thursday, December 06, 2018 1 ITEM N HIGHWAY PROGRAM STIP ADDITIONS DIVISION 9 * EB-5957 SR 2648 (OLD WINSTON ROAD), EXISTING SIDEWALK ENGINEERING FY 2019 - FORSYTH ACROSS FROM SEVENTH DAY ADVENTIST CHURCH FY 2019 - PROJ.CATEGORY PARKING LOT TO HOPKINS ROAD IN KERNERSVILLE. RIGHT-OF-WAY FY 2020 - DIVISION CONSTRUCT SIDEWALK ON SOUTH SIDE. FY 2020 - PROJECT ADDED AT REQUEST OF MPO. CONSTRUCTION FY 2021 - FY 2021 - * EB-5958 BERMUDA RUN, TWINS WAY (NEAR INTERSECTION FORSYTH WITH US-158) WEST TO PEDESTRIAN TUNNEL UNDER I- PROJ.CATEGORY 40 IN BERMUDA RUN. CONSTRUCT PORTION OF BLUE DIVISION HERON TRAIL. PROJECT ADDED AT REQUEST OF MPO. ENGINEERING CONSTRUCTION FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - * EB-5959 SR 3000 (IDOLS ROAD), SR 1103 (MIDDLEBROOK FORSYTH DRIVE) TO TANGLEWOOD PARK ROAD IN CLEMMONS. PROJ.CATEGORY CONSTRUCT SIDEWALK. DIVISION PROJECT ADDED AT REQUEST OF MPO. * U-6154 SR 1308 (LEWISVILLE-VIENNA ROAD), AT SR 1348 FORSYTH (ROBINHOOD ROAD) IN LEWISVILLE. CONVERT PROJ.CATEGORY EXISTING SIGNALIZED INTERSECTION TO A SINGLE DIVISION LANE ROUNDABOUT. PROJECT ADDED AT REQUEST OF MPO. * U-6155 SR 1725 (UNIVERSITY PKWY), AT INTERSECTION WITH FORSYTH COLISEUM DRIVE IN WINSTON-SALEM. CONSTRUCT PROJ.CATEGORY INTERSECTION IMPROVEMENTS FOR PEDESTRIAN DIVISION SAFETY. PROJECT ADDED AT REQUEST OF MPO. * INDICATES FEDERAL AMENDMENT ENGINEERING CONSTRUCTION ENGINEERING RIGHT-OF-WAY CONSTRUCTION ENGINEERING CONSTRUCTION FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2020 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2021 - FY 2021 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - $29,000 $7,000 $29,000 $7,000 $186,000 $46,000 $304,000 $189,000 $47,000 $1,263,000 $217,000 $2,000 $371,000 $2,089,000 $88,000 $22,000 $202,000 $516,000 $179,000 $1,007,000 $96,000 $24,000 $200,000 $50,000 $720,000 $180,000 $1,270,000 $60,000 $15,000 $65,000 $50,000 $60,000 $250,000 (STBG) (L) (STBG) (L) (STBGDA) (L) (STBG) (L) (STBG) (STBGDA) (TAPDA) (L) (STBGDA) (L) (STBG) (STBGDA) (L) (STBG) (L) (STBG) (L) (STBGDA) (L) (STBG) (L) (STBG) (HSIP) (L) Thursday, December 06, 2018 2 ITEM N HIGHWAY PROGRAM STIP ADDITIONS DIVISION 10 * U-57036 UNION PROJ.CATEGORY STATEWIDE US 74 (ROOSEVELT BLVD), REALIGN JAMES HAMILTON RIGHT-OF-WAY FY 2019 - $500,000 (T) ROAD TO INTERSECT WITH SR 1514 (ROCKY RIVER CONSTRUCTION FY 2020 - $650,000 (T) ROAD) AT MYERS ROAD. $1,150,000 ADD RIGHT-OF-WAY IN FY 19 NOT PREVIOUSLY PROGRAMMED. DIVISION 11 * I-6050 I-74 & I-77, I-74 & I-77 INTERCHANGES/RAMPS SURRY PROJECT ADDED AT REQUEST OF DIVISION. PROJ.CATEGORY STATEWIDE DIVISION 13 * EB-5547B BUNCOMBE PROJ.CATEGORY DIVISION CONSTRUCTION FY 2019 - $1,000,000 (NHPIM) $1,000,000 BLACK MOUNTAIN RIVERWALK GREENWAY, ENGINEERING FY 2019 - CONSTRUCT MULTI-USE PATH FROM BLACK FY 2019 - MOUNTAIN AVENUE TO THE INTO THE OAKS TRAIL. CONSTRUCTION FY 2020 - ADD CONSTRUCTION IN FY 20 NOT PREVIOUSLY FY 2020 - PROGRAMMED AT REQUEST OF MPO STIP MODIFICATIONS DIVISION 1 R-5740 SR 1329 (WOODVILLE ROAD), SR 1331 (RED BANK PERQUIMANS ROAD) TO SR 1300 (NEW HOPE ROAD). UPGRADE PROJ.CATEGORY ROADWAY. DIVISION PROJECT TO UTILIZE BUILD NC BONDS * INDICATES FEDERAL AMENDMENT BUILD NC CONST CONSTRUCTION FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2019 - $110,000 $28,000 $600,000 $150,000 $888,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $1,716,000 $800,000 $7,235,000 (STBGDA) (L) (STBGDA) (L) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) Thursday, December 06, 2018 3 ITEM N HIGHWAY PROGRAM DIVISION 2 R-3403B CRAVEN PROJ.CATEGORY REGIONAL STIP MODIFICATIONS US 17, SR 1433 (ANTIOCH ROAD) TO NC 43 RIGHT-OF-WAY COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. UTILITIES BUILD NC CONST CONSTRUCTION R-4463A CRAVEN PROJ.CATEGORY REGIONAL NC 43 CONNECTOR, US 17 TO SOUTH OF US 70. RIGHT-OF-WAY PROJECT TO UTILIZE BUILD NC BONDS UTILITIES BUILD NC CONST CONSTRUCTION R-5777C CRAVEN PROJ.CATEGORY STATEWIDE US 70, THURMAN ROAD TO HAVELOCK BYPASS. RIGHT-OF-WAY UPGRADE ROADWAY TO FREEWAY AND CONSTRUCT UTILITIES SERVICE ROADS. CONSTRUCTION ACCELERATE RIGHT-OF-WAY FROM PY TO FY 20 AND CONSTRUCTION FROM PY TO FY 20 TO EXPEDITE DELIVERY OF NEW STI PROJECT DUE TO RECENT AWARD OF FEDERAL INFRA GRANT. * INDICATES FEDERAL AMENDMENT FY 2020 - FY 2021 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2019 - FY 2019 - FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2019 - $3,400,000 $3,400,000 $450,000 $450,000 $1,373,000 $1,373,000 $1,373,000 $1,373,000 $1,373,000 $1,373,000 $1,373,000 $1,373,000 $9,611,000 $6,340,000 $6,340,000 $6,340,000 $6,340,000 $6,340,000 $59,995,000 $1,225,000 $500,000 $472,000 $472,000 $472,000 $472,000 $472,000 $472,000 $472,000 $472,000 $472,000 $472,000 $472,000 $1,888,000 $500,000 $9,305,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) FY 2020 - $28,500,000 (T) FY 2020 - $1,100,000 (T) FY 2020 - $6,175,000 (T) FY 2021 - $39,108,000 (T) FY 2022 - $39,108,000 (T) FY 2023 - $39,109,000 (T) $153,100,000 Thursday, December 06, 2018 4 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 2 R-5813 US 70, SR 1227 (JIM SUTTON ROAD)/SR 1252 (WILLIE LENOIR MEASLEY ROAD). CONSTRUCT AT GRADE PROJ.CATEGORY INTERSECTION TO INTERCHANGE REGIONAL COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. * U-2817 SR 1700 (EVANS STREETI OLD TAR ROAD), SR 1711 PITT (WORTHINGTON ROAD) IN WINTERVILLE TO US 264 PROJ.CATEGORY ALTERNATE (GREENVILLE BOULEVARD) IN DIVISION GREENVILLE. WIDEN TO MULTI-LANES. U-5860 BEAUFORT PROJ.CATEGORY DIVISION DIVISION 3 AV-5739 BRUNSWICK PROJ.CATEGORY DIVISION * B-5981 DUPLIN PROJ.CATEGORY STATEWIDE COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. RIGHT-OF-WAY FY 2022 - $14,930,000 UTILITIES FY 2022 - $2,191,000 CONSTRUCTION FY 2024 - $8,208,000 FY 2025 - $8,208,000 FY 2026 - $8,208,000 FY 2027 - $8,208,000 $49,953,000 RIGHT-OF-WAY UTILITIES CONSTRUCTION FY 2019 - FY 2020 - FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - $22,500,000 $22,500,000 $1,150,000 $1,150,000 $8,575,000 $8,575,000 $8,575,000 $8,575,000 $81,600,000 SR 1306 (15TH STREET), US 17 BUSINESS (CAROLINA RIGHT-OF-WAY FY 2024 - AVENUE) TO BROWN STREET. WIDEN TO MULTI- CONSTRUCTION FY 2026 - LANES. FY 2027 - TO ALLOW ADDITIONAL TIME FOR PLANNING AND FY 2028 - DESIGN, DELAY RIGHT-OF-WAY FROM FY 18 TO FY 24 AND CONSTRUCTION FROM FY 19 TO FY 26. CAPE FEAR REGIONAL (SUT), APPROACH CLEARING CONSTRUCTION FY 2019 - AT RUNWAY 5 AND RUNWAY 23. TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 16 TO FY 19. $5,885,000 $3,203,000 $3,203,000 $3,203,000 $15,494,000 (T) (T) (T) (T) (T) (T) (STBG) (STBG) (STBG) (STBG) (STBG) (STBG) (STBG) (STBG) (T) (T) (T) (T) $170,000 (T) $170,000 US 117 NBL, REPLACE BRIDGE 300016 OVER CSX RIGHT-OF-WAY FY 2021 - $443,000 (STBG) RAILROAD. BRIDGE PRESERVATION OF BRIDGE 300017 CONSTRUCTION FY 2022 - $5,052,000 (STBG) OVER CSX. $5,495,000 MODIFY PROJECT SCOPE, FUNDING AMOUNTS, AND SCHEDULE. * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 5 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 3 * U-3338C SR 1175 (KERR AVENUE), SR 1175 (KERR AVENUE) RIGHT-OF-WAY FY 2019 - $3,912,000 (STBG) NEW HANOVER INTERCHANGE AT US 74 (MLK, JR. PARKWAY). CONSTRUCTION FY 2020 -$20,500,000 (STBG) PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% $24,412,000 REGIONAL THRESHOLDS. U-5932 US 17, NC 211. CONVERT INTERSECTION TO BRUNSWICK INTERCHANGE. PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% STATEWIDE THRESHOLDS. RIGHT-OF-WAY UTILITIES CONSTRUCTION FY 2022 - FY 2023 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - $10,000,000 $10,000,000 $5,200,000 $5,200,000 $6,667,000 $6,667,000 $6,666,000 $50,400,000 (T) (T) (T) (T) (T) (T) (T) DIVISION 4 B-5947 NC 581, REPLACE BRIDGE 630091 OVER TAR RIVER. NASH ACCELERATE RIGHT-OF-WAY FROM FY 25 TO FY 20 PROJ.CATEGORY AND CONSTRUCTION FROM FY 26 TO FY 21. REGIONAL RIGHT-OF-WAY FY 2020 - CONSTRUCTION FY 2021 - FY 2022 - FY 2023 - $400,000 $2,667,000 $2,667,000 $2,667,000 $8,401,000 (T) (T) (T) (T) P-5711A CSX A LINE, CCX INTERMODAL TERMINAL AND TRACK CONSTRUCTION FY 2019 -$50,000,000 (T) EDGECOMBE IMPROVEMENTS. FY 2020 - $43,100,000 (T) PROJ.CATEGORY MODIFYPROJECTSCOPEANDFUNDINGAMOUNTS. $93,100,000 STATEWIDE R-38256 NC 42, EAST OF SR 1902 (GLEN LAUREL ROAD) TO SR CONSTRUCTION FY 2019 -$22,200,000 (T) JOHNSTON 1003 (BUFFALOE ROAD). FY 2020 -$22,200,000 (T) PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% FY 2021 -$22,200,000 (T) DIVISION THRESHOLDS. $66,600,000 * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 6 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 4 U-3609B US 13 (BERKELEY BOULEVARD), SR 1003 (NEW HOPE BUILD NC ROW WAYNE ROAD) TO SR1572 (SAULSTON ROAD). PROJ.CATEGORY TO ALLOW ADDITIONAL TIME FOR PLANNING AND REGIONAL DESIGN DELAY RIGHT-OF-WAY FROM FY 19 TO FY 20. DIVISION 5 G5183B DURHAM PROJ.CATEGORY EXEMPT RIGHT-OF-WAY UTILITIES CONSTRUCTION SR 1945 (S. ALSTON AVE.), SR 1171 (RIDDLE RD.) TO CONSTRUCTION CAPPS ST. TO ALLOW ADDITIONAL TIME FOR RIGHT OF WAY, UTILITIES AND FINAL DESIGN DELAY CONSTRUCTION FROM FY 18 TO FY 19, AT REQUEST OF MPO. * EB-5895 NC 55 (EAST WILLIAMS STREET), SR 1301 (SUNSET WAKE LAKE ROAD) TO NC 55 IN HOLLY SPRINGS. PROJ.CATEGORY CONSTRUCT SIDEWALK. DIVISION TO REFLECT CURRENT PROJECT DELIVERY SCOPE AND SCHEDULE, ADD RIGHT OF WAY IN FY 19 AND DELAY CONSTRUCTION FROM FY 19 TO FY 20 AT THE REQUEST OF TOWN AND MPO. * INDICATES FEDERAL AMENDMENT RIGHT-OF-WAY CONSTRUCTION FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2020 - FY 2020 - FY 2021 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $2,575,000 $1,750,000 $1,750,000 $1,750,000 $5,875,000 $5,875,000 $5,875,000 $5,875,000 $36,475,000 $644,360 $161,090 $805,450 $80,000 $20,000 $400,000 $100,000 $600,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (CMAQ) (L) (TAP) (L) (TAP) (L) Thursday, December 06, 2018 7 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 5 * I-5870 I-440 / US 1, WEST OF RIDGE ROAD TO EAST OF US 70 RIGHT-OF-WAY WAKE (GLENWOOD AVENUE) IN RALEIGH. CONSTRUCT NEW UTILITIES PROJ.CATEGORY INTERCHANGE AT RIDGE ROAD TO CONNECT WITH CONSTRUCTION STATEWIDE CRABTREE VALLEY AVENUE, REALIGN I-440 / US 1 INTERCHANGE WITH US 70 (GLENWOOD AVENUE), REALIGN AND WIDEN CRABTREE VALLEY AVENUE BETWEEN SR 3009 (EDWARDS MILL ROAD) AND RIDGE ROAD, AND REPLACE BRIDGE 910494 OVER CRABTREE CREEK ON SR 1670 (BLUE RIDGE ROAD). COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. * P-5717 DURHAM PROJ.CATEGORY REGIONAL FY 2022 - $115,000,000 (T) FY 2022 - $1,200,000 (T) FY 2022 - $5,325,000 (T) FY 2023 - $25,294,000 (T) FY 2024 - $25,294,000 (T) FY 2025 - $50,587,000 (T) $222,700,000 NORFOLK SOUTHERN H LINE, CROSSING 734742W AT RIGHT-OF-WAY FY 2019 - SR 1121 (CORNWALLIS ROAD) IN DURHAM. CONSTRUCTION FY 2020 - CONSTRUCT GRADE SEPARATION. FY 2020 - COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. R-5705B NC 55, NC 210 TO SR 4809 (JICARILLA LANE). PART ON HARNETT NEW LOCATION. WAKE MODIFY PROJECT SCOPE AND FUNDING AMOUNTS. PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% REGIONAL THRESHOLDS. $2,500,000 (T) $15,600,000 (T) $500,000 (0) $18,600,000 RIGHT-OF-WAY FY 2020 - $2,685,000 (T) UTILITIES FY 2020 - $355,000 (T) CONSTRUCTION FY 2022 - $12,466,000 (T) FY 2023 - $12,466,000 (T) FY 2024 - $12,466,000 (T) $40,438,000 R-5705C NC 55, SR 4809 (JICARILLA LANE) TO NC 42 IN FUQUAY- RIGHT-OF-WAY POST YR- $6,800,000 (T) WAKE VARINA. UTILITIES POST YR- $900,000 (T) MODIFYPROJECT SCOPE AND FUNDING AMOUNTS. CONSTRUCTION POST YR- $17,900,000 (T) $25,600,000 * U-2901 B NC 55 (WILLIAMS STREET), US 1 TO NORTH OF SR 1160 RIGHT-OF-WAY FY 2019 - $770,000 (T) WAKE (OLIVE CHAPEL ROAD). CONVERT EXISTING UTILITIES FY 2019 - $93,000 (T) PROJ.CATEGORY MULTILANES TO MEDIAN DIVIDED SECTION AND CONSTRUCTION FY 2021 -$23,100,000 (T) REGIONAL WIDEN REMAINING 2-LANE SECTIONS TO MULTILANES. $23,963,000 COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 8 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 5 U-4916 SR 1165 (BECKFORD DRIVE), HARRISON STREET TO VANCE NORTH PARK DRIVE IN HENDERSON. WIDEN TO PROJ.CATEGORY THREE LANES WITH CURB AND GUTTER, STORM TRANSITION DRAINAGE, AND SIDEWALKS. TO ALLOW CITYADDITIONAL TIME TO COMPLETE FINAL DESIGN, DELA Y CONSTRUCTION FROM FY 18 TO FY 19. CONSTRUCTION FY 2019 - $679,000 (HP) FY 2019 - $170,000 (L) $849,000 U-5302 US 401, SOUTH OF SR 1006 (OLD STAGE ROAD) TO RIGHT-OF-WAY WAKE SOUTH OF SR 2538 (MECHANICAL BOULEVARD) I BUILD NC CONST PROJ.CATEGORY GARNER STATION BOULEVARD IN GARNER. CONVERT REGIONAL TO SUPERSTREET. REVISE TERMINI AT REQUEST OF DIVISION TO REFLECT CURRENT DOCUMENT SCOPE. * U-5745 NC 751 (HOPE VALLEY ROAD), SR 1183 (UNIVERSITY DURHAM DRIVE) INTERSECTION IN DURHAM. CONSTRUCT PROJ.CATEGORY ROUNDABOUT. REGIONAL PROJECT TO UTILIZE BUILD NC BONDS U-5747A WAKE PROJ.CATEGORY DIVISION CONSTRUCTION FY 2019 - $850,000 FY 2020 - $515,000 FY 2021 - $515,000 FY 2022 - $515,000 FY 2023 - $515,000 FY 2024 - $515,000 FY 2025 - $515,000 FY 2026 - $515,000 FY 2027 - $515,000 FY 2028 - $515,000 FY 2029 - $515,000 POST YR- $2,575,000 FY 2020 - $7,200,000 $15,775,000 BUILD NC CONST FY 2019 - $86,000 FY 2020 - $86,000 FY 2021 - $86,000 FY 2022 - $86,000 FY 2023 - $86,000 FY 2024 - $86,000 FY 2025 - $86,000 FY 2026 - $86,000 FY 2027 - $86,000 FY 2028 - $86,000 FY 2029 - $86,000 POST YR- $344,000 $1,290,000 SR 1635 (MCCRIMMON PARKWAY), SR 1613 (DAVIS RIGHT-OF-WAY DRIVE) TO NORTH OF SR 1637 (CHURCH STREET) IN UTILITIES MORRISVILLE. WIDEN TO 4-LANE DIVIDED FACILITY. CONSTRUCTION TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY RIGHT-OF-WAY FROM FY 19 TO FY 20. * INDICATES FEDERAL AMENDMENT FY 2020 - $2,000,000 FY 2020 - $500,000 FY 2021 - $3,500,000 FY 2022 - $3,500,000 FY 2023 - $3,500,000 $13,000,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) Thursday, December 06, 2018 9 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 5 U-5747B NC 54, SR 1635 (MCCRIMMON PARKWAY) IN BUILD NC ROW WAKE MORRISVILLE. CONVERT AT-GRADE INTERSECTION PROJ.CATEGORY TO GRADE SEPARATION, INCLUDING GRADE REGIONAL SEPARATION OF NORTH CAROLINA RAILROAD. TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY RIGHT-OF-WAY FROM FY 19 TO FY 20. DIVISION 6 * EB-5800 CUMBERLAND PROJ.CATEGORY DIVISION * I-5850B ROBESON PROJ.CATEGORY STATEWIDE I-59386 ROBESON PROJ.CATEGORY STATEWIDE RIGHT-OF-WAY UTILITIES CONSTRUCTION FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2020 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - SR 2251 (OWEN DRIVE), US 301 TO SR 1007 (ALL CONSTRUCTION FY 2019 - AMERICAN EXPRESSWAY). CONSTRUCT SIDEWALK FY 2019 - ON EAST SIDE. TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN, DELAY CONSTRUCTION FROM FY 18 TO FY 19. I-95, PAVEMENT REHABILITATION COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $515,000 $2,575,000 $1,800,000 $500,000 $4,134,000 $4,134,000 $4,134,000 $22,427,000 $441,000 $110,000 $551,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (TAP) (L) CONSTRUCTION FY 2019 - $14,000,000 (NHPIM) $14,000,000 I-74, PAVEMENT REHABILITATION COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. * INDICATES FEDERAL AMENDMENT CONSTRUCTION FY 2019 - $16,700,000 (NHPIM) $16,700,000 Thursday, December 06, 2018 10 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 6 R-5705A NC 55, JUST SOUTH OF SR 1532 (OAK GROVE CHURCH RIGHT-OF-WAY FY 2020 - $3,253,000 (T) HARNETT ROAD) TO NC 210. PART ON NEW LOCATION. UTILITIES FY 2020 - $1,159,000 (T) PROJ.CATEGORY MODIFY PROJECT SCOPE AND FUNDING AMOUNTS. CONSTRUCTION FY 2022 -$11,900,000 (T) DIVISION COST INCREASE EXCEEDING $2 MILLION AND 25% FY 2023 -$11,900,000 (T) THRESHOLDS. FY 2024 - $11,900,000 (T) $40,112,000 R-5819 US 741US 76, SR 1740 (OLD LAKE ROAD). CONVERT AT- UTILITIES COLUMBUS GRADE INTERSECTION TO OVERPASS. CONSTRUCTION PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% REGIONAL THRESHOLDS. R-5820 US 741US 76, SR 1735 (CHAUNCEY TOWN ROAD) COLUMBUS CONVERT AT-GRADE INTERSECTION TO PROJ.CATEGORY INTERCHANGE. REGIONAL COST INCREASE EXCEEDING $2 MILLION AND e' THRESHOLDS. UTILITIES CONSTRUCTION FY 2020 - $35,000 FY 2022 - $5,350,000 FY 2023 - $5,350,000 $10,735,000 FY 2020 - $47,000 FY 2022 - $6,533,000 FY 2023 - $6,533,000 FY 2024 - $6,534,000 $19,647,000 DIVISION 7 C-5650 SR 1919 (SMITH LEVEL ROAD I S. GREENSBORO ST), ORANGE PUBLIC WORKS DRIVE TO N. END OF OLD PITTSBORO PROJ.CATEGORY ROAD IN CARRBORO. CONSTRUCT 3,100 LF SIDEWALK DIVISION ON ONE SIDE. ENGINEERING FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2021 - FY 2021 - FY 2021 - RIGHT-OF-WAY TO REFLECT CURRENT TOWN DELIVERYSCHEDULE, CONSTRUCTION DELAY ENGINEERING FROM FY 18 TO FY 19, RIGHT-OF- WAY FROM FY 18 TO FY 20 AND CONSTRUCTION FROM FY 18 TO FY 21. C-5700 OAKDALE ROAD, EXISTING SIDEWALK EAST OF EAST CONSTRUCTION FY 2019 - GUILFORD MAIN STREET TO CHIMNEY COURT IN JAMESTOWN. FY 2019 - PROJ.CATEGORY EXTEND SIDEWALK. EXEMPT TOWN NEEDS ADDITIONAL TIME FOR PLANNING AND DESIGN. DELAY CONSTRUCTION FROM FY 18 TO FY 19. * INDICATES FEDERAL AMENDMENT $84,000 $21,000 $100,000 $25,000 $440,000 $530,000 $748,000 $1,948,000 $136,000 $34,000 $170,000 (T) (T) (T) (T) (T) (T) (T) (STBGDA) (L) (STBGDA) (L) (CMAQ) (STBGDA) (L) (CMAQ) (L) Thursday, December 06, 2018 11 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 7 EB-5721 ORANGE COUNTY BICYCLE ROUTE 1, CLELAND DRIVE CONSTRUCTION FY 2019 - $375,000 (TAP) ORANGE TO WILLOW DRIVE IN CHAPEL HILL. UPGRADE FY 2019 - $94,000 (L) PROJ.CATEGORY EXISTING OFF-ROAD PATH AND CONSTRUCT NEW $469,000 DIVISION SECTION OF PATH. TO REFLECT CURRENT TOWN DELIVERY SCHEDULE, DELAY CONSTRUCTION FROM FY 18 TO FY 19 AT REQUEST OF MPO. EB-5879 ALAMANCE PROJ.CATEGORY DIVISION * EB-5880 ORANGE PROJ.CATEGORY DIVISION * EB-5886A ORANGE PROJ.CATEGORY DIVISION US 70 (NORTH CHURCH STREET), SR 1716 (GRAHAM- HOPEDALE ROAD) TO SR 1719 (SELLARS MILL ROAD) IN BURLINGTON. CONSTRUCT SIDEWALK. ENGINEERING RIGHT-OF-WAY TO REFLECT CURRENT CITY DELIVERY SCHEDULE, DELAYENGINEERING, RIGHT-OF-WAYAND CONSTRUCTION CONSTRUCTION FROM FY 18 TO FY 19. SR 1005 (JONES FERRY ROAD), DAVIE ROAD TO SR 1010 (WEST MAIN STREET) IN CARRBORO. CONSTRUCT SIDEWALK ON NORTH SIDE. ENGINEERING RIGHT-OF-WAY TO REFLECT CURRENT TOWN DELIVERY SCHEDULE, DELAY ENGINEERING FROM FY 18 TO FY 22, RIGHT OF CONSTRUCTION WAY FROM FY 20 TO FY 23 AND CONSTRUCTION FROM FY 21 TO FY 24. SR 1780 (ESTES DRIVE), SR 1772 (NORTH GREENSBORO STREET) TO SOUTH OF NORFOLK- SOUTHERN RR TRACKS IN CARRBORO ENGINEERING RIGHT-OF-WAY TO REFLECT CURRENT TOWN DELIVERY SCHEDULE, DELAY ENGINEERING FROM FY 18 TO FY 20, RIGHT OF CONSTRUCTION WAY FROM FY 20 TO FY 21 AND CONSTRUCTION FROM FY 21 TO FY 22. * EB-5890 BARNES STREET, KING STREET TO SR 1005 (JONES ORANGE FERRY ROAD) IN CARRBORO. CONSTRUCT SIDEWALK. PROJ.CATEGORY TO REFLECT CURRENT TOWN DELIVERY SCHEDULE, DIVISION DELAY ENGINEERING FROM FY 19 TO FY 22, RIGHT OF WAY FROM FY 21 TO FY 23 AND CONSTRUCTION FROM FY 22 TO FY 24. * INDICATES FEDERAL AMENDMENT ENGINEERING RIGHT-OF-WAY CONSTRUCTION FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2022 - FY 2022 - FY 2023 - FY 2023 - FY 2024 - FY 2024 - FY 2020 - FY 2020 - FY 2021 - FY 2021 - FY 2022 - FY 2022 - FY 2022 - FY 2022 - FY 2023 - FY 2023 - FY 2024 - FY 2024 - $13,000 $3,000 $22,000 $6,000 $53,000 $13,000 $110,000 $71,000 $18,000 $25,000 $6,000 $353,000 $88,000 $561,000 $136,000 $34,000 $37,000 $9,000 $678,000 $170,000 $1,064,000 $37,000 $9,000 $13,000 $3,000 $184,000 $46,000 $292,000 (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) (TAP) (L) Thursday, December 06, 2018 12 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 7 I-5898 FUTURE I-73 I US 220, US 311 I NC 135 INTERCHANGE. RIGHT-OF-WAY ROCKINGHAM WIDEN BRIDGE 780074 AND UPGRADE INTERCHANGE. UTILITIES PROJ.CATEGORY TO REFLECT CURRENT PROJECT DELIVERY CONSTRUCTION REGIONAL SCHEDULE, DELAY RIGHT-OF-WAY FROM FY 18 TO FY 19. * U-2581BA US 70, SR3045 (MOUNT HOPE CHURCH ROAD) TO SR RIGHT-OF-WAY GUILFORD 3175 (BIRCH CREEK ROAD) UTILITIES PROJ.CATEGORY COSTINCREASE EXCEEDING $2 MILLION AND 25% BUILD NC CONST DIVISION THRESHOLDS. CONSTRUCTION FY 2019 - FY 2019 - FY 2020 - FY 2019 - FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2020 - U-5543 VARIOUS, VARIABLE MESSAGE SIGNS FOR TRAFFIC CONSTRUCTION FY 2019 - DURHAM MANAGEMENT ON MAJOR CORRIDORS IN CHAPEL FY 2019 - ORANGE HILL. PROJ.CATEGORY TOWN NEEDS ADDITIONAL TIME FOR PLANNING AND EXEMPT DESIGN. DELAY CONSTRUCTION FROM FY 18 TO FY 19. U-5841 FRIENDLY AVENUE, WEST OF GREEN VALLEY ROAD RIGHT-OF-WAY FY 2020 - GUILFORD TO LINDELL ROAD IN GREENSBORO. WIDENING AND UTILITIES FY 2020 - PROJ.CATEGORY INTERSECTION IMPROVEMENTS. CONSTRUCTION FY 2021 - DIVISION TO CONFORM TO CURRENTLY PROGRAMMED FUNDING SOURCE, DELAY RIGHT-OF-WAY FROM FY 19 TO FY 20 AND CONSTRUCTION FROM FY 20 TO FY 21(NOTE: NO CHANGE TO PROJECT DELIVERY SCHEDULE). * INDICATES FEDERAL AMENDMENT $300,000 $30,000 $1,875,000 $2,205,000 $1,597,000 $473,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $2,145,000 $5,900,000 $14,405,000 $786,000 $197,000 $983,000 $250,000 $100,000 $1,250,000 $1,600,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (STBGDA) (L) (T) (T) (T) Thursday, December 06, 2018 13 ITEM N HIGHWAY PROGRAM DIVISION 8 * EB-5872A SCOTLAND PROJ.CATEGORY DIVISION STIP MODIFICATIONS SR 1108 (WEST BOULEVARD), SR 1105 (TURNPIKE RIGHT-OF-WAY ROAD) TO GLASGOW DRIVE AND EAST OF US 15 / US 401 / US 501 TO SUNSET DRIVE IN LAURINBURG. CONSTRUCTION ADD RIGHT OF WAY IN FY 20 AT THE REQUEST OF RPO. * R-2527 NC 24 / NC 27, NC 73 TO TROY BYPASS. WIDEN TO MONTGOMERY MULTILANES. PROJ.CATEGORY PROJECT TO UTILIZE BUILD NC BONDS REGIONAL * U-5727 US 1/ US 151 US 501, SOUTH OF SR 1198 (BRYAN LEE DRIVE) TO SR 1237 (CARTHAGE STREET) IN SANFORD PROJ.CATEGORY UPGRADE TO SUPERSTREET AND RELOCATE NC 78 REGIONAL (TRAMWAY ROAD). REVISE TERMINI AND SCOPE AT REQUEST OF DIVISION TO CONFORM TO CURRENT PROJECT CONFIGURATION. BUILD NC ROW RIGHT-OF-WAY UTILITIES CONSTRUCTION FY 2020 - FY 2020 - FY 2020 - FY 2020 - FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2019 - FY 2019 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - $133,000 $33,000 $348,000 $88,000 $602,000 $686,000 $686,000 $686,000 $686,000 $686,000 $686,000 $686,000 $686,000 $686,000 $686,000 $686,000 $2,744,000 $426,000 $1,011,000 $11,550,000 $11,550,000 $11,550,000 $11,550,000 $57,927,000 RIGHT-OF-WAY FY 2019 - $3,600,000 CONSTRUCTION FY 2020 - $8,816,000 FY 2021 - $8,816,000 FY 2022 - $8,816,000 $30,048,000 (TAP) (L) (TAP) (L) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (NHP) (NHP) (NHP) (NHP) U-5975 US 1/ US 151 US 501, US 151 US 501 (WHITE HILL RIGHT-OF-WAY FY 2020 -$22,957,000 (T) LEE ROAD) I SR 1179 (ROCKY FORK CHURCH ROADO TO UTILITIES FY 2020 - $2,755,000 (T) PROJ.CATEGORY SOUTH OF SR 1198 (BRYAN DRIVE). UPGRADE TO CONSTRUCTION FY 2021 -$12,746,000 (T) REGIONAL SUPERSTREET. $38,458,000 REVISE N.TERMINUS AT DIV. REQUEST. TO ALLOW ADDITIONAL TIME TO COORDINATE DESIGN, DELAY RIGHT OF WAY FROM FY 19 TO FY 20. TO CONFORM TO CURRENTLY PROGRAMMED FUNDING SOURCE, DELAY CONSTRUCTION FROM FY 20 TO FY 21(NOTE: NO CHANGE IN LETTING SCHEDULE). * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 14 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 9 B-4626 NC 8 I NC 49, REPLACE BRIDGE 790003 AND APPLY RIGHT-OF-WAY FY 2019 - $300,000 (STBG) ROWAN DECK PRESERVATION TREATEMENT TO BRIDGE UTILITIES FY 2019 - $300,000 (STBG) PROJ.CATEGORY 790008 OVER YADKIN RIVER AND WINSTON-SALEM CONSTRUCTION FY 2020 - $6,165,000 (STBG) STATEWIDE SOUTHBOUND RAILROAD. $6,765,000 TO ALLOW ADDITIONAL TIME TO COMPLETE THE RIGH-OF-WAY PLANS, DELAY RIGHT-OF-WAY FROM FY 18 TO FY 19, AT REQUEST OF STRUCTURE MANAGEMENT UNIT. EB-4020C FORSYTH PROJ.CATEGORY TRANSITION BRUSITY FORK GREENWAY, LOWERY STREET TO REYNOLDS PARK ROAD TO REFLECT CURRENT CITY DELIVERY SCHEDULE, DELAY CONSTRUCTION FROM FY 19 TO FY 20 AT REQUEST OF MPO . CONSTRUCTION FY 2020 - $300,000 (STBG) FY 2020 - $700,000 (STBGDA) FY 2020 - $175,000 (L) $1,175,000 EB-5619 ROWAN PROJ.CATEGORY DIVISION GRANTS CREEK GREENWAY, KELSEY SCOTT PARK TO CATAWBA COLLEGE. CONSTRUCT MULTIUSE PATH. PROJECT SPLIT INTO SEGMENTS AT REQUEST OF MPO AND CITY TO FACILITATE DELIVERY - SEE FOLLOWING ENTRIES FOR FUNDING AND SCHEDULES. EB-5619A GRANTS CREEK GREENWAY, VICINITY OF CONSTRUCTION FY 2019 - $134,800 (TAPDA) ROWAN FORESTDALE DRIVE TO CATAWBA COLLEGE IN FY 2019 - $33,700 (L) PROJ.CATEGORY SALISBURY. CONSTRUCT LOW-WATER BRIDGE $168,500 DIVISION GREENWAY CONNECTION. PROJECT BREAK CREATED AT REQUEST OF MPO AND CITY. ACCELERATE CONSTRUCTION FY 20 TO FY 19 TO FACILITATE DELIVERY. EB-5619B GRANTS CREEK GREENWAY, KELSEY SCOTT PARK TO ROWAN VICINITY OF FORESTDALE DRIVE IN SALISBURY. PROJ.CATEGORY CONSTRUCT MULTIUSE PATH. DIVISION PROJECT BREAK CREATED AT REQUEST OF MPO AND CITY TO FACILITATE DELIVERY. * INDICATES FEDERAL AMENDMENT RIGHT-OF-WAY CONSTRUCTION FY 2019 - FY 2019 - FY 2020 - FY 2020 - $40,000 (TAPDA) $10,000 (L) $660,000 (TAPDA) $165,000 (L) $875,000 Thursday, December 06, 2018 15 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 9 EB-5722 NC 67 (SILAS CREEK PARKWAY), BOLTON STREET TO ENGINEERING FORSYTH LOCKLAND AVENUE IN WINSTON-SALEM. CONSTRUCT PROJ.CATEGORY SIDEWALK ON NORTH SIDE TO CONNECT EXISTING DIVISION SECTIONS. RIGHT-OF-WAY * EB-5810 FORSYTH PROJ.CATEGORY DIVISION * I-5952 FORSYTH PROJ.CATEGORY STATEWIDE ADD RIGHT OF WAY IN FY 19 NOT PREVIOUSLY PROGRAMMED, AT REQUEST OF MPO. TO REFLECT CONSTRUCTION CURRENT TOWN DELIVERY SCHEDULE, DELAY ENGINEERING FROM FY18 TO FY 19. VARIOUS, BARBARA JANE AVENUE, BYERLY ROAD, ENGINEERING AND BARRY STREET IN WINSTON-SALEM. CONSTRUCT SIDEWALKS. CONSTRUCTION ADD ENGINEERING IN FY 19 NOT PREVIOUSLY PROGRAMMED AND DELAY CONSTRUCTION FROM FY 18 TO FY 20, BOTH AT REQUEST OF MPO TO REFLECT CURRENT TOWN DELIVERY SCHEDULE. I-40, SR 1101 (HARPER ROAD) IN CLEMMONS TO EAST OF US 421 / BUSINESS 40 IN WINSTON-SALEM. PAVEMENT REHABILITATION. PROJECT BREAK CREATED AT REQUEST OF DIVISION OFFICE. SEE 1-5952A ENTRY FOR DETAILS. COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - $296,000 $36,000 $83,000 $728,000 $182,000 $360,000 $90,000 $1,775,000 $48,000 $12,000 $176,000 $44,000 $280,000 (STBG) (TAP) (L) (STBG) (L) (TAP) (L) (STBG) (L) (TAP) (L) I-5952A i-40, BRIDGE REHABILITATION. CONSTRUCTION FY 2020 - $2,516,000 (NHPIM) FORSYTH NEW PROJECT BREAK CREATED WITH $2,516,000 PROJ.CATEGORY CONSTRUCTION IN FY 20 AT REQUEST OF DIVISION STATEWIDE OFFICE FOR SEPARATE LETTING OF BRIDGE COMPONENT * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 16 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 9 * R-2577A US 158, MULTI-LANES NORTH OF US 421 / I-40 RIGHT-OF-WAY FORSYTH BUSINESS TO SR 1965 (BELEWS CREEK ROAD) UTILITIES PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% BUILD NC CONST REGIONAL THRESHOLDS. CONSTRUCTION DIVISION 10 C-5225B CHARLOTTE, TOBY CREEK GREENWAY, ROCKLAND MECKLENBURG DRIVE TO BLUE ROCK DRIVE. PROJ.CATEGORY TO ALLOW ADDITIONAL TIME FOR DESIGN DELAY EXEMPT CONSTRUCTION FROM FY 18 TO FY 19 C-5538 MECKLENBURG PROJ.CATEGORY DIVISION C-5557 CABARRUS PROJ.CATEGORY EXEMPT FY 2020 - FY 2020 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2022 - FY 2023 - $7,800,000 $469,000 $2,574,000 $2,574,000 $2,574,000 $2,574,000 $2,574,000 $2,574,000 $2,574,000 $2,574,000 $18,018,000 $7,700,000 $7,700,000 $62,279,000 CONSTRUCTION FY 2019 - FY 2019 - CHARLOTTE, INTERSECTION OF TUCKASEEGEE- CONSTRUCTION FY 2019 - BERRYHILL-THRIFT ROADS IN CHARLOTTE. FY 2019 - CONSTRUCT A TRAFFIC CIRCLE. FY 2019 - TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 18 TO FY 19 CONCORD, CITY OF CONCORD'S NE SUBSET CONSTRUCTION FY 2019 - SIDEWALKS. INSTALL SIDEWALKS AT VARIOUS FY 2019 - LOCATIONS. TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 18 TO FY 19 EB-5775 CORNELIUS, SOUTH PRONG ROCKY RIVER CONSTRUCTION MECKLENBURG GREENWAY (SOUTH STREET - MAIN STREET). PROJ.CATEGORY CONSTRUCT GREENWAY. DIVISION TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 18 TO FY 19 AND UPDATE FUNDING * INDICATES FEDERAL AMENDMENT $1,240,000 $360,000 $1,600,000 $1,797,000 $1,053,000 $826,000 $3,676,000 $420,000 $105,000 $525,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (CMAQ) (L) (CMAQ) (STBGDA) (L) (CMAQ) (L) FY 2019 - $840,000 (STBGDA) FY 2019 - $628,000 (TAPDA) FY 2019 - $367,000 (L) $1,835,000 Thursday, December 06, 2018 17 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 10 * EB-5844 KANNAPOLIS, LITTLE TEXAS ROAD, LANE STREET TO ENGINEERING CABARRUS DALE EARNHARDT BOULEVARD. CONSTRUCT PROJ.CATEGORY SIDEWALK AND CURB AND GUTTER. RIGHT-OF-WAY DIVISION TO ALLOW ADDITIONAL TIME FOR PLANNING DELAY PRELIMINARY ENGINEERING FROM FY 18 TO FY 19 AT CONSTRUCTION REQUEST OF MPO FY 2019 - FY 2019 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2020 - FY 2020 - $320,000 $80,000 $320,000 $80,000 $131,000 $1,280,000 $320,000 $33,000 $2,564,000 (TAP) (L) (TAP) (L) (CMAQ) (TAP) (L) (L) EB-5931 INDIAN TRAIL, NORTH INDIAN TRAIL ROAD. SOUTH CONSTRUCTION FY 2019 -$2,510,000 (STBGDA) UNION FORK ROAD TO LIBERTY LANE. CONSTRUCT FY 2019 - $1,351,000 (L) PROJ.CATEGORY COMPLETE STREET. $3,861,000 DIVISION TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 18 TO FY 19 I-5797 I-85, CONCRETE PAVEMENT JOINT SOUTH OF NC 16 CONSTRUCTION FY 2019 - $100,000 (NHPIM) MECKLENBURG TO CONCRETE PAVEMENT JOINT AT US 29/NC40 $100,000 PROJ.CATEGORY CONNECTOR. RESTRIPE PAVEMENT. STATEWIDE TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 18 TO FY 19 I-5837 I-85, GASTON COUNTY LINE TO 0.7 MILES NORTH OF CONSTRUCTION FY 2020 - $1,800,000 (NHPIM) MECKLENBURG GASTON COUNTY LINE. INCLUDES RAMPS FROM $1,800,000 PROJ.CATEGORY GASTON COUNTY LINE TO GLENWOOD AVENUE. STATEWIDE PAVEMENT REHABILITATION. TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 19 TO FY 20 * I-5902 I-485, SR 1786 TO NC 27. BRIDGE REHABILITATION. CONSTRUCTION FY 2020 - $900,000 (NHPIM) MECKLENBURG ACCELERATE CONSTRUCTION FROM FY 22 TO FY 20 $900,000 PROJ.CATEGORY AT DIVISION REQUEST STATEWIDE * I-5905 I-85, 0.2 MILE WEST OF NC 16 (BROOKSHIRE CONSTRUCTION FY 2020 -$14,000,000 (NHPIM) MECKLENBURG BOULEVARD) TO CONCRETE PAVEMENT JOINT AT US $14,000,000 PROJ.CATEGORY 291NC 49 CONNECTOR. PAVEMENT REHABILITATION. STATEWIDE ACCELERATE CONSTRUCTION FROM FY 23 TO FY 20 AT REQUEST OF DIVISION * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 18 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 10 U-5108 MECKLENBURG PROJ.CATEGORY TRANSITION * U-6032 CABARRUS MECKLENBURG PROJ.CATEGORY DIVISION DIVISION 12 * R-3603A ALEXANDER CATAWBA PROJ.CATEGORY DIVISION NORTHCROSS DRIVE EXTENSION, NC 73 IN RIGHT-OF-WAY HUNTERSVILLE TO WESTMORELAND ROAD IN CORNELIUS. CONSTRUCT ROAD ON NEW LOCATION. TO ALLOW ADDITIONAL TIME FOR PLANNING DELAY RIGHT-OF-WAY FROM FY 18 TO FY 19 SR 2464 (ODELL SCHOOL ROAD), I-485 TO CONCORD MILLS BOULEVARD. WIDEN TO MULTI-LANES DIVIDED. COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. CONSTRUCTION BUILD NC ROW RIGHT-OF-WAY UTILITIES CONSTRUCTION NC 127, SR 1400 (CLONINGER MILL ROAD) TO SR 1156 RIGHT-OF-WAY (RICHEY ROAD). UTILITIES COST INCREASE EXCEEDING $2 MILLION AND 25% CONSTRUCTION THRESHOLDS. * INDICATES FEDERAL AMENDMENT FY 2019 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2020 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2020 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - $955,000 $500,000 $489,000 $4,765,000 $1,000,000 $2,023,000 $9,732,000 $86,000 $86,000 $86,000 $86,000 $86,000 $86,000 $86,000 $86,000 $86,000 $86,000 $430,000 $1,400,000 $500,000 $8,333,000 $8,333,000 $8,334,000 $28,190,000 (STBGDA) (BA) (L) (STBG) (BA) (L) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) FY 2021 - $3,400,000 (T) FY 2021 - $100,000 (T) FY 2023 - $12,967,000 (T) FY 2024 - $12,966,000 (T) FY 2025 - $12,967,000 (T) $42,400,000 Thursday, December 06, 2018 19 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 12 R-5100A IREDELL PROJ.CATEGORY DIVISION * U-2221 C CLEVELAND * W-5212DIV CATAWBA IREDELL PROJ.CATEGORY DIVISION DIVISION 13 B-5876 RUTHERFORD PROJ.CATEGORY STATEWIDE SR 1109 (WILLIAMSON ROAD), I-77 TO SR 1100 BUILD NC ROW (BRAWLEY SCHOOL ROAD). WIDEN TO MULTI-LANES. PROJECT TO UTILIZE BUILD NC BONDS NC 180, SR 2052 TO NC 150. COST INCREASE EXCEEDING $2 MILLION AND 25% THRESHOLDS. VARIOUS, DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY. ADD RIGHT-OF-WAY IN FY 19 AND FY 20 AND CONSTRUCTION IN FY 19 AND FY 20 NOT PREVIOUSLY PROGRAMMED. RIGHT-OF-WAY UTILITIES CONSTRUCTION FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2019 - FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $2,400,000 $1,000,000 $500,000 $500,000 $10,100,000 $10,100,000 $10,200,000 $41,400,000 RIGHT-OF-WAY FY 2023 - $7,600,000 UTILITIES FY 2023 - $900,000 CONSTRUCTION FY 2025 - $14,800,000 $23,300,000 RIGHT-OF-WAY CONSTRUCTION US 74, REPLACE BRIDGE 800083 AND BRIDGE 800084 RIGHT-OF-WAY OVER SECOND BROAD RIVER. CONSTRUCTION ACCELERATE RIGHT-OF-WAY FROM FY 20 TO FY 19 AND CONSTRUCTION FROM FY 21 TO FY 20 AFTER PRESCREENING AND SCOPING WITH FIRM. PROJECT IS NO LONGER COMBINED WITH 8-5871 * INDICATES FEDERAL AMENDMENT (T) (T) (T) FY 2019 - $50,000 (HSIP) FY 2020 - $50,000 (HSIP) FY 2019 - $2,500,000 (HSIP) FY 2020 - $2,500,000 (HSIP) $5,100,000 FY 2019 - $440,000 (STBG) FY 2020 - $4,400,000 (STBG) FY 2021 - $4,400,000 (STBG) $9,240,000 Thursday, December 06, 2018 20 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 13 EB-5547A BLACK MOUNTAIN RIVERWALK GREENWAY, ENGINEERING BUNCOMBE CONSTRUCT MULTI-USE PATH FROM EXISTING FLAT PROJ.CATEGORY CREEK GREENWAY TRAILHEAD NORTH OF US 70 TO RIGHT-OF-WAY DIVISION BLACK MOUNTAIN AVENUE. * EB-5925 BUNCOMBE PROJ.CATEGORY DIVISION * U-5019A BUNCOMBE PROJ.CATEGORY DIVISION * U-50196 BUNCOMBE PROJ.CATEGORY DIVISION TO ALLOW ADDITIONAL TIME FOR PLANNING AND CONSTRUCTION DESIGN DELAY RIGHT-OF-WAY FROM FY 18 TO FY 19 AND CONSTRUCTION FROM FY 19 TO FY 20 BEAVERDAM CREEK GREENWAY, NC 251 TO US 25. ENGINEERING CONSTRUCT MULTI-USE PATH. ADD PRELIMINARYENGINEERING IN FY 19 NOT CONSTRUCTION PREVIOUSLY PROGRAMMED AND TO ALLOW TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 2018 TO FY 2020 AT REQUEST OF MPO RIVERWAY MULTI-MODAL NETWORK, TOWN BRANCH CONSTRUCTION GREENWAY DELAY CONSTRUCTION FROM FY 20 TO FY 21 AT REQUEST OF MPO. FY 2018 - FY 2018 - FY 2019 - FY 2019 - FY 2020 - FY 2020 - FY 2020 - $487,000 $122,000 $80,000 $20,000 $2,300,000 $334,000 $659,000 $4,002,000 (STBGDA) (L) (STBGDA) (L) (STBG) (STBGDA) (L) FY 2019 - $600,000 (STBGDA) FY 2019 - $150,000 (L) FY 2020 - $1,600,000 (STBGDA) FY 2020 - $400,000 (L) $2,750,000 FY 2021 - $3,420,000 (STBGDA) FY 2021 - $855,000 (L) $4,275,000 RIVERWAY MULTI-MODAL NETWORK, FRENCH BROAD CONSTRUCTION FY 2019 - $4,000,000 (STBGDA) RIVER WEST GREENWAY, FRENCH BROAD RIVER FY 2019 - $1,000,000 (L) PARK TO HAYWOOD ROAD. $5,000,000 ACCELERATE CONSTRUCTION FROM FY 21 TO FY 19 AT REQUEST OF MPO. U-5833 SR 2241 (OAK STREET), SR 2159 (PINE RIDGE ROAD) RUTHERFORD TO US 74. WIDEN EXISTINGoij ROADWAY. PROJ.CATEGORY PROJECT TO UTILIZE BUILD NC BONDS DIVISION * INDICATES FEDERAL AMENDMENT BUILD NC CONST FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- CONSTRUCTION FY 2019 - $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $429,000 $1,716,000 $300,000 $6,735,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) Thursday, December 06, 2018 21 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 13 U-5834 BUNCOMBE PROJ.CATEGORY DIVISION * W-5213DIV BUNCOMBE PROJ.CATEGORY DIVISION DIVISION 14 SR 3116 (MILLS GAP ROAD), US 25 (HENDERSONVILLE RIGHT-OF-WAY ROAD) TO SR 3157 (WESTON ROAD). UPGRADE EXISTING ROADWAY. TO ALLOW ADDITIONAL TIME FOR PLANNING DELAY RIGHT-OF-WAY FROM FY 18 TO FY 19 VARIOUS, DIVISION 13 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY. ADD RIGHT-OF-WAY IN FY 19 AND FY 20 AND CONSTRUCTION IN FY 19 AND FY 20 NOT PREVIOUSLY PROGRAMMED. CONSTRUCTION RIGHT-OF-WAY CONSTRUCTION FY 2019 - $6,167,000 (T) FY 2020 - $6,167,000 (T) FY 2021 - $6,166,000 (T) FY 2021 - $3,000,000 (T) $21,500,000 FY 2019 - $50,000 (HSIP) FY 2020 - $50,000 (HSIP) FY 2019 - $700,000 (HSIP) FY 2020 - $700,000 (HSIP) $1,500,000 * A-0011C NC 69, GEORGIA STATE LINE TO US 64 (HAYESVILLE RIGHT-OF-WAY FY 2018 - $8,300,000 (APD) CLAY BYPASS). WIDEN TO FOUR-LANES CONSTRUCTION FY 2020 -$18,750,000 (APD) PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% FY 2021 -$18,750,000 (APD) EXEMPT THRESHOLDS. $45,800,000 B-6031 JACKSON PROJ.CATEGORY DIVISION B-6032 JACKSON PROJ.CATEGORY DIVISION SR 1300 (PUMPKINTOWN ROAD), REPLACE BRIDGE RIGHT-OF-WAY FY 2019 - 490069 OVER SAVANNAH CREEK. CONSTRUCTION FY 2021 - TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 20 TO FY 21 AT REQUEST OF DIVISION SR 1397 (THOMAS VALLEY ROAD), REPLACE BRIDGE RIGHT-OF-WAY FY 2019 - 490144 OVER NATIONS CREEK. CONSTRUCTION FY 2021 - TO ALLOW ADDITIONAL TIME FOR PLANNING AND DESIGN DELAY CONSTRUCTION FROM FY 20 TO FY 21 AT REQUEST OF DIVISION B-6033 SR 1445 (LEE BUMGARNER ROAD), REPLACE BRIDGE RIGHT-OF-WAY FY 2019 - JACKSON 490129 OVER SCOTT CREEK. CONSTRUCTION FY 2021 - PROJ.CATEGORY TO ALLOW ADDITIONAL TIME FOR PLANNING AND DIVISION DESIGN DELAY CONSTRUCTION FROM FY 20 TO FY 21 AT REQUEST OF DIVISION * INDICATES FEDERAL AMENDMENT $80,000 $800,000 $880,000 $50,000 $500,000 $550,000 $120,000 $1,200,000 $1,320,000 (STBGOFF) (STBGOFF) (STBGOFF) (STBGOFF) (STBGOFF) (STBGOFF) Thursday, December 06, 2018 22 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 14 B-6034 SR 1300 (PUMPKINTOWN ROAD), REPLACE BRIDGE RIGHT-OF-WAY FY 2019 - $80,000 (STBGOFF) JACKSON 490065 OVER SAVANNAH CREEK. CONSTRUCTION FY 2021 - $800,000 (STBGOFF) PROJ.CATEGORY TO ALLOW ADDITIONAL TIME FOR PLANNING AND $880,000 DIVISION DESIGN DELAY CONSTRUCTION FROM FY 20 TO FY 21 AT REQUEST OF DIVISION B-6035 SR 1738 (HOOPER CEMETERY ROAD), REPLACE RIGHT-OF-WAY FY 2019 - $70,000 (STBGOFF) JACKSON BRIDGE 490203 OVER CANEY FORK. CONSTRUCTION FY 2021 - $700,000 (STBGOFF) PROJ.CATEGORY TO ALLOW ADDITIONAL TIME FOR PLANNING AND $770,000 DIVISION DESIGN DELAY CONSTRUCTION FROM FY 20 TO FY 21 AT REQUEST OF DIVISION B-6036 SR 1737 (CANEY FORK ROAD), REPLACE BRIDGE RIGHT-OF-WAY FY 2019 - $70,000 (STBGOFF) JACKSON 490081 OVER JOHNS CREEK. CONSTRUCTION FY 2021 - $700,000 (STBGOFF) PROJ.CATEGORY TO ALLOW ADDITIONAL TIME FOR PLANNING AND $770,000 DIVISION DESIGN DELAY CONSTRUCTION FROM FY 20 TO FY 21 AT REQUEST OF DIVISION * I-5922 I-40, TENNESSEE STATE LINE TO MILEMARKER 7. CONSTRUCTION FY 2019 - $2,673,000 (STBGIM) HAYWOOD PAVEMENT REHABILITATION. FY 2020 - $2,673,000 (STBGIM) PROJ.CATEGORY ACCELERATE CONSTRUCTION FROM FY 22 TO FY 19 $5,346,000 STATEWIDE AT REQUEST OF DIVISION * I-5923 I-40, MILEMARKER 7 TO MILEMARKER 15. PAVEMENT CONSTRUCTION FY 2019 -$2,344,000 (STBGIM) HAYWOOD REHABILITATION. FY 2020 - $2,344,000 (STBGIM) PROJ.CATEGORY qCCELERATE CONSTRUCTION FROM FY 22 TO FY 19 $4,688,000 STATEWIDE AT REQUEST OF DIVISION * R-25886 NC 191, SR 1381 (MOUNTAIN ROAD) TO NC 280 SOUTH HENDERSON OF MILLS RIVER. PROJ.CATEGORY ACCELERATE CONSTRUCTION FROM FY 22 TO FY 21 DIVISION PER DIVISION RIGHT-OF-WAY UTILITIES CONSTRUCTION FY 2020 - $2,250,000 (STBG) FY 2021 - $2,250,000 (STBG) FY 2020 - $500,000 (STBG) FY 2022 - $14,500,000 (STBG) FY 2023 - $14,500,000 (STBG) FY 2024 - $14,500,000 (STBG) $48,500,000 * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 23 ITEM N HIGHWAY PROGRAM STIP MODIFICATIONS DIVISION 14 R-4751 US 19, SR 1152 (HUGHES BRANCH ROAD) IN BRYSON RIGHT-OF-WAY FY 2020 - $400,000 (T) SWAIN CITY TO SR 1195 (US 19A). MODERNIZE ROADWAY. UTILITIES FY 2020 - $100,000 (T) PROJ.CATEGORY TO ALLOW ADDITIONAL TIME FOR PLANNING DELAY CONSTRUCTION FY 2021 - $8,500,000 (T) REGIONAL RIGHT-OF-WAY FROM FY 19 TO FY 20 $9,000,000 * R-5799 US 64, US 276, NC 280, US 64, US 276, NC 280 AND US RIGHT-OF-WAY FY 2020 - $7,100,000 (T) TRANSYLVANIA 64. CONSTRUCT INTERSECTION IMPROVEMENTS. UTILITIES FY 2020 - $100,000 (T) PROJ.CATEGORY COST INCREASE EXCEEDING $2 MILLION AND 25% CONSTRUCTION FY 2021 -$6,400,000 (T) REGIONAL THRESHOLDS. $13,600,000 U-5840 SR 1547 (OLD AIRPORT ROAD), US 25 TO MILLS GAP HENDERSON ROAD. WIDEN ROADWAY. PROJ.CATEGORY PROJECT TO UTILIZE BUILD NC BONDS DIVISION BUILD NC CONST CONSTRUCTION FY 2019 - FY 2020 - FY 2021 - FY 2022 - FY 2023 - FY 2024 - FY 2025 - FY 2026 - FY 2027 - FY 2028 - FY 2029 - POST YR- FY 2019 - $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $600,000 $2,400,000 $200,000 $9,200,000 (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) (T) STATEWIDE * SR-5001 VARIOUS, SAFE ROUTES TO SCHOOL PROGRAM. CONSTRUCTION 2019 $500,000 (SRTS) STATEWIDE PROJECTS TO IMPROVE SAFETY, REDUCE TRAFFIC, $500,000 PROJ.CATEGORY FUEL CONSUMPTION AND AIR POLLUTION IN VICINITY DIVISION OF SCHOOLS. ADD CONSTRUCTION IN FY 19 NOT PREVIOUSLY PROGRAMMED. * INDICATES FEDERAL AMENDMENT Thursday, December 06, 2018 24 ITEM N HIGHWAY PROGRAM STIP DELETIONS DIVISION 1 * F-5702D HYDE PROJ.CATEGORY DIVISION DIVISION 2 * B-6045 PAMLICO PROJ.CATEGORY DIVISION DIVISION 4 P-5711 B EDGECOMBE NASH PROJ.CATEGORY STATEWIDE DIVISION 7 * EL-4828B ORANGE ORANGE PROJ.CATEGORY TRANSITION NC 12, CONSTRUCT TRANSIT SHELTERSIBENCHES CONSTRUCTION FY 2018 - $110,000 (0) AND TRANSIT VEHICLES $110,000 DELETE, WORK TO BE ACCOMPLISHED UNDER OTHER STATE FUNDS. SR 1302 (JANERIO ROAD), REPLACE BRIDGE 680057 RIGHT-OF-WAY FY 2022 - $600,000 (STBGOFF) OVER DAWSON CREEK. CONSTRUCTION FY 2023 - $6,000,000 (STBGOFF) DELETE, WORK TO BE ACCOMPLISHED UNDER $6,600,000 PROJECT 8-5995. CSX A LINE, DOUBLE TRACK IMPROVEMENTS FROM CONSTRUCTION FY 2018 -$19,695,000 (T) MILEPOST A105 TO A117 FY 2019 -$19,695,000 (T) DELETE, WORK TO BE ACCOMPLISHED UNDER $39,390,000 PROJECT P-5711A. MORGAN CREEK GREENWAY, PHASE 2 CONSTRUCTION FY 2018 - $730,000 (TAPDA) DELETE PROJECT BREAK AT THE REQUEST OF TOWN FY 2018 - $182,000 (L) AND DIVISION OFFICE. $912,000 DIVISION 9 * C-5216 SR 3346 (SOUTH MAIN STREET), EXTEND SIDEWALKS DAVIDSON ON SOUTH MAIN STREET AND PROVIDE WIDE PAVED PROJ.CATEGORY SHOULDERS ON ANNA LEWIS DRIVE AND EMERGENCY EXEMPT DRIVE TO PROVIDE BICYCLE ACCESS TO LEXINGTON MEMORIAL HOSPITAL IN LEXINGTON. DELETE AT REQUEST OF MPO; PROJECT DECLINED BY CITY. * INDICATES FEDERAL AMENDMENT ENGINEERING CONSTRUCTION FY 2018 - FY 2018 - FY 2019 - FY 2019 - $107,000 (CMAQ) $27,000 (L) $481,000 (CMAQ) $120,000 (L) $735,000 Thursday, December 06, 2018 25 ITEM N DIVISION 9 * G5217 DAVIDSON PROJ.CATEGORY EXEMPT DIVISION 10 * G5502 CABARRUS PROJ.CATEGORY EXEMPT HIGHWAY PROGRAM STIP DELETIONS VARIOUS, BIKE AND PEDESTRIAN IMPROVEMENTS IN VICINITY OF SCHOOL. BISECKER AND MIZE ROADS, PROVIDE WIDE PAVED SHOULDERS AND CONSTRUCT SIDE-WALKS ON CORNELIA STREET AND HILLSIDE DRIVE IN LEXINGTON. DELETE AT REQUEST OF MPO; PROJECT DECLINED BY CITY. LITTLE TEXAS ROAD, LITTLE TEXAS ROAD IN KANNAPOLIS, FOREST PARK DRIVE TO EXISTING SIDEWALK SOUTH OF MISSION TRIPP STREET. CONSTRUCT 800 FEET OF SIDEWALK. DELETE, WORK TO BE ACCOMPLISHED UNDER PROJECT EB-5844 CONSTRUCTION FY 2019 - FY 2019 - $152,000 (CMAQ) $38,000 (L) $190,000 DIVISION 14 * C-5151 EASTERN BAND OF CHEROKEE INDIANS (EBCI), GREAT CONSTRUCTION FY 2018 - $177,000 (CMAQ) HAYWOOD SMOKIES NATIONAL PARK. CONSTRUCT A MIXED-USE FY 2018 - $65,000 (L) SWAIN PATHWAY. $242,000 PROJ.CATEGORY DELETE AT THE REQUEST OF DIVISION. EXEMPT ITEM N SUMMARY ADDITION S MODIFICATION S DELETION S * INDICATES FEDERAL AMENDMENT 13 PROJECTS 96 PROJECTS 8 PROJECTS 117 PROJECTS $12,900,000 $48,179,000 ($35,279,000) Thursday, December 06, 2018 26 Item O Page 1 of 11 NCDOT December 6, 2018 Board of Transportation Agenda SUMMARY: There are a total of 28 agreements for approval by the Board of Transportation. Division 1 Dare County This Project consists of improvements on SR 1217 R-5014 (Colington Road) from the dead end road to US 158 41162.3.1 (Croatan Highway) in Kill Devil Hills. This Utility Construction Agreement (UCA) is for the adjustment and/or relocation of water lines. The County is responsible for actual costs of the relocation work. The estimated reimbursement is $463,064.47. Division 2 Contentnea Metropolitan Sewer District Pitt County R-2250 34411.3.7 This Design-Build Project consists of improvements on US 264 (Greenville Southwest Bypass) from south of SR 1149 (Old NC 11) to existing US 264. This Utility Construction Agreement (UCA) is for Betterments. The District has requested an upgrade of the existing 14" sanitary sewer force main to a proposed 20". The District shall reimburse the Department a lump sum payment of $82,965.63 for the utility work. NC Wildlife Resources This Project consists of the construction of pedestrian Commission facilities, boardwalk and sidewalk along NC 58 to provide Jones County access to Brock's Mill Pond in Jones County. The 48240 Commission shall perform the work. The Department shall participate in the construction costs of the project up to a maximum amount of $69,525. Costs which exceed this amount shall be borne by the Commission. Division 3 City of Wilmington This Project consists of construction of a bus pull-out and New Hanover County loading area along Shipyard Boulevard including sidewalk U-5534N at Rutledge Drive to Vance Street in Wilmington. This 44096.1.15 Supplemental Agreement is to increase funding for the 44096.2.15 Project. The Department's original participation was 44096.3.15 $240,000 in STP-DA funds. The Department shall reimburse the Municipality an additional $80,000 (80%) of approved eligible costs from STBGP-DA funds. The Municipality will provide $20,000 (20%) as a local match. The Municipality is responsible for all phases of the Project and all costs that exceed the total available funding. December 6, 2018 Item O Page 2 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 5 Town of Morrisville This Project consists of the design and construction of a Wake County greenway trail connecting residential neighborhoods to C-5168 retail and employment areas in Morrisville. This 46233.1.1 Supplemental Agreement is to increase the funding for the 46233.2.1 Project. The Department's original participation was 46233.3.1 $4,203,816 in CMAQ and TAP funds. The Department agrees to reimburse the Municipality an additional $129,786 (50%) in TAP funds. The Municipality's original participation was $1,655,680. The Municipality will provide $129,786 (50%) as their additional local match. The total estimated cost of the Project is $6,119,068. Any costs that exceed the total available funding will be the responsibility of the Municipality. Town of Wake Forest This Project consists of improvements to SR 1930 (Stadium Wake County Drive), from US 1 to SR 1954 (North Wingate Street) in U-5515 Wake Forest, including widening, sidewalk, bicycle lanes 55056.1.1 and pedestrian/transit amenities in Wake Forest. This 55056.2.F1 Supplemental Agreement is to add new funding to the 55056.3.1 Project. The Department's original participation was $3,562,400 in STP-DA funds and $100,000 in High Impact/Low Cost State funds. The Department agrees to reimburse the Municipality an additional $3,038,750 (50%) of STBG-DA funds. The Municipality's original participation was $890,600. The Municipality will provide $3,038,750 (50%) as their additional local match. The total estimated cost of the Project is $10,630,500. Any costs that exceed the total available funding will be the responsibility of the Municipality. Town of Holly Springs This Project consists of the construction of a superstreet on Wake County NC 55 Bypass at Sportsmanship Way in Holly Springs. U-5118JB This Supplemental Agreement is to increase the funding for 42379.3.35 the Project. The Department's original participation was $1,200,000 in STP-DA funds. The Department agrees to reimburse the Municipality an additional $577,967 (50%) of STBG-DA funds. The Municipality's original match was $300,000. The Municipality will provide $577,967 (50%) as their additional local match. The total estimated cost of the Project is $2,655,934. Any costs that exceed the total available funding will be the responsibility of the Municipality. December 6, 2018 Item O Page 3 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 5, con't. City of Durham and Durham- This Project consists of the development of a web-based Chapel Hill-Carrboro interactive mapping application tool for the MPO congestion Metropolitan Planning management process to update the Comprehensive Organization (MPO) Transportation Plan and monitor the Metropolitan Durham County Transportation Plan performance measures. The M-0528CC Department shall reimburse 100% of eligible expenses 48232.3.3 incurred by the MPO up to a maximum amount of $150,000. The Municipality shall provide all costs that exceed the total available funding. City of Durham and Durham- This Project consists of the development and update of the Chapel Hill-Carrboro MPO-automated and electronic TIP Funding spatial Metropolitan Planning database and application portal that will link the Organization (MPO) Comprehensive Transportation Plan and monitor the Durham County Metropolitan Transportation Plan performance measures. M-0528CD The Department shall reimburse 100% of eligible expenses 48232.3.4 incurred by the MPO up to a maximum amount of $150,000. The Municipality shall provide all costs that exceed the total available funding. City of Durham This Project consists of the construction of bicycle lanes Durham County and/or sidewalks along University Dr (SR 2220, NC 751, EB-5514 SR 1183) from SR 2220 (Old Chapel Hill Rd) to SR 1158 50030.3.1 (W Cornwallis Rd). This Supplemental Agreement is to increase the funding for the Project. The Department's original participation was $1,025,000 using $820,000 in STP-EB federal funds and $205,000 as state match. The Department agrees to reimburse the Municipality an additional $905,611 with $724,489 (80%) of STBG federal funds and $181,122 (20%) as a state match. The total estimated cost of the Project is $1,930,611. Any costs that exceed the total available funding will be the responsibility of the Municipality. US Department of This Cooperative Agreement with US Department of Transportation (USDOT) Transportation (USDOT) using FY 17 TIGER funds will Wake County partially finance a contract for the Department to construct U-4437 a railroad grade separation and improvements at the 35868.3.4 intersection of Blue Ridge Road and Hillsborough Street in Raleigh. The USDOT shall participate in the amount of $19,900,000 using TIGER funds and the Department will utilize $37,198,674 in other federal funds, for a total federal share of $57,098,674 (80°/a). The Department will provide $14,274,669 (20%) in State funds as a match, for a total project amount of $71,373,343. December 6, 2018 Item O Page 4 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 6 Fayetteville Public Works This Project consists of construction, design, signal Commission revisions, and right of way and easement acquisition for a Cumberland County right turn lane into a proposed business located on NC W-5206AA Highway 59 in Fayetteville. The Municipality will relocate sewer and water lines and the Department will participate in the actual construction costs of the utility work. The estimated cost is $24,000. Fayetteville Public Works This Project consists of construction of the Fayetteville Commission Outer Loop from South of US 401 to South of SR 1400 Cumberland County (Cliffdale Road). This Utility Agreement is to design the U-2519CA preliminary construction plans for a Betterment of the water 34817.3.13 line from 16" to 24" as part of the utility work for the Project. The lump sum cost to the Municipality is $29,522.12. Division 7 City of High Point This Project consists of the installation of sidewalk in six (6) Guilford County locations within the city limits of High Point. The six (6) C-5609L locations include 1)James Road between E Hartley Drive 43731.2.10 (SR 4143) and Oakview Road, 2) Eastchester Drive (SR68) 43731.3.10 between Hickswood Road (SR 1523) and Ramsay Street, 3) N Main Street (SR 1009) between south of Dayton Avenue and Old Winston Road, 4) Fairfield Road (SR 610 and SR 1300) between Plaza Lane and Brentwood Street, 5) Eastchester Drive (SR 68) between N Main Street (SR 1009) and Johnson Street and 6) Eastchester Drive (SR 68) between E Hartley Drive (SR 4143)/University Parkway and Centennial Street. The Department shall reimburse 80% of eligible expenses incurred by the Municipality up to a maximum amount of $1,564,080. The Municipality shall provide the 20% match ($391,020) and all costs that exceed the total available funding. Division 8 Town of Mount Gilead This Project consists of the construction of a 5' sidewalk on Montgomery County one side of NC 731 to connect with Stanback Park in Mount EB-5899 Gilead. The Department shall reimburse the Municipality 47257.1.1 80% ($108,000) of approved eligible costs from TAP funds. 47257.3.3 The Municipality will provide 20% ($27,000) as a local match. The Municipality is responsible for all phases of the Project and all costs that exceed the total available funding. December 6, 2018 Item O Page 5 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 9 City of Winston-Salem This Municipal Operations Agreement (Schedule C) Forsyth County provides for the municipal operation of State-owned traffic 9.1034SM signals at certain intersections on the State Highway 9.2034SM System within or near the City of Winston-Salem. The Department shall pay the Municipality an annual approved amount for the traffic signals operation, maintenance, and administrative costs as per the Agreement. City of Winston-Salem This Municipal Operations Agreement (Schedule D) Forsyth County provides for the municipal operation of the computerized 9.1034SM traffic control system, including timing plans, electric traffic 9.2034SM signals and other traffic control devices on the State Highway System Streets located within or near the City of Winston-Salem. The Department shall pay the Municipality an annual approved cost for the traffic control system operation, maintenance, and administrative costs as per the Agreement. City of Salisbury The Project will relocate a portion of Klumac Road (SR Rowan County 2541), under the mainline track of NSR/NCRR, to tie into U-3459 existing Klumac Road (SR 2541) south of Kentucky Street 53500.3.STR01T4 and eliminate the need for the at-grade crossing on Klumac Road (SR 2541). At the request of the Municipality, NCDOT has agreed to construct sidewalks on the newly constructed Klumac Road. The Municipality has agreed to accept ownership and maintenance responsibilities for sidewalks on the newly relocated portion of Klumac Road from US 29 (Main Street) to south of Kentucky Street where it ties into the existing Klumac Road (SR 2541) and the remaining portion of old Klumac Road (SR 2541) from US 29 to south of Kentucky Street where it ties into the relocated Klumac Road, at no expense or liability whatsoever to NCDOT. The Municipality shall reimburse NCDOT thirty percent (30%), estimated to be $35,000.00, of the actual cost of constructing the sidewalks. Upon completion of the Project, the remaining portion of old Klumac Road (SR 2541) from US 29 (Main Street) to south of Kentucky Street, where it ties into the new Klumac Road, shall be owned and maintained by the Municipality, at no expense to the Department. The relocated portion of Klumac Road shall be owned and maintained by the Department, at no expense to the Municipality. This agenda item supersedes the item that was approved by the BOT on June 7, 2012. December 6, 2018 Item O Page 6 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 10 City of Charlotte This Project consists of the UNC Charlotte Adjacent Mecklenburg County Arterials Multimodal Solutions Study. The Municipality is M-0528BN responsible for the Project. The Department shall 48232.2.14 reimburse eligible costs up to $40,000 (80%) in SPR funding and $10,000 (20%) in state funding. The Municipality shall be responsible for all costs that exceed the total available funding of $50,000. City of Albemarle This Project consists of improvements on NC 24-27 from Stanly County Bird Avenue in Albemarle to west of the Pee Dee River. R-2530B This Utility Construction Agreement (UCA) is for the 34446.3.4 adjustment and/or relocation of water and sewer lines. The Municipality shall be responsible for actual costs of the relocation work. The estimated cost is $1,181,029.25. City of Charlotte This Project consists of a feasibility study for improvements Mecklenburg County to Providence Road (NC 16) from Alexander Road/Rea M-0522 Road in Mecklenburg County to the Rea Road Extension in 47433.1.13 Union County. The Department shall perform the study. The Municipality shall participate in 20% of the costs of the project in the amount of $64,204. Montgomery County This Project consists of improvements on NC 24-27 from Stanly County NC 740 in Albemarle to east of the Pee Dee River. This R-2530B Utility Construction Agreement (UCA) is for the adjustment 34446.3.4 and/or relocation of water lines. The County is responsible for actual costs of the relocation work. The estimated reimbursement is $59,025. NorFolk Southern Railway This Amendment #1 to the Charlotte Maintenance Facility Company (NS) Access Project Construction and Maintenance Agreement Mecklenburg County executed on March 7, 2016 is being executed to clarify the section on "Ownership" to match the original intent that NS is the owner of all railroad signal equipment installed by NS, regardless of location. There will be no additional cost to the Department. NorFolk Southern Railway This Rail Agreement provides for the review of engineering Company (NS) plans developed by the Department for the construction of Mecklenburg County improvements at the intersection of Crossing # 721 712S, U-5873 MP O 20.81 (NC 115 - N. Main Street) and (SR 6037 - 46425 Potts Street) in the Town of Davidson. Improvements may include, but not limited to, paving, grading, and drainage. The Department will reimburse NS 100% of the cost of work performed by NS under this Agreement. The estimated cost to the Department is $30,000. December 6, 2018 Item O Page 7 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 10, con't. CSX Transportation, Inc. (CSXT) Union County P-5704 46398 Division 11 On October 2, 2009, the Department and CSXT entered into a Railroad Master Construction Agreement which detailed the terms and conditions by which CSXT would construct various rail safety improvements within the State of North Carolina. This Addendum #10 to the Master Construction Agreement provides for the construction of a two-mile passing siding track in Indian Trail from east of Wesley Chapel Stouts Road near MP SF-312.5 to east of Indian Trail Road near MP SF- 315.31. The proposed passing siding improves the capacity and efficiency of the direct rail link between the Port of Wilmington and the Charlotte market. The Department has performed the design work and obtained the permits, under the terms of the Preliminary Engineering Agreement. CSXT shall perform all of the construction work for the project within the existing right-of-way. The Department shall reimburse CSXT 100% of the actual eligible costs. The estimated cost to the Department is $8,200,000. This Addendum #10 was previously approved by the Board on April 6, 2017 with a total estimated cost to the Department of $5,500,000. CSXT, at no cost to the Department, shall maintain the siding track once constructed. Town of Blowing Rock This Project consists of the construction of section 2 of the Watauga County recreational Greenway Trail heading into Blowing Rock at EB-5924 the parking area adjacent to Tanger Outlet and running up 47629.3 to the North end of the Chestnut Ridge property. The 44607 Municipality is responsible for all phases of the Project. The Department shall reimburse approved eligible costs from the Federal Lands Access Program (FLAP) funds allocation, not to exceed $1,791,988. The non-federal match for the FLAP funds is $145,000 from Contingency Funds and the Municipality will be responsible for providing $285,495 and all costs that exceed the total available funding of $2,222,483. Town of Yadkinville This Project consists of improvements on US 601 (State Yadkin County Street) from US 421 to SR 1146 (Lee Road). This Utility U-5809 Construction Agreement (UCA) is for the adjustment and/or 44382.3.1 relocation of water and sewer lines. The Municipality is responsible for actual costs of the relocation work. The estimated reimbursement is $489,324. December 6, 2018 Item O Page 8 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 14 Clay County This Project consists of improvements on NC 69 from the A-0011 C Georgia State Line to US 64. The Department shall prepare 32574.3.8 the environmental and/or planning document, project plans and specifications, acquire any needed right of way and construct the project. The County shall relocate and adjust any municipally-owned utilities. At the request of the County, the Department shall include in its contract the construction of pedestrian facilities within the project limits. The County shall reimburse the Department 30% of the actual cost of the work. The estimated reimbursement from the County is $46,170. December 6, 2018 Item O Page 9 of 11 NCDOT December 6, 2018 Board of Transportation Agenda SUMMARY: There are a total of 12 agreements for informational purposes only. Division 3 Town of Ocean Isle Beach This Project consists of landscaping for a roundabout at the Brunswick County intersection of Highway 179, Highway 904 (Causeway 3603.3.30 Drive) and SR 1184 (Ocean Isle Beach Road SW) in Ocean Isle Beach. The Department shall install the landscape plantings. The Municipality shall maintain the plantings after a one-year establishment period. Division 5 Win Duke LLC This Project consists of the modification of the existing Durham County traffic signal at the intersection of US 501 (North Duke 36249.3959 Street) at Frasier Street. The Department will review the traffic signal plans and inspect the traffic signal installation. The Developer shall reimburse the Department 100% of the actual cost of all work performed by the Department. The estimated cost is $5,000. Shelbourne Healthcare This Project consists of the upgrade of the existing traffic Development Group signal on Regency Parkway at Elderlee Drive in Cary. The Wake County Department will review the traffic signal plans and inspect 36249.3960 the traffic signal installation. The Developer shall reimburse the Department 100% of the actual cost of all work performed by the Department. The estimated cost is $5,000. G3 Properties, LLC This Project consists of the upgrade of the traffic signal on Wake County US 64 at Liles Dean Lane. The Department will review the 36249.3961 traffic signal plans and inspect the traffic signal installation. The Developer shall reimburse the Department 100% of the actual cost of all work performed by the Department. The estimated cost is $5,000. Trinity Group Investments This Project consists of the upgrade of the traffic signal on Franklin County US 1 at Bert Winston Road and installation of a new traffic 36249.3965 signal on US 1 at Northbound (U-Turn Movement). The Department will review the traffic signal plans and inspect the traffic signal installation. The Developer shall reimburse the Department 100% of the actual cost of all work performed by the Department. The estimated cost is $7,500. December 6, 2018 Item O Page 10 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 8 Town of Aberdeen This Agreement is to provide de-icing salt to the Moore County Municipality for the safe and efficient utilization of 36249.3879 transportation systems. The Municipality shall reimburse the Department 100% of the actual cost of the material. The estimated reimbursement to the Department is $93.73 per ton. Division 10 The Silverman Group This Project consists of the construction of roadway Cabarrus County improvements and the installation of traffic signals to U-4910B facilitate traffic flow association with the Developer's 40373.1.F3 proposed logistics warehouse site (SL 1000 Derita Road). 40373.2.F2 The Developer shall reimburse the Department 100% of the 40373.3.2 DepartmenYs work. The estimated reimbursement is $339,300. Division 13 City of Asheville This Project consists of turn lane improvements from Buncombe County SR 3503 (Overlook Road) onto US 25 (Hendersonville 47875 Highway) and a right turn lane from US 25 (Hendersonville Highway) onto SR 3503 (Overlook Road). The Department shall perform the work. At the request of the Municipality, additional work by the Department will include bus shelter improvements. The Municipality shall reimburse the Department 100% for the additional work. The estimated reimbursement is $2,200. City of Asheville This Project consists of construction of sidewalk on New Buncombe County Leicester Highway from the city limits to Patton Avenue. U-5190 This Supplemental Agreement modifies the Project funding 45251.1.1 source with no change in the amount of funding. The 45251.2.1 Department shall reimburse $2,199,000 (80%) of eligible 45251.3.1 expenses from STP funds and $705,000 (80%) from STP-DA funds allocation. The Municipality shall provide the 20% ($726,000) non-federal match and all costs that exceed the total estimated cost of $3,630,000. City of Asheville This Project consists of construction of sidewalk along US Buncombe County 25 (Hendersonville Road) within the Asheville city limits U-5189 from existing sidewalk near I-40 south to NC 146 (Long 45250.3.1 Shoals Road. This Supplemental Agreement is to extend the completion date for the Project to January 31, 2019, in lieu of May 30, 2018. December 6, 2018 Item O Page 11 of 11 NCDOT December 6, 2018 Board of Transportation Agenda Division 14 Town of Lake Santeetlah This Project consists of patching on various streets within Graham County the town limits. The Department shall perform the work. 36249.3958 The Municipality shall reimburse the Department 100% for the work. The estimated reimbursement is $10,470. City of Hendersonville This Project consists of the installation of a Rectangular Henderson County Rapid Flashing Beacon (RRFB) at the intersection of US 64 36249.3963 and Valley Street in Hendersonville. The Municipality shall reimburse the Department 100% for the work. The estimated reimbursement is $14,000. December 6, 2018 NCDOT December 2018 Board of Transportation Agenda Approval of Municipal Street System Changes Deletions to the State Highway System Division County Municipality Road 7 Alamance City of SR 2205; 2018_11_M001 Mebane Burgess Road 10 Union City of SR 3668; 2018_11_M001 Monroe Aeropointe Parkway Termini To delete Burgess Road To delete Aeropointe Parkway Total Miles = Length 0.140 � •: 0.438 Item P Page 1 December 6, 2018 NCDOT December 2018 Board of Transportation Agenda No. 1 2 3 4 5 6 7 6 7 Preliminary Right of Way Plans Final Right of Way Plans Revisions of Final Right of Way Plans Conveyance ROW Residue (HB 501) Approval of Conveyance of Highway Right of Way Residues Approval of Conveyance of Surplus Highway Right of Way Approval of Revision in Control of Access Advance Acquisition of Highway Right of Way Release of Interest Enacted Paqe No. R-1 &R-2 R-3&R-4 R-5&R-6 R-7—R-9 R-10 R-11 R-12 R-13 R-14 8 Award of Contracts to Private Firms for Engineering Services ROW R-15 — R-18 NCDOT December 2018 Board of Transportation Agenda Preliminary Right of Way Plans The Preliminary Right of Way Plans for the below projects, including Secondary Roads and Industrial Access Roads, provide for the construction, design, drainage and control of access as shown on the respective plans. Based upon the recommendations of the Manager of the Right of Way Unit, the Board finds that such rights of way as shown on these preliminary plans and drawings, including existing public dedicated right of way, are for a public use and are necessary for the construction of said projects. The rights of way for the location, construction, relocation, and control of access of R-1 highways embraced in the below projects shall be as shown in detail on the preliminary right of ways plans and drawings for said projects on file in the Right of Way Branch in the Department of Transportation in Raleigh. The Board finds such right of way acquisition to be necessary and hereby authorizes the Right of Way Branch to acquire right of way on the below projects either by negotiation or by condemnation through the Attorney General's Office. (Division 1) Pasquotank County; I.D. No. U-5942; Project No. 45861.2.1: Elizabeth City — Signal System (Utilities) (Division 2) Pitt County; I.D. No. B-4605; Project No. 38430.2.1: Bridge No. 5 over Chicod Creek on SR 1777 Greene; I.D. No. R-5812; Project No. 46981.2.1: US 13 Bypass from NC 58 (Kingold Boulevard) to NC 91 (Division 3) Onslow County; I.D. No. U-4007E; Project No. 35008.3.8: US 17 at NC 53 (Western Boulevard) and SR 1406 (Piney Green Road) (Division 5) Wake County; I.D. No. U-5302; Project No. 48000.2.1: US 401 from South of SR 1006 (Old Stage Road) to South of SR 2538 (Mechanical Boulevard) in Garner NCDOT December 2018 Board of Transportation Agenda Preliminary Right of Way Plans (continued) R-2 (Division 8) Moore County; I.D. No. U-5814; Project No. 44387.2.1: US 15/501 / NC 211 from US 1(Sandhills Boulevard) to Brucewood Road in Aberdeen and Southern Pines Moore County; I.D. No. U-5815B; Project No. 54041.2.4: US 1(Sandhills Boulevard) from Knight Street in Aberdeen to Old US 1 in Southern Pines, SR 1112 (Roseland Road) (Division 9) Forsyth County; I.D. No. U-6003; Project No. 47138.2.1: New Route from SR 1969 (Piney Grove Road) to NC 150 (North Main Street) in Kernersville (Division 10) Union County; I.D. No. W-5710K; Project No. 44856.2.11: NC 200 (Lancaster Highway) and SR 1128 (McWhorter Road) — Tom Starnes Road Mecklenburg County; I.D. No. C-5613H; Project No. 43735.2.12: Intersection of SR 2112 (Lakeview Road) and SR 2110 (Reames Road) and Lake View Road from Beatties Ford Road to Reames Road in Charlotte Union County; I.D. No. W-5710L; Project No. 44856.2.12 NC 16 (Providence Road) and Gray Byrum near Waxhaw (Division 12) Lincoln County; I.D. No. R-5712; Project No. 50208.2.1: NC 16 Business at intersection of NC 16 Business and SR 1439 (Unity Church Road)/ SR 1387 (Triangle Circle) (Division 13) Burke County; I.D. No. I-5875; Project No. 53076.2.1: I-40 at SR 1712 (Drexel Road) Burke County; I.D. No. I-5874; Project No. 53075.2.1: I-40 at SR 1142 (Jamestown Road) Exit 100 Burke County; I.D. No. I-5008; Project No. 41497.2.1: I-40 at SR 1734 / SR 1826 (Exit 111) PRELIMINARY RIGHT OF WAY PLANS 15 PROJECT(S) $ 0.00 NCDOT December 2018 Board of Transportation Agenda Final Right of Way Plans R-3 Right of way acquisition in accordance with the preliminary right of way plans on file in the Right of Way Unit has been determined to be necessary for public use and was authorized by the Board. Certain changes in the right of way have necessitated alteration of the preliminary right of way plans. Final plans have been prepared and provide for the construction, design, drainage and control of access for these projects. The Board finds that such rights of way and control of access as shown on the final plans are for a public use and are necessary for construction. The sections of roads which were shown on the preliminary plans as sections of roads to be abandoned are hereby abandoned and removed from the State Highway System for Maintenance upon the completion and acceptance of the project. The rights of way for the location, design and construction of highways embraced in the following projects shall be as shown in detail on the final plans for said projects as follows: (Division 2) Project No. 45834.2.2; Pitt County; I.D. No. U-5606: Paving, drainage, grading, signals and retaining walls on SR 1598 / SR 1620 (Dickinson Ave) from NC 11 (Memorial Dr) to SR 1610 (Reade Circle) with the right of way indicated upon the final plans for said project. (Division 3) Project No. 40238.2.4; New Hanover County; I.D. No. U-4902D: Grading, drainage, paving and signals in Wilmington — US 17 Business (Market Street) from SR 1403 (Middle Sound Loop Road) to SR 2290 (Mendenhall Drive) / SR 2734 (Marsh Oaks Drive) with the right of way indicated upon the final plans for said project. Project No. 50139.2.1; Onslow County; I.D. No. W-5602: Drainage, paving and grading on NC 172 Camp Lejeune Gate to NC 210. Convert two lane roadway to three lane roadway with a two-way left turn lane with the right of way indicated upon the final plans for said project. (Division 5/7) Project No. 38664.2.FD1; Durham/Orange Counties; I.D. No. EB-4707A: Drainage, paving and grading on SR 1838 / SR 2220 (Old Durham Road) from US 15 / US 501 in Orange County to SR 1113 (Pope Road) in Durham County with the right of way indicated upon the final plans for said project. NCDOT December 2018 Board of Transportation Agenda Final Right of Way Plans (continued) R-4 (Division 11) Project No. 46103.2.1; Alleghany County; I.D. No. B-5388: Drainage, paving, grading and structure on Bridge No. 21 over Little River on NC 18 with the right of way indicated upon the final plans for said project. (Division 13) Project No. 50225.2.1; Rutherford County; I.D. No. U-5833: Grading, drainage, paving, signals and retaining wall on SR 2241 (Oak Street) from SR 2159 (Pine Ridge Road) to US 74 with the right of way indicated upon the final plans for said project. (Division 14) Project No. 50231.2.1; Henderson County; I.D. No. U-5840: Drainage, Paving and grading on SR 1547 (Old Airport Road) from US 25 to Mills Gap Road. Widen Roadway with the right of way indicated upon the final plans for said project. FINAL RIGHT OF WAY PLANS 7 PROJECT(S) $ 0.00 NCDOT December 2018 Board of Transportation Agenda Revisions of the Final Right of Way Plans R-5 Right of way acquisition in accordance with the final right of way plans for the following projects has been determined to be necessary and authorized by the Board. Plans are on file at the Office of the Secretary to the Board of Transportation as an addendum to the minutes of the meetings hereinafter indicated. Certain changes in right of way, construction and drainage easements, and control of access have been necessitated by alterations in the construction plans of these projects. Amended plan sheets for these projects have been prepared which provide for changes of certain right of way areas, construction and drainage easements and control of access. The Board finds that the revised areas of right of way, construction and drainage easements and control of access, as shown on the amended plan sheets hereinafter set out, are for a public purpose and are necessary for the construction of projects. The right of way, construction and drainage easements and control of access are hereby revised as shown on the plan sheets incorporated herein as an addendum, said projects, date of original final approval, and revised right of way, easements and access being as follows: (Division 3) Project No. 40191.2.1; I.D. No. U-4751; New Hanover County: Final Right of Way plans approved on the minutes of the October 5, 2017 Board of Transportation Meeting. Revised additional right of way, easements or control of access shown on plan sheet(s) 6 as presented at the December 6, 2018 Board of Transportation Meeting. (Division 4) Project No. 39930.2.2; I.D. No. U-4762; Edgecombe County: Final Right of Way plans approved on the minutes of the March 8, 2018 Board of Transportation Meeting. Revised additional right of way, easements or control of access shown on plan sheet(s) 4& 5 as presented at the December 6,2018 Board of Transportation Meeting. (Division 5) Project No. 34745.2.8; I.D. No. U-0071; Durham County: Final Right of Way plans approved on the minutes of the November 6, 2014 Board of Transportation Meeting. Revised additional right of way, easements or control of access shown on plan sheet(s) 6 as presented at the December 6,2018 Board of Transportation Meeting. NCDOT December 2018 Board of Transportation Agenda Revisions of the Final Right of Way Plans (continued) R-6 (Division 12) Project No. 34522.2.FR6; I.D. No. R-3100A; Catawba County: Final Right of Way plans approved on the minutes of the April 6, 2017 Board of Transportation Meeting. Revised additional right of way, easements or control of access shown on plan sheet(s) 15 as presented at the December 6,2018 Board of Transportation Meeting. REVISION FINAL ROW PLANS 4 PROJECT(S) $0.00 NCDOT December 2018 Board of Transportation Agenda R-7 Approval of Conveyance of Highway Right of Way Residues by Real Estate Agent and/or Auctioneer per House Bill 501 Pilot Program It is hereby resolved, based upon the recommendation of the Manager of the Right of Way Unit, that the following highway right of way conveyances are approved: (Division 2) Project 34440.2.6, R2510B Parcel 013, US 17 from south of SR 1149 Price Road and US 17 to north of SR 1509 Springs Road Beaufort County Conveyance of an approximate 2.289-acre landlocked B-class residue area to Saravanan Bala for the highest offer amount of $2,500.00; commission $200.00 Project 34440.2., R-2510A Parcel 063, US 17 from south of SR 1127 Possum Track Road to SR 1149 Price Road Beaufort County Conveyance of an approximate 0.348-acre landlocked C-class residue area to Saravanan Bala for the highest offer amount of $2,000.00; commission $160.00 Project 34440.2.6, R-2510A Parcel 108, US 17 from south of SR 1127 Possum Track Road to SR 1149 Price Road Beaufort County Conveyance of an approximate 0.576-acre landlocked C-class residue area to Saravanan Bala for the highest offer amount of $2,500.00; commission $200.00 (Division 4) Project 34459.2.7, R-2552C Parcel 016-018 US 70 Clayton Bypass from east of SR 1560 to US 70 east of Clayton Johnston County Conveyance of an approximate 0.791-acre landlocked B-class residue area to Neptali Dominguez and Veronica Martinez for the highest offer amount of $10,000.00; commission $600.00 Project 34363.2.8, R-1030D Parcel 006, US 117 Bypass from south of US 301 to US 264 Bypass Wilson County Conveyance of an approximate 0.640-acre landlocked C-class residue area to Wilson Mini Storage, LLC for the highest offer amount of $2,000.00; commission $120.00 Project 34459.2.5, R-2552B Parcel 014, US 70 Clayton Bypass from east of NC 42 to east of SR 1560 Ranch Road Johnston County Conveyance of an approximate 1.090-acre A-class residue area to Steven Cogar for the highest offer amount of $22,000.00; commission $1,320.00 NCDOT December 2018 Board of Transportation Agenda R-8 Approval of Conveyance of Highway Right of Way Residues by Real Estate Agent and/or Auctioneer per House Bill 501 Pilot Program (continued) (Division 4) (continued) Project 8.1330504, R-1030BA Parcel 015, US 117 Bypass from south of SR 1002 to south of SR 1342 Wayne County Conveyance of an approximate 24.040-acre landlocked B-class residue area to Janet L Thomas for the highest offer amount of $5,000.00; commission $300.00 (Division 6) Project 34866.2.2, U-2810B Parcel 063, SR 1003 Camden Road from NC 162 Hope Mills Bypass to east of Oakland Ave. Cumberland County Conveyance of an approximate 0.110-acre landlocked C-class residue area to Everett Johnson for the highest offer amount of $150.00; commission $15.00 Project 34886.2.2, X-2000C Parcels 031 & 032, US 24 extension Fayetteville Outer Loop from east of NC 87/NC 210 to west of US 401 Cumberland County Conveyance of an approximate combined 0.570-acre consisting of a landlocked B-class and a landlocked C-class residue area to Jimmy Santos for the highest offer amount of $1,550.00; commission $155.00 Project 34994.2.2, U-3849 Parcel 058, SR 1363 Elk Road from SR 1132 Legion Road to US 301/I-95 Business Cumberland County Conveyance of an approximate 0.127-acre landlocked B-class residue area to John Darrah for the highest offer amount of $800.00; commission $80.00 Project 34866.2.2, U-2810B Parcel 069, SR 1003 Camden Road from NC 162 Hope Mills Bypass to east of Oakland Ave. Cumberland County Conveyance of an approximate 0.540-acre landlocked C-class residue area to Melissa Brown for the highest offer amount of $7.50; commission $0.75 Project 34866.2.2, U-2810B Parcel 029, SR 1003 Camden Road from NC 162 Hope Mills Bypass to east of Oakland Ave. Cumberland County Conveyance of an approximate 0.113-acre landlocked C-class residue area to Jimmy Santos for the highest offer amount of $130.00; commission $13.00 NCDOT December 2018 Board of Transportation Agenda R-9 Approval of Conveyance of Highway Right of Way Residues by Real Estate Agent and/or Auctioneer per House Bill 501 Pilot Program (continued) (Division 7) Project 8.2493501, B-2834 Parcel 003, Bridge #101 over Horsepen Creek on SR 2182 Guilford County Conveyance of an approximate 2.390-acre A-class residue area to Stephen Boskovic for the highest offer amount of $10,000.00; commission $600.00 (Division 12) Project 34517.2.2, R-2911A Parcel 049, US 70 from SR 2318 near Statesville to the Rowan County line Iredell County Conveyance of an approximate 0.168-acre landlocked C-class residue area to Joshua Nowlin for the highest offer amount of $113.00; commission $13.00 Project 8.1821403, R-1017AB Parcel 081, US 64/NC 90 from west of the Alexander County line to west of I-40 at Statesville Iredell County Conveyance of an approximate 0.430-acre landlocked C-class residue area to Joshua Nowlin for the highest offer amount of $270.00; commission $27.00 Project 34517.2.2, R-2911A Parcels 093 & 094, US 70 from SR 2318 near Statesville to the Rowan County line Iredell County Conveyance of an approximate 2.584-acre landlocked B-class residue area to Michael Sullivan for the highest offer amount of $8,673.00; commission $867.30 Project 34517.2.2, R-2911A Parcel 026, US 70 from SR 2318 near Statesville to the Rowan County line Iredell County Conveyance of an approximate 0.970-acre landlocked C-class residue area to Michael Sullivan for the highest offer amount of $1,628.00; commission $162.80 Project 34517.2.2, R-2911A Parcel 062, US 70 from SR 2318 near Statesville to the Rowan County line Iredell County Conveyance of an approximate 1.088-acre landlocked B-class residue area to Hammad Raza for the highest offer amount of $2,250.00; commission $225.00 Project 34517.2.2, R-2911A Parcel 020, US 70 from SR 2318 near Statesville to the Rowan County line Iredell County Conveyance of an approximate 1.006-acre landlocked B-class residue area to Hammad Raza for the highest offer amount of $7,600.00; commission $760.00 CONVEYANCE ROW RESIDUE (HB 501) 19 PROJECT(S) $ 79,171.50 NCDOT December 2018 Board of Transportation Agenda Approval of Conveyance of Highway Right of Way Residues R-10 It is hereby resolved, based upon the recommendation of the Manager of the Right of Way Unit, that the following highway right of way conveyances are approved: (Division 7) Project 34802.2.3, Parcels U-2412B 080, 081, 082, SR 1486/ SR 1421 (Greensboro/ High Point Road) from SR 4228 (Vickrey Chapel Road) to SR 1424 (Hilltop Road) Guilford County Conveyance of an approximate 0.194-acre residue area to G.L. Wilson Building Company for the high bid amount of $2,500.00. (Division 9) Project 40278.2.1, U-4909 024, SR 2643 (Union Cross Road) Forsyth County Conveyance of an approximate 0.346-acre residue area to Mark Franklin Icenhower for the high bid amount of $10,000.00. (Division 10) Project 8.U671619, Parcel 922, I-485 (Charlotte Outer Loop) from South of NC 218 to North of NC 51 Mecklenburg County Conveyance of an approximate 1.560-acre residue area to the Town of Mint Hill for no monetary consideration. The Town of Mint Hill intends to use this property for the expansion of their Veteran's Memorial Park. If the land use changes to anything other than for the park's use, the property shall revert back to the Department. If any portion of the property is needed for future transportation uses, the Town of Mint Hill will convey back the Department the portion needed for transportation uses at no cost. CONVEYANCE ROW RESIDUE 3 PROJECT(S) $ 12,500.00 NCDOT December 2018 Board of Transportation Agenda Approval of Conveyance of Surplus Highway Right of Way R-11 It is hereby resolved, based upon the recommendation of the Manager of the Right of Way Unit that the following highway right of way conveyances are approved: (Division 10) Project 8.1636613, SR 2623 (Trailer Drive) and SR 2635 Mecklenburg County Abandonment of an approximate 0.385-acre permanent easement area to C.A.T. Industrial Properties, LLC for no monetary consideration. CONVEYANCE OF SURPLUS RIGHT OF WAY 1 PROJECT(S) $ 0.00 NCDOT December 2018 Board of Transportation Agenda Approval of Revision in Control of Access R-12 It is hereby resolved, based upon the recommendation of the Manager of the Right of Way Unit that the following highway right of way conveyances are approved: (Division 7) Project 8.1500602, Parcel U-2003B 007, US 15-501 (Fordham Blvd) at SR 1902 (Manning Drive) in Chapel Hill Orange County Grant of a revision in the existing control of access to the University of North Carolina for an approximate 130-foot break on US 15-501 (Fordham Blvd) at SR 1902 (Manning Drive) in Chapel Hill for no monetary consideration. CONVEYANCE OF PERMANENT EASEMENT 1 PROJECT(S) $ 0.00 NCDOT December 2018 Board of Transportation Agenda Advance Acquisition of Highway Right of Way R-13 Upon recommendation of the Manager of the Right of Way Unit, the Board has been requested to authorize the acquisition of the following properties through negotiation or condemnation for purposes of highway construction in order to prevent undue hardship on property owners or to protect the right of way corridor from development prior to regular project approval. The Board finds such acquisitions to be necessary, and hereby authorizes the Right of Way Branch to acquire said properties either by negotiation or by condemnation through the Office of the Attorney General. Division 5 Property of Capital Properties of Raleigh II, LLC I.D. No. U-5825, Parcel #903 WBS 44396.1.1, F. A. Project N/A, County of Wake Division 8 Property of Joseph R. Cothran I.D. No. R-5709, Parcel #900 WBS 50205.1.1, F. A. Project N/A, County of Hoke/Moore Division 9 Property of Busick Brothers Masonry, Inc. (Williams Printing, Inc. Tenant) I.D. No. U-5899, Parcel 900 WBS 44689.1.1, F. A. Project N/A County of Forsyth APPROVAL OF ADVANCE ACQUISITION FOR HIGHWAY ROW 3 PROJECT(S) $ 0.00 NCDOT December 2018 Board of Transportation Agenda Release of Interest to Morehead Street Investors, LLC R-14 It is hereby resolved, based upon the recommendation of the Manager of the Right of Way Unit that the following highway right of way conveyances are approved: (Division 10) The Department's Rail Division has been requested by Morehead Street Investors, LLC to Quitclaim any interest the Department may have acquired in the original Right of Way of Piedmont and Northern Co. Railroad as the tracts were originally located near West Hill Street in Charlotte, Mecklenburg County. Since there is no record of any conveyance to the Department from Piedmont and Northern Co. Railroad in the Mecklenburg County Registry, the Department is seeking authority to Quitclaim any interest it may have acquired to Morehead Street Investors, LLC. This is also to request authority for Manager of Right of Way to execute appropriate instrument. RELEASE OF INTEREST 1 PROJECT(S) $0.00 NCDOT December 2018 Board of Transportation Agenda Award of Contracts to Private Firms for Engineering Services Right of Way Branch STATEWIDE: R-15 After careful evaluation of the workload and schedules of the work that can be accomplished by our staff, it was determined necessary to employ private firms to perform asbestos inspections, abatement, and structure clearings for our Department to obligate available funds. Our staff was authorized to proceed with the actions required to employ private firms in accordance with the rules and regulations adopted by the Board on April 7, 2005. STATEWIDE (1) Projects: Firm: Engineering Fee DBE Utilization: Various 4 Seasons Site & Demolition Inc., Wilmington, NC $3,000,000.00 0% (2) Projects: Various Firm: A1 Consulting Group, Inc., Morrisville, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (3) Projects: Various Firm: Abatemaster, Inc., Winston-Salem, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (4) Projects: Various Firm: Abatement Technology and Construction Solutions, Tobaccoville, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (5) Projects: Various Firm: Carolina Construction Worx, Inc., Raleigh, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (6) Projects: Various Firm: Carolina Envirotech Inc., Mooresville, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% NCDOT December 2018 Board of Transportation Agenda Award of Contracts to Private Firms for Engineering Services Right of Way Branch (continued) (7) Projects: Firm: Engineering Fee DBE Utilization: Various Clement Construction Corporation, Winston-Salem, NC $3,000,000.00 100% (8) Projects: Various Firm: Contaminant Control, Inc., Fayetteville, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (9) Projects: Various Firm: D.H. Griffin Wrecking Co., Inc., Greensboro, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (10) Projects: Various Firm: Double D Trucking, Inc., Winston-Salem, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (11) Projects: Various Firm: Elevated Environmental Corporation, Reidsville, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (12) Projects: Firm: Engineering Fee DBE Utilization: Various Enpuricon, Inc., Apex, NC $3,000,000.00 0% (13) Projects: Various Firm: High Point Builders, LLC., Archdale, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% R-16 (14) Projects: Various Firm: Janezic Building Group, LLC., Raleigh, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% NCDOT December 2018 Board of Transportation Agenda Award of Contracts to Private Firms for Engineering Services Right of Way Branch (continued) (15) Projects: Various Firm: KTF Contractor Services, LLC., Winston-Salem, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (16) Projects: Various Firm: M.B.H Enterprises, Inc., Rural Hall, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (17) Projects: Various Firm: Marley Trucking & Demolition, Inc., Asheboro, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (18) Projects: Various Firm: Mitch Contracting Company, Inc., Fairview, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (19) Projects: Various Firm: Nehemiah Builders, Inc., Raleigh, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (20) Projects: Various Firm: NEO Corporation, Canton, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% (21) Projects: Various Firm: Premier Design Builders, Inc., Kernersville, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (22) Projects: Various Firm: T& T Abatement, Toast, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% R-17 NCDOT December 2018 Board of Transportation Agenda Award of Contracts to Private Firms for Engineering Services Right of Way Branch (continued) (23) Projects: Firm: Engineering Fee DBE Utilization: Various Tierney Commercial Construction, LLC., Greenville, NC $3,000,000.00 0% (24) Projects: Various Firm: Vistabution, LLC, Raleigh, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (25) Projects: Various Firm: W& W Trucking & Demolition Services, LLC., Winston-Salem, NC Engineering Fee: $3,000,000.00 DBE Utilization: 100% (26) Projects: Various Firm: W.C. Black and Sons, Inc., Charlotte, NC Engineering Fee: $3,000,000.00 DBE Utilization: 0% APPROVAL OF CONTRACTS PRIVATE FIRMS 26 PROJECTS $78,000,000.00 R-18 R-ITEM SUMMARY 80 PROJECT(S) TOTAL:$ 78,091,671.50 Item S NORTH CAROLINA BOARD OF TRANSPORTATION RECOMMENDED SUPPLEMENTAL ALLOCATION OF HIGHWAY MAINTENANCE APPROPRIATIONS FISCAL YEAR 2018-2019 There will be no Item S submitted to the Board for approval at the December 2018 Board meeting. t � It�iTE r-t vavember 19. 2018 MEMORANDUM TO: Board of Transportation FROM: Transportation Planning Division SUB.iECT: Submission of the Martin County Comprehensive Transportation Plan for Mutual Adoption �y the Board of Transportation The Transportation Plaru�in� DivisEon has worked coo�erativel�� w•ith the Martin County on the deve4opment of a Comp�-ehensive Transpo�tation Plan {CTP). �I'he plar� �va� adopted by Martin Co�nty or� July 1 1. 2018, ihe Town of Bear Grass on April 12. 201 S, the Tow�n ot E��eretts an June 7. ?Ol $. the Town of Hamilton on May �_ 2018. the Town of Hassel� on June t? 20] S, the Town of Jamesville on May 14. 20] 8, the Tawn of Oak City on May 7. �018. the Tow�n of Parmele on May l. 201 S. the Town of Roberson��lle on May S, 201 S. and the Town of Williamston on May 7. 2018. It was endorsed by the Mid-East RPO on October S, 2018. The plan is based on an analysis of existing a.nd projected travel and land use. public involvement and field investigations oirecommended improvements. It is Iocated on the �r���b ac: https:/Iconnect.ncdot.gov/projects/planning/Fa�esICTP-Details.aspx?stud� id—Martin County 'i'he Transportation Alarining Division recommends the mutuai adoption of the Martin County Comprel�ensive Transportatian PIan as showr on the attached map. �°ith a recarrlmendation date of October 1 �. 2� 18. Sincerely, 4 .iarnal Alavi. P.E_ Director, Transportaiion Planning Division Attachment December 6, 20l 8 Adopted b�,�\ Marti rt�a u�iy����� Date� .ol���'I 1�r�0'1�6;\ \�`��`` � � _� _ �. '�,� Towr��of ����� (�rass � ` �`-��wn of Oak City �#�: Apr`I�12�r,�Q18� � ,��a�'e: May 7, 2018 ToVYr� of Evel�etts T�e�iv�i of Parmele Date:�.iune�7, 2018 ���''-�� � Date:��Vlay 1, 2018 Tornrn'�qf Hami��n � To�n of Rrgbersonville Da��,111�y 3, 20� 8�,� , Dat�.:�J IVlay 8, 2018 Tov�`��f M�a s Hamilton , , J ��ell � ti�,,,�� vwrn o'� Willi�m_stqn Date �n��'12�� - � 1 ��o � D�at 01� Town o�slarr�esvill ' ����� 7�\� ' —, f ,a � �` , � _,- - _ ry � Date: May 14;; �Q, ,;a�se;, � ' � " / � � �_ � NCDOT � C: �% , �'se„ �dGPP �s Date: � � °°_� s �' � ��; '' �.� � __ �"�_ ° �� �>_ Endg��ed; � 13 ' �� . � —_ , ,\\v � � �ld-EasiRP�J �\� pa le ; " R berso v�lle . , Date: October �, �2g18 y . ! ;__� _��1 :� �� �� /; :r '' \ .._--•�.�� � t Recommended by: ��° ' -` �� ~'1 Transportation Planning Division �5 Date: October 10, 2018 ���--� Notes: ,�� q r @°4 , � B E R T I E C O U N T Y � � i i , - ` / � - � J mesville / / � �� � , , , ,. . , ����� � ����� � , � y� I �/ � � / !'l C� :I �' j � � � •� , _ _ �' P�i �,� ,\vy i � G�v .f z � o � � C� � � __ T J � o � U s� Adoption Sheet � '. . MA�TIN _ Martin County North Carolina Comprehensive Transportation Plan RECOMMENDED MAP (October 10, 2018) Sheet 1 Adoption Sheet Sheet 2 Highway Map Sheet 3 Public Transportation and Rail Map Sheet 4 Bicycle Map Sheet 5 Pedestrian Map �__ _ j County Boundaries Municipal Boundaries Roads Railroads �= Airports �• Hospitals/Medical Centers scnools Miles 0 1.5 3 6 N Figure 1- Sheet 1 of 5 w�e Base map date: November 2015 S Refer to CTP document for more details i��a►��•� NORTH CAROLINA BOARD OF TRANSPORTATION There will be no Item V submitted to the Board for approval at the December 5-6, 2018, Board meeting.