Loading...
HomeMy WebLinkAbout20141082 Ver 1_CAMA Major Permit Renewal_20190104Permit Class RENEWAL STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 116-14 Issued to Wanchese Marina, LLC., 2000 Northgate Plaza Commerce Parkway, Suffolk, VA 23435 Authorizing development in Dare County at adi. to Mill Creek, at 4457 Mill Landing Road, NC 345, in Wanchese as requested in the permittee's application dated letter dated This permit, issued on January 4, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may Lie suoJect to tines, imprisonment or civet action; or may cause me permit to De nun ana vola. 1) This renewal shall be attached to Permit No. 116-14, which was issued to the permittee on 1/5/15, as well as all subsequent modifications and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 14-1082. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2014-02302. NOTE: A permit renewal application processing fee of $100 was received by DCM for this project. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2020 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. DBr n C. Davis, Director ivision of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee It/14ft -oc H WANCHESE MARINA LLC December 14, 2018 To: NC Division of Coastal Management Attn: Cynthia Roundtree RE: Wanchese Marina LLC / Renewal of Permit # 116-14 Wanchese Marina LLC would like to request a CAMA Permit Extension for permit number 116-14.1 am including a check for the fee of $100.00. The intention of work to be done is the same as originally requested when permit was issued. There are a couple of modifications that are being worked on. The reason an extension is required is due to the amount of work. We are completing tasks as we have the financial resources to do so. The LLC did change hands as was filed as follows: Wanchese Marina LLC Registered Agent: Derek A Hatchell Sr. Mailing Address: PO Box 2405 Manteo, NC 27954 Principal Office: 1002 Driftwood Drive Manteo, NC 27954 Managers: Derek Hatchell & David Hatchell I am attaching the annual report with new owner information. The new address of the LLC has changed to NC. The current work completed has been to dock area and the project is following the current permit and is complying. Sincerely, Derek Hatchell DEC 2 7 2018 DCM4411-40 CITY