HomeMy WebLinkAbout20181249 Ver 1_Attachment 12 - 2016-02-22 E-mail from Gary Jordan to Kiersten Bass_20181217Re: Complete 540 (R-2721, R-2828, R-2829) -"Interagency Meeting to Review the
Recommendation for the Preferred Alternative"
From: Jordan, Gary <garyJordan@fws.gov>
To: Kiersten Bass <kbass@hntb.com>
Cc: emidkiff@ncdot.gov <emidkiff@ncdot.gov>, Donnie.Brew@dot.gov
<Donnie.Brew@dot.gov>, Hanson, Robert P (rhanson@ncdot.gov)
<rhanson@ncdot.gov>, Jennifer Harris <jhharris@hntb.com>, Midkiff, Eric
</o=ExchangeLabs/ou=Exchange Administrative Group
(FYDIBOHF23SPDLT)/cn=Recipients/cn=ebed7dee8bef40d2b165cf3a34adc30c-
emidkiff>, Hanson, Robert P</o=ExchangeLabs/ou=Exchange Administrative Group
(FYDIBOHF23SPDLT)/cn=Recipients/cn=d2a73b1 e66bf44baba9d 1 d23f4a369e1-
rphanson>
Sent: February 22, 2016 4:01:47 PM EST
Received: February 22, 2016 4:02:08 PM EST
Kiersten,
Striking the last sentence would probably be the best. Thanks for addressing that.
I understand the intended meaning of the original statement, but I just did not want anyone to be confused by it. We
have no Issue of Concern in the selection of the preferred, but there is a Issue of Concern for the overall project.
Although the coordination on the dwarf wedgemussel issue is going very well, it is still within the realm of possibility
that the USFWS could issue a Jeopary Biological Opinion.
Gary JordanFish and Wildlife Biologist
Liaison to NCDOT
US Fish and Wildlife Service
P.O. Box 33726
Raleigh, NC 27636-3726
Phone: 919-856-4520 x.32
Email: garyJordan@fws.gov <mailto:garyJordan@fws.gov>
On Mon, Feb 22, 2016 at 3:50 PM, Kiersten Bass <kbass@hntb.com <mailto:kbass@hntb.com» wrote:
Gary — I would like to clarify that an Issue of Concern, in accordance with the project's 6002 Coordination Plan, is any
issue that could delay the project or could prevent an agency from granting a permit or other approval that is needed
for the project. Through agency review of the draft Preferred Alternative Report, NCDOT is asking if the agencies
have an Issue of Concern regarding the selection of DSA 2 as the Preferred Alternative. In your email below, you note
that the USFWS does not oppose DSA 2 being selected as the Preferred Alternative. We acknowledge that additional
coordination regarding DWM is required. Barring any issues of concern, NCDOT will move forward with developing
preliminary designs for the Preferred Alternative and prepare the Final EIS.
I propose we revise the meeting summary to strike the last sentence. Please let me know if this revision satisfies your
comment.
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
Thank you,
Kiersten R. Bass
Planning Services Manager
¢HNTB North Carolina, P.C.
From: Jordan, Gary [mailto:garyJordan@fws.gov <mailto:garyJordan@fws.gov>]
Sent: Monday, February 22, 2016 2:23 PM
To: Kiersten Bass
Cc: 'eric.c.alsmeyer@usace.army.mil <mailto:eric.c.alsmeyer@usace.army.mil>' (eric.c.alsmeyer@usace.army.mil
<mailto:eric.c.alsmeyer@usace.army.mil>); Ridings, Rob; Van Der Wiele, Cynthia; Wilson, Travis W.; Gledhill-earley,
Renee; 'Chris.Lukasina@campo-nc.us <mailto:Chris.Lukasina@campo-nc.us>' (Chris.Lukasina@campo-nc.us
<mailto:Chris.Lukasina@campo-nc.us>); Houser, Anthony A; Teague, Jeff L; Huang, Herman (hfhuang@ncdot.gov
<mailto:hfhuang@ncdot.gov>); Hopkins, Joey; Lauffer, Matthew S; Elam, William H; Joyner, Drew; Robbins, Jamille A;
Marshall, Harrison; Furr, Mary Pope; Mellor, Colin; knmedlin@ncdot.gov <mailto:knmedlin@ncdot.gov>; Hauser,
James W; Staley, Mark K; Stanley, Mike; Ishak, Doumit Y; Childrey, Tom; Paugh, Leilani Y; Pilipchuk, John L;
Chapman, Amy; dwjernigan@ncdot.gov <mailto:dwjernigan@ncdot.gov>; awshapiro@ncdot.gov
<mailto:awshapiro@ncdot.gov>; cjlee@ncdot.gov <mailto:cjlee@ncdot.gov>; keith.hanson@noaa.gov
<mailto:keith.hanson@noaa.gov>; Desai, Rupal P(rpdesai@ncdot.gov <mailto:rpdesai@ncdot.gov>); Pleasant, Kyle
A (kpleasant@ncdot.gov <mailto:kpleasant@ncdot.gov>); ken.riley@noaa.gov <mailto:ken.riley@noaa.gov>;
Donnie.Brew@dot.gov <mailto:Donnie.Brew@dot.gov>; emidkiff@ncdot.gov <mailto:emidkiff@ncdot.gov>; Jennifer
Harris; rbruce@hwlochner.com <mailto:rbruce@hwlochner.com>; kmaseman@hwlochner.com
<mailto:kmaseman@hwlochner.com>; fred.skaer@gmail.com <mailto:fred.skaer@gmail.com>; John Studt
Qfstudt@gmail.com <mailto:jfstudt@gmail.com>); rhancock@ncdot.gov <mailto:rhancock@ncdot.gov>; Hanson,
Robert P (rhanson@ncdot.gov <mailto:rhanson@ncdot.gov>)
Subject: Re: Complete 540 (R-2721, R-2828, R-2829) -"Interagency Meeting to Review the Recommendation for the
Preferred Alternative"
Kiersten,
As the draft summary states I was not able to attend the meeting. However, I do have one comment. The draft
summary states "If this coordination continues satisfactorily to USFWS, the agency does not foresee any Issues of
Concern with regard to the selection of DSA 2 as the Preferred Alternative." This statement, as written, could be
misunderstood by some people. The USFWS does have an issue of concern, as we previously stated multiple times,
with the overall project. The likely adverse effects on the dwarF wedgemussel are a serious concern. Since this
concern covers all the alternatives to one degree or another, the USFWS has not taken a position for or against any
particular alternative. In other words, we are not opposing the selection of DSA 2 as the Preferred Alternative, but our
serious concerns remain. Perhaps you could reword the statement to clarify or even just delete it.
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
Gary Jordan
Fish and Wildlife Biologist
Liaison to NCDOT
US Fish and Wildlife Service
P.O. Box 33726
Raleigh, NC 27636-3726
Phone: 919-856-4520 x.32
Email: garyJordan@fws.gov <mailto:garyJordan@fws.gov>
On Mon, Feb 22, 2016 at 1:49 PM, Kiersten Bass <kbass@hntb.com <mailto:kbass@hntb.com» wrote:
All — thank you for attending the interagency meeting (February 17, 2016) regarding the draft Preferred Alternative
Report for Complete 540 project. Attached for your review is a draft summary of the subject meeting. Please review
and provide your comments on the draft summary by Monday, February 29th. A revised final summary will be
distributed soon afterward.
If I have missed anyone or you feel others should be included in this review, please let me know so that I can share
the draft and final versions with them.
If you have any questions regarding the project or this summary, please do not hesitate to contact me.
Thank you,
Kiersten R. Bass
Planning Services Manager
¢HNTB North Carolina, P.C.
343 E. Six Forks Road, Suite 200
Raleigh, NC 27609
Direct 919.424.0457
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
Mobile 919.610.1366
-----Original Appointment-----
From: tahart@ncdot.gov <mailto:tahart@ncdot.gov> [mailto:tahart@ncdot.gov <mailto:tahart@ncdot.gov>] On Behalf
Of DOT PDEA INTERAGENCY MEETING CALENDAR
Sent: Tuesday, February 02, 2016 4:09 PM
To: DOT PDEA INTERAGENCY MEETING CALENDAR; Medlin, Kenneth N; Midkiff, Eric; donnie.brew@fhwa.dot.gov
<mailto:donnie.brew@fhwa.dot.gov>; 'eric.c.alsmeyer@usace.army.mil <mailto:eric.c.alsmeyer@usace.army.mil>'
(eric.c.alsmeyer@usace.army.mil <mailto:eric.c.alsmeyer@usace.army.mil>); Ridings, Rob; Van Der Wiele, Cynthia ;
'garyJordan@fws.gov <mailto:garyJordan@finrs.gov>' (garyJordan@fws.gov <mailto:garyJordan@fws.gov>);
Wilson, Travis W.; Gledhill-earley, Renee; 'Chris.Lukasina@campo-nc.us <mailto:Chris.Lukasina@campo-nc.us>'
(Chris.Lukasina@campo-nc.us <mailto:Chris.Lukasina@campo-nc.us>); Houser, Anthony A; Teague, Jeff L; Little,
Timothy M; Hopkins, Joey; Lauffer, Matthew S; Elam, William H; Lovinggood, Ray D; Joyner, Drew; Robbins, Jamille
A; Marshall, Harrison; Furr, Mary Pope; Mellor, Colin; Rivenbark, Chris; Riffey, Deanna; Hauser, James W; Staley,
Mark K; Stanley, Mike; Strickland, Neal O; Ishak, Doumit Y; Roy Bruce; Kristin Maseman; 'jshlotter@hwlochner.com
<mailto:jshlotter@hwlochner.com>'; Kiersten Bass; Jennifer Harris; jstudt@dawsonassociates.com
<mailto:jstudt@dawsonassociates.com>; fskaer@dawsonassociates.com <mailto:fskaer@dawsonassociates.com>;
Hall, Dolores; Argabright, Van; Barbour, Deborah M; Bourne, John S; Childrey, Tom; Cook, Alena R; Dagnino, Carla
S; Dunlop, James H; Fuller, Gregory A; Griffin, Randy W; Hancock, Richard W; Harris, David B; Harris, Philip S; Ishak,
Joseph; Johnson, Benjetta L; Kite, Steve; Kuse, Jessica D; Lee, Donald G; Chambers, Marla J; Marshall, Travis K;
Memory, John R; Morgan, Stephen R; Murphy, Brian G; Paugh, Leilani Y; Pilipchuk, John L; Rochelle, Rodger D;
Thomas, Earlene W; Tortorella, James; Twisdale, John W; Chapman, Amy; Clarence Coleman; Fritz Rohde; George
Hoops; Henry Wicker Jr.; Karen Compton; Pace Wilber; Tom Steffens; Walter, Tracy A; Nelson, Eric B
Subject: Complete 540 (R-2721, R-2828, R-2829) -"Interagency Meeting to Review the Recommendation for the
Preferred Alternative"
When: Wednesday, February 17, 2016 1:00 PM-3:00 PM (UTC-05:00) Eastern Time (US & Canada).
Where: Structure Design Conference Room
This meeting is being held in the Structure Design Conference Room CCA.
Meeting time is subject to change until 2 weeks before meeting day.
Entire agenda can be found at our new web location:
https://connect. ncdot.gov/resources/Environmental/Pages/Merger-Process-Guide.aspx
<https://connect.ncdot.gov/resou rces/Environmental/Pages/Merger-Process-Gu ide.aspx>
Meeting packages will be posted 2 weeks prior to the designated meeting date at the following website:
https://xfer.services.ncdot.gov/pdea/MergerMeetings/ <https://xfer.services.ncdot.gov/pdea/MergerMeetings/>
Please contact meeting requestor listed below if packets are not available within the designated 2 week period.
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
Join online meeting <https://meet.lync.com/ncconnect-ncdot/tahart/WGG3P8CC>
https://meet.lync.com/ncconnect-ncdot/tahart/WGG3P8CC <https://meet.lync.com/ncconnect-
ncdot/tahart/WGG3P8CC>
First online meeting? <http://go.microsoft.com/fwlink/?Linkld=389737>
[!OC([1033])!]
Call In Number 919-250-7882
EASTERN REGION AGENCY MEETING — February 17
Time: 1 pm to 3 pm
Requestor:
Eric Midkiff
STI P#: R-2721, R-2828, R-2829
Project: Complete 540, Triangle Expressway Southeast Extension
Division: 4 and 5
County: Wake and Johnston
Purpose: Recommend a Preferred Alternative
[Section 6002 Coordination, Not in Merger]
PROJECT TEAM LEADS:
FHWA — Donnie Brew
NCDWR — Rob Ridings
USACE — Eric Alsmeyer
NCDOT — Eric Midkiff
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
TEAM MEMBERS:
USEPA — Cynthia Van Der Wiele, Ph.D.
SHPO — Renee Gledhill-Earley
USFWS — Gary Jordan
OSA — Dolores Hall
NCWRC — Travis Wilson
CAMPO — Chris Lukasina
SUPPORT STAFF:
Roadway — Tony Houser
Structures — Rick Nelson
Roadway — Jeffrey Teague
TIP — Mike Stanley
Division 4 — Tim Little
ROW — Neal Strickland
Division 5 — Joey Hopkins
PDEA — Eric Midkiff
Hydraulics — Matt Lauffer
Cong. Man. — Doumit Ishak
Hydraulics — Bill Elam
Hydraulics — Ray Lovinggood
Consultant — Roy Bruce (rbruce@hwlochner.com <mailto:rbruce@hwlochner.com>)
HES — Drew Joyner
Consultant — Kristin Maseman (kmaseman@hwlochner.com <mailto:kmaseman@hwlochner.com>)
HES — Jamille Robbins
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
Consultant — Jeff Schlotter (jschlotter@hwlochner.com <mailto:jschlotter@hwlochner.com>)
HES — Harrison Marshall
Consultant — Kiersten Bass (kbass@hntb.com <mailto:kbass@hntb.com>)
HES — Mary Pope Furr
Consultant — Jennifer Harris Qhharris@hntb.com <mailto:jhharris@hntb.com>)
NES — Colin Mellor
Consultant — Fred Skaer Qstudt@dawsonassociates.com <mailto:jstudt@dawsonassociates.com>)
NES — Chris Rivenbark
Consultant — John Studt (fskaer@dawsonassociates.com <mailto:fskaer@dawsonassociates.com>)
NES — Deanna Riffey
NES — Jim Hauser
NES — Neil Medlin
Roadside — Mark Staley
FACI LITATORS:
PDEA — Eric Midkiff
Consultant — Roy Bruce, Lochner
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
This message was secured by the HNTB Email Security system.
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or
entity to whom they are addressed. If you are NOT the intended recipient and receive this communication, please
delete this message and any attachments.
This message was secured by the HNTB Email Security system.
This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or
entity to whom they are addressed. If you are NOT the intended recipient and receive this communication, please
delete this message and any attachments.
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
Attachment
1. image001.png
Type: image/png
Size: 16 KB (17,086 bytes)
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the
Attachment #1
image001.png
Image
�-1Nhile U5F1NS stafFwas ur�able tra attend the meetirx�, the a�er�cy pranrided verbal cnmmer�ts t�
Eric hali�kiff in advar�ce �f the meeting. N�a�T presented those comments, which reiterated the
a�ency'� continued �ttention to potential effects on the �nrartwedc�emussel, but �Isc� n�ted the
or�oin� coor�ination between N�DOT and U�FW� in the multiphase dwarf wed�emussel
�����I�}�����r. I##hicrnnrr�ina4inn r�nn#in�iac eafiefar#nrilirfnl IC�ll41C fhaarvanr3rr�noc nnf
�i .,.ti.l i
Feb 22, 2016 4 02 08 PM ESTRe Complete 540 (R-2721,
R-2828, R-2829) -"Interagency Meeting to Review the